1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- August 10, 1999 LETTING Sealed proposals will be received by the West Virginia Department of Transportation, Division of Highways at its office in Building Five, Room A-148, 1900 Kanawha Boulevard East, Charleston, West Virginia 25305-0430 until 10 A.M. August 10, 1999 and said proposals will be publicly opened and read immediately thereafter for the construction of the following project(s): ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 001 *9913322 S339-0072/00-006.30 00 0STP 0072 062 E00 REHABILITATION-RESTORATION-RESURFACING ROWLESBURG ROAD US 50 - ROWLESBURG SO CORP LIMIT COUNTY: PRESTON ------------------------------------------------------------------------------------------------------------------------------------ 002 9836301 U330-0010/00-000.00 00 UPGRADE & WIDEN PAVEMENT RIGHT FORK OF BEN'S CREEK CR 13 TO 1.80 MI. S. CR 13 COUNTY: MINGO ------------------------------------------------------------------------------------------------------------------------------------ 003 9805506 U319-0340/00-012.21 00 00NH 0340 037 E00 CONST NEW/RELOC 2 LANE ROAD SHIPLEY SCHOOL ROAD WV 230 - 0.10 MI N CO 340/13 COUNTY: JEFFERSON DBE GOAL: 8 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 004 9815632 S330-0006/00-001.06 00 0STP 0006 016 E00 REHABILITATION-RESTORATION-RESURFACING MATE CREEK 3 RD 0.6 MI W CO 6/16 - 0.11 MI W CO 6/14 COUNTY: MINGO ------------------------------------------------------------------------------------------------------------------------------------ 005 *9722618 U341-0003/00-046.42 00 UPGRADE & WIDEN PAVEMENT SHADY SPRING ROAD US 19 - 0.06 MILE E. US 19 COUNTY: RALEIGH ------------------------------------------------------------------------------------------------------------------------------------ 006 9218158 S346-0050/00-010.33 00 ACBR 0050 077 E00 CONST NEW/RELOC ROAD W/BRIDGE(S) FETTERMAN TRUSS BRIDGE #4241 GRAFTON, OVER TYGART R & CSX RR, .3 MI E CO 40 COUNTY: TAYLOR BRIDGE : #4241 CONCRETE SLAB ON STEEL THRU TRUSS SPAN(S): 7 ; STRUCTURE STEEL: 649508 KG DBE GOAL: 6 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 007 9802205 X349-0033/15-000.00 00 CONST NEW/RELOC ROAD UPSHUR COUNTY INDUSTRIAL PARK CONNECTOR CO RTE 33/15, CONNECTING US RTE 33 & CO RTE 13 - BUCKHANNON COUNTY: UPSHUR ------------------------------------------------------------------------------------------------------------------------------------ 008 9800911 U338-0219/00-016.75 00 UPGRADE & WIDEN PAVEMENT PRICE HILL ROAD 0.06 MI N CO 219/7 - 0.5 MI S CO 19 COUNTY: POCAHONTAS ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- August 10, 1999 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 009 9918302 S320-0053/00-000.00 00 RESURFACING WILLS CREEK ROAD CO 43 - CO 53/2 COUNTY: KANAWHA ------------------------------------------------------------------------------------------------------------------------------------ 010 9918301 S327-0033/00-010.54 00 RESURFACING WEST CREEK TO JACKSON COUNTY LINE E END BR - JACKSON CO LI COUNTY: MASON ------------------------------------------------------------------------------------------------------------------------------------ 011 *9918101 S340-0002/00-002.28 00 RESURFACING JIM RIDGE ROAD CO 5 - JACKSON CO LI COUNTY: PUTNAM ------------------------------------------------------------------------------------------------------------------------------------ 012 *9917606 S318-0068/00-000.95 00 RESURFACING WASHINGTON STREET .08 MI. S. CR 2/19 TO .03 MI. N. OF CR 33/1 COUNTY: JACKSON ------------------------------------------------------------------------------------------------------------------------------------ 013 *9918103 S340-0033/00-003.86 00 RESURFACING SCOTT DEPOT TO SCARY 0.11 MI E CO 33/5 - US 35 COUNTY: PUTNAM ------------------------------------------------------------------------------------------------------------------------------------ 014 *9918205 S341-0002/00-006.97 00 RESURFACING UPPER SANDLICK ROAD CR 2/4 - WV 3 COUNTY: RALEIGH ------------------------------------------------------------------------------------------------------------------------------------ 015 9914081R1 G026-0HDQ/00-001.00 01 BUILDING CONSTRUCTION DISTRICT SIX OFFICE BUILDING 09 MI. N. CO 2/21 COUNTY: MARSHALL REMARKS : PREQUALIFICATION NOT REQUIRED ------------------------------------------------------------------------------------------------------------------------------------ 016 9825801R1 U318-0033/00-023.00 00 DRAINAGE IMPROVEMENTS RIPLEY - FROZEN CAMP 0.11 MI W CO 16 COUNTY: JACKSON CONTRACT: 9825801 DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. ------------------------------------------------------------------------------------------------------------------------------------ 017 *9714201R1 U335-0088/00-006.18 00 0STP 0088 024 E00 CONST TURN LANE(S) BETHANY PIKE RIGHT TURNING LANE WV 88 AT INTERSECTION OF US 40 COUNTY: OHIO CONTRACT: 9714201 DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- August 10, 1999 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 018 9816841R1 U331-0045/00-000.39 00 RAISE OR LOWER GRADE RIVER ROAD 0.39 MI E US 19 - 0.62 MI E US 19 COUNTY: MONONGALIA CONTRACT: 9816841 DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. ------------------------------------------------------------------------------------------------------------------------------------ Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25304-0430 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virginia Code. All contractors submitting bids on project(s) must include one of the following forms properly executed with each proposal: Proposal Guaranty Bond, Cashier's Check, or Certified Check for $500.00 or 5% of total bid, whichever is greater. Failure to include one of the above forms could result in a bid being declared irregular. Proposals and bid bonds must be submitted on standard forms which may be obtained at the Charleston office. The right is reserved to reject any or all proposals. *These are projects on which any contractor with a Category "W" Prequalification Rating may be eligible to bid. Final award of all Interstate and Federal-Aid Projects, with the exception of exempt projects, is subject to the approval of the Federal Highway Administration. Minimum wage rates for these projects have been predetermined as required by law and are set forth in the bid proposal. Federal-Aid projects are subject to the WHA of 1961 PL-581 approved August 13, 1962. Plans and proposals on all projects will be furnished at twenty-five dollars ($25.00) per set. Extra plans will be furnished at fifteen dollars ($15.00) per set and extra proposals will be furnished at ten dollars ($10.00) per proposal. Cross sections will be furnished at fifty dollars ($50.00) per set. All will be furnished without refund and transmitted at your risk. The above noted project information will be available in the Contract Unit, Construction Section, Division of Highways, Room A-737, Building 5, 1900 Kanawha Boulevard East, Charleston, WV 25305 and may also be ordered by calling (304)558-2874. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid bidding proposals will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. The West Virginia Department of Transportation, Division of Highways hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex or national orign in consideration for an award. No proposals for these projects will be issued after 3:00 P.M. on the day prior to the letting. It is necessary to advise your approximate uncompleted workload when ordering plans and proposals. Announcement, opening and reading of bids received will be in the order as designated in the "Notice to Contractors". Sealed proposals may also be deposited in the bid depository box which will be located near the corner of Piedmont Road and California Avenue between the hours of 9 A.M. and 10 A.M., the day of the letting. Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25305-0430 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division Of Highways John J. Welch, Jr., Director Project Control Division 1 1 FEDERAL PROJECT PAGE 1 Call Order : 001 CONTRACT ID : 9913322 Letting Date : 08/10/99 10:00 A.M. PROJECTS : S339-0072/00-006.30 00 0STP 0072 062 E00 COUNTIES : PRESTON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/00 RES. ENG.: DONALD WILLIAMS DESCRIPTION: ROWLESBURG ROAD NOTE : USER DEFINED, BOILERPLATE TEXT WILL BE DISPLAYED. THE TEXT DISPLAYED IN THIS AREA WILL BE DETERMINED BY THE SETASID CODE. A MAXIMUM OF 25 LINES WILL BE DISPLAYED. ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 DRAINAGE, RESURFACING, SAFETY 0005 229-01 SHOULDERS AND DITCHES 1.720 LM 0010 240-01(15) CLEANING CULVERTS 42.000 LF 0015 240-01(18) CLEANING CULVERTS 88.000 LF 0020 240-01(36) CLEANING CULVERTS 65.000 LF 0025 408-02 BITUMINOUS MATERIAL 1,040.000 GA 0030 605-09 TYPE G INLET 2.000 EA 0035 605-50 ADJUSTING CONCRETE HEADWALL 3.000 EA 0040 607-01(I) TYPE 1 GUARDRAIL 2,350.000 LF 0045 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 1,000.000 LF 0050 607-10-1(A) GUARDRAIL REMOVAL 112.500 LF 0055 607-65 FLARED END TERMINAL 12.000 EA 0060 636-06 PILOT TRUCK AND DRIVER 10.000 DA 0065 636-11 TRAFFIC CONTROL DEVICES 1,870.000 UN 0070 636-14 FLAGGER 200.000 HR 0075 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 880.000 TN AA1 0080 308-01S CLASS 1 AGGREGATE, SLAG 790.000 TN AA2 0085 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,720.000 TN BB1 0090 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 1,550.000 TN BB2 0095 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 1,150.000 TN CC1 1 FEDERAL PROJECT PAGE 2 Call Order : 001 CONTRACT ID : 9913322 Letting Date : 08/10/99 10:00 A.M. PROJECTS : S339-0072/00-006.30 00 0STP 0072 062 E00 COUNTIES : PRESTON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/00 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 DRAINAGE, RESURFACING, SAFETY 0100 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 1,035.000 TN CC2 1 STATE PROJECT PAGE 3 Call Order : 002 CONTRACT ID : 9836301 Letting Date : 08/10/99 10:00 A.M. PROJECTS : U330-0010/00-000.00 00 COUNTIES : MINGO GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/99 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 207-01 UNCLASSIFIED EXCAVATION 1,136.000 CY 0010 408-02 BITUMINOUS MATERIAL 1,375.000 GA 0015 409-02 BITUMINOUS MATERIAL 1,539.000 GA 0020 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 19,516.000 LF 0025 636-11 TRAFFIC CONTROL DEVICES 880.000 UN 0030 636-14 FLAGGER 400.000 HR 0035 663-02-1(II)Y LANE LINE OR CENTERLINE YELLOW 19,516.000 LF 0040 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 2,000.000 TN AA1 0045 308-01S CLASS 1 AGGREGATE, SLAG 1,820.000 TN AA2 0050 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 10,774.000 TN BB1 0055 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 9,804.000 TN BB2 0060 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 2,800.000 TN CC1 0065 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 2,548.000 TN CC2 0070 401-03SG HOT-LAID ASPHALT PATCH & LEVEL COURSE, STONE OR GRAVEL 300.000 TN DD1 2 IN THICKNESS MAXIMUM 0075 401-03S HOT-LAID ASPHALT PATCH & LEVEL COURSE, SLAG 273.000 TN DD2 2 IN THICKNESS MAXIMUM 1 FEDERAL PROJECT PAGE 4 Call Order : 003 CONTRACT ID : 9805506 Letting Date : 08/10/99 10:00 A.M. PROJECTS : U319-0340/00-012.21 00 00NH 0340 037 E00 COUNTIES : JEFFERSON DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/30/00 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 NEW CONSTRUCTION 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 11,399.000 CY 0020 207-02 SUBGRADE 1,425.000 CY 0025 207-34 FABRIC FOR SEPARATION 9,009.000 SY 0030 307-01 CLASS 1 AGGREGATE BASE COURSE 2,144.000 CY 0035 409-02 BITUMINOUS MATERIAL 1,083.000 GA 0040 604-37(18)III REINFORCED CONCRETE PIPE 80.000 LF 0045 604-37(30)III REINFORCED CONCRETE PIPE 168.000 LF 0050 608-02(3F11I) RIGHT-OF-WAY FENCE, FARM FIELD TYPE 370.000 LF 0055 636-11 TRAFFIC CONTROL DEVICES 3,002.000 UN 0060 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 12.000 EA 0065 636-14 FLAGGER 100.000 HR 0070 636-25(B) WARNING LIGHTS 250.000 DA 0075 638-02 RIGHT OF WAY MARKERS 6.000 EA 0080 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0085 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0090 636-02SG AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 100.000 TN AA1 0095 636-02S AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 95.000 TN AA2 0100 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,518.000 TN BB1 0105 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 1,455.000 TN BB2 1 FEDERAL PROJECT PAGE 5 Call Order : 003 CONTRACT ID : 9805506 Letting Date : 08/10/99 10:00 A.M. PROJECTS : U319-0340/00-012.21 00 00NH 0340 037 E00 COUNTIES : JEFFERSON DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/30/00 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 NEW CONSTRUCTION 0110 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 429.000 TN CC1 0115 402-01(1)S HMA SKID PVT, (W-1) SLAG 407.000 TN CC2 1 FEDERAL PROJECT PAGE 6 Call Order : 004 CONTRACT ID : 9815632 Letting Date : 08/10/99 10:00 A.M. PROJECTS : S330-0006/00-001.06 00 0STP 0006 016 E00 COUNTIES : MINGO GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/30/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 3R 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 130.000 M3 0020 211-02 ROCK BORROW EXCAVATION 10.000 M3 0025 218-03 GABIONS 67.188 M3 0030 229-01 SHOULDERS AND DITCHES 0.774 KM 0035 240-010450 CLEANING CULVERTS 450MM 73.000 M 0040 240-06 CLEAN INLET AND OUTLET DITCHES 30.000 M 0045 408-02 BITUMINOUS MATERIAL 1,325.000 L 0050 409-02 BITUMINOUS MATERIAL PRIME 330.000 L 0055 601-02 CLASS B CONCRETE 11.148 M3 0060 604-010400A2 METALLIC COATED CORRUGATED STEEL PIPE 400MM, A2 43.000 M 0065 604-010450A2 METALLIC COATED CORRUGATED STEEL PIPE, 450MM, A2 374.760 M 0070 604-010600A2 METALLIC COATED CORRUGATED STEEL PIPE, 600MM, A2 17.000 M 0075 604-090400 END SECTION FOR CORRUGATED STEEL PIPE 400MM 1.000 EA 0080 604-090600 END SECTION FOR CORRUGATED STEEL PIPE 600MM 1.000 EA 0085 604-540450V JACKED CONDUIT, REINFORCED CONCRETE PIPE, 450MM, CLASS V 15.240 M 0090 605-04 TYPE B INLET 10.000 EA 0095 605-0410 CONCRETE BOX DITCH 17.000 M 0100 605-09 TYPE G INLET 6.000 EA 0105 605-091 TYPE G INLET, MODIFIED 1.000 EA 1 FEDERAL PROJECT PAGE 7 Call Order : 004 CONTRACT ID : 9815632 Letting Date : 08/10/99 10:00 A.M. PROJECTS : S330-0006/00-001.06 00 0STP 0006 016 E00 COUNTIES : MINGO GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/30/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 3R 0110 605-15 ADJUST EXISTING MANHOLE 10.000 EA 0115 605-50 ADJUSTING CONCRETE HEADWALL 1.000 EA 0120 610-031 COMBINATION CONCRETE CURBING AND GUTTER TYPE I 282.000 M 0125 610-034 COMBINED CONCRETE CURBING & GUTTER TYPE IV 64.000 M 0130 636-08 TEMP PVMT MARKING-PAINT 774.000 M 0135 636-11 TRAFFIC CONTROL DEVICE 3,000.000 UN 0140 636-14 FLAGGER 1,000.000 HR 0145 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0150 663-0112W EDGE LINE WHITE TYPE II 1,548.000 M 0155 663-0212Y LANE LINE OR CENTER LINE YELLOW TYPE II 1,548.000 M 0160 663-055 TYPE V STOP LINES 36.000 M 0165 663-155 RAILROAD CROSSING MARKINGS TYPE V 4.000 EA 0170 670-07019200 PLASTIC PIPE CLASS 200, 19MM 2.000 M 0175 670-07025200 PLASTIC PIPE CLASS 200, 25MM 2.000 M 0180 670-07100200 PLASTIC PIPE CLASS 200, 100MM 2.000 M 0185 670-07150200 PLASTIC PIPE CLASS 200, 150MM 2.000 M 0190 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE/GRAVE 66.000 MGR AA1 0195 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 60.000 MGR AA2 0200 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 167.000 MGR BB1 0205 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 152.000 MGR BB2 0210 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 110.000 MGR CC1 1 FEDERAL PROJECT PAGE 8 Call Order : 004 CONTRACT ID : 9815632 Letting Date : 08/10/99 10:00 A.M. PROJECTS : S330-0006/00-001.06 00 0STP 0006 016 E00 COUNTIES : MINGO GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/30/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 3R 0215 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 100.000 MGR CC2 0220 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 100.000 MGR DD1 0225 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 91.000 MGR DD2 0230 402-01(1)SG HOT MIX ASPHALT SKID PAVEMENT, STONE OR GRAVEL 350.000 MGR EE1 0235 402-01(1)S HOT MIX ASPHALT SKID PAVEMENT, SLAG 318.000 MGR EE2 1 STATE PROJECT PAGE 9 Call Order : 005 CONTRACT ID : 9722618 Letting Date : 08/10/99 10:00 A.M. PROJECTS : U341-0003/00-046.42 00 COUNTIES : RALEIGH GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/01/99 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ADD LEFT LANE 0005 204-01 MOBILIZATION LUMP LUMP 0010 207-01 UNCLASSIFIED EXCAVATION 106.200 CY 0015 408-02 BITUMINOUS MATERIAL 167.000 GA 0020 409-02 BITUMINOUS MATERIAL 81.000 GA 0025 636-06 PILOT TRUCK AND DRIVER 5.000 DA 0030 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 3,736.000 LF 0035 636-11 TRAFFIC CONTROL DEVICES 1,610.000 UN 0040 636-14 FLAGGER 150.000 HR 0045 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0050 657-10 (3.00LB) CHANNEL POSTS 30.000 LF 0055 661-01(2) (0.100),FLAT SHEET SIGNS 9.000 SF 0060 661-11 INSTALLATION OF REUSABLE SIGNS 2.000 EA 0065 663-01-1(II)W EDGE LINE, WHITE 2,520.000 LF 0070 663-02-1(II)W LANE LINE OR CENTERLINE, WHITE 55.000 LF 0075 663-04(II) TYPE II CHANNELIZING LINES 571.000 LF 0080 663-05(V) TYPE V, STOP LINES 24.000 LF 0085 663-07(II)W TYPE II, STRIPES WHITE (12 IN) 552.000 LF 0090 663-07(II)Y TYPE II, STRIPE YELLOW (12 IN) 280.000 LF 0095 663-10(V) TYPE V, LANE ARROWS 4.000 EA 0100 663-11(V) TYPE V, LANE LETTERS 8.000 EA 0105 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 175.000 TN AA1 1 STATE PROJECT PAGE 10 Call Order : 005 CONTRACT ID : 9722618 Letting Date : 08/10/99 10:00 A.M. PROJECTS : U341-0003/00-046.42 00 COUNTIES : RALEIGH GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/01/99 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ADD LEFT LANE 0110 308-01S CLASS 1 AGGREGATE, SLAG 159.250 TN AA2 0115 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 93.000 TN BB1 0120 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 84.630 TN BB2 0125 401-7SG SCRATCH COURSE, STONE OR GRAVEL 160.000 TN CC1 0130 401-7S SCRATCH COURSE, SLAG 145.600 TN CC2 0135 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 355.000 TN DD1 0140 402-01(1)S HMA SKID PVT, (W-1) SLAG 323.500 TN DD2 1 FEDERAL PROJECT PAGE 11 Call Order : 006 CONTRACT ID : 9218158 Letting Date : 08/10/99 10:00 A.M. PROJECTS : S346-0050/00-010.33 00 ACBR 0050 077 E00 COUNTIES : TAYLOR DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/01 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0015 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0020 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0025 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0030 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0035 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0040 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0045 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0050 204-01 MOBILIZATION LUMP LUMP 0055 207-01 UNCLASSIFIED EXCAVATION 16,082.000 M3 0060 207-02 SUBGRADE 1,734.000 M3 0065 207-34 FABRIC FOR SEPARATION 11,443.000 M2 0070 211-02 ROCK BORROW EXCAVATION 1,858.000 M3 0075 307-01 CLASS I AGGREGATE BASE COURSE 2,260.000 M3 0080 308-01 CLASS 1 AGGREGATE BASE COURSE 576.000 MGR 0085 409-02 BITUMINOUS MATERIAL PRIME 17,556.000 L 0090 502-01300 PORTLAND CEMENT CONCRETE APPRACH SLAB 300MM 240.000 M2 0095 601-02 CLASS B CONCRETE 15.200 M3 0100 605-01 TYPE A MANHOLE 1.000 EA 0105 605-03 TYPE A INLET 2.000 EA 1 FEDERAL PROJECT PAGE 12 Call Order : 006 CONTRACT ID : 9218158 Letting Date : 08/10/99 10:00 A.M. PROJECTS : S346-0050/00-010.33 00 ACBR 0050 077 E00 COUNTIES : TAYLOR DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/01 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 605-04 TYPE B INLET 10.000 EA 0115 605-09 TYPE G INLET 15.000 EA 0120 606-200300 AGGREGATE FILL FABRIC UNDERDRAIN 300MM 390.000 M 0125 607-011 TYPE 1 GUARDRAIL, CLASS I 177.000 M 0130 607-06 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 4.000 EA 0135 607-65 FLARED END TERMINAL 2.000 EA 0140 609-01 CONCRETE SIDEWALK 633.000 M2 0145 610-031 COMBINATION CONCRETE CURBING AND GUTTER TYPE I 502.000 M 0150 610-034 COMBINED CONCRETE CURBING & GUTTER TYPE IV 75.000 M 0155 633-03 DUMPED ROCK GUTTER 49.000 M3 0160 636-07 ERADICATION PAVEMENT MARKINGS 1,460.000 M 0165 636-08 TEMP PVMT MARKING-PAINT 2,920.000 M 0170 636-09 TEMP PVMT MARKING-TAPE 1,080.000 M 0175 636-10 TEMPORARY RAISED PAVEMENT MARKERS 80.000 EA 0180 636-11 TRAFFIC CONTROL DEVICE 20,930.000 UN 0185 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 2.000 EA 0190 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 40.000 EA 0195 636-14 FLAGGER 2,880.000 HR 0200 636-15 TEMPORARY GUARDRAIL CHANNELIZATION DEVICE 240.000 M 0205 636-16 REMOVEING AND RESETING TEMPORARY GUARDRAIL CHANNELIZE DEVICE 240.000 M 0210 636-19 TEMPORARY GUARDRAIL BARRIERS 200.000 M 1 FEDERAL PROJECT PAGE 13 Call Order : 006 CONTRACT ID : 9218158 Letting Date : 08/10/99 10:00 A.M. PROJECTS : S346-0050/00-010.33 00 ACBR 0050 077 E00 COUNTIES : TAYLOR DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/01 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0215 636-20 REMOVING AND RESETTING TEMPORARY GUARDRAIL BARRIER 200.000 M 0220 636-21 ELECTRIC ARROW 90.000 DA 0225 636-25B WARNING LIGHTS TYPE B 2,160.000 DA 0230 636-25C WARNING LIGHTS TYPE C 8,640.000 DA 0235 637-01 WATER FOR DUST PALLIATIVE 158.000 M3 0240 638-02 RIGHT OF WAY MARKERS 35.000 EA 0245 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0250 640-01 STANDARD FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0255 640-03 BUILDING EQUIPMENT LUMP LUMP 0260 642-01 TEMPORARY BERMS 372.000 M 0265 642-02 SLOPE DRAINS 4.500 M 0270 642-031 DITCH CHECKS 15.000 EA 0275 642-032 CHECK DAMS 2.000 EA 0280 642-043 SEED MIXTURE D 12.000 KG 0285 642-044 SEED MIXTURE L 101.000 KG 0290 642-051 STRAW OR HAY MULCH 3.100 MGR 0295 642-052 WOOD CELLULOSE FIBER MULCH 0.200 MGR 0300 642-06 FERTILIZER 0.300 MGR 0305 642-09 CONTOUR DITCH 1,300.000 M 0310 642-10 AGRICULTURAL LIMESTONE 2.500 MGR 0315 642-12 SILT FENCE 1,378.000 M 1 FEDERAL PROJECT PAGE 14 Call Order : 006 CONTRACT ID : 9218158 Letting Date : 08/10/99 10:00 A.M. PROJECTS : S346-0050/00-010.33 00 ACBR 0050 077 E00 COUNTIES : TAYLOR DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/01 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0320 652-01 AGRICULTURAL LIMESTONE 2.500 MGR 0325 652-021 FERTILIZER 10-20-10 0.400 MGR 0330 652-022 UREA FORMALDEHYDE FERTILIZER 0.300 MGR 0335 652-031 SEED MIXTURES B, C-1, OR C-2 8.000 KG 0340 652-032 SEED MIXTURES D 12.000 KG 0345 652-035 SEED MIXTURE L 101.000 KG 0350 652-041 STRAW OR HAY MULCH 3.100 MGR 0355 652-042 WOOD CELLULOSE FIBER MULCH 0.100 MGR 0385 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 5,003.000 MGR AA1 0390 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 4,568.000 MGR AA2 0395 402-01(1)SG HOT MIX ASPHALT SKID PAVEMENT, STONE OR GRAVEL 523.000 MGR BB1 0400 402-01(1)S HOT MIX ASPHALT SKID PAVEMENT, SLAG 477.000 MGR BB2 0405 604-010450A2 METALLIC COATED CORRUGATED STEEL PIPE, 450MM, A2 472.000 M CC1 0410 604-090450 END SECTION FOR CORRUGATED STEEL PIPE 450MM 2.000 EA CC1 0415 604-3704502 REINFORCED CONCRETE PIPE, 450MM, CLII 472.000 M CC2 0420 604-380450 REINFORCED CONCRETE END SECTION, 450MM 2.000 EA CC2 0425 604-760450A2 ALUMINUM COATED CORRUGATED STEEL PIPE, 450MM, A2 472.000 M CC3 0430 604-090450 END SECTION FOR CORRUGATED STEEL PIPE 450MM 2.000 EA CC3 0435 604-010600A2 METALLIC COATED CORRUGATED STEEL PIPE, 600MM, A2 76.000 M DD1 0440 604-3706002 REINFORCED CONCRETE PIPE, 600MM, CLASS II 76.000 M DD2 0445 604-760600A2 ALUMINUM COATED CORRUGATED STEEL PIPE, 600MM, A2 76.000 M DD3 1 FEDERAL PROJECT PAGE 15 Call Order : 006 CONTRACT ID : 9218158 Letting Date : 08/10/99 10:00 A.M. PROJECTS : S346-0050/00-010.33 00 ACBR 0050 077 E00 COUNTIES : TAYLOR DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/01 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0450 636-02SG AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 100.000 MGR EE1 0455 636-02S AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 91.000 MGR EE2 0460 657-08 2.98KG CHANNEL POST 89.000 M 0465 657-10 4.5KG CHANNEL POST 147.000 M 0470 657-19 PIPE POST 2.000 EA 0475 661-011 2MM FLAT SHEET SIGNS 24.000 M2 0480 661-041 DELINEATORS, REFLEX REFLECTOR, WHITE SINGLE 20.000 EA 0485 661-08 DELINEATOR BRACKET, TYPE A 12.000 EA 0490 661-11 INSTALL REUSABLE SIGNS 4.000 EA SECTION NO. 0003 PAVEMENT MARKINGS 0495 663-0112W EDGE LINE WHITE TYPE II 1,930.000 M 0500 663-0212Y LANE LINE OR CENTER LINE YELLOW TYPE II 360.000 M 0505 663-0312 BARRIER LINES TYPE II 1,260.000 M 0510 663-042 TYPE II CHANNELIZING LINES 130.000 M 0515 663-055 TYPE V STOP LINES 60.000 M 0520 663-075Y TYPE V STRIPES YELLOW 250.000 M 0525 663-105 TYPE V LANE ARROWS 13.000 EA 0530 663-115 TYPE V LANE LETTERS 8.000 EA SECTION NO. 0004 SEWER RELOCATION 0535 207-34 FABRIC FOR SEPARATION 468.000 M2 1 FEDERAL PROJECT PAGE 16 Call Order : 006 CONTRACT ID : 9218158 Letting Date : 08/10/99 10:00 A.M. PROJECTS : S346-0050/00-010.33 00 ACBR 0050 077 E00 COUNTIES : TAYLOR DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/01 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0004 SEWER RELOCATION 0540 308-01 CLASS 1 AGGREGATE BASE COURSE 167.000 MGR 0545 608-0118 RIGHT OF WAY FENCE CHAIN LINK 1.8M 153.000 M 0550 608-056 VEHICULAR GATE CHAIN LINK 6M 1.000 EA 0555 609-01 CONCRETE SIDEWALK 3.000 M2 0560 633-03 DUMPED ROCK GUTTER 1.000 M3 0565 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0570 675-0820052 DUCTILE IRON SEWER PIPE CLASS 52, 200MM 86.000 M 0575 675-14 MANHOLE COMPLETE, INCLUDING CASTINGS 7.000 EA 0580 675-15 DROP MANHOLE COMPLETE, INCLUDING CASTINGS 1.000 EA 0585 675-50 COMBINED SEWER OVERFLOW TANK LUMP LUMP 0590 675-51 CHEMICAL/PUMP CONTROL BUILDING LUMP LUMP 0595 675-52 CHLORINATION/DECHLORINATION TANK LUMP LUMP 0600 675-53 LIFT STATION MODIFICATIONS LUMP LUMP SECTION NO. 0005 WATER RELOCATION 0605 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0610 670-04150252 DUCTILE IRON PIPE TYPE II CLASS 52, 150MM 244.000 M 0615 670-04200255 DUCTILE IRON PIPE TYPE II CLASS 55, 200MM 34.000 M 0620 670-09150 GATE VALVE AND VALVE BOX, 150MM 6.000 EA 0625 670-09200 GATE VALVE AND VALVE BOX, 200MM 2.000 EA 0630 670-10030006 STEEL CASING PIPE, 300MM 6.35MM 669.000 M 0635 670-19 SPECIAL VALVE 1.000 EA 1 FEDERAL PROJECT PAGE 17 Call Order : 006 CONTRACT ID : 9218158 Letting Date : 08/10/99 10:00 A.M. PROJECTS : S346-0050/00-010.33 00 ACBR 0050 077 E00 COUNTIES : TAYLOR DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/01 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0005 WATER RELOCATION 0640 670-19200 PRESSURE REDUCING VAULT 1.000 EA SECTION NO. 0006 BRIDGE #4241 0645 203-01 DISMANTLING STRUCTURES LUMP LUMP 0650 212-01 STRUCTURE EXCAVATION 1,909.000 M3 0655 212-02 WET EXCAVATION 1,667.000 M3 0660 212-05 SELECT MATERIAL FOR BACKFILLING 400.000 M3 0665 601-02 CLASS B CONCRETE 2,864.000 M3 0670 601-03 CLASS K CONCRETE 1,097.000 M3 0675 602-01 REIN STEEL BARS 171,422.000 KG 0680 602-02 EPOXY COATED REINFORCING BARS 193,071.000 KG 0685 615-01 STEEL SUPERSTRUCTURE ( 1.00 ) LUMP 0690 616-04H250062 STEEL BEARING PILES, HP 250X62, DRIVEN 844.000 M 0695 616-05H250062 STEEL BEARING PILES, HP 250X62, PRE-DRILLED AND DRIVEN 144.000 M 0700 617-03 ALUMINUM RAILING 277.000 M 0705 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0710 679-02 LATEX MODIFIED PORTLAND CEMENT MORTAR OR CONCRETE 139.000 M3 OVERLAYMENT OF BRIDGE DECK 0713 679-04 MICROSILICA CONCRETE OVERLAY 139.000 M3 0715 679-06 TEST SLAB LUMP LUMP SECTION NO. 0007 COMPUTER SYSTEM 0720 640-04 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP SECTION NO. 0008 ON THE JOB TRAINING 1 FEDERAL PROJECT PAGE 18 Call Order : 006 CONTRACT ID : 9218158 Letting Date : 08/10/99 10:00 A.M. PROJECTS : S346-0050/00-010.33 00 ACBR 0050 077 E00 COUNTIES : TAYLOR DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/01 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0008 ON THE JOB TRAINING 0725 699 ON JOB TRAINING 2,000.000 HR 1 STATE PROJECT PAGE 19 Call Order : 007 CONTRACT ID : 9802205 Letting Date : 08/10/99 10:00 A.M. PROJECTS : X349-0033/15-000.00 00 COUNTIES : UPSHUR GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 422,271.000 M3 0020 207-02 SUBGRADE 2,605.000 M3 0025 207-34 FABRIC FOR SEPARATION 17,313.000 M2 0030 211-02 ROCK BORROW EXCAVATION 15,097.000 M3 0035 307-01 CLASS I AGGREGATE BASE COURSE 322.000 M3 0040 308-01 CLASS 1 AGGREGATE BASE COURSE 1,713.000 MGR 0045 311-06 OPEN GRADED FREE DRAINING BASE 1,617.000 M3 0050 409-02 BITUMINOUS MATERIAL PRIME 3,027.000 L 0055 501-01250 REIN PORTLAND CEMENT CONCRETE PAVEMENT 250MM 1,172.000 M2 0060 601-02 CLASS B CONCRETE 59.070 M3 0065 604-010400A2 METALLIC COATED CORRUGATED STEEL PIPE 400MM, A2 30.500 M 0070 604-010450A2 METALLIC COATED CORRUGATED STEEL PIPE, 450MM, A2 80.100 M 0075 604-010600A2 METALLIC COATED CORRUGATED STEEL PIPE, 600MM, A2 99.650 M 0080 604-010800A2 METALLIC COATED CORRUGATED STEEL PIPE 800MM, A2 122.800 M 0085 604-011200A2 METALLIC COATED CORRUGATED STEEL PIPE, 1200MM, A2 70.500 M 0090 604-011350C2 METALLIC COATED CORRUGATED STEEL PIPE, 1350MM, C2 287.400 M 0095 604-011800A5 METALLIC COATED CORRUGATED STEEL PIPE, 1800MM, A5 98.800 M 0100 604-981800X12 REINFORCED CONCRETE CATTLE UNDERPASS 1800 MM X 1200 MM 30.700 M 0105 605-09 TYPE G INLET 8.000 EA 1 STATE PROJECT PAGE 20 Call Order : 007 CONTRACT ID : 9802205 Letting Date : 08/10/99 10:00 A.M. PROJECTS : X349-0033/15-000.00 00 COUNTIES : UPSHUR GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 605-091 TYPE G INLET, MODIFIED 1.000 EA 0115 606-29 FREE DRAINING BASE (FDB) TRENCH 3,189.000 M 0120 606-30 OUTLET PIPE 400.000 M 0125 607-011 TYPE 1 GUARDRAIL, CLASS I 80.010 M 0130 607-012 TYPE 1 GUARDRAIL CLASS II 1,017.270 M 0135 633-03 DUMPED ROCK GUTTER 443.800 M3 0140 636-11 TRAFFIC CONTROL DEVICE 6,860.000 UN 0145 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 2.000 EA 0150 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 30.000 EA 0155 636-14 FLAGGER 300.000 HR 0160 636-21 ELECTRIC ARROW 60.000 DA 0165 636-25B WARNING LIGHTS TYPE B 720.000 DA 0170 637-01 WATER FOR DUST PALLIATIVE 4,120.000 M3 0175 638-02 RIGHT OF WAY MARKERS 66.000 EA 0180 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0185 640-02 SMALL FIELD OFFICE/STORAGE BUILDING LUMP LUMP 0190 640-03 BUILDING EQUIPMENT LUMP LUMP 0195 642-01 TEMPORARY BERMS 1,042.000 M 0200 642-031 DITCH CHECKS 39.000 EA 0205 642-033 SEDIMENT TRAP 892.000 M3 0210 642-036 SEDIMENT REMOVAL 446.000 M3 1 STATE PROJECT PAGE 21 Call Order : 007 CONTRACT ID : 9802205 Letting Date : 08/10/99 10:00 A.M. PROJECTS : X349-0033/15-000.00 00 COUNTIES : UPSHUR GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0215 642-041 TEMPORARY SEED 606.000 KG 0220 642-051 STRAW OR HAY MULCH 1.400 MGR 0225 642-052 WOOD CELLULOSE FIBER MULCH 7.100 MGR 0230 642-06 FERTILIZER 7.700 MGR 0235 642-07 FIBER MATTING 1,237.000 M2 0240 642-09 CONTOUR DITCH 4,060.000 M 0245 642-10 AGRICULTURAL LIMESTONE 29.000 MGR 0250 642-12 SILT FENCE 4,060.000 M 0255 652-01 AGRICULTURAL LIMESTONE 29.000 MGR 0260 652-021 FERTILIZER 10-20-10 7.700 MGR 0265 652-022 UREA FORMALDEHYDE FERTILIZER 2.800 MGR 0270 652-035 SEED MIXTURE L 1,100.000 KG 0275 652-041 STRAW OR HAY MULCH 1.400 MGR 0280 652-042 WOOD CELLULOSE FIBER MULCH 7.100 MGR 0285 655-02B PERMANENT EROSION MATTING, TYPE B 3,380.000 M2 0290 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 4,715.000 MGR AA1 0295 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 4,288.000 MGR AA2 0300 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 890.000 MGR BB1 0305 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 809.000 MGR BB2 SECTION NO. 0002 SIGNING AND PAVEMENT MARKINGS 0310 657-08 2.98KG CHANNEL POST 47.250 M 1 STATE PROJECT PAGE 22 Call Order : 007 CONTRACT ID : 9802205 Letting Date : 08/10/99 10:00 A.M. PROJECTS : X349-0033/15-000.00 00 COUNTIES : UPSHUR GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 SIGNING AND PAVEMENT MARKINGS 0315 657-10 4.5KG CHANNEL POST 65.750 M 0320 661-011 2MM FLAT SHEET SIGNS 11.320 M2 0325 661-02 EXTRUDED PANEL SIGNS 3.780 M2 0330 661-051 DELINEATOR, REFLEX REFLACTOR, AMBER SINGLE 5.000 EA 0335 661-07 DELINEATOR, AMBER, THREE PER UNIT 2.000 UN 0340 661-13 PLASTIC DELINIATOR POSTS 7.000 EA 0345 663-0112W EDGE LINE WHITE TYPE II 800.000 M 0350 663-0312 BARRIER LINES TYPE II 720.000 M 0355 663-042 TYPE II CHANNELIZING LINES 100.000 M 0360 663-055 TYPE V STOP LINES 5.000 M 0365 663-105 TYPE V LANE ARROWS 2.000 EA 0370 663-115 TYPE V LANE LETTERS 4.000 EA 1 STATE PROJECT PAGE 23 Call Order : 008 CONTRACT ID : 9800911 Letting Date : 08/10/99 10:00 A.M. PROJECTS : U338-0219/00-016.75 00 COUNTIES : POCAHONTAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/16/00 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 30,712.000 CY 0020 207-02 SUBGRADE 1,187.000 CY 0025 207-34 FABRIC FOR SEPARATION 1,315.000 SY 0030 307-01 CLASS 1 AGGREGATE BASE COURSE 469.000 CY 0035 308-01 CLASS 1 AGGREGATE BASE COURSE 433.000 TN 0040 408-02 BITUMINOUS MATERIAL 800.000 GA 0045 409-02 BITUMINOUS MATERIAL 718.000 GA 0050 601-02 CLASS B CONCRETE 9.000 CY 0055 604-01(24)A2 METALLIC COATED CORRUGATED STEEL PIPE 103.000 LF 0060 604-01(42)A2 METALLIC COATED CORRUGATED STEEL PIPE 48.000 LF 0065 604-09(24) END SECION FOR CORRUGATED STEEL PIPE 1.000 EA 0070 604-09(42) END SECION FOR CORRUGATED STEEL PIPE 1.000 EA 0075 604-70(3X3) PRECAST CONCRETE BOX CULVERT 20.000 LF 0080 605-09 TYPE G INLET 1.000 EA 0085 607-01(I) TYPE 1 GUARDRAIL 780.000 LF 0090 633-03 DUMPED ROCK GUTTER 158.000 CY 0095 636-07 ERADICATION OF PAVEMENT MARKINGS 5,300.000 LF 0100 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 5,300.000 LF 0105 636-11 TRAFFIC CONTROL DEVICES 8,670.000 UN 1 STATE PROJECT PAGE 24 Call Order : 008 CONTRACT ID : 9800911 Letting Date : 08/10/99 10:00 A.M. PROJECTS : U338-0219/00-016.75 00 COUNTIES : POCAHONTAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/16/00 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 3.000 EA 0115 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 100.000 EA 0120 636-14 FLAGGER 700.000 HR 0125 636-17 TEMPORARY CONCRETE BARRIERS 1,450.000 LF 0130 636-23(01) TEMPORARY TRAFFIC SIGNAL ( 1.00 ) LUMP 0135 636-23(02) TEMPORARY TRAFFIC SIGNAL ( 1.00 ) LUMP 0140 636-25(B) WARNING LIGHTS 720.000 DA 0145 637-01 WATER FOR DUST PALLIATIVE 31.320 MG 0150 638-02 RIGHT OF WAY MARKERS 17.000 EA 0155 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0160 642-03-1 DITCH CHECKS 45.000 EA 0165 642-04-04 SEED MIXTURE L 334.080 LB 0170 642-05-1 STRAW OR HAY MULCH 2.980 TN 0175 642-05-2 WOOD CELLULOSE FIBER MULCH 1.320 TN 0180 642-06 FERTILIZER 1.390 TN 0185 642-10 AGRICULTURAL LIMESTONE 3.480 TN 0190 642-11 HAY OR STRAW BALES 757.000 EA 0195 642-12 SILT FENCE 2,270.000 LF 0200 652-01 AGRICULTURAL LIMESTONE 3.480 TN 0205 652-02-1 FERTILIZER, 10-20-10 3.060 TN 0210 652-02-2 UREA FORMALDEHYDE FERTILIZER 0.530 TN 1 STATE PROJECT PAGE 25 Call Order : 008 CONTRACT ID : 9800911 Letting Date : 08/10/99 10:00 A.M. PROJECTS : U338-0219/00-016.75 00 COUNTIES : POCAHONTAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/16/00 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0215 652-03-4 SEED MIXTURES TREES 421.080 LB 0220 652-04-1 STRAW OR HAY MULCH 3.480 TN 0225 652-04-2 WOOD CELLULOSE FIBER MULCH 2.290 TN 0230 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 223.000 TN AA1 0235 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 200.000 TN AA2 0240 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 381.000 TN BB1 0245 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 343.000 TN BB2 SECTION NO. 0002 PILING WALL #1 0250 614-1(W10X54) STEEL PILES 665.000 LF 0255 614-1(W8X40) STEEL PILES 275.000 LF 0260 614-3(8) CONCRETE LAGGING 1,050.000 SF 0265 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP SECTION NO. 0003 PILING WALL #2 0270 614-1(W12X53) STEEL PILES 1,400.000 LF 0275 614-1(W14X99) STEEL PILES 900.000 LF 0280 614-3(8) CONCRETE LAGGING 3,650.000 SF 0285 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP SECTION NO. 0004 PILING WALL #3 0290 614-1(W12X53) STEEL PILES 1,250.000 LF 0295 614-3(8) CONCRETE LAGGING 1,750.000 SF 1 STATE PROJECT PAGE 26 Call Order : 008 CONTRACT ID : 9800911 Letting Date : 08/10/99 10:00 A.M. PROJECTS : U338-0219/00-016.75 00 COUNTIES : POCAHONTAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/16/00 RES. ENG.: WALTER HOPWOOD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0004 PILING WALL #3 0300 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 STATE PROJECT PAGE 27 Call Order : 009 CONTRACT ID : 9918302 Letting Date : 08/10/99 10:00 A.M. PROJECTS : S320-0053/00-000.00 00 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/30/00 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 1,740.000 GA 0010 636-11 TRAFFIC CONTROL DEVICES 11,937.000 UN 0015 636-14 FLAGGER 85.000 HR 0020 663-01-1(II)W EDGE LINE, WHITE 26,610.000 LF 0025 663-02-1(II)Y LANE LINE OR CENTERLINE YELLOW 21,620.000 LF 0030 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 430.000 TN AA1 0035 308-01S CLASS 1 AGGREGATE, SLAG 390.000 TN AA2 0040 407-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 4,780.000 TN BB1 0045 407-1(II)S HOT-MIX ASPHALT BASE COURSE, SLAG 4,310.000 TN BB2 1 STATE PROJECT PAGE 28 Call Order : 010 CONTRACT ID : 9918301 Letting Date : 08/10/99 10:00 A.M. PROJECTS : S327-0033/00-010.54 00 COUNTIES : MASON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/99 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 3,720.000 GA 0010 636-11 TRAFFIC CONTROL DEVICES 19,297.000 UN 0015 636-14 FLAGGER 230.000 HR 0020 663-01-1(II)W EDGE LINE, WHITE 75,190.000 LF 0025 663-02-1(II)Y LANE LINE OR CENTERLINE YELLOW 47,680.000 LF 0030 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 3,030.000 TN AA1 0035 308-01S CLASS 1 AGGREGATE, SLAG 2,730.000 TN AA2 0040 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 5,240.000 TN BB1 0045 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 4,720.000 TN BB2 0050 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 70.000 TN CC1 0055 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 65.000 TN CC2 0060 401-7SG SCRATCH COURSE, STONE OR GRAVEL 2,530.000 TN DD1 0065 401-7S SCRATCH COURSE, SLAG 2,280.000 TN DD2 1 STATE PROJECT PAGE 29 Call Order : 011 CONTRACT ID : 9918101 Letting Date : 08/10/99 10:00 A.M. PROJECTS : S340-0002/00-002.28 00 COUNTIES : PUTNAM GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/99 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 550.000 GA 0010 636-11 TRAFFIC CONTROL DEVICES 3,519.000 UN 0015 636-14 FLAGGER 29.000 HR 0020 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 300.000 TN AA1 0025 308-01S CLASS 1 AGGREGATE, SLAG 270.000 TN AA2 0030 407-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,540.000 TN BB1 0035 407-1(II)S HOT-MIX ASPHALT BASE COURSE, SLAG 1,390.000 TN BB2 1 STATE PROJECT PAGE 30 Call Order : 012 CONTRACT ID : 9917606 Letting Date : 08/10/99 10:00 A.M. PROJECTS : S318-0068/00-000.95 00 COUNTIES : JACKSON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/99 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 600.000 GA 0010 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 6,300.000 SY 0015 609-01 CONCRETE SIDEWALK 130.000 SY 0020 610-01(I) PLAIN CONCRETE CURBING 177.000 LF 0025 610-01(IV) PLAIN CONCRETE CURBING 64.000 LF 0030 636-06 PILOT TRUCK AND DRIVER 2.000 DA 0035 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 9,400.000 LF 0040 636-11 TRAFFIC CONTROL DEVICES 7,354.000 UN 0045 636-14 FLAGGER 200.000 HR 0050 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 29.000 TN AA1 0055 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 27.000 TN AA2 0060 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 100.000 TN BB1 0065 308-01S CLASS 1 AGGREGATE, SLAG 91.000 TN BB2 0070 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 1,106.000 TN CC1 0075 402-01(1)S HMA SKID PVT, (W-1) SLAG 1,007.000 TN CC2 1 STATE PROJECT PAGE 31 Call Order : 013 CONTRACT ID : 9918103 Letting Date : 08/10/99 10:00 A.M. PROJECTS : S340-0033/00-003.86 00 COUNTIES : PUTNAM GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/99 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408-02 BITUMINOUS MATERIAL 1,160.000 GA 0010 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 25,770.000 LF 0015 636-11 TRAFFIC CONTROL DEVICES 9,511.000 UN 0020 636-14 FLAGGER 42.000 HR 0025 663-01-1(II)W EDGE LINE, WHITE 25,770.000 LF 0030 663-02-1(II)Y LANE LINE OR CENTERLINE YELLOW 25,770.000 LF 0035 663-05(V) TYPE V, STOP LINES 24.000 LF 0040 663-10(V) TYPE V, LANE ARROWS 4.000 EA 0045 663-11(V) TYPE V, LANE LETTERS 8.000 EA 0050 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 510.000 TN AA1 0055 308-01S CLASS 1 AGGREGATE, SLAG 460.000 TN AA2 0060 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 1,610.000 TN BB1 0065 402-01(1)S HMA SKID PVT, (W-1) SLAG 1,450.000 TN BB2 1 STATE PROJECT PAGE 32 Call Order : 014 CONTRACT ID : 9918205 Letting Date : 08/10/99 10:00 A.M. PROJECTS : S341-0002/00-006.97 00 COUNTIES : RALEIGH GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/99 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 409-02 BITUMINOUS MATERIAL 550.000 GA 0010 636-11 TRAFFIC CONTROL DEVICES 2,875.000 UN 0015 636-14 FLAGGER 96.000 HR 0020 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 500.000 TN AA1 0025 308-01S CLASS 1 AGGREGATE, SLAG 455.000 TN AA2 0030 407-1(II)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 2,150.000 TN BB1 0035 407-1(II)S HOT-MIX ASPHALT BASE COURSE, SLAG 1,957.000 TN BB2 1 STATE PROJECT PAGE 33 Call Order : 015 CONTRACT ID : 9914081R1 Letting Date : 08/10/99 10:00 A.M. PROJECTS : G026-0HDQ/00-001.00 01 COUNTIES : MARSHALL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 02/28/01 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 NEW CONSTRUCTION 0005 605-01 TYPE A MANHOLE 5.000 EA 0010 606-23 UNDERDRAIN JUNCTION BOX 3.000 EA 0015 606-25(4) UNDERDRAIN PIPE 200.000 LF 0020 606-25(6) UNDERDRAIN PIPE 570.000 LF 0025 606-25(8) UNDERDRAIN PIPE 420.000 LF 0030 609-01 CONCRETE SIDEWALK 557.000 SY 0035 609-02 BED COURSE MATERIAL 62.000 CY 0040 610-01(I) PLAIN CONCRETE CURBING 661.000 LF 0045 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0050 670-07(2)200 PLASTIC PIPE, CLASS 200 250.000 LF 0055 670-07(8)200 PLASTIC PIPE, CLASS 200 250.000 LF 0060 672-06 SITE LIGHTING LUMP LUMP 0065 672-13 OFFICE BUILDING LUMP LUMP 0070 675-07(6) PLASTIC SEWER PIPE 1,185.000 LF 1 STATE PROJECT PAGE 34 Call Order : 016 CONTRACT ID : 9825801R1 Letting Date : 08/10/99 10:00 A.M. PROJECTS : U318-0033/00-023.00 00 COUNTIES : JACKSON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/99 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 DRAINAGE 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-09 UNCLASSIFIED EXCAVATION LUMP LUMP 0020 211-02 ROCK BORROW EXCAVATION 200.000 CY 0025 601-02 CLASS B CONCRETE 14.400 CY 0035 604-54(60)V JACKED CONDUIT, REINFORCED CONCRETE PIPE CLASS V 131.000 LF 0040 636-11 TRAFFIC CONTROL DEVICES 1,930.000 UN 0045 636-14 FLAGGER 100.000 HR 0050 636-25(B) WARNING LIGHTS 180.000 DA 0055 638-02 RIGHT OF WAY MARKERS 3.000 EA 0060 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0065 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 1 FEDERAL PROJECT PAGE 35 Call Order : 017 CONTRACT ID : 9714201R1 Letting Date : 08/10/99 10:00 A.M. PROJECTS : U335-0088/00-006.18 00 0STP 0088 024 E00 COUNTIES : OHIO GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/99 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0015 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0020 204-01 MOBILIZATION LUMP LUMP 0025 207-01 UNCLASSIFIED EXCAVATION 271.000 M3 0030 207-02 SUBGRADE 65.000 M3 0035 207-34 FABRIC FOR SEPARATION 428.000 M2 0040 307-01 CLASS I AGGREGATE BASE COURSE 136.000 M3 0045 408-02 BITUMINOUS MATERIAL 474.000 L 0050 409-02 BITUMINOUS MATERIAL PRIME 700.000 L 0055 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 865.000 M2 0060 604-010450A2 METALLIC COATED CORRUGATED STEEL PIPE, 450MM, A2 44.000 M 0065 605-03 TYPE A INLET 1.000 EA 0070 605-04 TYPE B INLET 2.000 EA 0075 605-15 ADJUST EXISTING MANHOLE 2.000 EA 0080 606-200100 AGGREGATE FILL FABRIC UNDERDRAIN 100MM 114.000 M 0085 609-01 CONCRETE SIDEWALK 156.000 M2 0090 609-02 BED COURSE MATERIAL 32.000 M3 0095 610-032 COMBINED CONCRETE CURBING AND GUTTER TYPE II 104.000 M 0100 610-034 COMBINED CONCRETE CURBING & GUTTER TYPE IV 10.000 M 0105 636-11 TRAFFIC CONTROL DEVICE 4,450.000 UN 1 FEDERAL PROJECT PAGE 36 Call Order : 017 CONTRACT ID : 9714201R1 Letting Date : 08/10/99 10:00 A.M. PROJECTS : U335-0088/00-006.18 00 0STP 0088 024 E00 COUNTIES : OHIO GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/99 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 636-14 FLAGGER 500.000 HR 0115 636-25B WARNING LIGHTS TYPE B 200.000 DA 0120 638-02 RIGHT OF WAY MARKERS 9.000 EA 0125 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0130 640A-1 MINIMAL FIELD OFFICE LUMP LUMP 0135 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0140 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 80.000 MGR AA1 0145 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 73.000 MGR AA2 0150 402-01(1)SG HOT MIX ASPHALT SKID PAVEMENT, STONE OR GRAVEL 71.000 MGR BB1 0155 402-01(1)S HOT MIX ASPHALT SKID PAVEMENT, SLAG 65.000 MGR BB2 SECTION NO. 0002 PAVEMENT MARKINGS 0160 663-055 TYPE V STOP LINES 8.000 M 0165 663-075W TYPE V STRIPES WHITE 17.000 M 0170 663-105 TYPE V LANE ARROWS 4.000 EA 0175 663-12C6NR RAISED PAVEMENT MARKER, TYPE C 4.000 EA 0180 663-12C6R RAISED PAVEMENT MARKER TYPE C-6R 12.000 EA SECTION NO. 0003 SIGNALIZATION 0185 660-01A INSTALLATION ONLY 1.000 EA 0190 660-02LPSSD TRAFFIC DETECTORS 1.000 EA 0195 660-03V305 SIGNAL SECTIONS 4.000 EA 1 FEDERAL PROJECT PAGE 37 Call Order : 017 CONTRACT ID : 9714201R1 Letting Date : 08/10/99 10:00 A.M. PROJECTS : U335-0088/00-006.18 00 0STP 0088 024 E00 COUNTIES : OHIO GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/29/99 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0003 SIGNALIZATION 0200 660-04C1A SIGNAL SUPPORTS, INSTALLATION ONLY 1.000 EA 0205 660-05H JUNCTION BOXES TYPE H 4.000 EA 0210 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 1 STATE PROJECT PAGE 38 Call Order : 018 CONTRACT ID : 9816841R1 Letting Date : 08/10/99 10:00 A.M. PROJECTS : U331-0045/00-000.39 00 COUNTIES : MONONGALIA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 01/05/00 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RAISE GRADE 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 51.000 CY 0020 211-03 SELECT BORROW EXCAVATION 56.000 CY 0025 408-02 BITUMINOUS MATERIAL 263.000 GA 0030 409-02 BITUMINOUS MATERIAL 1,575.000 GA 0035 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 2,500.000 SY 0040 601-02 CLASS B CONCRETE 17.000 CY 0045 604-37(18)III REINFORCED CONCRETE PIPE 261.000 LF 0050 604-37(30)III REINFORCED CONCRETE PIPE 53.500 LF 0055 605-09 TYPE G INLET 1.000 EA 0060 607-01(II) TYPE 1 GUARDRAIL 1,375.000 LF 0065 607-10-1(A) GUARDRAIL REMOVAL 487.500 LF 0070 636-06 PILOT TRUCK AND DRIVER 30.000 DA 0075 636-11 TRAFFIC CONTROL DEVICES 5,451.000 UN 0080 636-14 FLAGGER 1,140.000 HR 0085 638-02 RIGHT OF WAY MARKERS 24.000 EA 0090 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0095 640A-1 MINIMAL FIELD OFFICE LUMP LUMP 0100 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0105 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 10,310.000 TN AA1 1 STATE PROJECT PAGE 39 Call Order : 018 CONTRACT ID : 9816841R1 Letting Date : 08/10/99 10:00 A.M. PROJECTS : U331-0045/00-000.39 00 COUNTIES : MONONGALIA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 01/05/00 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RAISE GRADE 0110 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 9,279.000 TN AA2 0115 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 337.000 TN BB1 0120 308-01S CLASS 1 AGGREGATE, SLAG 303.000 TN BB2 0125 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 290.000 TN CC1 0130 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 261.000 TN CC2 0135 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 580.000 TN DD1 0140 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 522.000 TN DD2 0145 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 145.000 TN EE1 0150 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 131.000 TN EE2