1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- August 18, 1998 LETTING Sealed proposals will be received by the West Virginia Department of Transportation, Division of Highways at its office in Building Five, Room A-148, 1900 Kanawha Boulevard East, Charleston, West Virginia 25305-0430 until 10 A.M. August 18, 1998 and said proposals will be publicly opened and read immediately thereafter for the construction of the following project(s): ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 001 9619917 S306-0052/00-001.01 00 00NH 0052 150 E DECK RENOVATION JAMES RIVER OP BRIDGE #2411.1 OVER FOUR POLE CREEK, CR 60/70 & CSX RR 0.29 NORTH OF I-64 COUNTY: CABELL BRIDGE : 2411.1 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 4 ; DBE GOAL: 8 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. REMARKS : EXPANSION DAMS ------------------------------------------------------------------------------------------------------------------------------------ 002 9619916A S306-0064/00-028.67 00 00NH 0641 235 E STRUCTURE RENOVATION S306-0064/00-029.44 00 00NH 0641 237 E KILGORE CREEK BRIDGE S306-0064/00-031.67 00 00NH 0641 239 E CR 60/19, 1.16 MI E CR 13 COUNTY: CABELL BRIDGE : #2118 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 2 ; BRIDGE : #2119 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 2 ; BRIDGE : #2120 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 2 ; DBE GOAL: 4 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. REMARKS : EXPANSION DAMS ------------------------------------------------------------------------------------------------------------------------------------ 003 *9611402 S318-0077/00-132.42 00 0STP 0773 282 E RETROFIT CRACKS & REPAIRS FAIRPLAIN BRIDGE #2200.1 HEAT STRAIGHTENING OVER US ROUTE 21 AT THE FAIRPLAIN INTERCHANGE COUNTY: JACKSON BRIDGE : #2200.1 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 3 ; ------------------------------------------------------------------------------------------------------------------------------------ 004 9218142 S331-0007/00-021.96 00 00BR 0007 081 E00 GRADE, DRAIN, PAVE, STRUCTURE CORE SLAB BRIDGE #4135 OVER DOLLS RUN, 0,01 MILES EAST CR 7/27 COUNTY: MONONGALIA BRIDGE : #4135 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 1 ; STRUCTURE STEEL: 21000 KG DBE GOAL: 10 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- August 18, 1998 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 005 9733901 E340-0035/00-019.80 00 00NH 0035 112 E00 SLIDE REPAIR WITH PILING US 35 SLIDE #2897 0.52 MI N CR 22 - 0.57MI N CR 22 COUNTY: PUTNAM DBE GOAL: 4 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 006 *9816885 S320-0024/03-000.00 00 RESURFACING CRAIG'S BRANCH ROAD (AKA SPRING FORK ROAD) CO 24 TO END OF R/W AT MP 0.60 COUNTY: KANAWHA ------------------------------------------------------------------------------------------------------------------------------------ 007 9529806 S330-0003/05-019.13 00 STRUCTURE REPLACEMENT LOWER BREEDEN DECK GIRDER OVER WEST FORK OF TWELVEPOLE CREEK COUNTY: MINGO BRIDGE : 4746 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ 008 9532001 S352-0007/01-000.01 00 STRUCTURE REPLACEMENT BURLINGTON BRIDGE DOOLIN RUN, 0.05 TO 0.03MI. W. CR 7/9 COUNTY: WETZEL BRIDGE : #4553 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 2 ; ------------------------------------------------------------------------------------------------------------------------------------ 009 9711503 S342-0046/00-023.13 00 STRUCTURE REPLACEMENT MILL CREEK ARCH BRIDGE BEGIN: 0.15 MI E CR42 END: SPANNING MILL CREEK COUNTY: RANDOLPH BRIDGE : #4516 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 2 ; ------------------------------------------------------------------------------------------------------------------------------------ 010 *9815881 R088-0REM/GR-099.00 00 GUARDRAIL DISTRICT WIDE VARIOUS COUNTY: RANDOLPH POCAHONTAS PENDLETON TUCKER ------------------------------------------------------------------------------------------------------------------------------------ 011 *9734918R1 S325-0074/00-000.00 00 RESURFACING CATAWBA ROAD +1 CR 73/6 TO DEAD END COUNTY: MARION ------------------------------------------------------------------------------------------------------------------------------------ 012 9734613 U304-0040/00-017.59 00 RESURFACING LITTLE BIRCH - ERBACON ROAD CR 19/40 TO 0.20 MI E CR 40/18 COUNTY: BRAXTON ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- August 18, 1998 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 013 9720624 S334-0019/02-001.80 00 RESURFACING MILL CREEK ROAD BEGIN: 1.80 MI E CR 19/40 END: 0.75 MI E CR 1/11 COUNTY: NICHOLAS ------------------------------------------------------------------------------------------------------------------------------------ 014 9721320 U336-0033/00-032.81 00 RESURFACING FRANKLINE - BRANDYWINE ROAD BEGIN JCT US 220 END JCT CR 12 COUNTY: PENDLETON ------------------------------------------------------------------------------------------------------------------------------------ 015 9721319 U336-0220/00-032.80 00 RESURFACING UPPER TRACT - GRANT COUNTY LINE BEGIN JCT CR 2 END GRANT CO LINE COUNTY: PENDLETON ------------------------------------------------------------------------------------------------------------------------------------ 016 9726201 S342-0053/00-002.43 00 RESURFACING NORTON COALTON ROAD BEGIN: JCT CR 17/4 AND CR 37/8 END: JCT CR 151 COUNTY: RANDOLPH ------------------------------------------------------------------------------------------------------------------------------------ 017 9804429 U351-0082/00-000.00 00 RESURFACING BIRCH RIVER - COWEN ROAD NICHOLAS COUNTY LINE TO 0.06 MI. W. CR 32 COUNTY: WEBSTER ------------------------------------------------------------------------------------------------------------------------------------ 018 9525407 U340-0034/00-010.20 00 00CM 0034 041 E00 GRADE, DRAIN, PAVE HURRICANE CREEK ROAD +1 I-64 HURRICANE CREEK COUNTY: PUTNAM DBE GOAL: 12 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 019 9629504 U341-0019/00-017.02 00 0STP 0019 185 EQ0 GRADE, DRAIN, PAVE, TRAFFIC SIGNAL RURAL ACRES DRIVE TURN LANE I/S US 19 W/WV 41 & CR 19/8 COUNTY: RALEIGH DBE GOAL: 10 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 020 *9819502 S302-0024/00-001.72 00 RESURFACING SYLVAN RETREAT ROAD CR 26 - WV 51 COUNTY: BERKELEY ------------------------------------------------------------------------------------------------------------------------------------ 021 *9819503 S312-0090/00-008.74 00 RESURFACING BAYARD - GORMANIA ROAD 0.07 MI N CR 50/1-US 50 COUNTY: GRANT ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- August 18, 1998 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 022 9723007 S320-0036/00-000.00 00 RESURFACING DERRICK'S RIDGE ROAD CR 30 TO CR 32 COUNTY: KANAWHA ------------------------------------------------------------------------------------------------------------------------------------ 023 *9723112 S327-0033/02-001.52 00 RESURFACING RISING SUN ROAD +1 CR 60 - JACK COUNTY LINE COUNTY: MASON ------------------------------------------------------------------------------------------------------------------------------------ 024 *9735007 S331-0119/00-014.42 00 RESURFACING NORTH WILLEY STREET - MILEGROUND BEGIN: US 119 SB END: CR 119/30 COUNTY: MONONGALIA ------------------------------------------------------------------------------------------------------------------------------------ 025 9412313 S355-0054/04-000.15 00 STRUCTURE REPLACEMENT MULLENS PONY TRUSS NO. 2 OVER SLAB FORK, 0.12 MI S WV 54 COUNTY: WYOMING BRIDGE : 4575 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ 026 9812182 RO82-0REM/GR-099.00 00 GUARDRAIL DISTRICT WIDE VARIOUS COUNTY: CABELL MINGO LINCOLN OTHER ------------------------------------------------------------------------------------------------------------------------------------ 027 *9723410 U350-0052/44-000.00 00 RESURFACING MOSES ASBURY ROAD JCT WV 37 TO JCT WV 152 COUNTY: WAYNE ------------------------------------------------------------------------------------------------------------------------------------ 028 9727311 U320-0622/00-013.98 00 RESURFACING SISSONVILLE HIGHSCHOOL CR 21 - 0.62 MI N (LAUREL MEADOWS) COUNTY: KANAWHA ------------------------------------------------------------------------------------------------------------------------------------ 029 9734611R1 E305-0002/00-001.53 00 00NH 0002 296 E00 SLIDE REPAIR SHORT CREEK - BEECH BOTTOM SLIDE CORRECTION 1.34 MI N CR 30 - 1.3 MI N CR 30 COUNTY: BROOKE CONTRACT: 9734611 DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. ------------------------------------------------------------------------------------------------------------------------------------ Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25304-0430 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virginia Code. All contractors submitting bids on project(s) must include one of the following forms properly executed with each proposal: Proposal Guaranty Bond, Cashier's Check, or Certified Check for $500.00 or 5% of total bid, whichever is greater. Failure to include one of the above forms could result in a bid being declared irregular. Proposals and bid bonds must be submitted on standard forms which may be obtained at the Charleston office. The right is reserved to reject any or all proposals. *These are projects on which any contractor with a Category "W" Prequalification Rating may be eligible to bid. Final award of all Interstate and Federal-Aid Projects, with the exception of exempt projects, is subject to the approval of the Federal Highway Administration. Minimum wage rates for these projects have been predetermined as required by law and are set forth in the bid proposal. Federal-Aid projects are subject to the WHA of 1961 PL-581 approved August 13, 1962. Plans and proposals on all projects will be furnished at twenty-five dollars ($25.00) per set. Extra plans will be furnished at fifteen dollars ($15.00) per set and extra proposals will be furnished at ten dollars ($10.00) per proposal. Cross sections will be furnished at fifty dollars ($50.00) per set. All will be furnished without refund and transmitted at your risk. The above noted project information will be available in the Contract Unit, Construction Section, Division of Highways, Room A-737, Building 5, 1900 Kanawha Boulevard East, Charleston, WV 25305 and may also be ordered by calling (304)558-2874. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid bidding proposals will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. The West Virginia Department of Transportation, Division of Highways hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex or national orign in consideration for an award. No proposals for these projects will be issued after 3:00 P.M. on the day prior to the letting. It is necessary to advise your approximate uncompleted workload when ordering plans and proposals. Announcement, opening and reading of bids received will be in the order as designated in the "Notice to Contractors". Sealed proposals may also be deposited in the bid depository box which will be located near the corner of Piedmont Road and California Avenue between the hours of 9 A.M. and 10 A.M., the day of the letting. Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25305-0430 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division Of Highways John J. Welch, Jr., Director Project Control Division 1 1 FEDERAL PROJECT PAGE 1 Call Order : 001 CONTRACT ID : 9619917 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S306-0052/00-001.01 00 00NH 0052 150 E COUNTIES : CABELL DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/30/99 RES. ENG.: CHARLES SHAVER DESCRIPTION: JAMES RIVER OP BRIDGE #2411.1 NOTE : USER DEFINED, BOILERPLATE TEXT WILL BE DISPLAYED. THE TEXT DISPLAYED IN THIS AREA WILL BE DETERMINED BY THE SETASID CODE. A MAXIMUM OF 25 LINES WILL BE DISPLAYED. ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 204-01 MOBILIZATION LUMP LUMP 0010 307-01 CLASS I AGGREGATE BASE COURSE 7.000 M3 0015 408-02 BITUMINOUS MATERIAL 2,592.000 L 0020 415-05 REMOVE EXISTING PAVEMENT SURFACE 1,197.000 M2 0025 502-01300 PORTLAND CEMENT CONCRETE APPRACH SLAB 300MM 46.000 M2 0030 636-05 TEMPORARY STRUCTURES FOR MAINTAINING TRAFFIC LUMP LUMP 0035 636-07 ERADICATION PAVEMENT MARKINGS 730.000 M 0040 636-09 TEMP PVMT MARKING-TAPE 2,400.000 M 0045 636-11 TRAFFIC CONTROL DEVICE 18,980.000 UN 0050 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 4.000 EA 0055 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 200.000 EA 0060 636-14 FLAGGER 300.000 HR 0065 636-17 TEMPORARY CONCRETE BARRIERS 295.000 M 0070 636-18 REMOVING AND RESETTING TEMPORARY CONCRETE BARRIERS 285.000 M 0075 636-21 ELECTRIC ARROW 160.000 DA 0080 636-25B WARNING LIGHTS TYPE B 2,600.000 DA 0085 636-26 TEMP LIGHTING LUMP LUMP 0090 662-07250W LUMINAIRES (250W.) 2.000 EA 0095 662-105 LIGHTING SUPPORT, TYPE V 1.000 EA 1 FEDERAL PROJECT PAGE 2 Call Order : 001 CONTRACT ID : 9619917 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S306-0052/00-001.01 00 00NH 0052 150 E COUNTIES : CABELL DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/30/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0100 662-16 SYSTEM MODIFICATION LUMP LUMP 0105 663-0112W EDGE LINE WHITE TYPE II 1,000.000 M 0110 663-0112Y EDGE LINE YELLOW TYPE II 1,000.000 M 0115 663-0212W LANE LINE OR CENTER LINE WHITE TYPE II 220.000 M 0120 663-042 TYPE II CHANNELIZING LINES 50.000 M 0125 663-075W TYPE V STRIPES WHITE 180.000 M 0130 664-014 IMPACT ATTENUATING DEVICE TYPE IV 1.000 EA 0135 664-014A REMOVE AND RESET G.R.E.A.T. ATTENUATING DEVICE TYPE IV 1.000 EA 0140 402-011S HOT-MIX ASPHALT SKID PAVEMENT, SLAG 73.000 MGR AB1 0145 402-011SG HOT-MIX ASPHALT SKID PAVEMENT, STONE OR GRAVEL 77.000 MGR AB2 SECTION NO. 0002 BRIDGE 0150 203-02(2) REMOVAL PORTION BR. SUPERSTRUC. LUMP LUMP 0155 203-02(3) REMOVAL PORTION BR. SUBSTRUCT. LUMP LUMP 0160 212-01 STRUCTURE EXCAVATION 8.000 M3 0165 212-05 SELECT MATERIAL FOR BACKFILLING 8.000 M3 0170 601-03 CLASS K CONCRETE 37.200 M3 0175 602-02 EPOXY COATED REINFORCING BARS 2,309.000 KG 0180 615-04 FABRICATED STRUCTURAL STEEL 4,027.000 KG 0185 615-12 RESETTING BRIDGE BEARINGS 8.000 EA 1 FEDERAL PROJECT PAGE 3 Call Order : 002 CONTRACT ID : 9619916A Letting Date : 08/18/98 10:00 A.M. PROJECTS : S306-0064/00-028.67 00 00NH 0641 235 E S306-0064/00-029.44 00 00NH 0641 237 E S306-0064/00-031.67 00 00NH 0641 239 E COUNTIES : CABELL DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/15/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESTORATION AND REHABILITATION 0005 204-01 MOBILIZATION LUMP LUMP 0010 601-03 CLASS K CONCRETE 34.000 CY 0015 602-02 EPOXY COATED REINFORCING STEELBARS 2,350.000 LB 0020 615-03 FABRICATED STRUCTURAL STEEL ( 1.00 ) LUMP 0025 625-16 REMOVE AND REBUILD EXPANSION JOINT 185.000 LF 0030 636-09 TEMPORARY PAVEMENT MARKINGS-TAPE 4" SOLID LINE 6,700.000 LF 0035 636-11 TRAFFIC CONTROL DEVICES 9,522.000 UN 0040 636-14 FLAGGER 25.000 HR 0045 636-21 ELECTRIC ARROW 52.000 DA 0050 636-25(B) WARNING LIGHTS 208.000 DA 0055 636-28 SHADOW VEHICLE 104.000 DA 0060 663-01-1(V)W EDGE LINE, WHITE 65.000 LF 0065 663-01-1(V)Y EDGE LINE, YELLOW 65.000 LF 0070 663-02-1(V)W LANE LINE OR CENTERLINE, WHITE 65.000 LF 0075 688-02 CLEANING AND PAINTING EXISTING STEEL BRIDGES COATED WITH LUMP LUMP LEAD BASE PAINT 0080 688-03 CONTAINMENT AND DISPOSAL OF SPENT MATERIAL LUMP LUMP SECTION NO. 0002 RESTORATION AND REHABILITATION 0085 204-01 MOBILIZATION LUMP LUMP 0090 601-03 CLASS K CONCRETE 34.000 CY 0095 602-02 EPOXY COATED REINFORCING STEELBARS 2,350.000 LB 1 FEDERAL PROJECT PAGE 4 Call Order : 002 CONTRACT ID : 9619916A Letting Date : 08/18/98 10:00 A.M. PROJECTS : S306-0064/00-028.67 00 00NH 0641 235 E S306-0064/00-029.44 00 00NH 0641 237 E S306-0064/00-031.67 00 00NH 0641 239 E COUNTIES : CABELL DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/15/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 RESTORATION AND REHABILITATION 0100 615-03 FABRICATED STRUCTURAL STEEL ( 1.00 ) LUMP 0105 625-16 REMOVE AND REBUILD EXPANSION JOINT 185.000 LF 0110 636-09 TEMPORARY PAVEMENT MARKINGS-TAPE 4" SOLID LINE 6,700.000 LF 0115 636-11 TRAFFIC CONTROL DEVICES 9,522.000 UN 0120 636-14 FLAGGER 25.000 HR 0125 636-21 ELECTRIC ARROW 52.000 DA 0130 636-25(B) WARNING LIGHTS 208.000 DA 0135 636-28 SHADOW VEHICLE 104.000 DA 0140 663-01-1(V)W EDGE LINE, WHITE 65.000 LF 0145 663-01-1(V)Y EDGE LINE, YELLOW 65.000 LF 0150 663-02-1(V)W LANE LINE OR CENTERLINE, WHITE 65.000 LF 0155 688-02 CLEANING AND PAINTING EXISTING STEEL BRIDGES COATED WITH LUMP LUMP LEAD BASE PAINT 0160 688-03 CONTAINMENT AND DISPOSAL OF SPENT MATERIAL LUMP LUMP SECTION NO. 0003 RESTORATION AND REHABILITATION 0165 204-01 MOBILIZATION LUMP LUMP 0170 601-03 CLASS K CONCRETE 34.000 CY 0175 602-02 EPOXY COATED REINFORCING STEELBARS 2,350.000 LB 0180 615-03 FABRICATED STRUCTURAL STEEL ( 1.00 ) LUMP 0185 625-16 REMOVE AND REBUILD EXPANSION JOINT 185.000 LF 0190 636-09 TEMPORARY PAVEMENT MARKINGS-TAPE 4" SOLID LINE 5,595.000 LF 1 FEDERAL PROJECT PAGE 5 Call Order : 002 CONTRACT ID : 9619916A Letting Date : 08/18/98 10:00 A.M. PROJECTS : S306-0064/00-028.67 00 00NH 0641 235 E S306-0064/00-029.44 00 00NH 0641 237 E S306-0064/00-031.67 00 00NH 0641 239 E COUNTIES : CABELL DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 08/15/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0003 RESTORATION AND REHABILITATION 0195 636-11 TRAFFIC CONTROL DEVICES 11,730.000 UN 0200 636-14 FLAGGER 50.000 HR 0205 636-21 ELECTRIC ARROW 76.000 DA 0210 636-25(B) WARNING LIGHTS 304.000 DA 0215 636-28 SHADOW VEHICLE 76.000 DA 0220 663-01-1(V)W EDGE LINE, WHITE 65.000 LF 0225 663-01-1(V)Y EDGE LINE, YELLOW 65.000 LF 0230 663-02-1(V)W LANE LINE OR CENTERLINE, WHITE 65.000 LF 0235 688-02 CLEANING AND PAINTING EXISTING STEEL BRIDGES COATED WITH LUMP LUMP LEAD BASE PAINT 0240 688-03 CONTAINMENT AND DISPOSAL OF SPENT MATERIAL LUMP LUMP 1 FEDERAL PROJECT PAGE 6 Call Order : 003 CONTRACT ID : 9611402 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S318-0077/00-132.42 00 0STP 0773 282 E COUNTIES : JACKSON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/30/98 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 HEAT STRAIGHTENING DAMAGED BEAM 0005 203-01(1) DISMANTLING STRUCTURES ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 307-01 CLASS 1 AGGREGATE BASE COURSE 272.000 CY 0020 615-04 FABRICATED STRUCTURAL STEEL 1,025.000 LB 0025 615-15 GIRDER REPAIR 6.000 EA 0030 615-15(A) GIRDER REPAIR RETROFIT 6.000 EA 0035 615-16 FIELD DRILLING 12.000 EA 0040 615-50 HEAT STRAIGHTENING AND REPAIR OF STRUCTURAL MEMBERS LUMP LUMP 0045 636-11 TRAFFIC CONTROL DEVICES 7,160.000 UN 0050 636-14 FLAGGER 720.000 HR 0055 636-25(B) WARNING LIGHTS 560.000 DA 0060 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 77.000 TN AA1 0065 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 85.000 TN AA2 1 FEDERAL PROJECT PAGE 7 Call Order : 004 CONTRACT ID : 9218142 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S331-0007/00-021.96 00 00BR 0007 081 E00 COUNTIES : MONONGALIA DBE GOALS : 10.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 04/30/98 RES. ENG.: DON WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 0.35 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 2,000.000 M3 0020 207-34 FABRIC FOR SEPARATION 2,818.000 M2 0025 211-02 ROCK BORROW EXCAVATION 573.000 M3 0030 307-01 CLASS I AGGREGATE BASE COURSE 538.000 M3 0035 408-02 BITUMINOUS MATERIAL 1,597.400 L 0040 409-02 BITUMINOUS MATERIAL PRIME 360.500 L 0045 502-01300 PORTLAND CEMENT CONCRETE APPRACH SLAB 300MM 176.000 M2 0050 607-011 TYPE 1 GUARDRAIL, CLASS I 136.800 M 0055 607-28 MODIFIED ECCENTRIC LOADER TERMINAL 3.000 EA 0060 636-07 ERADICATION PAVEMENT MARKINGS 400.000 M 0065 636-08 TEMP PVMT MARKING-PAINT 1,000.000 M 0070 636-09 TEMP PVMT MARKING-TAPE 257.000 M 0075 636-11 TRAFFIC CONTROL DEVICE 11,213.000 UN 0080 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 3.000 EA 0085 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 84.000 EA 0090 636-14 FLAGGER 500.000 HR 0091 636-19 TEMPORARY GUARDRAIL BARRIERS 76.000 M 0095 636-25B WARNING LIGHTS TYPE B 960.000 DA 0100 637-01 WATER FOR DUST PALLIATIVE 1,000.000 M3 1 FEDERAL PROJECT PAGE 8 Call Order : 004 CONTRACT ID : 9218142 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S331-0007/00-021.96 00 00BR 0007 081 E00 COUNTIES : MONONGALIA DBE GOALS : 10.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 04/30/98 RES. ENG.: DON WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0105 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0110 640-02 SMALL FIELD OFFICE/STORAGE BUILDING LUMP LUMP 0115 640-03 BUILDING EQUIPMENT LUMP LUMP 0120 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECT LUMP LUMP 0125 652-01 AGRICULTURAL LIMESTONE 0.700 MGR 0130 652-021 FERTILIZER 10-20-10 0.600 MGR 0135 652-022 UREA FORMALDEHYDE FERTILIZER 0.100 MGR 0140 652-031 SEED MIXTURES B, C-1, OR C-2 60.400 KG 0145 652-032 SEED MIXTURES D 42.300 KG 0150 652-041 STRAW OR HAY MULCH 1.400 MGR 0155 652-042 WOOD CELLULOSE FIBER MULCH 1.000 MGR 0160 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 541.000 MGR AA1 0165 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 492.200 MGR AA2 0170 402-011SG HOT-MIX ASPHALT SKID PAVEMENT, STONE OR GRAVEL 185.000 MGR AB1 0175 402-011S HOT-MIX ASPHALT SKID PAVEMENT, SLAG 168.300 MGR AB2 0180 604-760375A2 ALUMINUM COATED CORRUGATED STEEL PIPE, 375MM, A2 58.000 M AC1 0185 604-250375A2 CORRUGATED ALUMINUM ALLOY PIPE 375MM, A2 58.000 M AC2 0190 604-3703753 REINFORCED CONCRETE PIPE, 375MM, CLIII 58.000 M AC3 0195 636-02SG AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 85.000 MGR AD1 0200 636-02S AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 77.000 MGR AD2 SECTION NO. 0002 BRIDGE #4135 1 FEDERAL PROJECT PAGE 9 Call Order : 004 CONTRACT ID : 9218142 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S331-0007/00-021.96 00 00BR 0007 081 E00 COUNTIES : MONONGALIA DBE GOALS : 10.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 04/30/98 RES. ENG.: DON WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 BRIDGE #4135 0205 203-01 DISMANTLING STRUCTURES LUMP LUMP 0210 212-02 WET EXCAVATION 960.000 M3 0215 212-05 SELECT MATERIAL FOR BACKFILLING 82.000 M3 0220 601-02 CLASS B CONCRETE 393.000 M3 0225 601-03 CLASS K CONCRETE 82.000 M3 0230 602-01 REIN STEEL BARS 33,647.000 KG 0235 602-02 EPOXY COATED REINFORCING BARS 10,162.000 KG 0240 615-01 STEEL SUPERSTRUCTURE ( 21,000.00 ) LUMP 0245 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP SECTION NO. 0003 COMPUTER SYSTEM 0250 640-04 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP 1 FEDERAL PROJECT PAGE 10 Call Order : 005 CONTRACT ID : 9733901 Letting Date : 08/18/98 10:00 A.M. PROJECTS : E340-0035/00-019.80 00 00NH 0035 112 E00 COUNTIES : PUTNAM DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/13/98 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 US 35 SLIDE # 2897 0005 207-34 FABRIC FOR SEPARATION 150.000 SY 0010 408-02 BITUMINOUS MATERIAL 51.000 GA 0015 607-01(I) TYPE 1 GUARDRAIL 384.000 LF 0020 607-28 MODIFIED ECCENTRIC LOADER TERMINAL 2.000 EA 0025 614-1(W14X193 STEEL PILES 1,842.000 LF 0030 614-1(W14X257 STEEL PILES (W14X257) 2,837.000 LF 0035 614-3 CONCRETE LAGGING 1,050.000 SF 0040 636-11 TRAFFIC CONTROL DEVICES 2,898.000 UN 0045 636-14 FLAGGER 480.000 HR 0050 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 328.000 TN AA1 0055 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 302.000 TN AA2 0060 401-03SG HOT-LAID ASPHALT PATCH & LEVEL COURSE, STONE OR GRAVEL 14.000 TN BB1 2" THICKNESS MAXIMUM 0065 401-03S HOT-LAID ASPHALT PATCH & LEVEL COURSE, SLAG 12.750 TN BB2 2" THICKNESS MAXIMUM 0070 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 24.000 TN CC1 0075 402-01(1)S HMA SKID PVT, (W-1) SLAG 21.800 TN CC2 1 STATE PROJECT PAGE 11 Call Order : 006 CONTRACT ID : 9816885 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S320-0024/03-000.00 00 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/30/98 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 229-01 SHOULDERS AND DITCHES 0.600 LM 0010 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 194.000 LF 0015 604-01(24)A2 METALLIC COATED CORRUGATED STEEL PIPE 25.000 LF 0020 636-11 TRAFFIC CONTROL DEVICES 1,840.000 UN 0025 636-14 FLAGGER 72.000 HR 0030 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 100.000 TN AA1 0035 308-01S CLASS 1 AGGREGATE, SLAG 90.000 TN AA2 0040 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 940.000 TN BB1 0045 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 850.000 TN BB2 1 STATE PROJECT PAGE 12 Call Order : 007 CONTRACT ID : 9529806 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S330-0003/05-019.13 00 COUNTIES : MINGO GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/01/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 LOWER BREEDEN DECK GIRDER 0005 203-01 DISMANTLING STRUCTURES LUMP LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 321.000 CY 0020 211-01 UNCLASSIFIED BORROW EXCAVATION 1,178.000 CY 0025 212-01 STRUCTURE EXCAVATION 985.000 CY 0030 212-05 SELECT MATERIAL FOR BACKFILLING 150.000 CY 0035 218-01 RIPRAP 240.000 CY 0040 218-03 GABIONS 247.000 CY 0045 409-02 BITUMINOUS MATERIAL 153.000 GA 0050 601-02 CLASS B CONCRETE 450.000 CY 0055 601-03 CLASS K CONCRETE 68.000 CY 0060 602-02 EPOXY COATED REINFORCING STEELBARS 64,487.000 LB 0065 603-01 PRESTRESSED CONCRETE BEAMS 967.500 LF 0070 607-01(I) TYPE 1 GUARDRAIL 702.500 LF 0075 633-03 DUMPED ROCK GUTTER 130.000 CY 0080 636-05 TEMPORARY STRUCTURES FOR MAINTAINING TRAFFIC ( 1.00 ) LUMP 0085 636-11 TRAFFIC CONTROL DEVICES 3,933.000 UN 0090 636-14 FLAGGER 200.000 HR 0095 636-25(B) WARNING LIGHTS 134.000 DA 0100 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0105 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 1 STATE PROJECT PAGE 13 Call Order : 007 CONTRACT ID : 9529806 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S330-0003/05-019.13 00 COUNTIES : MINGO GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/01/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 LOWER BREEDEN DECK GIRDER 0110 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 190.000 TN AA1 0115 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 175.000 TN AA2 0120 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 211.000 TN BB1 0125 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 195.000 TN BB2 0130 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 35.000 TN CC1 0135 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 33.000 TN CC2 1 STATE PROJECT PAGE 14 Call Order : 008 CONTRACT ID : 9532001 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S352-0007/01-000.01 00 COUNTIES : WETZEL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 03/31/99 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 203-01 DISMANTLING STRUCTURES LUMP LUMP 0015 204-01 MOBILIZATION LUMP LUMP 0020 207-01 UNCLASSIFIED EXCAVATION 284.000 M3 0025 207-34 FABRIC FOR SEPARATION 161.000 M2 0030 211-02 ROCK BORROW EXCAVATION 59.000 M3 0035 212-01 STRUCTURE EXCAVATION 1,600.000 M3 0040 212-05 SELECT MATERIAL FOR BACKFILLING 115.000 M3 0045 307-01 CLASS I AGGREGATE BASE COURSE 229.000 M3 0050 308-01 CLASS 1 AGGREGATE BASE COURSE 14.000 MGR 0055 409-02 BITUMINOUS MATERIAL PRIME 1,705.000 L 0060 601-02 CLASS B CONCRETE 260.000 M3 0065 601-06 CLASS D CONCRETE 3.700 M3 0070 602-02 EPOXY COATED REINFORCING BARS 22,161.000 KG 0075 603-01 PRESTRESSED CONCRETE BEAMS 155.000 M 0080 604-010600A2 METALLIC COATED CORRUGATED STEEL PIPE, 600MM, A2 46.000 M 0085 605-09 TYPE G INLET 1.000 EA 0090 607-011 TYPE 1 GUARDRAIL, CLASS I 151.000 M 0095 636-01 TRAFFIC CONTROL LUMP LUMP 0100 638-02 RIGHT OF WAY MARKERS 8.000 EA 0105 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 STATE PROJECT PAGE 15 Call Order : 008 CONTRACT ID : 9532001 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S352-0007/01-000.01 00 COUNTIES : WETZEL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 03/31/99 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0110 640-02 SMALL FIELD OFFICE/STORAGE BUILDING LUMP LUMP 0115 640-03 BUILDING EQUIPMENT LUMP LUMP 0120 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECT LUMP LUMP 0125 663-0112W EDGE LINE WHITE TYPE II 200.000 M 0130 663-0112Y EDGE LINE YELLOW TYPE II 200.000 M 0135 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 151.000 MGR AA1 0140 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 138.000 MGR AA2 0145 402-013SG HOT-MIX ASPHALT SKID PAVEMENT, STONE OR GRAVEL 95.000 MGR BB1 0150 402-013S HOT-MIX ASPHALT SKID PAVEMENT, SLAG 86.000 MGR BB2 1 STATE PROJECT PAGE 16 Call Order : 009 CONTRACT ID : 9711503 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S342-0046/00-023.13 00 COUNTIES : RANDOLPH GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0005 203-01 DISMANTLING STRUCTURES LUMP LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-02 SUBGRADE 164.000 CY 0020 207-09 UNCLASSIFIED EXCAVATION LUMP LUMP 0025 207-34 FABRIC FOR SEPARATION 1,620.000 SY 0030 211-01 UNCLASSIFIED BORROW EXCAVATION 23.000 CY 0035 212-01 STRUCTURE EXCAVATION 255.000 CY 0040 212-05 SELECT MATERIAL FOR BACKFILLING 150.000 CY 0045 218-08 SHOT ROCK 330.000 TN 0050 307-01 CLASS 1 AGGREGATE BASE COURSE 164.000 CY 0055 409-02 BITUMINOUS MATERIAL 467.000 GA 0060 601-02 CLASS B CONCRETE 195.000 CY 0065 602-01 REINFORCING STEEL BARS 19,212.000 LB 0070 602-02 EPOXY COATED REINFORCING STEELBARS 4,616.000 LB 0075 603-01 PRESTRESSED CONCRETE BEAMS 775.000 LF 0080 607-01(I) TYPE 1 GUARDRAIL 75.000 LF 0085 636-01 TRAFFIC CONTROL LUMP LUMP 0090 636-05 TEMPORARY STRUCTURES FOR MAINTAINING TRAFFIC ( 1.00 ) LUMP 0095 638-02 RIGHT OF WAY MARKERS 8.000 EA 0100 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0105 640-02 SMALL FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 1 STATE PROJECT PAGE 17 Call Order : 009 CONTRACT ID : 9711503 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S342-0046/00-023.13 00 COUNTIES : RANDOLPH GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0110 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 0115 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 100.000 TN AA1 0120 308-08S CLASS 8 AGGREGATE, SLAG 91.000 TN AA2 0125 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 235.000 TN BB1 0130 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 214.000 TN BB2 0135 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 86.000 TN CC1 0140 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 78.000 TN CC2 1 STATE PROJECT PAGE 18 Call Order : 010 CONTRACT ID : 9815881 Letting Date : 08/18/98 10:00 A.M. PROJECTS : R088-0REM/GR-099.00 00 COUNTIES : RANDOLPH POCAHONTAS GUARANTY : 5% OF BID TOTAL PENDLETON OTHERS PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GUARDRAIL 0005 204-02 MOBILIZATION PER COUNTY 100.000 MI 0010 204-03 MOBILIZATION PER JOB ORDER 2.000 EA 0015 204-04 EMERGENCY MOBILIZATION 1.000 EA 0020 607-01(I) TYPE 1 GUARDRAIL 1,500.000 LF 0025 607-01(III) TYPE 1 GUARDRAIL 300.000 LF 0030 607-10-1 TYPE 1 GUARDRAIL REMOVED AND STORED 300.000 LF 0035 607-11(I) RESET TYPE I GUARDRAIL 300.000 LF 0040 607-11(III) RESET TYPE I GUARDRAIL 500.000 LF 0045 607-25(A) CUT SLOPE TERMINAL, TYPE A 2.000 EA 0050 607-25(B) CUT SLOPE TERMINAL, TYPE B 2.000 EA 0055 607-28 MODIFIED ECCENTRIC LOADER TERMINAL 6.000 EA 0060 607-28(II) MELT DIAPHRAGM PLATE 2.000 EA 0065 607-28(III) MELT STRUT AND YOKE ASSEMBLY 2.000 EA 0070 607-28(IV) MELT SHORT BREAKAWAY POST 2.000 EA 0075 607-28(V) MELT WOODEN BREAKAWAY LINE POST 2.000 EA 0080 607-28-1 M E L T REMOVE AND RESET 2.000 EA 0085 607-31 SPECIAL APPROACH END TERMINAL 1.000 EA 0090 607-35 GUARDRAIL ELEMENT 20.000 EA 0095 607-36 END SHOE FOR CUT TERMINALS AND BRIDGE CONNECTIONS 4.000 EA 0100 607-37 BUFFER END SECTION 15.000 EA 0105 607-39 TREATED WOOD BLOCK (6"X6"X14") 20.000 EA 1 STATE PROJECT PAGE 19 Call Order : 010 CONTRACT ID : 9815881 Letting Date : 08/18/98 10:00 A.M. PROJECTS : R088-0REM/GR-099.00 00 COUNTIES : RANDOLPH POCAHONTAS GUARANTY : 5% OF BID TOTAL PENDLETON OTHERS PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GUARDRAIL 0110 607-41 CURVED RAIL ELEMENT (13'-6.5") 10.000 EA 0115 607-42 STEEL POSTS (6') 50.000 EA 0120 607-43 STEEL POSTS (8') 20.000 EA 0125 607-44 TREATED WOOD POST (6"X8"X6') 6.000 EA 0130 607-46 TREATED WOOD POST, 7"ROUND X 6' 6.000 EA 0135 607-47 TREATED WOOD POST, 10"X10"X6' 4.000 EA 0140 607-48 STRUCTURE MOUNTED POST, ANCHORED 4.000 EA 0145 607-49 STEEL POSTS (10') 2.000 EA 0150 607-51 REMOVE & RESET GUARDRAIL POST 30.000 EA 0155 636-11 TRAFFIC CONTROL DEVICES 12,000.000 UN 0160 636-14 FLAGGER 100.000 HR 1 STATE PROJECT PAGE 20 Call Order : 011 CONTRACT ID : 9734918R1 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S325-0074/00-000.00 00 COUNTIES : MARION GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/98 RES. ENG.: DON WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 229-01 SHOULDERS AND DITCHES 2.860 LM 0010 408-02 BITUMINOUS MATERIAL 1,440.000 GA 0015 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 240.000 SY 0020 636-06 PILOT TRUCK AND DRIVER 6.000 DA 0025 636-11 TRAFFIC CONTROL DEVICES 2,140.000 UN 0030 636-14 FLAGGER 240.000 HR 0035 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 500.000 TN AA1 0040 308-01S CLASS 1 AGGREGATE, SLAG 450.000 TN AA2 0045 407-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 2,380.000 TN BB1 0050 407-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 2,142.000 TN BB2 1 STATE PROJECT PAGE 21 Call Order : 012 CONTRACT ID : 9734613 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U304-0040/00-017.59 00 COUNTIES : BRAXTON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 12/31/98 RES. ENG.: WILLIAM FOLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 211-08 ROCK BORROW EXCAVATION 207.000 TN 0010 229-01 SHOULDERS AND DITCHES 2.840 LM 0015 408-02 BITUMINOUS MATERIAL 800.000 GA 0020 409-02 BITUMINOUS MATERIAL 3,000.000 GA 0025 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 5,000.000 SY 0030 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 185.000 LF 0035 607-01(II) TYPE 1 GUARDRAIL 11,750.000 LF 0040 636-06 PILOT TRUCK AND DRIVER 32.000 DA 0045 636-11 TRAFFIC CONTROL DEVICES 7,705.000 UN 0050 636-14 FLAGGER 640.000 HR 0055 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 2,875.000 TN AA1 0060 308-01S CLASS 1 AGGREGATE, SLAG 2,866.000 TN AA2 0065 407-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 3,800.000 TN BB1 0070 407-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 3,458.000 TN BB2 0075 407-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 1,500.000 TN CC1 0080 407-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 1,338.000 TN CC2 1 STATE PROJECT PAGE 22 Call Order : 013 CONTRACT ID : 9720624 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S334-0019/02-001.80 00 COUNTIES : NICHOLAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/98 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 211-08 ROCK BORROW EXCAVATION 50.000 TN 0010 408-02 BITUMINOUS MATERIAL 715.000 GA 0015 604-01(15)A2 METALLIC COATED CORRUGATED STEEL PIPE 41.000 LF 0020 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 60.000 LF 0025 636-11 TRAFFIC CONTROL DEVICES 4,301.000 UN 0030 636-14 FLAGGER 260.000 HR 0035 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 2,075.000 TN AA1 0040 308-08S CLASS 8 AGGREGATE, SLAG 1,888.000 TN AA2 0045 407-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 3,950.000 TN BB1 0050 407-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 3,595.000 TN BB2 0055 407-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 1,350.000 TN CC1 0060 407-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 1,228.000 TN CC2 1 STATE PROJECT PAGE 23 Call Order : 014 CONTRACT ID : 9721320 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U336-0033/00-032.81 00 COUNTIES : PENDLETON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/98 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 211-08 ROCK BORROW EXCAVATION 15.000 TN 0010 408-02 BITUMINOUS MATERIAL 2,200.000 GA 0015 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 2,404.000 SY 0020 604-01(15)A2 METALLIC COATED CORRUGATED STEEL PIPE 20.000 LF 0025 604-50(18) CORRUGATED POLYETHYLENE PIPE 425.000 LF 0030 604-50(24) CORRUGATED POLYETHYLENE PIPE 60.000 LF 0035 605-09 TYPE G INLET 1.000 EA 0040 607-01(I) TYPE 1 GUARDRAIL 2,762.500 LF 0045 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 150.000 LF 0050 607-10-1 TYPE 1 GUARDRAIL REMOVED AND STORED 450.000 LF 0055 607-28 MODIFIED ECCENTRIC LOADER TERMINAL 8.000 EA 0060 607-37 BUFFER END SECTION 15.000 EA 0065 619-02 MEMBRANE WATERPROFFING WITHOUT PROTECTION COURSE 738.000 SY 0070 636-06 PILOT TRUCK AND DRIVER 36.000 DA 0075 636-11 TRAFFIC CONTROL DEVICES 1,420.000 UN 0080 636-14 FLAGGER 720.000 HR 0085 657-08 (2.00LB) CHANNEL POSTS 234.000 LF 0090 661-01(1) (0.080),FLAT SHEET SIGNS 90.000 SF 0095 663-01-1(II)W EDGE LINE, WHITE 11.300 LF 0100 663-02(II)Y LANE LINE OR CENTER LINE YELLOW 5.650 MI 0105 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 2,500.000 TN AA1 1 STATE PROJECT PAGE 24 Call Order : 014 CONTRACT ID : 9721320 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U336-0033/00-032.81 00 COUNTIES : PENDLETON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/98 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 308-08S CLASS 8 AGGREGATE, SLAG 2,275.000 TN AA2 0115 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,650.000 TN BB1 0120 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 1,502.000 TN BB2 0125 407-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 4,150.000 TN CC1 0130 407-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 3,731.000 TN CC2 0135 407-2(3)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 110.000 TN DD1 0140 407-2(3)S HOT-MIX ASPHALT WEARING COURSE, SLAG 100.000 TN DD2 0145 407-7SG SCRATCH COURSE, STONE OR GRAVEL 4,100.000 TN EE1 0150 407-7S SCRACTH COURSE, SLAG 3,731.000 TN EE2 1 STATE PROJECT PAGE 25 Call Order : 015 CONTRACT ID : 9721319 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U336-0220/00-032.80 00 COUNTIES : PENDLETON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 12/31/98 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 WEARING COURSE ASPHALT, SCRATCH COURSE ASPHALT, DRAINAGE, 0005 408-02 BITUMINOUS MATERIAL 2,275.000 GA 0010 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 1,510.000 SY 0015 604-50(18) CORRUGATED POLYETHYLENE PIPE 1,340.000 LF 0020 604-50(24) CORRUGATED POLYETHYLENE PIPE 95.000 LF 0025 607-01(I) TYPE 1 GUARDRAIL 950.000 LF 0030 607-10-1 TYPE 1 GUARDRAIL REMOVED AND STORED 112.500 LF 0035 607-25(A) CUT SLOPE TERMINAL, TYPE A 1.000 EA 0040 607-28 MODIFIED ECCENTRIC LOADER TERMINAL 1.000 EA 0045 607-37 BUFFER END SECTION 5.000 EA 0050 619-02 MEMBRANE WATERPROFFING WITHOUT PROTECTION COURSE 1,065.000 SY 0055 636-06 PILOT TRUCK AND DRIVER 36.000 DA 0060 636-11 TRAFFIC CONTROL DEVICES 3,670.000 UN 0065 636-14 FLAGGER 720.000 HR 0070 663-01(II)W EDGE LINE WHITE 11.760 MI 0075 663-02(II)Y LANE LINE OR CENTER LINE YELLOW 5.880 MI 0080 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 2,700.000 TN AA1 0085 308-08S CLASS 8 AGGREGATE, SLAG 2,457.000 TN AA2 0090 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,050.000 TN BB1 0095 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 955.000 TN BB2 0100 407-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 4,100.000 TN CC1 0105 407-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 3,731.000 TN CC2 1 STATE PROJECT PAGE 26 Call Order : 015 CONTRACT ID : 9721319 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U336-0220/00-032.80 00 COUNTIES : PENDLETON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 12/31/98 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 WEARING COURSE ASPHALT, SCRATCH COURSE ASPHALT, DRAINAGE, 0110 407-2(3)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 30.000 TN DD1 0115 407-2(3)S HOT-MIX ASPHALT WEARING COURSE, SLAG 27.300 TN DD2 0120 407-7SG SCRATCH COURSE, STONE OR GRAVEL 4,000.000 TN EE1 0125 407-7S SCRACTH COURSE, SLAG 3,640.000 TN EE2 1 STATE PROJECT PAGE 27 Call Order : 016 CONTRACT ID : 9726201 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S342-0053/00-002.43 00 COUNTIES : RANDOLPH GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 HMA RESURFACING 1", BASE WIDENING, SCRATCH, DRAINAGE, STONE 0005 203-01(1) DISMANTLING STRUCTURES ( 1.00 ) LUMP 0010 408-02 BITUMINOUS MATERIAL 1,700.000 GA 0015 601-02 CLASS B CONCRETE 60.800 CY 0020 602-01 REINFORCING STEEL BARS 5,536.000 LB 0025 604-70(12X6) PRECAST CONCRETE BOX CULVERT 68.000 LF 0030 607-01(I) TYPE 1 GUARDRAIL 3,200.000 LF 0035 636-06 PILOT TRUCK AND DRIVER 16.000 DA 0040 636-11 TRAFFIC CONTROL DEVICES 7,480.000 UN 0045 636-14 FLAGGER 56.000 HR 0050 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 0055 670-07(8)200 PLASTIC PIPE, CLASS 200 80.000 LF 0060 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 100.000 TN AA1 0065 308-01S CLASS 1 AGGREGATE, SLAG 91.000 TN AA2 0070 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 2,400.000 TN BB1 0075 308-08S CLASS 8 AGGREGATE, SLAG 2,184.000 TN BB2 0080 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,700.000 TN CC1 0085 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 1,547.000 TN CC2 0090 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 3,200.000 TN DD1 0095 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 2,912.000 TN DD2 0100 407-7SG SCRATCH COURSE, STONE OR GRAVEL 1,600.000 TN EE1 0105 407-7S SCRACTH COURSE, SLAG 1,456.000 TN EE2 1 STATE PROJECT PAGE 28 Call Order : 017 CONTRACT ID : 9804429 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U351-0082/00-000.00 00 COUNTIES : WEBSTER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/15/99 RES. ENG.: WILLIAM FOLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 207-01 UNCLASSIFIED EXCAVATION 565.000 CY 0010 229-01 SHOULDERS AND DITCHES 4.380 LM 0015 408-02 BITUMINOUS MATERIAL 1,544.000 GA 0020 409-02 BITUMINOUS MATERIAL 3,083.000 GA 0025 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 179.000 SY 0030 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 60.000 LF 0035 604-37(18)II REINFORCED CONCRETE PIPE 6.000 LF 0040 604-37(24)II REINFORCED CONCRETE PIPE 4.000 LF 0045 607-01(II) TYPE 1 GUARDRAIL 18,975.000 LF 0050 607-10-1(A) GUARDRAIL REMOVAL 14,762.500 LF 0055 636-06 PILOT TRUCK AND DRIVER 30.000 DA 0060 636-11 TRAFFIC CONTROL DEVICES 12,000.000 UN 0065 636-14 FLAGGER 600.000 HR 0070 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 1,621.000 TN AA1 0075 308-08S CLASS 8 AGGREGATE, SLAG 1,475.000 TN AA2 0080 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,131.000 TN BB1 0085 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 1,029.000 TN BB2 0090 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 2,830.000 TN CC1 0095 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 2,575.000 TN CC2 0100 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 2,830.000 TN DD1 0105 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 2,575.000 TN DD2 1 FEDERAL PROJECT PAGE 29 Call Order : 018 CONTRACT ID : 9525407 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U340-0034/00-010.20 00 00CM 0034 041 E00 COUNTIES : PUTNAM DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/99 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 3.60 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 25,562.000 M3 0020 207-02 SUBGRADE 5,506.000 M3 0025 207-34 FABRIC FOR SEPARATION 33,239.000 M2 0030 211-02 ROCK BORROW EXCAVATION 1,454.000 M3 0035 212-01 STRUCTURE EXCAVATION 47.000 M3 0040 307-01 CLASS I AGGREGATE BASE COURSE 2,060.000 M3 0045 308-01 CLASS 1 AGGREGATE BASE COURSE 439.000 MGR 0050 311-06 OPEN GRADED FREE DRAINING BASE 2,975.000 M3 0055 408-02 BITUMINOUS MATERIAL 437.000 L 0060 409-02 BITUMINOUS MATERIAL PRIME 8,676.000 L 0065 501-05200 NON-REIN PORTLAND CEMENT CONCRETE PAVEMENT 200MM 366.000 M2 0070 601-02 CLASS B CONCRETE 44.000 M3 0075 602-01 REIN STEEL BARS 2,893.000 KG 0080 605-01 TYPE A MANHOLE 1.000 EA 0085 605-06 TYPE D INLET 44.000 EA 0090 605-061 TYPE D INLET, MODIFIED 33.000 EA 0095 605-07 TYPE E INLET 2.000 EA 0100 605-071 TYPE E INLET, MODIFIED 1.000 EA 0105 605-09 TYPE G INLET 21.000 EA 1 FEDERAL PROJECT PAGE 30 Call Order : 018 CONTRACT ID : 9525407 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U340-0034/00-010.20 00 00CM 0034 041 E00 COUNTIES : PUTNAM DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/99 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 605-391 JUNCTION BOX, MODIFIED 1.000 EA 0115 605-41300063 SLOT INLET, 300MM 63MM 13.000 M 0120 605-41300216 SLOT INLET, 300MM 216MM 69.000 M 0125 606-23 UNDERDRAIN JUNCTION BOX 2.000 EA 0130 606-29 FREE DRAINING BASE (FDB) TRENCH 3,167.000 M 0131 606-30 OUTLET PIPE 622.000 M 0135 607-011 TYPE 1 GUARDRAIL, CLASS I 776.230 M 0140 607-28 MODIFIED ECCENTRIC LOADER TERMINAL 2.000 EA 0145 609-01 CONCRETE SIDEWALK 4,880.000 M2 0150 610-031 COMBINATION CONCRETE CURBING AND GUTTER TYPE I 3,185.000 M 0155 610-035 COMBINATION CONCRETE CURB & GUTTER TYPE V 524.000 M 0160 633-03 DUMPED ROCK GUTTER 140.300 M3 0165 636-07 ERADICATION PAVEMENT MARKINGS 6,600.000 M 0170 636-08 TEMP PVMT MARKING-PAINT 7,600.000 M 0175 636-09 TEMP PVMT MARKING-TAPE 8,600.000 M 0180 636-11 TRAFFIC CONTROL DEVICE 42,774.000 UN 0185 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 6.000 EA 0190 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 600.000 EA 0195 636-14 FLAGGER 2,400.000 HR 0200 636-17 TEMPORARY CONCRETE BARRIERS 510.000 M 0205 636-18 REMOVING AND RESETTING TEMPORARY CONCRETE BARRIERS 490.000 M 1 FEDERAL PROJECT PAGE 31 Call Order : 018 CONTRACT ID : 9525407 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U340-0034/00-010.20 00 00CM 0034 041 E00 COUNTIES : PUTNAM DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/99 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0210 636-21 ELECTRIC ARROW 30.000 DA 0215 636-23 TEMPORARY TRAFFIC SIGNAL LUMP LUMP 0220 636-24 TEMPORARY PIPE FOR MAINTAINING TRAFFIC 400.000 M 0225 636-25A WARNING LIGHTS TYPE A 4,500.000 DA 0230 636-25B WARNING LIGHTS TYPE B 7,000.000 DA 0235 636-25C WARNING LIGHTS TYPE C 12,000.000 DA 0240 637-01 WATER FOR DUST PALLIATIVE 260.000 M3 0245 638-02 RIGHT OF WAY MARKERS 41.000 EA 0250 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0255 640-01 STANDARD FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0260 640-03 BUILDING EQUIPMENT LUMP LUMP 0265 642-031 DITCH CHECKS 4.000 EA 0270 642-041 TEMPORARY SEED 94.000 KG 0275 642-042 SEED MIXTURE B 97.500 KG 0280 642-043 SEED MIXTURE D 40.100 KG 0285 642-051 STRAW OR HAY MULCH 6.300 MGR 0290 642-06 FERTILIZER 1.300 MGR 0295 642-10 AGRICULTURAL LIMESTONE 4.800 MGR 0300 642-11 HAY OR STRAW BALES 1,107.000 EA 0305 642-12 SILT FENCE 1,107.000 M 0310 652-01 AGRICULTURAL LIMESTONE 4.800 MGR 1 FEDERAL PROJECT PAGE 32 Call Order : 018 CONTRACT ID : 9525407 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U340-0034/00-010.20 00 00CM 0034 041 E00 COUNTIES : PUTNAM DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/99 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0315 652-021 FERTILIZER 10-20-10 1.300 MGR 0320 652-022 UREA FORMALDEHYDE FERTILIZER 0.500 MGR 0325 652-031 SEED MIXTURES B, C-1, OR C-2 97.500 KG 0330 652-032 SEED MIXTURES D 40.100 KG 0335 652-041 STRAW OR HAY MULCH 6.300 MGR 0340 655-02A PERMANENT EROSION MATTING, TYPE A 224.000 M2 0345 655-02B PERMANENT EROSION MATTING, TYPE B 340.000 M2 0350 664-014 IMPACT ATTENUATING DEVICE TYPE IV 6.000 EA 0355 664-014A REMOVE AND RESET G.R.E.A.T. ATTENUATING DEVICE TYPE IV 4.000 EA 0360 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 14,203.000 MGR AA1 0365 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 12,781.000 MGR AA2 0370 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 5,147.000 MGR BB1 0375 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 4,632.000 MGR BB2 0380 401-7SG SRCATCH COURSE, STONE OR GRAVEL 117.000 MGR CC1 0385 401-7S SCRATCH COURSE, SLAG 105.000 MGR CC2 0390 402-011SG HOT-MIX ASPHALT SKID PAVEMENT, STONE OR GRAVEL 2,212.000 MGR DD1 0395 402-011S HOT-MIX ASPHALT SKID PAVEMENT, SLAG 1,990.000 MGR DD2 0400 604-020300A2 FULL BITUMINOUS COATED CORRUGATED PIPE, 300MM, A2 25.400 M EE1 0405 604-250300A2 CORRUGATED ALUMINUM ALLOY PIPE, 300MM, A2 25.400 M EE2 0406 604-3703003 REINFORCED CONCRETE PIPE, 300MM, CLIII 25.400 M EE3 0410 604-020450A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, 450MM, A2 817.700 M FF1 1 FEDERAL PROJECT PAGE 33 Call Order : 018 CONTRACT ID : 9525407 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U340-0034/00-010.20 00 00CM 0034 041 E00 COUNTIES : PUTNAM DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/99 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0411 604-250450A2 CORRUGATED ALUMINUM ALLOY PIPE 450MM, A2 817.700 M FF2 0412 604-3704503 REINFORCED CONCRETE PIPE, 450MM, CLIII 817.700 M FF3 0415 604-020450A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, 450MM, A2 8.300 M GG1 0416 604-090450 END SECTION FOR CORRUGATED STEEL PIPE 450MM 1.000 EA GG1 0417 604-250450A2 CORRUGATED ALUMINUM ALLOY PIPE 450MM, A2 8.300 M GG2 0418 604-280450 END SECTION FOR CORRUGATED ALUMINUM ALLOY PIPE 450MM 1.000 EA GG2 0419 604-3704503 REINFORCED CONCRETE PIPE, 450MM, CLIII 8.300 M GG3 0420 604-380450 REINFORCED CONCRETE END SECTION, 450MM 1.000 EA GG3 0425 604-020450A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, 450MM, A2 8.000 M HH1 0426 604-090450 END SECTION FOR CORRUGATED STEEL PIPE 450MM 1.000 EA HH1 0427 604-720450 SAFETY SLOPE END SECTION, CSP 1.000 EA HH1 0428 604-250450A2 CORRUGATED ALUMINUM ALLOY PIPE 450MM, A2 8.000 M HH2 0429 604-280450 END SECTION FOR CORRUGATED ALUMINUM ALLOY PIPE 450MM 1.000 EA HH2 0430 604-720450 SAFETY SLOPE END SECTION, CSP 1.000 EA HH2 0431 604-3704503 REINFORCED CONCRETE PIPE, 450MM, CLIII 8.000 M HH3 0432 604-380450 REINFORCED CONCRETE END SECTION, 450MM 1.000 EA HH3 0433 604-720450 SAFETY SLOPE END SECTION, CSP 1.000 EA HH3 0435 604-020600A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, 600MM, A2 494.000 M JJ1 0436 604-250600A2 CORRUGATED ALUMINUM ALLOY PIPE 600MM, A2 494.000 M JJ2 0437 604-3706003 REINFORCED CONCRETE PIPE, 600MM, CLASS III 494.000 M JJ3 0440 604-020600A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, 600MM, A2 15.000 M KK1 1 FEDERAL PROJECT PAGE 34 Call Order : 018 CONTRACT ID : 9525407 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U340-0034/00-010.20 00 00CM 0034 041 E00 COUNTIES : PUTNAM DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/99 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0441 604-090600 END SECTION FOR CORRUGATED STEEL PIPE 600MM 1.000 EA KK1 0442 604-720600 SAFETY SLOPE END SECTION, CSP 1.000 EA KK1 0443 604-250600A2 CORRUGATED ALUMINUM ALLOY PIPE 600MM, A2 15.000 M KK2 0444 604-280600 END SECTION FOR CORRUGATED ALUMINUM ALLOY PIPE 600MM 1.000 EA KK2 0445 604-720600 SAFETY SLOPE END SECTION, CSP 1.000 EA KK2 0446 604-3706003 REINFORCED CONCRETE PIPE, 600MM, CLASS III 15.000 M KK3 0447 604-380600 REINFORCED CONCRETE END SECTION 600MM 1.000 EA KK3 0448 604-720600 SAFETY SLOPE END SECTION, CSP 1.000 EA KK3 0449 604-020900A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, 900MM, A2 1,129.000 M LL1 0450 604-250900A3 CORRUGATED ALUMINUM ALLOY PIPE 900MM,A3 1,129.000 M LL2 0455 604-3709003 REINFORCED CONCRETE PIPE, 900MM, CL III 1,129.000 M LL3 0460 604-021050A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, 1050MM, A2 168.000 M MM1 0465 604-251050A3 CORRUGATED ALUMINUM ALLOY PIPE 1050MM, A3 168.000 M MM2 0470 604-3710503 REINFORCED CONCRETE PIPE, 1050MM, CLASS III 168.000 M MM3 0480 636-02SG AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 1,400.000 MGR NN1 0485 636-02S AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 1,270.000 MGR NN2 SECTION NO. 0002 SIGNAL 0490 660-01 SIGNAL CONTROLLERS LUMP LUMP 0495 660-02LPSC TRAFFIC DETECTORS 6.000 EA 0500 660-03V203 SIGNAL SECTIONS 3.000 EA 0505 660-03V305 SIGNAL SECTIONS 23.000 EA 1 FEDERAL PROJECT PAGE 35 Call Order : 018 CONTRACT ID : 9525407 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U340-0034/00-010.20 00 00CM 0034 041 E00 COUNTIES : PUTNAM DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/99 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 SIGNAL 0510 660-04C1 SIGNAL SUPPORTS 1.000 EA 0515 660-04C1A SIGNAL SUPPORTS, INSTALLATION ONLY 3.000 EA 0520 660-05H JUNCTION BOXES TYPE H 3.000 EA 0525 660-06 SIGNAL INTERCONNECT LUMP LUMP 0530 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0535 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0540 662-07250W LUMINAIRES (250W.) 2.000 EA 0545 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP SECTION NO. 0003 SIGNING 0550 657-08 2.98KG CHANNEL POST 85.000 M 0555 657-10 4.5KG CHANNEL POST 301.000 M 0560 657-12 5.96KG BACK/BACK CHANNEL POST 34.000 M 0565 658-01 CLASS B CONCRETE FOOTINGS, REINFORCED, OVERHEAD 13.700 M3 0570 658-02 OVERHEAD SIGN STRUCTURE, STEEL-ALUMINUM COMBINATION 1.000 EA 0575 658-03 OVERHEAD SIGN GALVANIZED STEEL 1.000 EA 0580 658-03 OVERHEAD SIGN GALVANIZED STEEL 1.000 EA 0585 659-01 SIGN LIGHTING TYPE 3 LUMP LUMP 0590 659-01 SIGN LIGHTING TYPE 3 LUMP LUMP 0595 659-01 SIGN LIGHTING TYPE 3 LUMP LUMP 0600 661-011 2MM FLAT SHEET SIGNS 60.000 M2 0605 661-02 EXTRUDED PANEL SIGNS 60.000 M2 SECTION NO. 0004 PAVEMENT MARKINGS 1 FEDERAL PROJECT PAGE 36 Call Order : 018 CONTRACT ID : 9525407 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U340-0034/00-010.20 00 00CM 0034 041 E00 COUNTIES : PUTNAM DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/99 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== 0610 663-0112W EDGE LINE WHITE TYPE II 4,020.000 M 0615 663-0212W LANE LINE OR CENTER LINE WHITE TYPE II 230.000 M 0620 663-0212Y LANE LINE OR CENTER LINE YELLOW TYPE II 795.000 M 0625 663-0312 BARRIER LINES TYPE II 4,241.000 M 0630 663-042 TYPE II CHANNELIZING LINES 241.000 M 0635 663-055 TYPE V STOP LINES 165.000 M 0640 663-075W TYPE V STRIPES WHITE 44.000 M 0645 663-075Y TYPE V STRIPES YELLOW 94.000 M 0650 663-105 TYPE V LANE ARROWS 40.000 EA 0655 663-115 TYPE V LANE LETTERS 24.000 EA SECTION NO. 0005 WATERLINE RELOCATION 0660 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0665 670-04150250 DUCTILE IRON PIPE TYPE II CLASS 50, 150MM 112.000 M 0670 670-04250250 DUCTILE IRON PIPE TYPE II CLASS 50, 250MM 127.000 M 0675 670-07050200 PLASTIC PIPE CLASS 200, 50MM 365.000 M 0680 670-07100200 PLASTIC PIPE CLASS 200, 100MM 32.000 M 0685 670-07150200 PLASTIC PIPE CLASS 200, 150MM 742.000 M 0690 670-07250200 PLASTIC PIPE CLASS 200, 250MM 1,263.000 M 0695 670-0819 COPPER SERVICE PIPE, 19MM 92.000 M 0700 670-0825 COPPER SERVICE PIPE, 25MM 5.000 M 0705 670-0850 COPPER SERVICE PIPE, 50MM 3.000 M 0710 670-09050 GATE VALVE AND VALVE BOX, 50MM 2.000 EA 1 FEDERAL PROJECT PAGE 37 Call Order : 018 CONTRACT ID : 9525407 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U340-0034/00-010.20 00 00CM 0034 041 E00 COUNTIES : PUTNAM DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/99 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0005 WATERLINE RELOCATION 0715 670-09100 GATE VALVE AND VALVE BOX, 100MM 4.000 EA 0720 670-09150 GATE VALVE AND VALVE BOX, 150MM 17.000 EA 0725 670-09250 GATE VALVE AND VALVE BOX, 250MM 13.000 EA 0730 670-10015006 STEEL CASING PIPE, 150MM 6.35MM 18.000 M 0735 670-10035006 STEEL CASING PIPE, 350MM, 6.35MM 133.000 M 0740 670-10045010 STEEL CASING PIPE, 450MM 9.53MM 115.000 M 0745 670-13133 FIRE HYDRANT ASSEMBLY, 133.35MM 4.000 M 0750 670-16 RELOCATE METER 13.000 EA 0755 670-17 METER BOX 13.000 EA 0760 670-19 SPECIAL VALVE, AIR RELEASE 2.000 EA 0765 670-190050 SPECIAL VALVE, BLOWOFF ASSEMBLY 2.000 EA 0770 670-190150 SPECIAL VALVE, 150MM TAP & SLEEVE 2.000 EA 0775 670-190250 SPECIAL VALVE, 250MMX150MM TAP & SLEEVE 1.000 EA 0780 670-2119 HOUSE CONNECTION 19MM 11.000 M 0785 670-2125 HOUSE CONNECTION 25MM 2.000 M SECTION NO. 0006 SANITARY SEWER RELOCATION 0790 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0795 675-07254 PLASTIC SEWER PIPE 254MM 131.000 M 0800 675-08254250 DUCTILE IRON SEWER PIPE, TYPE II, CLASS 50, 254MM 50.000 M 0805 675-14 MANHOLE COMPLETE, INCLUDING CASTINGS 2.000 EA 0810 675-15 DROP MANHOLE COMPLETE, INCLUDING CASTINGS 1.000 EA 1 FEDERAL PROJECT PAGE 38 Call Order : 018 CONTRACT ID : 9525407 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U340-0034/00-010.20 00 00CM 0034 041 E00 COUNTIES : PUTNAM DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/99 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0006 SANITARY SEWER RELOCATION 0815 675-16 SPECIAL MANHOLE COMPLETE, INCULDING CASTING 2.000 EA 0820 675-17 ABANDONING MANHOLE 2.000 EA 0825 675-18 ADJUSTING MANHOLE 2.000 EA 0830 675-21045010 STEEL CASING PIPE 450MM 9.53MM 47.000 M SECTION NO. 0007 COMPUTER SYSTEM 0835 640-04 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP SECTION NO. 0008 ON JOB TRAINING 0840 699 ON JOB TRAINING 1,000.000 HR 1 FEDERAL PROJECT PAGE 39 Call Order : 019 CONTRACT ID : 9629504 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U341-0019/00-017.02 00 0STP 0019 185 EQ0 COUNTIES : RALEIGH DBE GOALS : 10.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/16/98 RES. ENG.: WAYNE MUSICK ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 1,048.000 M3 0020 207-02 SUBGRADE 120.000 M3 0025 207-34 FABRIC FOR SEPARATION 1,090.000 M2 0030 307-01 CLASS I AGGREGATE BASE COURSE 151.000 M3 0035 409-02 BITUMINOUS MATERIAL PRIME 2,142.000 L 0040 604-010450A2 METALLIC COATED CORRUGATED STEEL PIPE, 450MM, A2 5.000 M 0045 604-720450 SAFETY SLOPE END SECTION, CSP 1.000 EA 0050 633-01 CONCRETE GUTTER 293.000 M2 0055 636-11 TRAFFIC CONTROL DEVICE 20,080.000 UN 0060 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 2.000 EA 0065 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 150.000 EA 0070 636-14 FLAGGER 600.000 HR 0075 636-23 TEMPORARY TRAFFIC SIGNAL LUMP LUMP 0080 636-25B WARNING LIGHTS TYPE B 750.000 DA 0085 638-02 RIGHT OF WAY MARKERS 10.000 EA 0090 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0095 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0100 675-18 ADJUSTING MANHOLE 3.000 EA 0105 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 317.000 MGR AA1 1 FEDERAL PROJECT PAGE 40 Call Order : 019 CONTRACT ID : 9629504 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U341-0019/00-017.02 00 0STP 0019 185 EQ0 COUNTIES : RALEIGH DBE GOALS : 10.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/16/98 RES. ENG.: WAYNE MUSICK ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 317.000 MGR AA2 0115 402-01(1)S HOT MIX ASPHALT SKID PAVEMENT, SLAG 42.000 MGR BB1 0120 402-01(1)SG HOT MIX ASPHALT SKID PAVEMENT, STONE OR GRAVEL 42.000 MGR BB2 SECTION NO. 0002 SIGNAL MODIFICATION 0125 660-04C1A SIGNAL SUPPORTS, INSTALLATION ONLY 1.000 EA 0130 660-05H JUNCTION BOXES TYPE H 2.000 EA 0135 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 1 STATE PROJECT PAGE 41 Call Order : 020 CONTRACT ID : 9819502 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S302-0024/00-001.72 00 COUNTIES : BERKELEY GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/98 RES. ENG.: LARRY DEITZ ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 816.000 GA 0010 636-06 PILOT TRUCK AND DRIVER 5.000 DA 0015 636-11 TRAFFIC CONTROL DEVICES 3,490.000 UN 0020 636-14 FLAGGER 110.000 HR 0025 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 900.000 TN AA1 0030 308-01S CLASS 1 AGGREGATE, SLAG 855.000 TN AA2 0035 407-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 1,624.000 TN BB1 0040 407-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 1,543.000 TN BB2 0045 407-3SG HOT-MIX ASPHAPLT PATCH AND LEVEL COURSE, STONE OR GRAVEL 750.000 TN CC1 0050 407-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 713.000 TN CC2 0055 407-7SG SCRATCH COURSE, STONE OR GRAVEL 816.000 TN DD1 0060 407-7S SCRACTH COURSE, SLAG 775.000 TN DD2 1 STATE PROJECT PAGE 42 Call Order : 021 CONTRACT ID : 9819503 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S312-0090/00-008.74 00 COUNTIES : GRANT GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/98 RES. ENG.: LARRY DEITZ ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 740.000 GA 0010 636-06 PILOT TRUCK AND DRIVER 5.000 DA 0015 636-11 TRAFFIC CONTROL DEVICES 2,255.000 UN 0020 636-14 FLAGGER 100.000 HR 0025 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 735.000 TN AA1 0030 308-01S CLASS 1 AGGREGATE, SLAG 698.000 TN AA2 0035 407-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 1,360.000 TN BB1 0040 407-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 1,333.000 TN BB2 0045 407-3SG HOT-MIX ASPHAPLT PATCH AND LEVEL COURSE, STONE OR GRAVEL 375.000 TN CC1 0050 407-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 356.000 TN CC2 0055 407-7SG SCRATCH COURSE, STONE OR GRAVEL 675.000 TN DD1 0060 407-7S SCRACTH COURSE, SLAG 641.000 TN DD2 1 STATE PROJECT PAGE 43 Call Order : 022 CONTRACT ID : 9723007 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S320-0036/00-000.00 00 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/98 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 636-11 TRAFFIC CONTROL DEVICE 8,004.000 UN 0010 636-14 FLAGGER 175.000 HR 0015 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 1,385.000 MGR AA1 0020 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 1,250.000 MGR AA2 0025 407-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 5,200.000 MGR BB1 0030 407-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 4,700.000 MGR BB2 1 STATE PROJECT PAGE 44 Call Order : 023 CONTRACT ID : 9723112 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S327-0033/02-001.52 00 COUNTIES : MASON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/30/98 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 630.000 GA 0010 636-11 TRAFFIC CONTROL DEVICES 3,910.000 UN 0015 636-14 FLAGGER 96.000 HR 0020 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 1,110.000 TN AA1 0025 308-01S CLASS 1 AGGREGATE, SLAG 1,000.000 TN AA2 0030 407-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 4,390.000 TN BB1 0035 407-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 3,960.000 TN BB2 1 STATE PROJECT PAGE 45 Call Order : 024 CONTRACT ID : 9735007 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S331-0119/00-014.42 00 COUNTIES : MONONGALIA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/98 RES. ENG.: DON WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 1,970.000 GA 0010 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 39,350.000 SY 0015 636-06 PILOT TRUCK AND DRIVER 10.000 DA 0020 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4" SOLID LINE 28,440.000 LF 0025 636-11 TRAFFIC CONTROL DEVICES 2,120.000 UN 0030 636-14 FLAGGER 480.000 HR 0035 660-07(01) MISCELLANEOUS SIGNAL LUMP LUMP 0040 660-07(02) MISCELLANEOUS SIGNAL LUMP LUMP 0045 660-07(03) MISCELLANEOUS SIGNAL LUMP LUMP 0050 660-07(04) MISCELLANEOUS SIGNAL LUMP LUMP 0055 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 2,170.000 TN AA1 0060 402-01(1)S HMA SKID PVT, (W-1) SLAG 1,975.000 TN AA2 1 STATE PROJECT PAGE 46 Call Order : 025 CONTRACT ID : 9412313 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S355-0054/04-000.15 00 COUNTIES : WYOMING GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 04/01/99 RES. ENG.: WAYNE MUSICK ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0005 203-01 DISMANTLING STRUCTURES LUMP LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 81.500 CY 0020 207-34 FABRIC FOR SEPARATION 274.000 SY 0025 212-01 STRUCTURE EXCAVATION 1,000.000 CY 0030 212-05 SELECT MATERIAL FOR BACKFILLING 110.000 CY 0035 307-01 CLASS 1 AGGREGATE BASE COURSE 91.000 CY 0040 409-02 BITUMINOUS MATERIAL 79.000 GA 0045 415-05 REMOVE EXISTING PAVEMENT SURFACE 1,150.000 SY 0050 601-02 CLASS B CONCRETE 221.000 CY 0055 601-03 CLASS K CONCRETE 6.000 CY 0060 602-02 EPOXY COATED REINFORCING STEELBARS 34,770.000 LB 0065 603-16(27X36) PRESTRESSED CONCRETE BOX BEAMS 27X36 412.000 LF 0070 607-01(II) TYPE 1 GUARDRAIL 75.000 LF 0075 609-01 CONCRETE SIDEWALK 15.400 SY 0080 610-01(I) PLAIN CONCRETE CURBING 46.300 LF 0085 636-11 TRAFFIC CONTROL DEVICES 1,518.000 UN 0090 638-02 RIGHT OF WAY MARKERS 6.000 EA 0095 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0100 640-01 STANDARD FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0105 640-03 BUILDING EQUIPMENT LUMP LUMP 1 STATE PROJECT PAGE 47 Call Order : 025 CONTRACT ID : 9412313 Letting Date : 08/18/98 10:00 A.M. PROJECTS : S355-0054/04-000.15 00 COUNTIES : WYOMING GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 04/01/99 RES. ENG.: WAYNE MUSICK ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0110 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 0115 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 56.500 TN AA1 0120 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 53.750 TN AA2 0125 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 72.000 TN BB1 0130 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 68.600 TN BB2 1 STATE PROJECT PAGE 48 Call Order : 026 CONTRACT ID : 9812182 Letting Date : 08/18/98 10:00 A.M. PROJECTS : RO82-0REM/GR-099.00 00 COUNTIES : CABELL MINGO GUARANTY : 5% OF BID TOTAL LINCOLN OTHERS PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GUARDRAIL 0005 204-02 MOBILIZATION PER COUNTY 750.000 MI 0010 204-03 MOBILIZATION PER JOB ORDER 10.000 EA 0015 204-04 EMERGENCY MOBILIZATION 5.000 EA 0020 607-01(I) TYPE 1 GUARDRAIL 3,500.000 LF 0025 607-01(I)B TYPE 1 GUARDRAIL AT BRIDGE 300.000 LF 0030 607-01(II) TYPE 1 GUARDRAIL 4,000.000 LF 0035 607-01(III) TYPE 1 GUARDRAIL 1,000.000 LF 0040 607-05(I) TYPE 5 GUARDRAIL 200.000 LF 0045 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 2,000.000 LF 0050 607-10-1 TYPE 1 GUARDRAIL REMOVED AND STORED 1,000.000 LF 0055 607-25(A) CUT SLOPE TERMINAL, TYPE A 5.000 EA 0060 607-25(B) CUT SLOPE TERMINAL, TYPE B 5.000 EA 0065 607-28 MODIFIED ECCENTRIC LOADER TERMINAL 15.000 EA 0070 607-29-1 BREAKAWAY CABLE TERMINAL, REMOVED AND RESET 20.000 EA 0075 607-30 SPECIAL TRAILING END TERMINAL 20.000 EA 0080 607-31 SPECIAL APPROACH END TERMINAL 5.000 EA 0085 607-31(A) 25FT RAIL ELEMENT 5.000 EA 0090 607-31(B) 25FT APPROACH RAIL ELEMENT 5.000 EA 0095 607-31(C) NOSE COVER 5.000 EA 0100 607-31(D) STRUT (2000) 5.000 EA 0105 607-35 GUARDRAIL ELEMENT 500.000 EA 1 STATE PROJECT PAGE 49 Call Order : 026 CONTRACT ID : 9812182 Letting Date : 08/18/98 10:00 A.M. PROJECTS : RO82-0REM/GR-099.00 00 COUNTIES : CABELL MINGO GUARANTY : 5% OF BID TOTAL LINCOLN OTHERS PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/99 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GUARDRAIL 0110 607-36 END SHOE FOR CUT TERMINALS AND BRIDGE CONNECTIONS 25.000 EA 0115 607-37 BUFFER END SECTION 100.000 EA 0120 607-38 STEEL GUARDRAIL BLOCK 25.000 EA 0125 607-39 TREATED WOOD BLOCK (6"X6"X14") 400.000 EA 0130 607-40 TREATED WOOD BLOCK (8"X6"X14") 50.000 EA 0135 607-41 CURVED RAIL ELEMENT (13'-6.5") 100.000 EA 0140 607-42 STEEL POSTS (6') 300.000 EA 0145 607-43 STEEL POSTS (8') 100.000 EA 0150 607-44 TREATED WOOD POST (6"X8"X6') 25.000 EA 0155 607-45 TREATED WOOD POST (5.5"X7.5"X3'-8") 25.000 EA 0160 607-46 TREATED WOOD POST, 7"ROUND X 6' 25.000 EA 0165 607-47 TREATED WOOD POST, 10"X10"X6' 25.000 EA 0170 607-48 STRUCTURE MOUNTED POST, ANCHORED 50.000 EA 0175 607-48(I) BRIDGE POST SIDE MOUNTED WITH HARDWARE. 50.000 EA 0180 607-50 STEEL TUBE SLEEVE (8"X6"X5') 20.000 EA 0185 607-56(I) GUARDRAIL INSTAL ONLY CL. I 500.000 LF 0190 607-56(II) GUARDRAIL INSTAL ONLY CL. II 12,000.000 LF 1 STATE PROJECT PAGE 50 Call Order : 027 CONTRACT ID : 9723410 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U350-0052/44-000.00 00 COUNTIES : WAYNE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/98 RES. ENG.: CHARLES SHAVER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 1,585.000 GA 0010 636-11 TRAFFIC CONTROL DEVICES 880.000 UN 0015 636-14 FLAGGER 52.000 HR 0020 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 670.000 TN AA1 0025 308-01S CLASS 1 AGGREGATE, SLAG 610.000 TN AA2 0030 407-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,745.000 TN BB1 0035 407-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 1,588.000 TN BB2 0040 407-3SG HOT-MIX ASPHAPLT PATCH AND LEVEL COURSE, STONE OR GRAVEL 50.000 TN CC1 0045 407-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 46.000 TN CC2 1 STATE PROJECT PAGE 51 Call Order : 028 CONTRACT ID : 9727311 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U320-0622/00-013.98 00 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/99 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 WIDENING 0005 207-01 UNCLASSIFIED EXCAVATION 2,040.000 CY 0010 207-34 FABRIC FOR SEPARATION 4,613.000 SY 0015 229-01 SHOULDERS AND DITCHES 0.290 LM 0020 408-02 BITUMINOUS MATERIAL 1,868.000 GA 0025 409-02 BITUMINOUS MATERIAL 1,084.000 GA 0030 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 6,015.000 SY 0035 604-52(18) POLYVINYLCHLORIDE PIPE 1,477.000 LF 0040 605-04 TYPE B INLET 22.000 EA 0045 605-09 TYPE G INLET 1.000 EA 0050 606-22 CRUSHED STONE, GRAVEL,OR SILICA SAND FOR UNDERDRAINS 59.000 CY 0055 606-25(4) UNDERDRAIN PIPE 1,167.000 LF 0060 607-01(II) TYPE 1 GUARDRAIL 108.000 LF 0065 607-37 BUFFER END SECTION 2.000 EA 0070 607-51 REMOVE & RESET GUARDRAIL POST 858.000 EA 0075 610-05(II) BITUMINOUS CURBING 1,668.000 LF 0080 622-03 CANTILEVER MAILBOX SUPPORT 8.000 EA 0085 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4" SOLID LINE 9,840.000 LF 0090 636-11 TRAFFIC CONTROL DEVICES 5,635.000 UN 0095 636-14 FLAGGER 1,060.000 HR 0100 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0105 661-02 EXTRUDED PANEL SIGNS 12.000 SF 1 STATE PROJECT PAGE 52 Call Order : 028 CONTRACT ID : 9727311 Letting Date : 08/18/98 10:00 A.M. PROJECTS : U320-0622/00-013.98 00 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/99 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 WIDENING 0110 663-01-1(II)W EDGE LINE, WHITE 4,920.000 LF 0115 663-01-1(II)Y EDGE LINE, YELLOW 4,920.000 LF 0120 663-07(V)Y TYPE V, STRIPES, YELLOW 150.000 LF 0125 663-10(V) TYPE V, LANE ARROWS 24.000 EA 0130 663-11(V) TYPE V, LANE LETTERS 4.000 EA 0135 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 1,709.000 TN AA1 0140 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 1,538.000 TN AA2 0145 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 66.000 TN BB1 0150 308-01S CLASS 1 AGGREGATE, SLAG 60.000 TN BB2 0155 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 3,044.000 TN CC1 0160 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 2,990.000 TN CC2 0165 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 273.000 TN DD1 0170 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 250.000 TN DD2 0175 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 545.000 TN EE1 0180 402-01(1)S HMA SKID PVT, (W-1) SLAG 500.000 TN EE2 1 FEDERAL PROJECT PAGE 53 Call Order : 029 CONTRACT ID : 9734611R1 Letting Date : 08/18/98 10:00 A.M. PROJECTS : E305-0002/00-001.53 00 00NH 0002 296 E00 COUNTIES : BROOKE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/28/99 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SLIDE CORR 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 21,009.000 CY 0020 211-08 ROCK BORROW EXCAVATION 770.000 TN 0025 229-01 SHOULDERS AND DITCHES 0.200 LM 0030 408-02 BITUMINOUS MATERIAL 188.000 GA 0035 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 1,150.000 SY 0040 636-01 TRAFFIC CONTROL LUMP LUMP 0045 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4" SOLID LINE 9,100.000 LF 0050 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 2.000 EA 0055 636-14 FLAGGER 750.000 HR 0060 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0065 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0070 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 103.000 TN AA1 0075 308-01S CLASS 1 AGGREGATE, SLAG 101.000 TN AA2 0080 308-01STS CLASS 1 AGGREGATE, STEEL SLAG 115.000 TN AA3 0085 401-7SG SCRATCH COURSE, STONE OR GRAVEL 74.000 TN BB1 0090 401-7S SCRATCH COURSE, SLAG 67.000 TN BB2 0095 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 155.000 TN CC1 0100 402-01(1)S HMA SKID PVT, (W-1) SLAG 140.000 TN CC2