1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- August 19, 1997 LETTING Sealed proposals will be received by the West Virginia Department of Transportation, Division of Highways at its office in Building Five, Room A-148, 1900 Kanawha Boulevard East, Charleston, West Virginia 25305-0430 until 10 A.M. August 19, 1997 and said proposals will be publicly opened and read immediately thereafter for the construction of the following project(s): ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 001 9533503 U350-0052/00-039.80 04 0DPS 0011 093 000 GRADE, DRAIN, PAVE, STRUCTURE NORTH CRUM - JENNIE CREEK ROAD U.S. 52 RELOCATION, NORTH OF CRUM TO JENNIE CREEK ROAD COUNTY: WAYNE DBE GOAL: 8 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. REMARKS : 4,442,781 M3 UNCLASSIFIED EXCAVATION ------------------------------------------------------------------------------------------------------------------------------------ 002 9422704 S355-0054/04-000.01 00 00BR 0544 003 E00 GRADE, DRAIN, PAVE, STRUCTURE MULLENS S PONY TRUSS BRIDGE OVER SLAB FORK, 0.12 MI S WV 54 COUNTY: WYOMING BRIDGE : 4296 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 1 ; DBE GOAL: 2 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 003 9625702 U320-0064/00-047.42 02 00NH 0642 098 000 GRADE, DRAIN, PAVE CROSS LANES I/C - RAMP B WIDENING WESTBOUND OFF RAMP COUNTY: KANAWHA DBE GOAL: 8 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 004 *9700914 S317-0024/00-000.00 00 RESURFACING MEADOWBROOK ROAD US 50-CO 24/2 COUNTY: HARRISON ------------------------------------------------------------------------------------------------------------------------------------ 005 *9717402 S317-0035/00-000.72 00 RESURFACING KINCHELOE ROAD +1 CO 35/3-DODD CO LINE COUNTY: HARRISON ------------------------------------------------------------------------------------------------------------------------------------ 006 *9717403 S339-0014/03-001.72 00 RESURFACING SHAWHILL ROAD +1 CO 15/5-WV 26 (2RTS) COUNTY: PRESTON ------------------------------------------------------------------------------------------------------------------------------------ 007 *9629204 S345-0020/00-005.14 00 0STP 0020 129 EQ0 GUARDRAIL PIPESTEM - HINTON ROAD CO 20/3 - C0 44/10 COUNTY: SUMMERS ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- August 19, 1997 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 008 9423709 S351-0015/00-008.46 00 00BR 0015 052 E00 GRADE, DRAIN, PAVE, STRUCTURE DIANA BRIDGE NO. 4347 OVER RT FORK HOLLY RIVER, JCT. 5/4 COUNTY: WEBSTER BRIDGE : 4347 CONCRETE ON ROLLED I BEAM SPAN(S): 3 ; STRUCTURE STEEL: 48500 KG DBE GOAL: 10 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 009 *9631205 S310-0061/00-013.46 00 0STP 0061 025 EQ0 GUARDRAIL WRISTON - HAMILTON ROAD CO 61/22 - 0.70 MI N CO 61/22 COUNTY: FAYETTE ------------------------------------------------------------------------------------------------------------------------------------ 010 *9629205 S313-0020/00-011.57 00 0STP 0020 128 EQ0 GUARDRAIL QUINWOOD - NETTIE ROAD CO 2 - NICHOLAS COUNTY LINE COUNTY: GREENBRIER ------------------------------------------------------------------------------------------------------------------------------------ 011 *9608007 S327-0062/00-011.12 00 0STP 0062 033 EQ0 GUARDRAIL LEON TO AMBROSIA ROAD WV RTE. 62 COUNTY: MASON ------------------------------------------------------------------------------------------------------------------------------------ 012 *9629206 S334-0129/00-000.00 00 0STP 0129 001 EQ0 GUARDRAIL DRENNON - POE ROAD WV 39 - CO 11/1 COUNTY: NICHOLAS ------------------------------------------------------------------------------------------------------------------------------------ 013 *9635302 S339-0008/00-004.41 00 0STP 0008 029 EQ STRUCTURE RENOVATION CLIFTON MILLS W-BEAM BRIDGE (#1838.1) REPAIRS OVER LITTLE SANDY CREEK, 0.25 MILES SOUTH OF CO RTE 8/2 COUNTY: PRESTON BRIDGE : #1838.1 CONCRETE ON ROLLED I BEAM SPAN(S): 3 ; ------------------------------------------------------------------------------------------------------------------------------------ 014 9500904 X317-0024/00-000.60 00 GRADE, DRAIN, PAVE BRIDGEPORT SCHOOLS TURNING LANE 0.60 MILES NORTH U.S. 50 - 0.90 MILES NORTH U.S. 50 COUNTY: HARRISON ------------------------------------------------------------------------------------------------------------------------------------ 015 *9711801 U320-0061/00-016.33 00 TRAFFIC SIGNAL WV 61 AT WV 94 MARMET COUNTY: KANAWHA ------------------------------------------------------------------------------------------------------------------------------------ 016 *9711307 U335-0040/00-000.02 00 TRAFFIC SIGNAL MT. DE CHANTAL ROAD AT KROGER STORE WHEELING COUNTY: OHIO ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- August 19, 1997 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 017 9615905 S310-0019/00-015.48 00 00NH 0019 177 E STRUCTURE RENOVATION NEW RIVER GORGE BR #2719.3 ON US 19, 1.16 MILES NORTH OF WV 16 COUNTY: FAYETTE BRIDGE : 2719.3 STEEL DECK ARCH SPAN(S): 23 ; DBE GOAL: 8 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 018 9604656 U341-0064/00-131.43 00 0NHG 0644 108 E00 SIGNING TRUCK SPEED WARNING SYSTEM I-64 SANDSTONE MOUNTAIN DOWNHILL COUNTY: RALEIGH ------------------------------------------------------------------------------------------------------------------------------------ 019 *9635401 U340-0062/00-018.20 00 LIGHTING ELEANOR - BUFFALO ROAD LIGHTING TOYOTA PLANT COUNTY: PUTNAM ------------------------------------------------------------------------------------------------------------------------------------ 020 9703102 S312-0028/00-007.80 00 RESURFACING CABINS - PETERSBURG ROAD 0.02 MI E CO 28/4-CO 28/2 COUNTY: GRANT ------------------------------------------------------------------------------------------------------------------------------------ 021 9607410 S317-0005/09-001.87 00 STRUCTURE REPLACEMENT CRAYFISH ARCH BRIDGE SALEM FORK, 0.42 - 0.46 MI W CO 5 COUNTY: HARRISON BRIDGE : 4436 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ 022 *9711102 S338-0001/04-000.14 00 STRUCTURE RENOVATION CLOVER LICK BRIDGE 0.03 MILES WEST USFS 1/8 COUNTY: POCAHONTAS ------------------------------------------------------------------------------------------------------------------------------------ 023 9701401 X341-0021/15-000.00 00 GRADE, DRAIN, PAVE BECKLEY/STRATTON JUNIOR HIGH SCHOOL ACCESS ROAD 0.27 MI E CO 21/2 - SCHOOL SITE COUNTY: RALEIGH ------------------------------------------------------------------------------------------------------------------------------------ 024 *9635803 X343-0050/49-000.00 00 GRADE, DRAIN, PAVE SIMONTON WINDOWS INDUSTRIAL ACCESS ROAD OFF US ROUTE 50 MILE POST 50 COUNTY: RITCHIE ------------------------------------------------------------------------------------------------------------------------------------ 025 9619704 S347-0008/00-000.10 00 STRUCTURE REPLACEMENT OLD CHURCH BRIDGE 0.10 MILES WEST CO 21 COUNTY: TUCKER ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- August 19, 1997 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 026 *9716806 U352-0030/00-000.09 00 RESURFACING WHITEMAN HILL ROAD BEGIN: 0.09 MI S WV 2 END: JCT TYLER CR 28 COUNTY: WETZEL ------------------------------------------------------------------------------------------------------------------------------------ 027 9131019R2 S320-0060/62-000.14 00 0STP 6062 002 EQ0 RETROFIT CRACKS & REPAIRS 35TH AND 36TH STREET BRIDGES .14 MILES NORTH OF WV 61 COUNTY: KANAWHA BRIDGE : 2758 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 12 ; BRIDGE : 2565 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 12 ; DBE GOAL: 6 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. CONTRACT: 9131019R DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. ------------------------------------------------------------------------------------------------------------------------------------ 028 9624903R1 X313-0060/68-000.00 00 GRADE, DRAIN, PAVE BURNS MOTOR FREIGHT ACCESS ROAD US 60 - 0.24 MI W US 60 COUNTY: GREENBRIER CONTRACT: 9624903 DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. ------------------------------------------------------------------------------------------------------------------------------------ Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25304-0430 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virginia Code. All contractors submitting bids on project(s) must include one of the following forms properly executed with each proposal: Proposal Guaranty Bond, Cashier's Check, or Certified Check for $500.00 or 5% of total bid, whichever is greater. Failure to include one of the above forms could result in a bid being declared irregular. Proposals and bid bonds must be submitted on standard forms which may be obtained at the Charleston office. The right is reserved to reject any or all proposals. *These are projects on which any contractor with a Category "W" Prequalification Rating may be eligible to bid. Final award of all Interstate and Federal-Aid Projects, with the exception of exempt projects, is subject to the approval of the Federal Highway Administration. Minimum wage rates for these projects have been predetermined as required by law and are set forth in the bid proposal. Federal-Aid projects are subject to the WHA of 1961 PL-581 approved August 13, 1962. Plans and proposals on all projects will be furnished at twenty-five dollars ($25.00) per set. Extra plans will be furnished at fifteen dollars ($15.00) per set and extra proposals will be furnished at ten dollars ($10.00) per proposal. Cross sections will be furnished at fifty dollars ($50.00) per set. All will be furnished without refund and transmitted at your risk. The above noted project information will be available in the Contract Unit, Construction Section, Division of Highways, Room A-737, Building 5, 1900 Kanawha Boulevard East, Charleston, WV 25305 and may also be ordered by calling (304)558-2874. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid bidding proposals will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. The West Virginia Department of Transportation, Division of Highways hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex or national orign in consideration for an award. No proposals for these projects will be issued after 3:00 P.M. on the day prior to the letting. It is necessary to advise your approximate uncompleted workload when ordering plans and proposals. Announcement, opening and reading of bids received will be in the order as designated in the "Notice to Contractors". Sealed proposals may also be deposited in the bid depository box which will be located near the corner of Piedmont Road and California Avenue between the hours of 9 A.M. and 10 A.M., the day of the letting. Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25305-0430 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division Of Highways John J. Welch, Jr., Director Project Control Division 1 1 FEDERAL PROJECT PAGE 1 Call Order : 001 CONTRACT ID : 9533503 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U350-0052/00-039.80 04 0DPS 0011 093 000 COUNTIES : WAYNE DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/01/99 RES. ENG.: CHARLES SHAVER DESCRIPTION: NORTH CRUM - JENNIE CREEK ROAD ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0015 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0030 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0035 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0040 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0045 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0055 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0060 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0065 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0070 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0085 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0090 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0095 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0105 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0115 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0120 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0125 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0130 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0140 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 1 FEDERAL PROJECT PAGE 2 Call Order : 001 CONTRACT ID : 9533503 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U350-0052/00-039.80 04 0DPS 0011 093 000 COUNTIES : WAYNE DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/01/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0145 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0155 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0160 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0180 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0185 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0195 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0210 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0215 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0220 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0225 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0230 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0235 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0240 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0245 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0250 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0255 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0260 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0265 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0270 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0275 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0280 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 1 FEDERAL PROJECT PAGE 3 Call Order : 001 CONTRACT ID : 9533503 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U350-0052/00-039.80 04 0DPS 0011 093 000 COUNTIES : WAYNE DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/01/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0285 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0290 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0295 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0300 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0305 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0310 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0315 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0320 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0325 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0330 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0335 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0340 204-01 MOBILIZATION LUMP LUMP 0345 207-01 UNCLASSIFIED EXCAVATION 4,442,781.000 M3 0350 207-02 SUBGRADE 14,033.000 M3 0355 207-34 FABRIC FOR SEPARATION 117,419.000 M2 0356 208-01 STORAGE TANK REMOVAL 1.000 EA 0360 218-02 GROUTED RIPRAP 905.000 M3 0365 307-01 CLASS I AGGREGATE BASE COURSE 8,337.000 M3 0370 311-06 OPEN GRADED FREE DRAINING BASE 9,310.000 M3 0375 408-02 BITUMINOUS MATERIAL 2,117.000 L 0380 409-02 BITUMINOUS MATERIAL PRIME 2,494.000 L 1 FEDERAL PROJECT PAGE 4 Call Order : 001 CONTRACT ID : 9533503 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U350-0052/00-039.80 04 0DPS 0011 093 000 COUNTIES : WAYNE DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/01/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0385 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 3,814.000 M2 0390 601-02 CLASS B CONCRETE 81.000 M3 0395 604-040450A2 FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED STEEL PIP 268.000 M E, 450MM, A2 0400 604-040600A2 FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED STEEL PIP 235.000 M E, 600MM, A2 0405 604-040750A2 FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED STEEL PIP 95.000 M E, 750MM, A2 0410 604-040900A2 FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED STEEL PIP 159.000 M E, 900MM, A2 0415 604-041050B2 FULL BITUMINOUS COATED PAVED CORRUGATED PIPE, 1050MM, B2 79.000 M 0420 604-041200A2 FULL BITUMINOUSE COATED/PVD CORRUGATED PIPE, 1200MM, A2 108.000 M 0425 604-041400A2 FULL BITUMINOUS COATED AND PAVED INVERTED CORRUGATED STEEL 202.000 M PIPE 1400MM, A2 0430 604-041800A2 FULL BITUMINOUS COATED AND PAVED INVERTED CORRUGATED STEEL 130.000 M PIPE 1800MM, A2 0431 604-192700E FULL BITUMINOUS COATED AND FIELD PAVED STRUCTURAL PLATE PIPE 156.000 M ,2700, E 0435 605-09 TYPE G INLET 37.000 EA 0436 605-091 TYPE G INLET, MODIFIED 1.000 EA 0440 606-250150 UNDERDRAIN PIPE 150MM 56.500 M 0445 606-29 FREE DRAINING BASE (FDB) TRENCH 8,438.600 M 0450 606-30 OUTLET PIPE 7,236.100 M 0455 607-011 TYPE 1 GUARDRAIL, CLASS I 5,804.700 M 0460 607-25A CUT SLOPE TERMINAL, TYPE A 8.000 EA 0465 607-28 MODIFIED ECCENTRIC LOADER TERMINAL 6.000 EA 0470 607-30 SPECIAL TRAILING END TERMINAL 7.000 EA 0475 608-0211 RIGHT OF WAY FENCE FARM FIELD 1.19M 8,999.000 M 1 FEDERAL PROJECT PAGE 5 Call Order : 001 CONTRACT ID : 9533503 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U350-0052/00-039.80 04 0DPS 0011 093 000 COUNTIES : WAYNE DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/01/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0480 633-01 CONCRETE GUTTER 5,436.300 M2 0485 633-03 DUMPED ROCK GUTTER 4,093.000 M3 0490 636-07 ERADICATION PAVEMENT MARKINGS 3,920.000 M 0495 636-08 TEMP PVMT MARKING-PAINT 11,608.000 M 0500 636-09 TEMP PVMT MARKING-TAPE 600.000 M 0505 636-11 TRAFFIC CONTROL DEVICE 62,406.000 UN 0510 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 12.000 EA 0515 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 571.000 EA 0520 636-14 FLAGGER 1,800.000 HR 0525 636-17 TEMPORARY CONCRETE BARRIERS 720.000 M 0530 636-19 TEMPORARY GUARDRAIL BARRIERS 580.000 M 0535 636-25A WARNING LIGHTS TYPE A 15,314.000 DA 0540 636-25B WARNING LIGHTS TYPE B 12,220.000 DA 0545 637-01 WATER FOR DUST PALLIATIVE 30,836.000 M3 0550 638-02 RIGHT OF WAY MARKERS 57.000 EA 0555 638-03 SURVEY MARKERS 18.000 EA 0560 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0565 640-01 STANDARD FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0570 640-03 BUILDING EQUIPMENT LUMP LUMP 0575 642-01 TEMPORARY BERMS 1,668.000 M 0580 642-02 SLOPE DRAINS 444.000 M 1 FEDERAL PROJECT PAGE 6 Call Order : 001 CONTRACT ID : 9533503 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U350-0052/00-039.80 04 0DPS 0011 093 000 COUNTIES : WAYNE DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/01/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0585 642-031 DITCH CHECKS 48.000 EA 0590 642-032 CHECK DAMS 31.000 EA 0595 642-033 SEDIMENT TRAP 4,221.000 M3 0600 642-034 SEDIMENT DAM 1,925.000 M3 0605 642-036 SEDIMENT REMOVAL 10,367.000 M3 0610 642-041 TEMPORARY SEED 11,101.000 KG 0615 642-042 SEED MIXTURE B 3,982.000 KG 0620 642-043 SEED MIXTURE D 6,992.000 KG 0625 642-051 STRAW OR HAY MULCH 234.000 MGR 0630 642-052 WOOD CELLULOSE FIBER MULCH 31.000 MGR 0635 642-06 FERTILIZER 66.000 MGR 0640 642-07 FIBER MATTING 10,845.000 M2 0645 642-08 TEMPORARY PIPE 31.000 M 0650 642-09 CONTOUR DITCH 6,535.000 M 0655 642-10 AGRICULTURAL LIMESTONE 263.000 MGR 0660 642-11 HAY OR STRAW BALES 7,506.000 EA 0665 642-12 SILT FENCE 7,576.000 M 0670 652-01 AGRICULTURAL LIMESTONE 90.400 MGR 0675 652-021 FERTILIZER 10-20-10 67.100 MGR 0680 652-022 UREA FORMALDEHYDE FERTILIZER 12.700 MGR 0685 652-031 SEED MIXTURES B, C-1, OR C-2 1,142.600 KG 1 FEDERAL PROJECT PAGE 7 Call Order : 001 CONTRACT ID : 9533503 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U350-0052/00-039.80 04 0DPS 0011 093 000 COUNTIES : WAYNE DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/01/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0690 652-032 SEED MIXTURES D 4,117.800 KG 0695 652-041 STRAW OR HAY MULCH 170.000 MGR 0700 652-042 WOOD CELLULOSE FIBER MULCH 105.400 MGR 0705 655-01 MATTING 9,022.000 M2 0710 655-02A PERMANENT EROSION MATTING, TYPE A 14,622.000 M2 0715 663-0112W EDGE LINE WHITE TYPE II 7,500.000 M 0720 663-0112Y EDGE LINE YELLOW TYPE II 10,690.000 M 0725 663-0212W LANE LINE OR CENTER LINE WHITE TYPE II 1,350.000 M 0730 663-0312 BARRIER LINES TYPE II 5,390.000 M 0735 663-042 TYPE II CHANNELIZING LINES 615.000 M 0740 663-055 TYPE V STOP LINES 80.000 M 0745 663-105 TYPE V LANE ARROWS 20.000 EA 0750 663-115 TYPE V LANE LETTERS 12.000 EA 0755 665-01 PLUGGING GAS WELL 3.000 EA 0760 665-03 PLUGGING DRILLED WATER WELL 17.000 EA 0765 681-01 ASBESTOS ABATEMENT LUMP LUMP 0770 681-01 ASBESTOS ABATEMENT LUMP LUMP 0795 681-01 ASBESTOS ABATEMENT LUMP LUMP 0800 681-01 ASBESTOS ABATEMENT LUMP LUMP 0810 681-01 ASBESTOS ABATEMENT LUMP LUMP 0860 681-01 ASBESTOS ABATEMENT LUMP LUMP 1 FEDERAL PROJECT PAGE 8 Call Order : 001 CONTRACT ID : 9533503 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U350-0052/00-039.80 04 0DPS 0011 093 000 COUNTIES : WAYNE DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/01/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0875 681-01 ASBESTOS ABATEMENT LUMP LUMP 0885 681-01 ASBESTOS ABATEMENT LUMP LUMP 0900 681-01 ASBESTOS ABATEMENT LUMP LUMP 0910 681-01 ASBESTOS ABATEMENT LUMP LUMP 0915 681-01 ASBESTOS ABATEMENT LUMP LUMP 0935 681-01 ASBESTOS ABATEMENT LUMP LUMP 0940 681-01 ASBESTOS ABATEMENT LUMP LUMP 0965 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 92,331.000 MGR AA1 0970 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 84,021.000 MGR AA2 0975 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 1,025.000 MGR AB1 0980 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 933.000 MGR AB2 0985 402-01SG HMA SKID PAVEMENT, STONE/GRAVEL 5,942.000 MGR AC1 0990 402-01S HMA SKID PAVEMENT, SLAG 5,407.000 MGR AC2 0995 604-040450A2 FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED STEEL PIP 48.400 M AD1 E, 450MM, A2 1000 604-720450 SAFETY SLOPE END SECTION, CSP 1.000 EA AD1 1005 604-260450A2 CORRUGATED ALUMINUM ALLOY PIPE FIELD PAVED 450MM, A2 48.400 M AD2 1010 604-720450 SAFETY SLOPE END SECTION, CSP 1.000 EA AD2 1015 604-3704502 REINFORCED CONCRETE PIPE, 450MM, CLII 48.400 M AD3 1020 604-710450 SAFETY SLOPE END SECTION, RCP 1.000 EA AD3 1025 604-040450A2 FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED STEEL PIP 154.700 M AE1 E, 450MM, A2 1030 604-260450A2 CORRUGATED ALUMINUM ALLOY PIPE FIELD PAVED 450MM, A2 154.700 M AE2 1 FEDERAL PROJECT PAGE 9 Call Order : 001 CONTRACT ID : 9533503 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U350-0052/00-039.80 04 0DPS 0011 093 000 COUNTIES : WAYNE DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/01/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 1035 604-040450A2 FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED STEEL PIP 235.000 M AF1 E, 450MM, A2 1040 604-250450A2 CORRUGATED ALUMINUM ALLOY PIPE 450MM, A2 235.000 M AF2 1045 604-3704503 REINFORCED CONCRETE PIPE, 450MM, CLIII 235.000 M AF3 1050 604-040600A2 FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED STEEL PIP 14.200 M AG1 E, 600MM, A2 1055 604-720600 SAFETY SLOPE END SECTION, CSP 2.000 EA AG1 1060 604-260600A2 CORRUGATED ALUMINUM ALLOY PIPE FIELD PAVED 600MM, A2 14.200 M AG2 1065 604-720600 SAFETY SLOPE END SECTION, CSP 2.000 EA AG2 1070 604-3706002 REINFORCED CONCRETE PIPE, 600MM, CLASS II 14.200 M AG3 1075 604-710600 SAFETY SLOPE END SECTION, RCP 2.000 EA AG3 1080 604-040600A2 FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED STEEL PIP 455.000 M AH1 E, 600MM, A2 1085 604-250600A2 CORRUGATED ALUMINUM ALLOY PIPE 600MM, A2 455.000 M AH2 1090 604-3706003 REINFORCED CONCRETE PIPE, 600MM, CLASS III 455.000 M AH3 1095 604-040900A2 FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED STEEL PIP 117.800 M AJ1 E, 900MM, A2 1100 604-260900D2 CORRUGATED ALUMINUM ALLOY PIPE FIELD PAVED 900MM,D2 117.800 M AJ2 1105 636-02SG AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 401.000 MGR AK1 1110 636-02S AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 365.000 MGR AK2 SECTION NO. 0002 BOX CULVERT @ 10+792.137, US 52 1115 212-01 STRUCTURE EXCAVATION 11,000.000 M3 1120 601-02 CLASS B CONCRETE 1,016.300 M3 1125 602-01 REIN STEEL BARS 72,860.000 KG 1130 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP SECTION NO. 0003 BOX CULVERT @ 11+480, U.S. 52 1 FEDERAL PROJECT PAGE 10 Call Order : 001 CONTRACT ID : 9533503 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U350-0052/00-039.80 04 0DPS 0011 093 000 COUNTIES : WAYNE DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/01/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== 1135 212-01 STRUCTURE EXCAVATION 9,400.000 M3 1140 601-02 CLASS B CONCRETE 5,840.000 M3 1145 602-01 REIN STEEL BARS 408,000.000 KG 1150 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP SECTION NO. 0004 COMPUTER SYSTEM 1155 640-04 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP SECTION NO. 0005 ON JOB TRAINING 1160 699 ON JOB TRAINING 3,000.000 HR 1 FEDERAL PROJECT PAGE 11 Call Order : 002 CONTRACT ID : 9422704 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S355-0054/04-000.01 00 00BR 0544 003 E00 COUNTIES : WYOMING DBE GOALS : 2.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/98 RES. ENG.: WAYNE MUSICK ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0015 204-01 MOBILIZATION LUMP LUMP 0020 207-01 UNCLASSIFIED EXCAVATION 27.000 M3 0025 207-34 FABRIC FOR SEPARATION 117.000 M2 0030 307-01 CLASS I AGGREGATE BASE COURSE 23.000 M3 0035 409-02 BITUMINOUS MATERIAL PRIME 379.000 L 0040 604-010250A2 METALLIC COATED CORRUGATED STEEL PIPE, 250MM, A2 8.000 M 0045 607-012 TYPE 1 GUARDRAIL CLASS II 36.000 M 0050 609-01 CONCRETE SIDEWALK 15.000 M2 0055 610-011 PLAIN CONCRETE CURBING, TYPE I 21.000 M 0060 636-11 TRAFFIC CONTROL DEVICE 3,140.000 UN 0065 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 1.000 EA 0070 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 50.000 EA 0075 636-14 FLAGGER 50.000 HR 0080 636-25B WARNING LIGHTS TYPE B 960.000 DA 0085 638-02 RIGHT OF WAY MARKERS 5.000 EA 0090 638-01 PROJECT MARKERS 1.000 EA 0095 640-02 SMALL FIELD OFFICE/STORAGE BUILDING LUMP LUMP 0100 640-03 BUILDING EQUIPMENT LUMP LUMP 0105 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECT LUMP LUMP 1 FEDERAL PROJECT PAGE 12 Call Order : 002 CONTRACT ID : 9422704 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S355-0054/04-000.01 00 00BR 0544 003 E00 COUNTIES : WYOMING DBE GOALS : 2.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/98 RES. ENG.: WAYNE MUSICK ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 21.000 MGR AA1 0115 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 18.000 MGR AA2 0120 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 7.000 MGR BB1 0125 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 6.000 MGR BB2 SECTION NO. 0002 BRIDGE 0130 203-01 DISMANTLING STRUCTURES LUMP LUMP 0135 211-02 ROCK BORROW EXCAVATION 84.000 M3 0140 212-01 STRUCTURE EXCAVATION 143.000 M3 0145 212-02 WET EXCAVATION 60.000 M3 0150 212-05 SELECT MATERIAL FOR BACKFILLING 57.000 M3 0155 601-02 CLASS B CONCRETE 146.000 M3 0160 602-01 REIN STEEL BARS 7,624.000 KG 0165 602-02 EPOXY COATED REINFORCING BARS 1,305.000 KG 0170 603-01 PRESTRESSED CONCRETE BEAMS 137.000 M 0175 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 FEDERAL PROJECT PAGE 13 Call Order : 003 CONTRACT ID : 9625702 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U320-0064/00-047.42 02 00NH 0642 098 000 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/29/98 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN AND PAVE 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 7,160.000 CY 0020 207-02 SUBGRADE 835.000 CY 0025 207-34 FABRIC FOR SEPARATION 6,686.000 SY 0030 211-02 ROCK BORROW EXCAVATION 5,180.000 CY 0035 307-01 CLASS 1 AGGREGATE BASE COURSE 255.000 CY 0040 311-06 OPEN GRADED FREE DRAINING BASE COURSE 540.000 CY 0045 408-02 BITUMINOUS MATERIAL 1,273.000 GA 0050 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 900.000 SY 0052 604-09(18) END SECION FOR CORRUGATED STEEL PIPE 1.000 EA 0055 605-09 TYPE G INLET 2.000 EA 0060 606-29 FREE DRAINING BASE (FDB) TRENCH 3,000.000 LF 0065 606-30 OUTLET PIPE 435.000 LF 0070 607-01(I) TYPE 1 GUARDRAIL 970.000 LF 0075 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 2,100.000 LF 0080 607-28 MODIFIED ECCENTRIC LOADER TERMINAL 2.000 EA 0085 607-30 SPECIAL TRAILING END TERMINAL 4.000 EA 0090 607-31 SPECIAL APPROACH END TERMINAL 1.000 EA 0095 607-25(A) CUT SLOPE TERMINAL, TYPE A 1.000 EA 0100 608-02(3F11I) RIGHT-OF-WAY FENCE, FARM FIELD TYPE 1,140.000 LF 1 FEDERAL PROJECT PAGE 14 Call Order : 003 CONTRACT ID : 9625702 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U320-0064/00-047.42 02 00NH 0642 098 000 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/29/98 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN AND PAVE 0105 636-07 ERADICATION OF PAVEMENT MARKINGS 5,000.000 LF 0110 636-09 TEMPORARY PAVEMENT MARKINGS-TAPE 4" SOLID LINE 6,000.000 LF 0115 636-11 TRAFFIC CONTROL DEVICES 13,260.000 UN 0120 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 6.000 EA 0125 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 300.000 EA 0130 636-14 FLAGGER 800.000 HR 0135 636-17 TEMPORARY CONCRETE BARRIERS 3,050.000 LF 0140 636-18 REMOVING AND RESETTING TEMPORARY CONCRETE BARRIERS 700.000 LF 0145 636-21 ELECTRIC ARROW 60.000 DA 0150 636-22 CHANGABLE MESSAGE SIGN 360.000 DA 0155 636-25(B) WARNING LIGHTS 1,080.000 DA 0160 636-25(C) WARNING LIGHTS 7,200.000 DA 0165 637-01 WATER FOR DUST PALLIATIVE 24.000 MG 0170 638-02 RIGHT OF WAY MARKERS 2.000 EA 0175 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0180 640-01 STANDARD FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0185 640-03 BUILDING EQUIPMENT LUMP LUMP 0190 642-04-1 TEMPORARY SEED 44.000 LB 0195 642-05-1 STRAW OR HAY MULCH 1.740 TN 0200 642-06 FERTILIZER 0.350 TN 0205 642-10 AGRICULTURAL LIMESTONE 1.330 TN 1 FEDERAL PROJECT PAGE 15 Call Order : 003 CONTRACT ID : 9625702 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U320-0064/00-047.42 02 00NH 0642 098 000 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/29/98 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN AND PAVE 0210 642-11 HAY OR STRAW BALES 1,000.000 EA 0215 642-12 SILT FENCE 3,000.000 LF 0220 652-01 AGRICULTURAL LIMESTONE 0.450 TN 0225 652-02-1 FERTILIZER, 10-20-10 0.450 TN 0230 652-02-2 UREA FORMALDEHIDE FERTILIZER 0.140 TN 0235 652-03-1 SEED MIXTURES B, C-1 OR C-2 7.000 LB 0240 652-03-2 SEED MIXTURES D 54.000 LB 0245 652-04-1 STRAW OR HAY MULCH 1.740 TN 0250 663-01-1(II)W EDGE LINE, WHITE 4,475.000 LF 0255 663-01-1(II)Y EDGE LINE, YELLOW 2,750.000 LF 0260 663-02-1(II)W LANE LINE OR CENTERLINE, WHITE 1,075.000 LF 0265 663-04(II) TYPE II CHANNELIZING LINES 600.000 LF 0270 663-07(V)W TYPE V, STRIPES, WHITE 600.000 LF 0275 663-10(V) TYPE V, LANE ARROWS 6.000 EA 0280 663-11(V) TYPE V, LANE LETTERS 12.000 EA 0285 664-01(IV) IMPACT ATTENUATING DEVICE, TYPE IV 1.000 EA 0290 664-01(IV)A REMOVE AND RESET G.R.E.A.T. ATTENUATOR DEVICE 1.000 EA 0295 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 60.000 TN AA1 0300 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 54.000 TN AA2 0305 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 4,477.000 TN AB1 0310 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 4,029.000 TN AB2 1 FEDERAL PROJECT PAGE 16 Call Order : 003 CONTRACT ID : 9625702 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U320-0064/00-047.42 02 00NH 0642 098 000 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/29/98 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN AND PAVE 0315 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 441.000 TN AC1 0320 402-01(1)S HMA SKID PVT, (W-1) SLAG 397.000 TN AC2 0325 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 338.000 LF AE1 0330 604-25(18)A2 CORRUGATED ALUMINUM ALLOY PIPE 338.000 LF AE2 0335 604-37(18)III REINFORCED CONCRETE PIPE 338.000 LF AE3 0340 636-02SG AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 1,000.000 TN AF1 0345 636-02S AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 900.000 TN AF2 SECTION NO. 0002 HIGHWAY LIGHTING 0350 662-02(1) GALVANIZED STEEL CONDUIT ( 1.00 ) LUMP 0355 662-06(H18X18 JUNCTION BOX 6.000 EA 0360 662-07(250) LUMINAIRES 7.000 EA 0365 662-08(1) CABLE ( 1.00 ) LUMP 0370 662-10(40-16I LIGHTING SUPPORT, TYPE I 7.000 EA 0375 662-13(1) SERVICE AND CONTROL STATION ( 1.00 ) LUMP 0380 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0385 662-15(1) ELECTRICAL TESTS ( 1.00 ) LUMP SECTION NO. 0003 SIGNING 0390 657-06(W6X12) A-441SUPPORTS, GALVANIZED 124.000 LF 0395 657-10 (3.00LB) CHANNEL POSTS 45.000 LF 0400 657-12 (4.00LB BACK TO BACK) CHANNEL POSTS 45.000 LF 1 FEDERAL PROJECT PAGE 17 Call Order : 003 CONTRACT ID : 9625702 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U320-0064/00-047.42 02 00NH 0642 098 000 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/29/98 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0003 SIGNING 0405 657-17 CLASS B CONCRETE FOOTING, REINFORCED, ROADSIDE 4.200 CY 0410 657-18 POST REMOVAL 11.000 EA 0415 658-01 CLASS B CONCRETE FOOTING, REINFORCED, OVERHEAD 19.600 CY 0420 658-02(02) OVERHEAD SIGN STRUCTURE, STEEL-ALUMINUM COMBINATION 1.000 EA 0425 658-03(01) OVERHEAD SIGN STRUCTURE, GALVANIZED STEEL 1.000 EA 0430 658-03(03) OVERHEAD SIGN STRUCTURE, GALVANIZED STEEL 1.000 EA 0435 659-01(1)250W SIGN LIGHTING TYPE 3 (250W) LUMP LUMP 0440 659-01(2)250W SIGN LIGHTING TYPE 3 (250W) LUMP LUMP 0445 659-01(3)250W SIGN LIGHTING TYPE 3 (250W) LUMP LUMP 0450 661-01(1) (0.080),FLAT SHEET SIGNS 70.000 SF 0455 661-02 EXTRUDED PANEL SIGNS 648.000 SF 0460 661-11 INSTALLATION OF REUSABLE SIGNS 3.000 EA 1 STATE PROJECT PAGE 18 Call Order : 004 CONTRACT ID : 9700914 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S317-0024/00-000.00 00 COUNTIES : HARRISON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/15/98 RES. ENG.: HARRY LOOKER, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 229-01 SHOULDERS AND DITCHES 2.300 KM 0010 408-02 BITUMINOUS MATERIAL 9,500.000 L 0015 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 29,200.000 M2 0020 605-09 TYPE G INLET 1.000 EA 0025 605-24 ADJUSTING TYPE G INLET 1.000 EA 0030 636-06 PILOT TRUCK AND DRIVER 8.000 DA 0035 636-08 TEMP PVMT MARKING-PAINT 3,700.000 M 0040 636-11 TRAFFIC CONTROL DEVICE 4,230.000 UN 0045 636-14 FLAGGER 720.000 HR 0050 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 110.000 MGR AA1 0055 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 100.000 MGR AA2 0060 402-011SG HOT-MIX ASPHALT SKID PAVEMENT, STONE OR GRAVEL 2,280.000 MGR BB1 0065 402-011S HOT-MIX ASPHALT SKID PAVEMENT, SLAG 2,075.000 MGR BB2 1 STATE PROJECT PAGE 19 Call Order : 005 CONTRACT ID : 9717402 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S317-0035/00-000.72 00 COUNTIES : HARRISON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/97 RES. ENG.: HARRY LOOKER, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 229-01 SHOULDERS AND DITCHES 4.400 KM 0010 408-02 BITUMINOUS MATERIAL 4,925.000 L 0015 636-11 TRAFFIC CONTROL DEVICE 880.000 UN 0020 636-14 FLAGGER 180.000 HR 0025 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 300.000 MGR AA1 0030 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 270.000 MGR AA2 0035 407-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,895.000 MGR BB1 0040 407-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 1,706.000 MGR BB2 1 STATE PROJECT PAGE 20 Call Order : 006 CONTRACT ID : 9717403 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S339-0014/03-001.72 00 COUNTIES : PRESTON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/97 RES. ENG.: HARRY LOOKER, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 229-01 SHOULDERS AND DITCHES 3.520 KM 0010 408-02 BITUMINOUS MATERIAL 3,500.000 L 0015 636-11 TRAFFIC CONTROL DEVICE 880.000 UN 0020 636-14 FLAGGER 120.000 HR 0025 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 200.000 MGR AA1 0030 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 180.000 MGR AA2 0035 407-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 1,280.000 MGR BB1 0040 407-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 1,152.000 MGR BB2 1 FEDERAL PROJECT PAGE 21 Call Order : 007 CONTRACT ID : 9629204 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S345-0020/00-005.14 00 0STP 0020 129 EQ0 COUNTIES : SUMMERS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/15/97 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GUARDRAIL 0005 204-01 MOBILIZATION LUMP LUMP 0010 607-011 TYPE 1 GUARDRAIL, CLASS I 891.540 M 0015 607-25A CUT SLOPE TERMINAL, TYPE A 6.000 EA 0020 607-28 MODIFIED ECCENTRIC LOADER TERMINAL 6.000 EA 0025 636-11 TRAFFIC CONTROL DEVICE 880.000 UN 0030 636-14 FLAGGER 80.000 HR 1 FEDERAL PROJECT PAGE 22 Call Order : 008 CONTRACT ID : 9423709 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S351-0015/00-008.46 00 00BR 0015 052 E00 COUNTIES : WEBSTER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/98 RES. ENG.: WILLIAM FOLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN AND PAVE 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0015 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0020 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0025 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0030 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0035 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0040 202-02 WATER WELL ABANDONMENT LUMP LUMP 0045 202-02 WATER WELL ABANDONMENT LUMP LUMP 0050 202-02 WATER WELL ABANDONMENT LUMP LUMP 0055 202-02 WATER WELL ABANDONMENT LUMP LUMP 0060 202-02 WATER WELL ABANDONMENT LUMP LUMP 0065 202-02 WATER WELL ABANDONMENT LUMP LUMP 0075 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0080 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0085 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0086 202-03 SEPTIC TANK ABANDONMENT LUMP LUMP 0090 204-01 MOBILIZATION LUMP LUMP 0095 207-01 UNCLASSIFIED EXCAVATION 26,362.000 M3 0100 207-02 SUBGRADE 1,145.000 M3 0105 207-34 FABRIC FOR SEPARATION 5,793.000 M2 1 FEDERAL PROJECT PAGE 23 Call Order : 008 CONTRACT ID : 9423709 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S351-0015/00-008.46 00 00BR 0015 052 E00 COUNTIES : WEBSTER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/98 RES. ENG.: WILLIAM FOLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN AND PAVE 0110 307-01 CLASS I AGGREGATE BASE COURSE 1,370.000 M3 0115 308-01 CLASS 1 AGGREGATE BASE COURSE 272.000 MGR 0120 409-02 BITUMINOUS MATERIAL PRIME 10,719.000 L 0125 502-01300 PORTLAND CEMENT CONCRETE APPRACH SLAB 300MM 132.000 M2 0130 605-09 TYPE G INLET 2.000 EA 0132 606-250100 UNDERDRAIN PIPE 100MM 14.000 M 0135 607-012 TYPE 1 GUARDRAIL CLASS II 135.000 M 0140 607-013 TYPE 1 GUARDRAIL CLASS III 99.000 M 0145 633-03 DUMPED ROCK GUTTER 56.000 M3 0150 636-07 ERADICATION PAVEMENT MARKINGS 480.000 M 0155 636-08 TEMP PVMT MARKING-PAINT 2,700.000 M 0160 636-09 TEMP PVMT MARKING-TAPE 1,630.000 M 0165 636-11 TRAFFIC CONTROL DEVICE 19,065.000 UN 0170 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 10.000 EA 0175 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 150.000 EA 0180 636-14 FLAGGER 900.000 HR 0185 636-17 TEMPORARY CONCRETE BARRIERS 16.000 M 0190 636-19 TEMPORARY GUARDRAIL BARRIERS 34.000 M 0195 636-24 TEMPORARY PIPE FOR MAINTAINING TRAFFIC 19.000 M 0200 636-25A WARNING LIGHTS TYPE A 3,600.000 DA 0205 636-25B WARNING LIGHTS TYPE B 2,400.000 DA 1 FEDERAL PROJECT PAGE 24 Call Order : 008 CONTRACT ID : 9423709 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S351-0015/00-008.46 00 00BR 0015 052 E00 COUNTIES : WEBSTER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/98 RES. ENG.: WILLIAM FOLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN AND PAVE 0210 637-01 WATER FOR DUST PALLIATIVE 20.000 M3 0215 638-02 RIGHT OF WAY MARKERS 40.000 EA 0220 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0225 640-02 SMALL FIELD OFFICE/STORAGE BUILDING LUMP LUMP 0230 640-03 BUILDING EQUIPMENT LUMP LUMP 0235 642-031 DITCH CHECKS 2.000 EA 0240 642-041 TEMPORARY SEED 55.000 KG 0245 642-042 SEED MIXTURE B 35.000 KG 0250 642-043 SEED MIXTURE D 36.000 KG 0255 642-06 FERTILIZER 1.000 MGR 0260 642-051 STRAW OR HAY MULCH 1.000 MGR 0265 642-052 WOOD CELLULOSE FIBER MULCH 1.000 MGR 0270 642-10 AGRICULTURAL LIMESTONE 7.000 MGR 0275 642-11 HAY OR STRAW BALES 863.000 EA 0280 642-12 SILT FENCE 776.000 M 0285 652-01 AGRICULTURAL LIMESTONE 7.000 MGR 0290 652-021 FERTILIZER 10-20-10 1.000 MGR 0295 652-022 UREA FORMALDEHYDE FERTILIZER 1.000 MGR 0300 652-031 SEED MIXTURES B, C-1, OR C-2 42.000 KG 0305 652-032 SEED MIXTURES D 35.000 KG 0310 652-041 STRAW OR HAY MULCH 1.000 MGR 1 FEDERAL PROJECT PAGE 25 Call Order : 008 CONTRACT ID : 9423709 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S351-0015/00-008.46 00 00BR 0015 052 E00 COUNTIES : WEBSTER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/98 RES. ENG.: WILLIAM FOLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN AND PAVE 0315 652-042 WOOD CELLULOSE FIBER MULCH 1.000 MGR 0320 655-02A PERMANENT EROSION MATTING, TYPE A 135.000 M2 0325 670-10015005 STEEL CASING PIPE, 150MM 4.76MM 20.500 M 0330 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,369.000 MGR AA1 0335 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 1,246.000 MGR AA2 0340 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 283.000 MGR BB1 0345 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 257.000 MGR BB2 0350 604-020400A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE 400MM,A2 34.200 M CC1 0355 604-250400A2 CORRUGATED ALUMINUM ALLOY PIPE, 400MM, A2 34.200 M CC2 0360 604-020450A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, 450MM, A2 39.500 M DD1 0365 604-090450 END SECTION FOR CORRUGATED STEEL PIPE 450MM 2.000 EA DD1 0370 604-250450A2 CORRUGATED ALUMINUM ALLOY PIPE 450MM, A2 39.500 M DD2 0375 604-280450 END SECTION FOR CORRUGATED ALUMINUM ALLOY PIPE 450MM 2.000 EA DD2 0380 604-020900A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, 900MM, A2 14.500 M EE1 0385 604-090900 END SECTION FOR CORRUGATED STEEL PIPE, 900MM 1.000 EA EE1 0390 604-250900A3 CORRUGATED ALUMINUM ALLOY PIPE 900MM,A3 14.500 M EE2 0395 604-280900 END SECTION FOR CORRUGATED ALUMINUM ALLOY PIPE 900MM 1.000 EA EE2 0400 636-02SG AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 300.000 MGR FF1 0405 636-02S AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 273.000 MGR FF2 SECTION NO. 0002 BRIDGE NO. 4347 0410 203-01 DISMANTLING STRUCTURES LUMP LUMP 1 FEDERAL PROJECT PAGE 26 Call Order : 008 CONTRACT ID : 9423709 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S351-0015/00-008.46 00 00BR 0015 052 E00 COUNTIES : WEBSTER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/98 RES. ENG.: WILLIAM FOLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 BRIDGE NO. 4347 0415 212-01 STRUCTURE EXCAVATION 130.000 M3 0420 212-02 WET EXCAVATION 128.000 M3 0425 212-05 SELECT MATERIAL FOR BACKFILLING 58.000 M3 0430 601-02 CLASS B CONCRETE 299.000 M3 0435 601-03 CLASS K CONCRETE 130.000 M3 0440 602-01 REIN STEEL BARS 5,037.000 KG 0445 602-02 EPOXY COATED REINFORCING BARS 30,787.000 KG 0450 615-01 STEEL SUPERSTRUCTURE ( 48,500.00 ) LUMP 0455 616-05H250062 STEEL BEARING PILES, HP 250X62, PRE-DRILLED AND DRIVEN 94.000 M 0460 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 FEDERAL PROJECT PAGE 27 Call Order : 009 CONTRACT ID : 9631205 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S310-0061/00-013.46 00 0STP 0061 025 EQ0 COUNTIES : FAYETTE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/15/97 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GUARDRAIL 0005 204-01 MOBILIZATION LUMP LUMP 0010 607-011 TYPE 1 GUARDRAIL, CLASS I 914.330 M 0015 607-25A CUT SLOPE TERMINAL, TYPE A 2.000 EA 0020 607-28 MODIFIED ECCENTRIC LOADER TERMINAL 9.000 EA 0025 636-11 TRAFFIC CONTROL DEVICE 880.000 UN 0030 636-14 FLAGGER 100.000 HR 1 FEDERAL PROJECT PAGE 28 Call Order : 010 CONTRACT ID : 9629205 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S313-0020/00-011.57 00 0STP 0020 128 EQ0 COUNTIES : GREENBRIER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/15/97 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GUARDRAIL 0005 204-01 MOBILIZATION LUMP LUMP 0010 607-011 TYPE 1 GUARDRAIL, CLASS I 1,066.820 M 0015 607-25A CUT SLOPE TERMINAL, TYPE A 2.000 EA 0020 607-28 MODIFIED ECCENTRIC LOADER TERMINAL 12.000 EA 0025 636-11 TRAFFIC CONTROL DEVICE 880.000 UN 0030 636-14 FLAGGER 100.000 HR 1 FEDERAL PROJECT PAGE 29 Call Order : 011 CONTRACT ID : 9608007 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S327-0062/00-011.12 00 0STP 0062 033 EQ0 COUNTIES : MASON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/15/97 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GUARDRAIL 0005 607-011 TYPE 1 GUARDRAIL, CLASS I 2,636.520 M 0010 607-25A CUT SLOPE TERMINAL, TYPE A 1.000 EA 0015 607-25B CUT SLOPE TERMINAL, TYPE B 1.000 EA 0020 607-28 MODIFIED ECCENTRIC LOADER TERMINAL 22.000 EA 0025 607-30 SPECIAL TRAILING END TERMINAL 2.000 EA 0030 636-11 TRAFFIC CONTROL DEVICE 1,520.000 UN 0035 636-14 FLAGGER 100.000 HR 1 FEDERAL PROJECT PAGE 30 Call Order : 012 CONTRACT ID : 9629206 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S334-0129/00-000.00 00 0STP 0129 001 EQ0 COUNTIES : NICHOLAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/15/97 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GUARDRAIL 0005 204-01 MOBILIZATION LUMP LUMP 0010 607-011 TYPE 1 GUARDRAIL, CLASS I 2,060.960 M 0015 607-25A CUT SLOPE TERMINAL, TYPE A 2.000 EA 0020 607-25B CUT SLOPE TERMINAL, TYPE B 2.000 EA 0025 607-28 MODIFIED ECCENTRIC LOADER TERMINAL 8.000 EA 0030 636-11 TRAFFIC CONTROL DEVICE 880.000 UN 0035 636-14 FLAGGER 120.000 HR 1 FEDERAL PROJECT PAGE 31 Call Order : 013 CONTRACT ID : 9635302 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S339-0008/00-004.41 00 0STP 0008 029 EQ COUNTIES : PRESTON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/15/98 RES. ENG.: HARRY LOOKER, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CLIFTON MILLS W-BEAM BRIDGE (1838.1) REPAIRS 0005 203-01 DISMANTLING STRUCTURES LUMP LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 601-15B EPOXY RESIN PROTECTIVE COATING LUMP LUMP 0020 601-35 SUBSTRUCTURE MODIFICATION LUMP LUMP 0025 615-03 FABRICATED STRUCTURAL STEEL ( 1.00 ) LUMP 0030 625-16 REMOVE AND REBUILD EXPANSION JOINT 27.000 M 0035 636-09 TEMP PVMT MARKING-TAPE 750.000 M 0040 636-11 TRAFFIC CONTROL DEVICE 3,840.000 UN 0045 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 1.000 EA 0050 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 50.000 EA 0055 636-14 FLAGGER 50.000 HR 0060 636-23 TEMPORARY TRAFFIC SIGNAL LUMP LUMP 0065 636-25B WARNING LIGHTS TYPE B 360.000 DA 1 STATE PROJECT PAGE 32 Call Order : 014 CONTRACT ID : 9500904 Letting Date : 08/19/97 10:00 A.M. PROJECTS : X317-0024/00-000.60 00 COUNTIES : HARRISON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/14/97 RES. ENG.: HARRY LOOKER, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 1,527.000 CY 0020 207-02 SUBGRADE 488.000 CY 0025 207-34 FABRIC FOR SEPARATION 3,940.000 SY 0030 211-01 UNCLASSIFIED BORROW EXCAVATION 1,351.000 CY 0035 307-01 CLASS 1 AGGREGATE BASE COURSE 868.000 CY 0040 408-02 BITUMINOUS MATERIAL 377.000 GA 0045 409-02 BITUMINOUS MATERIAL 1,464.000 GA 0050 601-02 CLASS B CONCRETE 16.400 CY 0055 604-02(12)A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE 31.000 LF 0060 604-02(15)A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE 352.000 LF 0065 604-37(15)III REINFORCED CONCRETE PIPE 68.000 LF 0070 604-4138X60H3 REINFORCED CONCRETE ELLIPTICAL PIPE 38 X 60, H3 96.000 LF 0075 605-01 TYPE A MANHOLE 1.000 EA 0080 605-04 TYPE B INLET 9.000 EA 0085 605-19 ADJUSTING TYPE B INLET 3.000 EA 0090 606-22 CRUSHED STONE, GRAVEL,OR SILICA SAND FOR UNDERDRAINS 211.000 CY 0095 606-25(6) UNDERDRAIN PIPE 1,785.000 LF 0100 607-01(II) TYPE 1 GUARDRAIL 328.000 LF 0105 607-10-1 TYPE 1 GUARDRAIL REMOVED AND STORED 338.000 LF 1 STATE PROJECT PAGE 33 Call Order : 014 CONTRACT ID : 9500904 Letting Date : 08/19/97 10:00 A.M. PROJECTS : X317-0024/00-000.60 00 COUNTIES : HARRISON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/14/97 RES. ENG.: HARRY LOOKER, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 608-01(4F) RIGHT-OF-WAY FENCE, CHAIN LINK TYPE 400.000 LF 0115 608-01(5F) RIGHT-OF-WAY FENCE, CHAIN LINK TYPE 60.000 LF 0120 609-01 CONCRETE SIDEWALK 762.000 SY 0125 610-01(I) PLAIN CONCRETE CURBING 28.000 LF 0130 610-03(I) COMBINATION CONCRETE CURB AND GUTTER 1,786.000 LF 0135 617-01 PIPE RAILING 35.000 LF 0140 633-01 CONCRETE GUTTER 70.000 SY 0145 636-07 ERADICATION OF PAVEMENT MARKINGS 1,600.000 LF 0150 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4" SOLID LINE 7,150.000 LF 0155 636-09 TEMPORARY PAVEMENT MARKINGS-TAPE 4" SOLID LINE 4,800.000 LF 0160 636-11 TRAFFIC CONTROL DEVICES 11,144.000 UN 0165 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 2.000 EA 0170 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 115.000 EA 0175 636-14 FLAGGER 900.000 HR 0180 636-25(A) WARNING LIGHTS 2,100.000 DA 0185 636-25(B) WARNING LIGHTS 1,200.000 DA 0190 636-25(C) WARNING LIGHTS 840.000 DA 0195 637-01 WATER FOR DUST PALLIATIVE 10.000 MG 0200 638-02 RIGHT OF WAY MARKERS 22.000 EA 0205 638-03 SURVEY MARKERS 2.000 EA 0210 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 STATE PROJECT PAGE 34 Call Order : 014 CONTRACT ID : 9500904 Letting Date : 08/19/97 10:00 A.M. PROJECTS : X317-0024/00-000.60 00 COUNTIES : HARRISON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/14/97 RES. ENG.: HARRY LOOKER, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0215 640A-1 MINIMAL FIELD OFFICE LUMP LUMP 0220 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0225 652-01 AGRICULTURAL LIMESTONE 1.300 TN 0230 652-02-1 FERTILIZER, 10-20-10 0.470 TN 0235 652-02-2 UREA FORMALDEHIDE FERTILIZER 0.160 TN 0240 652-03-1 SEED MIXTURES B, C-1 OR C-2 97.600 LB 0245 652-04-1 STRAW OR HAY MULCH 3.150 TN 0250 663-01-1(II)W EDGE LINE, WHITE 4,800.000 LF 0255 663-03-1(II) BARRIER LINES 4,800.000 LF 0260 663-04(II) TYPE II CHANNELIZING LINES 680.000 LF 0265 663-05(V) TYPE V, STOP LINES 135.000 LF 0270 663-07(II)Y TYPE II, STRIPE YELLOW (12") 460.000 LF 0275 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 63.000 TN AA1 0280 308-01S CLASS 1 AGGREGATE, SLAG 57.000 TN AA2 0285 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,025.000 TN BB1 0290 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 933.000 TN BB2 0295 401-7SG SCRATCH COURSE, STONE OR GRAVEL 612.000 TN CC1 0300 401-7S SCRATCH COURSE, SLAG 557.000 TN CC2 0305 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 612.000 TN DD1 0310 402-01(1)S HMA SKID PVT, (W-1) SLAG 557.000 TN DD2 0315 636-02SG AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 150.000 TN EE1 1 STATE PROJECT PAGE 35 Call Order : 014 CONTRACT ID : 9500904 Letting Date : 08/19/97 10:00 A.M. PROJECTS : X317-0024/00-000.60 00 COUNTIES : HARRISON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/14/97 RES. ENG.: HARRY LOOKER, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0320 636-02S AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 137.000 TN EE2 1 STATE PROJECT PAGE 36 Call Order : 015 CONTRACT ID : 9711801 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U320-0061/00-016.33 00 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/14/97 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 TRAFFIC SIGNAL 0005 204-01 MOBILIZATION LUMP LUMP 0010 636-11 TRAFFIC CONTROL DEVICE 4,800.000 UN 0015 636-14 FLAGGER 100.000 HR 0020 660-01 SIGNAL CONTROLLERS LUMP LUMP 0025 660-02LPSC TRAFFIC DETECTORS 6.000 EA 0030 660-03V305 SIGNAL SECTIONS 35.000 EA 0035 660-04C1A SIGNAL SUPPORTS, INSTALLATION ONLY 2.000 EA 0040 660-05H JUNCTION BOXES TYPE H 1.000 EA 0045 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0050 663-055 TYPE V STOP LINES 30.000 M 0055 663-105 TYPE V LANE ARROWS 6.000 EA 1 STATE PROJECT PAGE 37 Call Order : 016 CONTRACT ID : 9711307 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U335-0040/00-000.02 00 COUNTIES : OHIO GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/14/97 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 TRAFFIC SIGNAL 0005 204-01 MOBILIZATION LUMP LUMP 0010 636-11 TRAFFIC CONTROL DEVICE 4,600.000 UN 0015 636-14 FLAGGER 80.000 HR 0020 660-01 SIGNAL CONTROLLERS LUMP LUMP 0025 660-02LPSC TRAFFIC DETECTORS 6.000 EA 0030 660-03V305 SIGNAL SECTIONS 25.000 EA 0035 660-04C1A SIGNAL SUPPORTS, INSTALLATION ONLY 3.000 EA 0040 660-05H JUNCTION BOXES TYPE H 6.000 EA 0045 660-06 SIGNAL INTERCONNECT LUMP LUMP 0050 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0055 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0060 663-045 TYPE V CHANNELIZING LINES 55.000 M 0065 663-055 TYPE V STOP LINES 24.000 M 0070 663-075Y TYPE V STRIPES YELLOW 35.000 M 0075 663-105 TYPE V LANE ARROWS 9.000 EA 1 FEDERAL PROJECT PAGE 38 Call Order : 017 CONTRACT ID : 9615905 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S310-0019/00-015.48 00 00NH 0019 177 E COUNTIES : FAYETTE DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 12/15/97 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CLEAN AND REPAIR NEW RIVER GORGE BRIDGE # 2719.3 0005 204-01 MOBILIZATION LUMP LUMP 0010 615-03 FABRICATED STRUCTURAL STEEL ( 1.00 ) LUMP 0015 615-11 REMOVE AND REPLACE RIVET OR BOLT 800.000 EA 0020 615-19 CAULKING OF SEAMS AND JOINTS IN STRUCTURAL STEEL LUMP LUMP 0025 636-11 TRAFFIC CONTROL DEVICES 23,250.000 UN 0030 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 1.000 EA 0035 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 200.000 EA 0040 636-14 FLAGGER 400.000 HR 0045 636-21 ELECTRIC ARROW 240.000 DA 0050 636-25(B) WARNING LIGHTS 600.000 DA 0055 685-01A ULTRA HIGH PRESSURE WATER JETTING LUMP LUMP 0060 685-01B LOW PRESSURE WATER CLEANING LUMP LUMP 1 FEDERAL PROJECT PAGE 39 Call Order : 018 CONTRACT ID : 9604656 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U341-0064/00-131.43 00 0NHG 0644 108 E00 COUNTIES : RALEIGH GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/98 RES. ENG.: WAYNE MUSICK ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 WARNING SYSTEM 0005 204-01 MOBILIZATION LUMP LUMP 0010 607-011 TYPE 1 GUARDRAIL, CLASS I 120.000 M 0015 607-28 MODIFIED ECCENTRIC LOADER TERMINAL 2.000 EA 0020 607-30 SPECIAL TRAILING END TERMINAL 2.000 EA 0025 636-11 TRAFFIC CONTROL DEVICE 6,470.000 UN 0030 636-14 FLAGGER 50.000 HR 0035 636-14B TRAFFIC DIRECTOR 30.000 HR 0040 636-21 ELECTRIC ARROW 6.000 DA 0045 636-25B WARNING LIGHTS TYPE B 120.000 DA 0050 636-28 SHADOW VEHICLE 4.000 DA 0055 660-30 DOWNHILL TRUCK SPEED ADVISORY SYSTEMS LUMP LUMP 0060 662-02 GALVANIZED STEEL CONDUIT LUMP LUMP 0065 662-06H250 JUNCTION BOX (250X250MM) 6.000 EA 0070 662-06H450 JUNCTION BOX (450X450MM) 11.000 EA 0075 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP 1 STATE PROJECT PAGE 40 Call Order : 019 CONTRACT ID : 9635401 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U340-0062/00-018.20 00 COUNTIES : PUTNAM GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 12/31/97 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 LIGHTING 0005 204-01 MOBILIZATION LUMP LUMP 0010 636-11 TRAFFIC CONTROL DEVICES 3,416.000 UN 0015 636-14 FLAGGER 600.000 HR 0020 636-25(B) WARNING LIGHTS 300.000 DA 0025 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0030 662-02(1) GALVANIZED STEEL CONDUIT ( 1.00 ) LUMP 0035 662-06(H10X10 JUNCTION BOX 6.000 EA 0040 662-06(H18X18 JUNCTION BOX 6.000 EA 0045 662-07(250)W LUMINAIRES 13.000 EA 0050 662-08(1) CABLE ( 1.00 ) LUMP 0055 662-10(40-6II LIGHTING SUPPORT, TYPE II 6.000 EA 0060 662-10(40-8II LIGHTING SUPPORT, TYPE II 7.000 EA 0065 662-13(1) SERVICE AND CONTROL STATION ( 1.00 ) LUMP 0070 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0075 662-15(1) ELECTRICAL TESTS ( 1.00 ) LUMP 1 STATE PROJECT PAGE 41 Call Order : 020 CONTRACT ID : 9703102 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S312-0028/00-007.80 00 COUNTIES : GRANT GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/97 RES. ENG.: LARRY DEITZ ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 207-01 UNCLASSIFIED EXCAVATION 800.000 M3 0010 408-02 BITUMINOUS MATERIAL 3,965.000 L 0015 409-02 BITUMINOUS MATERIAL PRIME 1,360.000 L 0020 636-06 PILOT TRUCK AND DRIVER 15.000 DA 0025 636-11 TRAFFIC CONTROL DEVICE 3,265.000 UN 0030 636-14 FLAGGER 300.000 HR 0035 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 760.000 MGR AA1 0040 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 722.000 MGR AA2 0045 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,730.000 MGR BB1 0050 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 1,644.000 MGR BB2 0055 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 3,220.000 MGR CC1 0060 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 3,059.000 MGR CC2 0065 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 125.000 MGR DD1 0070 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 119.000 MGR DD2 1 STATE PROJECT PAGE 42 Call Order : 021 CONTRACT ID : 9607410 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S317-0005/09-001.87 00 COUNTIES : HARRISON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/01/98 RES. ENG.: HARRY LOOKER, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 362.000 CY 0020 207-34 FABRIC FOR SEPARATION 978.000 SY 0025 211-01 UNCLASSIFIED BORROW EXCAVATION 112.000 CY 0030 211-02 ROCK BORROW EXCAVATION 77.000 CY 0035 307-01 CLASS 1 AGGREGATE BASE COURSE 178.000 CY 0040 409-02 BITUMINOUS MATERIAL 342.000 GA 0045 607-01(III) TYPE 1 GUARDRAIL 225.000 LF 0050 636-11 TRAFFIC CONTROL DEVICES 2,174.000 UN 0055 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 1.000 EA 0060 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 4.000 EA 0065 636-14 FLAGGER 120.000 HR 0070 636-25(A) WARNING LIGHTS 240.000 DA 0075 636-25(B) WARNING LIGHTS 480.000 DA 0080 638-02 RIGHT OF WAY MARKERS 6.000 EA 0085 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0090 640A-1 MINIMAL FIELD OFFICE LUMP LUMP 0095 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 198.000 TN AA1 0100 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 181.000 TN AA2 SECTION NO. 0002 BRIDGE 1 STATE PROJECT PAGE 43 Call Order : 021 CONTRACT ID : 9607410 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S317-0005/09-001.87 00 COUNTIES : HARRISON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/01/98 RES. ENG.: HARRY LOOKER, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 BRIDGE 0105 203-01 DISMANTLING STRUCTURES LUMP LUMP 0110 212-01 STRUCTURE EXCAVATION 249.000 CY 0115 212-05 SELECT MATERIAL FOR BACKFILLING 23.000 CY 0120 218-06 FOUNDATION PROTECTION 116.000 CY 0125 601-02 CLASS B CONCRETE 134.000 CY 0130 602-02 EPOXY COATED REINFORCING STEELBARS 10,928.000 LB 0135 603-01 PRESTRESSED CONCRETE BEAMS 346.500 LF 0140 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0145 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 1 STATE PROJECT PAGE 44 Call Order : 022 CONTRACT ID : 9711102 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S338-0001/04-000.14 00 COUNTIES : POCAHONTAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/15/97 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 MINOR BRIDGE REHABILITATION 0005 204-01 MOBILIZATION LUMP LUMP 0010 212-02 WET EXCAVATION 125.000 CY 0015 212-05 SELECT MATERIAL FOR BACKFILLING 56.000 CY 0020 601-02 CLASS B CONCRETE 30.000 CY 0025 602-01 REINFORCING STEEL BARS 2,966.000 LB 0030 636-01 TRAFFIC CONTROL LUMP LUMP 0035 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 1 STATE PROJECT PAGE 45 Call Order : 023 CONTRACT ID : 9701401 Letting Date : 08/19/97 10:00 A.M. PROJECTS : X341-0021/15-000.00 00 COUNTIES : RALEIGH GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/10/97 RES. ENG.: WAYNE MUSICK ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY CONSTRUCTION 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 3,966.000 M3 0020 207-34 FABRIC FOR SEPARATION 975.000 M2 0025 211-02 ROCK BORROW EXCAVATION 337.000 M3 0030 307-01 CLASS I AGGREGATE BASE COURSE 1,262.000 M3 0035 408-02 BITUMINOUS MATERIAL 200.000 L 0040 409-02 BITUMINOUS MATERIAL PRIME 8,975.000 L 0045 601-02 CLASS B CONCRETE 0.780 M3 0050 604-010375A2 METALLIC COATED CORRUGATED STEEL PIPE, 375MM, A2 30.500 M 0055 604-010600A2 METALLIC COATED CORRUGATED STEEL PIPE, 600MM, A2 5.000 M 0060 636-11 TRAFFIC CONTROL DEVICE 5,095.000 UN 0065 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 1.000 EA 0070 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 50.000 EA 0075 636-14 FLAGGER 500.000 HR 0080 636-25A WARNING LIGHTS TYPE A 120.000 DA 0085 636-25B WARNING LIGHTS TYPE B 360.000 DA 0090 638-02 RIGHT OF WAY MARKERS 43.000 EA 0095 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0100 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0105 308-07SG CLASS 7 AGGREGATE STONE OR GRAVEL 799.000 MGR AA1 1 STATE PROJECT PAGE 46 Call Order : 023 CONTRACT ID : 9701401 Letting Date : 08/19/97 10:00 A.M. PROJECTS : X341-0021/15-000.00 00 COUNTIES : RALEIGH GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/10/97 RES. ENG.: WAYNE MUSICK ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY CONSTRUCTION 0110 308-07S CLASS 7 AGGREGATE, SLAG 719.000 MGR AA2 0115 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,551.000 MGR BB1 0120 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 1,410.000 MGR BB2 0125 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 254.000 MGR CC1 0130 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 231.000 MGR CC2 0135 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 35.000 MGR DD1 0140 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 32.000 MGR DD2 0145 401-17SG HOT-MIX ASPHALT POTHOLE REPAIR, STONE OR GRAVEL 20.000 MGR EE1 0150 401-17S HOT-MIX ASPHALT POTHOLE REPAIR, SLAG 18.000 MGR EE2 1 STATE PROJECT PAGE 47 Call Order : 024 CONTRACT ID : 9635803 Letting Date : 08/19/97 10:00 A.M. PROJECTS : X343-0050/49-000.00 00 COUNTIES : RITCHIE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/97 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RECONSTRUCT ROAD 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0005 204-01 MOBILIZATION LUMP LUMP 0010 207-01 UNCLASSIFIED EXCAVATION 85.000 CY 0015 207-34 FABRIC FOR SEPARATION 2,177.000 SY 0020 228-01 SUBGRADE PREPARATION 2,633.000 SY 0025 307-01 CLASS 1 AGGREGATE BASE COURSE 315.000 CY 0030 308-01 CLASS 1 AGGREGATE BASE COURSE 148.000 TN 0035 409-02 BITUMINOUS MATERIAL 838.000 GA 0040 636-11 TRAFFIC CONTROL DEVICES 3,439.000 UN 0045 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 1.000 EA 0050 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 50.000 EA 0055 636-14 FLAGGER 200.000 HR 0060 636-25(B) WARNING LIGHTS 720.000 DA 0065 638-02 RIGHT OF WAY MARKERS 6.000 EA 0070 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0075 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0080 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 582.000 TN AA1 0085 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 524.000 TN AA2 0090 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 82.000 TN BB1 0095 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 74.000 TN BB2 1 STATE PROJECT PAGE 48 Call Order : 025 CONTRACT ID : 9619704 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S347-0008/00-000.10 00 COUNTIES : TUCKER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 12/31/97 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0005 203-01 DISMANTLING STRUCTURES LUMP LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-09 UNCLASSIFIED EXCAVATION LUMP LUMP 0020 212-01 STRUCTURE EXCAVATION 500.000 CY 0025 212-05 SELECT MATERIAL FOR BACKFILLING 35.000 CY 0030 601-02 CLASS B CONCRETE 193.000 CY 0035 602-01 REINFORCING STEEL BARS 16,972.000 LB 0040 602-02 EPOXY COATED REINFORCING STEELBARS 3,892.000 LB 0045 603-01 PRESTRESSED CONCRETE BEAMS 346.500 LF 0050 607-01(I) TYPE 1 GUARDRAIL 162.500 LF 0055 636-01 TRAFFIC CONTROL LUMP LUMP 0060 636-05 TEMPORARY STRUCTURES FOR MAINTAINING TRAFFIC ( 1.00 ) LUMP 0065 638-02 RIGHT OF WAY MARKERS 8.000 EA 0070 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0075 640-02 SMALL FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0080 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 0085 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 122.000 TN AA1 0090 308-01S CLASS 1 AGGREGATE, SLAG 111.000 TN AA2 1 STATE PROJECT PAGE 49 Call Order : 026 CONTRACT ID : 9716806 Letting Date : 08/19/97 10:00 A.M. PROJECTS : U352-0030/00-000.09 00 COUNTIES : WETZEL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/97 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 9,591.000 L 0010 636-11 TRAFFIC CONTROL DEVICE 1,219.000 UN 0015 636-14 FLAGGER 300.000 HR 0020 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 556.000 MGR AA1 0025 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 545.000 MGR AA2 0030 407-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 2,854.000 MGR BB1 0035 407-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 2,597.000 MGR BB2 1 FEDERAL PROJECT PAGE 50 Call Order : 027 CONTRACT ID : 9131019R2 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S320-0060/62-000.14 00 0STP 6062 002 EQ0 COUNTIES : KANAWHA DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/98 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 204-01 MOBILIZATION LUMP LUMP 0010 636-07 ERADICATION PAVEMENT MARKINGS 200.000 M 0015 636-09 TEMP PVMT MARKING-TAPE 1,200.000 M 0020 636-11 TRAFFIC CONTROL DEVICE 44,220.000 UN 0025 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 6.000 EA 0030 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 500.000 EA 0035 636-14 FLAGGER 1,200.000 HR 0040 636-14B TRAFFIC DIRECTOR 200.000 HR 0045 636-21 ELECTRIC ARROW 400.000 DA 0050 636-22 CHANGEABLE MESSAGE SIGN 1,000.000 DA 0055 636-25A WARNING LIGHTS TYPE A 1,900.000 DA 0060 636-25B WARNING LIGHTS TYPE B 2,400.000 DA 0065 636-28 SHADOW VEHICLE 300.000 DA 0070 640-01 STANDARD FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0075 640-03 BUILDING EQUIPMENT LUMP LUMP SECTION NO. 0002 35TH STREET BRIDGE #2758 0080 203-02(2) REMOVAL PORTION BR. SUPERSTRUC. LUMP LUMP 0085 601-03 CLASS K CONCRETE 40.000 M3 0090 601-15B EPOXY RESIN PROTECTIVE COATING LUMP LUMP 0095 601-30 PATCHING CONCRETE STRUCTURES 2.000 M2 0100 601-31 EPOXY INJECTION CRACK REPAIR 34.000 M 1 FEDERAL PROJECT PAGE 51 Call Order : 027 CONTRACT ID : 9131019R2 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S320-0060/62-000.14 00 0STP 6062 002 EQ0 COUNTIES : KANAWHA DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/98 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 35TH STREET BRIDGE #2758 0105 602-02 EPOXY COATED REINFORCING BARS 3,577.000 KG 0110 615-04 FABRICATED STRUCTURAL STEEL 2,350.000 KG 0115 615-13 CLEAN AND LUBRICATE BRIDGE BEARINGS 3.000 EA 0120 615-15(C) GIRDER REPAIR RETROFIT, TYPE C 13.000 EA 0125 615-15(D) GIRDER REPAIR RETROFIT, TYPE D 157.000 EA 0130 615-15(E) GRIDER REPAIR RETROFIT TYPE, E 77.000 EA 0135 625-11(1) REMOVE AND REPLACE EXPANSION DEVICE 1.000 EA 0140 625-11(2) REMOVE AND REPLACE EXPANSION DEVICE 1.000 EA 0145 625-12(1) REMOVE AND REPLACE EXPANSION JOINT DAM WITH SINGLE UNIT 22.000 M STRIP 0150 625-12(2) REMOVE AND REPLACE EXPANSION JOINT DAM WITH SINGLE UNIT 20.000 M STRIP 0155 625-12(3) REMOVE AND REPLACE EXPANSION JOINT DAM WITH SINGLE UNIT 17.000 M STRIP 0160 625-16 REMOVE AND REBUILD EXPANSION JOINT 9.000 M 0165 625-17 INSTALL SILICONE EXPANSION JOINT SYSTEM 35.000 M 0170 680-02 CLASS 2 BRIDGE DECK REPAIR 300.000 M2 SECTION NO. 0003 36TH STREET BRIDGE #2565 0175 203-02(2) REMOVAL PORTION BR. SUPERSTRUC. LUMP LUMP 0180 601-03 CLASS K CONCRETE 14.000 M3 0185 601-15B EPOXY RESIN PROTECTIVE COATING LUMP LUMP 0190 601-30 PATCHING CONCRETE STRUCTURES 1.000 M2 0195 601-31 EPOXY INJECTION CRACK REPAIR 6.000 M 0200 602-02 EPOXY COATED REINFORCING BARS 1,695.000 KG 1 FEDERAL PROJECT PAGE 52 Call Order : 027 CONTRACT ID : 9131019R2 Letting Date : 08/19/97 10:00 A.M. PROJECTS : S320-0060/62-000.14 00 0STP 6062 002 EQ0 COUNTIES : KANAWHA DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/30/98 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0003 36TH STREET BRIDGE #2565 0205 615-04 FABRICATED STRUCTURAL STEEL 8,910.000 KG 0210 615-12(A) REMOVE AND REPLACE BRIDGE SHOES 16.000 EA 0215 615-13 CLEAN AND LUBRICATE BRIDGE BEARINGS 2.000 EA 0220 615-15(A) GRIDER REPAIR RETROFIT, TYPE A 2.000 EA 0225 615-15(B) GIRDER REPAIR RETROFIT, TYPE B 1.000 EA 0230 615-15(C) GIRDER REPAIR RETROFIT, TYPE C 2.000 EA 0235 615-15(D) GIRDER REPAIR RETROFIT, TYPE D 145.000 EA 0240 615-15(E) GRIDER REPAIR RETROFIT TYPE, E 65.000 EA 0245 615-39 JACKING STEEL SUPERSTRUCTURE LUMP LUMP 0250 625-11(1) REMOVE AND REPLACE EXPANSION DEVICE 1.000 EA 0255 625-12(1) REMOVE AND REPLACE EXPANSION JOINT DAM WITH SINGLE UNIT 20.000 M STRIP 0260 625-12(2) REMOVE AND REPLACE EXPANSION JOINT DAM WITH SINGLE UNIT 50.000 M STRIP 0265 625-12(3) REMOVE AND REPLACE EXPANSION JOINT DAM WITH SINGLE UNIT 19.000 M STRIP 0270 680-02 CLASS 2 BRIDGE DECK REPAIR 30.000 M2 1 STATE PROJECT PAGE 53 Call Order : 028 CONTRACT ID : 9624903R1 Letting Date : 08/19/97 10:00 A.M. PROJECTS : X313-0060/68-000.00 00 COUNTIES : GREENBRIER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/03/97 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 1,266.000 CY 0020 207-02 SUBGRADE 991.000 CY 0025 211-01 UNCLASSIFIED BORROW EXCAVATION 1,273.000 CY 0030 211-02 ROCK BORROW EXCAVATION 1,130.000 CY 0035 307-01 CLASS 1 AGGREGATE BASE COURSE 2,170.000 CY 0040 409-02 BITUMINOUS MATERIAL 2,494.000 GA 0045 60410(35X24A2 METALLIC COATED CORRUGATED STEEL PIPE ARCH 36.000 LF 0050 60410(49X33B2 METALLIC COATED CORRUGATED STEEL PIPE ARCH 36.000 LF 0055 636-11 TRAFFIC CONTROL DEVICES 3,726.000 UN 0060 636-14 FLAGGER 160.000 HR 0065 638-02 RIGHT OF WAY MARKERS 7.000 EA 0070 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0075 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0080 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,140.000 TN AA1 0085 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 1,036.000 TN AA2 0090 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 228.000 TN BB1 0095 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 207.000 TN BB2