1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- September 14, 1999 LETTING Sealed proposals will be received by the West Virginia Department of Transportation, Division of Highways at its office in Building Five, Room A-148, 1900 Kanawha Boulevard East, Charleston, West Virginia 25305-0430 until 10 A.M. September 14, 1999 and said proposals will be publicly opened and read immediately thereafter for the construction of the following project(s): ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 001 9920008 U301-0250/00-016.58 00 CONST NEW/RELOC 2 LANE ROAD W/BRIDGE(S) PHILIPPI BRIDGE BYPASS 0.11 MI S PHILIPPI BRIDGE - US 250 COUNTY: BARBOUR BRIDGE : #4988 CONCRETE SLAB ON PRESTRESSED GIRDER SPAN(S): 7 ; ------------------------------------------------------------------------------------------------------------------------------------ 002 9907101 U306-0060/00-010.45 00 TRAFFIC SIGNAL US60 AT GLEN CARLA DRIVE TO DEER CREEK BARBOURSVILLE COUNTY: CABELL ------------------------------------------------------------------------------------------------------------------------------------ 003 9722619 U328-0104/00-000.74 00 CONST TURN LANE(S) STAFFORD DRIVE US 19 - 0.11 MILE E. US 19 COUNTY: MERCER ------------------------------------------------------------------------------------------------------------------------------------ 004 9231701 S337-0002/00-009.63 02 ACNH 0002 214 E00 CONST NEW/RELOC 4 LANE ROAD W/BRIDGE(S) THIRD STREET BRIDGE WV 807 CO 2/10 (GEORGE ST.) COUNTY: PLEASANTS BRIDGE : 3554 PRESTRESSED CONCRETE TT GIRDER SPAN(S): 1 ; DBE GOAL: 5 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 005 9830903 S320-0060/16-000.00 00 DRAINAGE IMPROVEMENTS GEORGES DR. +1 US 60 END 60/16 COUNTY: KANAWHA ------------------------------------------------------------------------------------------------------------------------------------ 006 *9611302 S318-0338/00-000.00 00 STRUCTURE RENOVATION WILLIAM S. RITCHIE JR. BRIDGE 0.43 MI. W. WV 68 COUNTY: JACKSON BRIDGE : 2972.1 CONCRETE SLAB ON STEEL THRU TRUSS SPAN(S): 7 ; ------------------------------------------------------------------------------------------------------------------------------------ 007 *9630412 S343-0050/39-003.75 00 0STP 5039 003 EQ0 REPAIR DAMAGE PENNSBORO RAILROAD OVERPASS BRIDGE 2408.2 B & O RR, 0.06 MI. E. CO. 16/10 COUNTY: RITCHIE BRIDGE : 2408.2 CONCRETE SLAB ON STEEL DECK TRUSS SPAN(S): 9 ; ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- September 14, 1999 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 008 9916003 S304-0015/00-004.80 00 0STP 0015 057 E00 RESURFACING LAUREL FORK - DIANA ROAD CR 15/4 TO CR 22/12 COUNTY: BRAXTON DBE GOAL: 12 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 009 *9805902 U315-0105/00-004.19 00 UPGRADE TO 3 LANE ROAD PENNSYLVANIA AVENUE BEGIN: 0.07 MI W CR 22/1 END: 0.09 MI E CR 22/1 COUNTY: HANCOCK ------------------------------------------------------------------------------------------------------------------------------------ 010 9218032 S325-0218/00-011.47 00 STRUCTURE REPLACEMENT FAIRVIEW CONCRETE GIRDER BRIDGE OVER BENNEFIELD PRONG, 0.06 MI S CR 17 COUNTY: MARION BRIDGE : 4664 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ 011 9722404 U334-0039/00-034.55 00 CONST NEW/RELOC ROAD WO/PAVING CANVAS - NETTIE ROAD MP 34.55 OF WV RTE 39 0.57 MI E OF CR 39/5 COUNTY: NICHOLAS ------------------------------------------------------------------------------------------------------------------------------------ 012 9916281A G020-0MCS/0T-001.00 00 2 BUILDING CONSTRUCTION G020-0MCS/0T-001.00 00 3 MCS&T HEADQUARTERS BUILDING G020-0MCS/0T-001.00 00 4 BUILDING #1 COUNTY: KANAWHA REMARKS : PRE-QUAL.NOT REQUIRED.MANDATORY PRE-BID 9/1/99 10:00AM SITE ------------------------------------------------------------------------------------------------------------------------------------ 013 9916211 G009-0DCM/0H-001.00 00 BUILDING CONSTRUCTION COUNTY MAINTAINANCE HEADQUARTERS MAINT HDQ AT CO 50/70 COUNTY: DODDRIDGE REMARKS : PRE-QUAL.NOT REQUIRED.MANDATORY PRE-BID 8/31/99 10:00AM SITE ------------------------------------------------------------------------------------------------------------------------------------ 014 9722605 S343-0074/03-000.00 00 STRUCTURE CONST NEW LIZZIES ROOST BRIDGE LIZZIES ROOST RUN, WV 74-0.04 MI W WV 74 COUNTY: RITCHIE BRIDGE : #4581 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ 015 9727513 U341-0002/00-000.00 00 UPGRADE & WIDEN PAVEMENT SANDLICK ROAD WV 3 - CR 2/4 COUNTY: RALEIGH ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- September 14, 1999 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 016 9730903 U341-0016/00-015.80 00 UPGRADE & WIDEN PAVEMENT ROBERT C BYRD DRIVE CR 3/8 - CR 16/9 COUNTY: RALEIGH ------------------------------------------------------------------------------------------------------------------------------------ 017 *9805001 S302-0005/00-002.60 00 STRUCTURE DEMOLITION MEYERS FORD BRIDGE OPEQUON CREEK, 0.42 MI W CO 5/1 COUNTY: BERKELEY BRIDGE : #0001 TIMBER DECK ON STEEL THRU TRUSS SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ 018 9532002 S326-0001/00-001.25 00 STRUCTURE REPLACEMENT BOGGS RUN BRIDGE #2 CR 1, MILE POST 1.25 COUNTY: MARSHALL BRIDGE : #4654 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ 019 *9909912 S323-0010/00-032.93 00 MISCELLANEOUS CONSTRUCTION CHAPMANVILLE SIDEWALKS 0.07 MI. S. CO 10/84 TO CO 3 COUNTY: LOGAN ------------------------------------------------------------------------------------------------------------------------------------ 020 9821101 X344-0033/02-000.00 00 CONST NEW/RELOC 2 LANE ROAD W/BRIDGE(S) ROANE CO/SPENCER BUSINESS PARK LOCATED ON OLD STATE HOSPITAL ROAD AT MP 12.84 OF US 33 COUNTY: ROANE BRIDGE : #4842 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25304-0430 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virginia Code. All contractors submitting bids on project(s) must include one of the following forms properly executed with each proposal: Proposal Guaranty Bond, Cashier's Check, or Certified Check for $500.00 or 5% of total bid, whichever is greater. Failure to include one of the above forms could result in a bid being declared irregular. Proposals and bid bonds must be submitted on standard forms which may be obtained at the Charleston office. The right is reserved to reject any or all proposals. *These are projects on which any contractor with a Category "W" Prequalification Rating may be eligible to bid. Final award of all Interstate and Federal-Aid Projects, with the exception of exempt projects, is subject to the approval of the Federal Highway Administration. Minimum wage rates for these projects have been predetermined as required by law and are set forth in the bid proposal. Federal-Aid projects are subject to the WHA of 1961 PL-581 approved August 13, 1962. Plans and proposals on all projects will be furnished at twenty-five dollars ($25.00) per set. Extra plans will be furnished at fifteen dollars ($15.00) per set and extra proposals will be furnished at ten dollars ($10.00) per proposal. Cross sections will be furnished at fifty dollars ($50.00) per set. All will be furnished without refund and transmitted at your risk. The above noted project information will be available in the Contract Unit, Construction Section, Division of Highways, Room A-737, Building 5, 1900 Kanawha Boulevard East, Charleston, WV 25305 and may also be ordered by calling (304)558-2874. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid bidding proposals will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. The West Virginia Department of Transportation, Division of Highways hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex or national orign in consideration for an award. No proposals for these projects will be issued after 3:00 P.M. on the day prior to the letting. It is necessary to advise your approximate uncompleted workload when ordering plans and proposals. Announcement, opening and reading of bids received will be in the order as designated in the "Notice to Contractors". Sealed proposals may also be deposited in the bid depository box which will be located near the corner of Piedmont Road and California Avenue between the hours of 9 A.M. and 10 A.M., the day of the letting. Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25305-0430 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division Of Highways John J. Welch, Jr., Director Project Control Division 1 1 STATE PROJECT PAGE 1 Call Order : 001 CONTRACT ID : 9920008 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U301-0250/00-016.58 00 COUNTIES : BARBOUR GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/13/00 RES. ENG.: GARY K CLAYTON DESCRIPTION: PHILIPPI BRIDGE BYPASS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 202-01(03) BUILDING DEMOLITION ( 1.00 ) LUMP 0015 202-01(10) BUILDING DEMOLITION ( 1.00 ) LUMP 0020 202-01(14) BUILDING DEMOLITION ( 1.00 ) LUMP 0025 202-01(17) BUILDING DEMOLITION ( 1.00 ) LUMP 0030 202-01(18) BUILDING DEMOLITION ( 1.00 ) LUMP 0035 202-01(22) BUILDING DEMOLITION ( 1.00 ) LUMP 0040 204-01 MOBILIZATION LUMP LUMP 0045 207-01 UNCLASSIFIED EXCAVATION 294,593.000 CY 0050 207-02 SUBGRADE 3,170.000 CY 0055 207-34 FABRIC FOR SEPARATION 20,823.000 SY 0060 211-02 ROCK BORROW EXCAVATION 13,277.000 CY 0061 212-05 SELECT MATERIAL FOR BACKFILLING 590.000 CY 0065 307-01 CLASS 1 AGGREGATE BASE COURSE 333.000 CY 0070 308-01 CLASS 1 AGGREGATE BASE COURSE 2,290.000 TN 0075 311-06 OPEN GRADED FREE DRAINING BASE COURSE 2,011.000 CY 0080 408-02 BITUMINOUS MATERIAL 100.000 GA 0085 409-02 BITUMINOUS MATERIAL 435.000 GA 0090 415-05 REMOVE EXISTING PAVEMENT SURFACE 188.000 SY 0100 502-01(12I) PORTLAND CEMENT CONCRETE APPROACH SLAB 198.000 SY 1 STATE PROJECT PAGE 2 Call Order : 001 CONTRACT ID : 9920008 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U301-0250/00-016.58 00 COUNTIES : BARBOUR GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/13/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0101 501-10 BRIDGE APPROACH EXPANSION JOINT 2.000 EA 0102 601-02 CLASS B CONCRETE 24.300 CY 0103 60429(22X13A7 CORRUGATED ALUMINUM ALLOY PIPE ARCH 48.000 LF 0104 604-32(22X13) END SECTION FOR CORRUGATED ALUMINUM ALLOY PIPE ARCH 4.000 EA 0105 604-37(18)III REINFORCED CONCRETE PIPE 403.000 LF 0106 604-37(24)III REINFORCED CONCRETE PIPE 846.000 LF 0107 604-37(36)III REINFORCED CONCRETE PIPE 160.000 LF 0108 604-37(42)III REINFORCED CONCRETE PIPE 124.000 LF 0109 604-38(18) REINFORCED CONCRETE END SECTION FOR ROUND CONCRETE PIPE 1.000 EA 0110 605-01 TYPE A MANHOLE 6.000 EA 0115 605-07 TYPE E INLET 12.000 EA 0120 605-09 TYPE G INLET 8.000 EA 0125 605-10 TYPE H INLET 1.000 EA 0126 606-25(6) UNDERDRAIN PIPE 320.000 LF 0130 606-29 FREE DRAINING BASE (FDB) TRENCH 6,337.000 LF 0135 606-30 OUTLET PIPE 1,181.000 LF 0140 607-01(I) TYPE 1 GUARDRAIL 4,367.000 LF 0145 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 51.000 LF 0150 607-65 FLARED END TERMINAL 4.000 EA 0155 607-06 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 4.000 EA 0160 609-01 CONCRETE SIDEWALK 450.000 SY 1 STATE PROJECT PAGE 3 Call Order : 001 CONTRACT ID : 9920008 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U301-0250/00-016.58 00 COUNTIES : BARBOUR GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/13/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0165 609-02 BED COURSE MATERIAL 75.000 CY 0170 610-01(I) PLAIN CONCRETE CURBING 1,421.000 LF 0175 610-03(I) COMBINATION CONCRETE CURB AND GUTTER 360.000 LF 0180 610-05(I) BITUMINOUS CURBING 80.000 LF 0200 633-03 DUMPED ROCK GUTTER 14.200 CY 0205 636-07 ERADICATION OF PAVEMENT MARKINGS 14,400.000 LF 0210 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 10,000.000 LF 0215 636-09 TEMPORARY PAVEMENT MARKINGS-TAPE 4 IN SOLID LINE 30,000.000 LF 0220 636-11 TRAFFIC CONTROL DEVICES 21,345.000 UN 0225 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 3.000 EA 0230 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 200.000 EA 0235 636-14 FLAGGER 1,200.000 HR 0240 636-17 TEMPORARY CONCRETE BARRIERS 992.000 LF 0245 636-19 TEMPORARY GUARDRAIL BARRIER 250.000 LF 0250 636-24 TEMPORARY PIPE FOR MAINTAINING TRAFFIC 125.000 LF 0255 636-25(A) WARNING LIGHTS 3,000.000 DA 0260 636-25(B) WARNING LIGHTS 6,000.000 DA 0265 636-25(C) WARNING LIGHTS 3,000.000 DA 0275 637-01 WATER FOR DUST PALLIATIVE 445.000 MG 0280 638-02 RIGHT OF WAY MARKERS 94.000 EA 0285 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 STATE PROJECT PAGE 4 Call Order : 001 CONTRACT ID : 9920008 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U301-0250/00-016.58 00 COUNTIES : BARBOUR GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/13/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0290 640-01 STANDARD FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0295 640-03 BUILDING EQUIPMENT LUMP LUMP 0300 642-01 TEMPORARY BERMS 6,240.000 LF 0305 642-02 SLOPE DRAINS 1,438.000 LF 0310 642-03-1 DITCH CHECKS 27.000 EA 0315 642-03-2 CHECK DAMS 33.000 EA 0320 642-03-3 SEDIMENT TRAP 301.000 CY 0325 642-03-6 SEDIMENT REMOVAL 151.000 CY 0330 642-04-1 TEMPORARY SEED 70.000 LB 0335 642-04-3 SEED MIXTURE D 955.000 LB 0340 642-05-1 STRAW OR HAY MULCH 12.600 TN 0345 642-05-2 WOOD CELLULOSE FIBER MULCH 6.900 TN 0350 642-06 FERTILIZER 6.200 TN 0355 642-11 HAY OR STRAW BALES 1,653.000 EA 0360 642-12 SILT FENCE 4,954.000 LF 0365 652-01 AGRICULTURAL LIMESTONE 23.200 TN 0370 652-02-1 FERTILIZER, 10-20-10 7.700 TN 0375 652-02-2 UREA FORMALDEHYDE FERTILIZER 2.400 TN 0380 652-03-1 SEED MIXTURES B, C-1 OR C-2 108.000 LB 0385 652-03-2 SEED MIXTURES D 955.000 LB 0390 652-04-1 STRAW OR HAY MULCH 12.600 TN 1 STATE PROJECT PAGE 5 Call Order : 001 CONTRACT ID : 9920008 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U301-0250/00-016.58 00 COUNTIES : BARBOUR GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/13/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0395 652-04-2 WOOD CELLULOSE FIBER MULCH 6.900 TN 0400 655-01 MATTING 1,035.000 SY 0405 657-06(S4X7.7 A-441SUPPORTS, GALVANIZED 122.000 LF 0410 657-08 (2.00LB) CHANNEL POSTS 602.000 LF 0415 657-10 (3.00LB) CHANNEL POSTS 631.000 LF 0420 657-17 CLASS B CONCRETE FOOTING, REINFORCED, ROADSIDE 2.400 CY 0425 657-18 POST REMOVAL 10.000 EA 0430 661-01(1) (0.080),FLAT SHEET SIGNS 514.000 SF 0435 661-04(1) DELINEATORS, REFLEX REFLECTOR ,WHITE SINGLE 78.000 EA 0440 661-08 DELINEATOR BRACKET, TYPE A 6.000 EA 0445 662-02(1) GALVANIZED STEEL CONDUIT ( 1.00 ) LUMP 0450 662-02(2) GALVANIZED STEEL CONDUIT ( 1.00 ) LUMP 0455 662-06(A) JUNCTION BOX 9.000 EA 0460 662-06(H18X18 JUNCTION BOX 19.000 EA 0465 662-07(250) LUMINAIRES 25.000 EA 0470 662-08(1) CABLE ( 1.00 ) LUMP 0475 662-08(2) CABLE ( 1.00 ) LUMP 0480 662-10(40-10I LIGHTING SUPPORT, TYPE I 2.000 EA 0485 662-10(40-12I LIGHTING SUPPORT, TYPE I 23.000 EA 0490 662-13(1) SERVICE AND CONTROL STATION ( 1.00 ) LUMP 0495 662-13(2) SERVICE AND CONTROL STATION ( 1.00 ) LUMP 1 STATE PROJECT PAGE 6 Call Order : 001 CONTRACT ID : 9920008 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U301-0250/00-016.58 00 COUNTIES : BARBOUR GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/13/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0500 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0505 662-15(1) ELECTRICAL TESTS ( 1.00 ) LUMP 0510 662-15(2) ELECTRICAL TESTS ( 1.00 ) LUMP 0515 663-01-1(II)W EDGE LINE, WHITE 11,400.000 LF 0520 663-02-1(II)W LANE LINE OR CENTERLINE, WHITE 870.000 LF 0525 663-03-1(II) BARRIER LINES 13,210.000 LF 0530 663-04(II) TYPE II CHANNELIZING LINES 1,270.000 LF 0535 663-05(V) TYPE V, STOP LINES 140.000 LF 0540 663-06(II) TYPE II, CROSSWALK LINES 170.000 LF 0545 663-07(II)Y TYPE II, STRIPE YELLOW (12 IN) 300.000 LF 0550 663-10(V) TYPE V, LANE ARROWS 23.000 EA 0555 663-11(V) TYPE V, LANE LETTERS 16.000 EA 0556 664-01(IV) IMPACT ATTENUATING DEVICE, TYPE IV 4.000 EA 0560 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 8,772.000 TN AA1 0565 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 8,041.000 TN AA2 0570 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 1,137.000 TN AB1 0575 402-01(1)S HMA SKID PVT, (W-1) SLAG 1,042.000 TN AB2 0580 604-02(18)A7 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE 90.000 LF AD1 0585 604-25(18)A7 CORRUGATED ALUMINUM ALLOY PIPE 90.000 LF AD2 0590 604-02(18)A7 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE 94.000 LF AE1 0595 604-25(18)A7 CORRUGATED ALUMINUM ALLOY PIPE 94.000 LF AE2 1 STATE PROJECT PAGE 7 Call Order : 001 CONTRACT ID : 9920008 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U301-0250/00-016.58 00 COUNTIES : BARBOUR GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/13/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0600 604-37(18)III REINFORCED CONCRETE PIPE 94.000 LF AE3 0605 604-02(24)A7 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE 85.000 LF AF1 0610 604-25(24)A7 CORRUGATED ALUMINUM ALLOY PIPE 85.000 LF AF2 0615 604-02(24)A7 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE 489.000 LF AG1 0620 604-25(24)A7 CORRUGATED ALUMINUM ALLOY PIPE 489.000 LF AG2 0625 604-37(24)III REINFORCED CONCRETE PIPE 489.000 LF AG3 SECTION NO. 0002 COMPUTER SYSTEM 0630 640-04 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP ****** ERROR - NO PROPOSAL SECTION FOR ITEM 699 , CONTRACT 9920008 , SECTION 0003 ***** 1 STATE PROJECT PAGE 8 Call Order : 002 CONTRACT ID : 9907101 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U306-0060/00-010.45 00 COUNTIES : CABELL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 03/15/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 TRAFFIC SIGNALS 0005 204-01 MOBILIZATION LUMP LUMP 0010 636-11 TRAFFIC CONTROL DEVICES 9,700.000 UN 0015 636-14 FLAGGER 290.000 HR 0020 636-21 ELECTRIC ARROW 12.000 DA 0025 660-01 SIGNAL CONTROLLERS LUMP LUMP 0030 660-01 SIGNAL CONTROLLERS LUMP LUMP 0035 660-01 SIGNAL CONTROLLERS LUMP LUMP 0040 660-01 SIGNAL CONTROLLERS LUMP LUMP 0045 660-02(LPS-C) TRAFFIC DETECTORS 24.000 EA 0050 660-03(V-12) SIGNAL SECTIONS 84.000 EA 0055 660-04(C1)A SIGNAL SUPPORTS, INSTALLATION ONLY 6.000 EA 0060 660-05(H) JUNCTION BOXES, TYPE H 12.000 EA 0065 660-06(1) SIGNAL INTERCONNECT LUMP LUMP 0070 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0075 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0080 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0085 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0090 660-16 AREA MASTER CONTROLLER 1.000 EA 0095 660-17 INTERSECTION PHONE SYSTEM LUMP LUMP 0100 660-60C MISCELLANEOUS RADIO INSTALLATION LUMP LUMP 0105 660-60R SPREAD SPECTRUM RADIO TRANSCEIVER 4.000 EA 1 STATE PROJECT PAGE 9 Call Order : 002 CONTRACT ID : 9907101 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U306-0060/00-010.45 00 COUNTIES : CABELL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 03/15/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 TRAFFIC SIGNALS 0110 661-13 PLASTIC DELINEATOR POSTS 6.000 EA 0115 662-07(250)W LUMINAIRES 2.000 EA 0120 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0125 663-05(V) TYPE V, STOP LINES 210.000 LF 0130 663-12(C-6NR) RAISED PAVEMENT MARKER, TYPE C-6NR 69.000 EA 0135 663-12(C-6R) RAISED PAVEMENT MARKING 18.000 EA 1 STATE PROJECT PAGE 10 Call Order : 003 CONTRACT ID : 9722619 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U328-0104/00-000.74 00 COUNTIES : MERCER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/00 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 240.000 CY 0020 207-02 SUBGRADE 175.000 CY 0025 207-34 FABRIC FOR SEPARATION 998.000 SY 0030 307-01 CLASS 1 AGGREGATE BASE COURSE 183.000 CY 0035 408-02 BITUMINOUS MATERIAL 341.000 GA 0040 409-02 BITUMINOUS MATERIAL 493.000 GA 0045 601-02 CLASS B CONCRETE 16.000 CY 0050 605-09 TYPE G INLET 1.000 EA 0055 607-01(I) TYPE 1 GUARDRAIL 110.000 LF 0060 607-28 MODIFIED ECCENTRIC LOADER TERMINAL 1.000 EA 0065 636-07 ERADICATION OF PAVEMENT MARKINGS 1,200.000 LF 0070 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 1,200.000 LF 0075 636-11 TRAFFIC CONTROL DEVICES 9,378.000 UN 0080 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 10.000 EA 0085 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 150.000 EA 0090 636-14 FLAGGER 600.000 HR 0095 636-25(B) WARNING LIGHTS 720.000 DA 0100 638-02 RIGHT OF WAY MARKERS 8.000 EA 0105 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 STATE PROJECT PAGE 11 Call Order : 003 CONTRACT ID : 9722619 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U328-0104/00-000.74 00 COUNTIES : MERCER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/00 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 640-02 SMALL FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0115 640-03 BUILDING EQUIPMENT LUMP LUMP 0120 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 397.000 TN AA1 0125 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 361.000 TN AA2 0130 401-03SG HOT-LAID ASPHALT PATCH & LEVEL COURSE, STONE OR GRAVEL 273.000 TN BB1 2 IN THICKNESS MAXIMUM 0135 401-03S HOT-LAID ASPHALT PATCH & LEVEL COURSE, SLAG 249.000 TN BB2 2 IN THICKNESS MAXIMUM 0140 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 600.000 TN CC1 0145 402-01(1)S HMA SKID PVT, (W-1) SLAG 546.000 TN CC2 0150 604-02(18)A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE 60.000 LF DD1 0155 604-25(18)A2 CORRUGATED ALUMINUM ALLOY PIPE 60.000 LF DD2 0160 604-09(18) END SECION FOR CORRUGATED STEEL PIPE 1.000 EA EE1 0165 604-28(18) END SECTION FOR CORRUGATED ALUMINUM ALLOY PIPE 1.000 EA EE2 0170 636-02SG AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 50.000 TN FF1 0175 636-02S AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 46.000 TN FF2 SECTION NO. 0002 SIGNING 0180 658-01 CLASS B CONCRETE FOOTING, REINFORCED, OVERHEAD 4.200 CY 0185 658-03(01) OVERHEAD SIGN STRUCTURE, GALVANIZED STEEL 1.000 EA 0190 661-02 EXTRUDED PANEL SIGNS 169.000 SF SECTION NO. 0003 SIGNAL 0195 660-03(V-12) SIGNAL SECTIONS 8.000 EA 1 STATE PROJECT PAGE 12 Call Order : 003 CONTRACT ID : 9722619 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U328-0104/00-000.74 00 COUNTIES : MERCER GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/00 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0003 SIGNAL 0200 660-04(C1)A SIGNAL SUPPORTS, INSTALLATION ONLY 1.000 EA 0205 660-05(H) JUNCTION BOXES, TYPE H 1.000 EA 0210 660-07 MISCELLANEOUS SIGNAL LUMP LUMP SECTION NO. 0004 PAVEMENT MARKINGS 0215 663-01-1(II)W EDGE LINE, WHITE 2,250.000 LF 0220 663-02-1(II)W LANE LINE OR CENTERLINE, WHITE 270.000 LF 0225 663-03-1(II) BARRIER LINES 2,200.000 LF 0230 663-04(V) TYPE V CHANNELIZING LINES 460.000 LF 0235 663-05(V) TYPE V, STOP LINES 72.000 LF 0240 663-10(V) TYPE V, LANE ARROWS 16.000 EA 0245 663-11(V) TYPE V, LANE LETTERS 36.000 EA 1 FEDERAL PROJECT PAGE 13 Call Order : 004 CONTRACT ID : 9231701 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S337-0002/00-009.63 02 ACNH 0002 214 E00 COUNTIES : PLEASANTS DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 202-01(01) BUILDING DEMOLITION ( 1.00 ) LUMP 0015 202-01(02) BUILDING DEMOLITION ( 1.00 ) LUMP 0020 203-01(1) DISMANTLING STRUCTURES ( 1.00 ) LUMP 0025 203-01(2) DISMANTLING STRUCTURES ( 1.00 ) LUMP 0030 204-01 MOBILIZATION LUMP LUMP 0035 207-01 UNCLASSIFIED EXCAVATION 11,550.000 CY 0040 207-02 SUBGRADE 3,020.000 CY 0045 207-34 FABRIC FOR SEPARATION 22,695.000 SY 0047 208-03 CONTAMINATED SOIL 4,083.000 CY 0050 209-01 MONITORING WELL CONSTRUCTION 3.000 EA 0055 211-02 ROCK BORROW EXCAVATION 1,207.000 CY 0060 307-01 CLASS 1 AGGREGATE BASE COURSE 1,199.000 CY 0065 308-01 CLASS 1 AGGREGATE BASE COURSE 121.000 TN 0070 311-06 OPEN GRADED FREE DRAINING BASE COURSE 1,913.000 CY 0075 409-02 BITUMINOUS MATERIAL 2,216.000 GA 0080 501-05(6I) NON-REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT 168.000 SY 0085 502-01(12I) PORTLAND CEMENT CONCRETE APPROACH SLAB 906.000 SY 0090 601-02 CLASS B CONCRETE 6.400 CY 0095 604-04(15)A2 FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED STL PIPE 122.000 LF 0100 604-04(18)A2 FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED STL PIPE 93.000 LF 1 FEDERAL PROJECT PAGE 14 Call Order : 004 CONTRACT ID : 9231701 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S337-0002/00-009.63 02 ACNH 0002 214 E00 COUNTIES : PLEASANTS DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0105 604-04(24)A2 FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED STL PIPE 28.000 LF 0110 604-37(18)III REINFORCED CONCRETE PIPE 1,300.000 LF 0115 604-37(24)III REINFORCED CONCRETE PIPE 588.000 LF 0120 604-37(30)III REINFORCED CONCRETE PIPE 20.000 LF 0125 604-37(36)III REINFORCED CONCRETE PIPE 25.000 LF 0130 604-37(60)V REINFORCED CONCRETE PIPE 76.000 LF 0135 604-53(36) RELAID CONDUIT 35.000 LF 0140 604-53(60) RELAID CONDUIT 64.000 LF 0145 605-01-1 TYPE A MANHOLE, MODIFIED 1.000 EA 0150 605-03 TYPE A INLET 18.000 EA 0155 605-04 TYPE B INLET 7.000 EA 0160 605-08 TYPE F INLET 9.000 EA 0165 605-09 TYPE G INLET 2.000 EA 0170 605-09-1 TYPE G INLET, MODIFIED 1.000 EA 0175 605-16 ADJUSTING TYPE A MANHOLE 1.000 EA 0180 605-19 ADJUSTING TYPE B INLET 1.000 EA 0185 606-29 FREE DRAINING BASE (FDB) TRENCH 4,216.000 LF 0190 606-30 OUTLET PIPE 1,735.000 LF 0195 607-01(I) TYPE 1 GUARDRAIL 1,381.000 LF 0200 607-06 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 4.000 EA 0205 607-30 SPECIAL TRAILING END TERMINAL 1.000 EA 1 FEDERAL PROJECT PAGE 15 Call Order : 004 CONTRACT ID : 9231701 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S337-0002/00-009.63 02 ACNH 0002 214 E00 COUNTIES : PLEASANTS DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0210 607-65 FLARED END TERMINAL 1.000 EA 0215 608-01(6F) RIGHT-OF-WAY FENCE, CHAIN LINK TYPE 249.000 LF 0225 609-01 CONCRETE SIDEWALK 1,289.000 SY 0230 609-02 BED COURSE MATERIAL 145.000 CY 0235 610-01(I) PLAIN CONCRETE CURBING 289.000 LF 0240 610-03(I)MOD COMBINATION CONCRETE CURB AND GUTTER (MODIFIED) 3,058.000 LF 0245 610-03(IV)MOD COMBINATION CONCRETE CURB AND GUTTER, MODIFIED 586.000 LF 0250 633-01 CONCRETE GUTTER 165.000 SY 0255 633-03 DUMPED ROCK GUTTER 41.000 CY 0260 636-07 ERADICATION OF PAVEMENT MARKINGS 8,500.000 LF 0265 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 25,750.000 LF 0270 636-09 TEMPORARY PAVEMENT MARKINGS-TAPE 4 IN SOLID LINE 25,750.000 LF 0275 636-11 TRAFFIC CONTROL DEVICES 42,964.000 UN 0280 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 4.000 EA 0285 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 400.000 EA 0290 636-14 FLAGGER 540.000 HR 0295 636-17 TEMPORARY CONCRETE BARRIERS 530.000 LF 0300 636-18 REMOVING AND RESETTING TEMPORARY CONCRETE BARRIERS 320.000 LF 0305 636-23(01) TEMPORARY TRAFFIC SIGNAL ( 1.00 ) LUMP 0310 636-24 TEMPORARY PIPE FOR MAINTAINING TRAFFIC 300.000 LF 0315 636-25(B) WARNING LIGHTS 2,700.000 DA 1 FEDERAL PROJECT PAGE 16 Call Order : 004 CONTRACT ID : 9231701 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S337-0002/00-009.63 02 ACNH 0002 214 E00 COUNTIES : PLEASANTS DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0320 636-25(C) WARNING LIGHTS 3,200.000 DA 0325 637-01 WATER FOR DUST PALLIATIVE 48.000 MG 0330 638-02 RIGHT OF WAY MARKERS 28.000 EA 0335 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0340 640-01 STANDARD FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0345 640-03 BUILDING EQUIPMENT LUMP LUMP 0350 642-01 TEMPORARY BERMS 2,025.000 LF 0355 642-02 SLOPE DRAINS 87.000 LF 0360 642-03-1 DITCH CHECKS 5.000 EA 0365 642-03-2 CHECK DAMS 8.000 EA 0370 642-04-1 TEMPORARY SEED 76.000 LB 0375 642-04-2 SEED MIXTURE B 7.000 LB 0380 642-04-3 SEED MIXTURE D 78.000 LB 0385 642-05-1 STRAW OR HAY MULCH 1.000 TN 0390 642-06 FERTILIZER 0.500 TN 0395 642-07 FIBER MATTING 348.000 SY 0400 642-08 TEMPORARY PIPE 540.000 LF 0405 642-09 CONTOUR DITCH 4,900.000 LF 0410 642-10 AGRICULTURAL LIMESTONE 1.000 TN 0415 642-11 HAY OR STRAW BALES 1,620.000 EA 0420 642-12 SILT FENCE 2,700.000 LF 1 FEDERAL PROJECT PAGE 17 Call Order : 004 CONTRACT ID : 9231701 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S337-0002/00-009.63 02 ACNH 0002 214 E00 COUNTIES : PLEASANTS DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0422 651-01 FURNISHING AND PLACING TOPSOIL 120.000 CY 0425 652-01 AGRICULTURAL LIMESTONE 0.300 TN 0430 652-02-1 FERTILIZER, 10-20-10 0.500 TN 0435 652-02-2 UREA FORMALDEHYDE FERTILIZER 0.200 TN 0440 652-03-1 SEED MIXTURES B, C-1 OR C-2 7.000 LB 0445 652-03-2 SEED MIXTURES D 78.100 LB 0450 652-04-1 STRAW OR HAY MULCH 2.500 TN 0455 664-01(IV) IMPACT ATTENUATING DEVICE, TYPE IV 2.000 EA 0460 664-01(IV)A REMOVE AND RESET G.R.E.A.T. ATTENUATOR DEVICE 2.000 EA 0465 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 10,119.000 TN AA1 0470 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 9,208.000 TN AA2 0475 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 1,674.000 TN AB1 0480 402-01(1)S HMA SKID PVT, (W-1) SLAG 1,521.000 TN AB2 SECTION NO. 0002 BOX CULVERT 0485 203-01(4) DISMANTLING STRUCTURES ( 1.00 ) LUMP 0490 240-01(60X48) CLEANING CULVERTS 200.000 LF 0495 212-01 STRUCTURE EXCAVATION 90.000 CY 0500 212-05 SELECT MATERIAL FOR BACKFILLING 34.000 CY 0505 601-02 CLASS B CONCRETE 40.000 CY 0510 602-01 REINFORCING STEEL BARS 2,700.000 LB 0515 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP SECTION NO. 0003 BRIDGE #3554 1 FEDERAL PROJECT PAGE 18 Call Order : 004 CONTRACT ID : 9231701 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S337-0002/00-009.63 02 ACNH 0002 214 E00 COUNTIES : PLEASANTS DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== 0520 203-01(3) DISMANTLING STRUCTURES ( 1.00 ) LUMP 0530 601-02 CLASS B CONCRETE 163.000 CY 0535 601-03 CLASS K CONCRETE 347.000 CY 0540 602-01 REINFORCING STEEL BARS 12,448.000 LB 0545 602-02 EPOXY COATED REINFORCING STEELBARS 62,491.000 LB 0550 603-18(45) PRESTRESSED CONCRETE I BEAMS, 45IN 710.000 LF 0555 616-05HP12X53 STEEL BEARING PILES, PRE-DRILLED AND DRIVEN 2,601.000 LF 0560 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0565 679-06 TEST SLAB LUMP LUMP 0570 679-02 LATEX MODIFED PORTLAND CEMENT CONCRETE OVERLAY BRIDGE DECK 35.000 CY AC1 0575 679-04M MICROSILICA CONCRETE OVERLAY 35.000 CY AC2 SECTION NO. 0004 RETAINING WALL #1 0580 626-01 RETAINING WALL, REINFORCED EARTH 2,926.000 SF AD1 0585 626-02 RETAINING WALL, VSL RETAINED EARTH 2,926.000 SF AD2 0590 626-03 RETAINING WALL, CAST IN PLACE REINFORCED CONCRETE 2,750.000 SF AD3 SECTION NO. 0005 ABUTMENT WALLS & WINGWALLS 0595 626-01 RETAINING WALL, REINFORCED EARTH 14,244.000 SF AE1 0600 626-02 RETAINING WALL, VSL RETAINED EARTH 14,244.000 SF AE2 SECTION NO. 0006 SIGNING & PAVEMENT MARKINGS 0605 657-08 (2.00LB) CHANNEL POSTS 305.000 LF 0610 657-10 (3.00LB) CHANNEL POSTS 258.000 LF 1 FEDERAL PROJECT PAGE 19 Call Order : 004 CONTRACT ID : 9231701 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S337-0002/00-009.63 02 ACNH 0002 214 E00 COUNTIES : PLEASANTS DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0006 SIGNING & PAVEMENT MARKINGS 0615 657-18 POST REMOVAL 21.000 EA 0620 658-01 CLASS B CONCRETE FOOTING, REINFORCED, OVERHEAD 7.000 CY 0625 658-03(01) OVERHEAD SIGN STRUCTURE, GALVANIZED STEEL 1.000 EA 0630 658-03(02) OVERHEAD SIGN STRUCTURE, GALVANIZED STEEL 1.000 EA 0635 658-03(03) OVERHEAD SIGN STRUCTURE, GALVANIZED STEEL 1.000 EA 0640 661-01(1) (0.080),FLAT SHEET SIGNS 240.000 SF 0645 661-11 INSTALLATION OF REUSABLE SIGNS 4.000 EA 0650 663-01-1(II)W EDGE LINE, WHITE 4,800.000 LF 0655 663-02-1(II)W LANE LINE OR CENTERLINE, WHITE 1,050.000 LF 0660 663-02-1(II)Y LANE LINE OR CENTERLINE YELLOW 1,000.000 LF 0665 663-03-1(II) BARRIER LINES 4,460.000 LF 0670 663-04(II) TYPE II CHANNELIZING LINES 200.000 LF 0675 663-05(V) TYPE V, STOP LINES 100.000 LF 0680 663-07(V)W TYPE V, STRIPES, WHITE 500.000 LF 0685 663-10(V) TYPE V, LANE ARROWS 12.000 EA 0690 663-11(V) TYPE V, LANE LETTERS 4.000 EA SECTION NO. 0007 LIGHTING 0695 662-02(1) GALVANIZED STEEL CONDUIT ( 1.00 ) LUMP 0700 662-06(H18X18 JUNCTION BOX 8.000 EA 0705 662-07(250) LUMINAIRES 4.000 EA 0710 662-08(1) CABLE ( 1.00 ) LUMP 1 FEDERAL PROJECT PAGE 20 Call Order : 004 CONTRACT ID : 9231701 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S337-0002/00-009.63 02 ACNH 0002 214 E00 COUNTIES : PLEASANTS DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0007 LIGHTING 0715 662-10(35-12I LIGHTING SUPPORT, TYPE I 4.000 EA 0720 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0725 662-15(1) ELECTRICAL TESTS ( 1.00 ) LUMP 0730 662-16 SYSTEM MODIFICATION LUMP LUMP SECTION NO. 0008 WATERLINE RELOCATION 0735 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0740 670-07(2)200 PLASTIC PIPE, CLASS 200 485.000 LF 0745 670-07(6)200 PLASTIC PIPE, CLASS 200 1,740.000 LF 0750 670-09(6) GATE VALVE AND VALVE BOX 8.000 EA 0755 670-09(4) GATE VALVE AND VALVE BOX 1.000 EA 0760 670-09(2) GATE VALVE AND VALVE BOX 2.000 EA 0765 670-10(16).19 STEEL CASING PIPE 173.000 LF 0770 670-10(16).25 STEEL CASING PIPE 46.000 LF 0775 670-16 RELOCATED METERS 1.000 EA 0780 670-19 SPECIAL VALVE 2.000 EA 0790 670-21(3/4) HOUSE CONNECTION 40.000 LF SECTION NO. 0009 SANITARY SEWER RELOCATION 0795 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0800 675-08(4)I51 DUCTILE IRON SEWER PIPE, TYPE I, CLASS 51 168.000 LF 0805 675-08(12)I50 DUCTILE IRON SEWER PIPE CLASS 50 293.000 LF 1 FEDERAL PROJECT PAGE 21 Call Order : 004 CONTRACT ID : 9231701 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S337-0002/00-009.63 02 ACNH 0002 214 E00 COUNTIES : PLEASANTS DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0009 SANITARY SEWER RELOCATION 0810 675-14 MANHOLE COMPLETE, INCLUDING CASTINGS 5.000 EA 0815 675-18 ADJUSTING MANHOLE 4.000 EA 0820 675-21(10).19 STEEL CASING PIPE 112.000 LF 0825 675-21(20).31 STEEL CASING PIPE 18.000 LF SECTION NO. 0010 COMPUTER SYSTEM 0830 640-04 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP SECTION NO. 0011 ON JOB TRAINING 0835 699 ON JOB TRAINING 2,000.000 HR 1 STATE PROJECT PAGE 22 Call Order : 005 CONTRACT ID : 9830903 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S320-0060/16-000.00 00 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/01/99 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 UPGR PVMT, INST DR 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 207-01 UNCLASSIFIED EXCAVATION 600.000 CY 0015 240-01(12) CLEANING CULVERTS 45.000 LF 0020 240-01(15) CLEANING CULVERTS 16.000 LF 0025 240-01(18) CLEANING CULVERTS 90.000 LF 0030 240-02 CLEANING INLETS 2.000 EA 0035 604-50(15) CORRUGATED POLYETHYLENE PIPE 1,111.000 LF 0040 604-50(18) CORRUGATED POLYETHYLENE PIPE 30.000 LF 0045 604-50(24) CORRUGATED POLYETHYLENE PIPE 6.000 LF 0050 605-04 TYPE B INLET 9.000 EA 0055 605-51 TYPE U INLET 1.000 EA 0060 636-11 TRAFFIC CONTROL DEVICES 1,012.000 UN 0065 636-14 FLAGGER 300.000 HR 0070 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0075 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 510.000 TN AA1 0080 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 450.000 TN AA2 0085 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 325.000 TN BB1 0090 308-01S CLASS 1 AGGREGATE, SLAG 300.000 TN BB2 0095 407-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 530.000 TN CC1 0100 407-1(II)S HOT-MIX ASPHALT BASE COURSE, SLAG 450.000 TN CC2 1 STATE PROJECT PAGE 23 Call Order : 006 CONTRACT ID : 9611302 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S318-0338/00-000.00 00 COUNTIES : JACKSON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/15/99 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE NO. 2972.1 0005 203-02(3) REMOVAL PORTION BR. SUBSTRUCT. LUMP LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 601-30 PATCHING CONCRETE STRUCTURES 24.000 M2 1 FEDERAL PROJECT PAGE 24 Call Order : 007 CONTRACT ID : 9630412 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S343-0050/39-003.75 00 0STP 5039 003 EQ0 COUNTIES : RITCHIE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/01/99 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REHABILITATION 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 212-01 STRUCTURE EXCAVATION 73.000 CY 0020 409-02 BITUMINOUS MATERIAL 29.000 GA 0025 601-02 CLASS B CONCRETE 8.000 CY 0030 602-01 REINFORCING STEEL BARS 1,172.000 LB 0035 605-09 TYPE G INLET 2.000 EA 0040 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 108.000 LF 0045 625-16 REMOVE AND REBUILD EXPANSION JOINT 62.000 LF 0050 625-17 INSTALL SILICONE EXPANSION JOINT SYSTEM 191.000 LF 0055 633-03 DUMPED ROCK GUTTER 39.000 CY 0060 636-09 TEMPORARY PAVEMENT MARKINGS-TAPE 4 IN SOLID LINE 1,500.000 LF 0065 636-11 TRAFFIC CONTROL DEVICES 4,000.000 UN 0070 636-14 FLAGGER 100.000 HR 0075 636-23 TEMPORARY TRAFFIC SIGNAL ( 1.00 ) LUMP 0080 636-25(B) WARNING LIGHTS 240.000 DA 0085 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 0090 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 66.000 TN AA1 0095 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 60.000 TN AA2 0100 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 9.000 TN AB1 0105 402-01(1)S HMA SKID PVT, (W-1) SLAG 8.000 TN AB2 1 FEDERAL PROJECT PAGE 25 Call Order : 007 CONTRACT ID : 9630412 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S343-0050/39-003.75 00 0STP 5039 003 EQ0 COUNTIES : RITCHIE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/01/99 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REHABILITATION 0110 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 26.000 LF AC1 0115 604-02(18)A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE 26.000 LF AC2 0120 604-25(18)A2 CORRUGATED ALUMINUM ALLOY PIPE 26.000 LF AC3 1 FEDERAL PROJECT PAGE 26 Call Order : 008 CONTRACT ID : 9916003 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S304-0015/00-004.80 00 0STP 0015 057 E00 COUNTIES : BRAXTON DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 04/01/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURF(1"), GDRL 0005 207-01 UNCLASSIFIED EXCAVATION 230.000 CY 0010 211-08 ROCK BORROW EXCAVATION 2,248.000 TN 0015 218-03 GABIONS 94.000 CY 0020 229-01 SHOULDERS AND DITCHES 2.370 LM 0025 408-02 BITUMINOUS MATERIAL 864.000 GA 0030 409-02 BITUMINOUS MATERIAL 1,480.000 GA 0035 604-01(15)A2 METALLIC COATED CORRUGATED STEEL PIPE 30.000 LF 0040 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 85.000 LF 0045 604-01(24)A2 METALLIC COATED CORRUGATED STEEL PIPE 40.000 LF 0050 604-37(15)II REINFORCED CONCRETE PIPE 8.000 LF 0055 604-37(18)II REINFORCED CONCRETE PIPE 16.000 LF 0060 605-09 TYPE G INLET 17.000 EA 0065 607-01(I) TYPE 1 GUARDRAIL 8,400.000 LF 0070 607-10-1(A) GUARDRAIL REMOVAL 275.000 LF 0075 607-65 FLARED END TERMINAL 30.000 EA 0080 607-66 TANGENT END TERMINAL 2.000 EA 0085 622-03 CANTILEVER MAILBOX SUPPORT 1.000 EA 0090 636-06 PILOT TRUCK AND DRIVER 25.000 DA 0095 636-11 TRAFFIC CONTROL DEVICES 7,015.000 UN 0100 636-14 FLAGGER 700.000 HR 0105 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 60.000 TN AA1 1 FEDERAL PROJECT PAGE 27 Call Order : 008 CONTRACT ID : 9916003 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S304-0015/00-004.80 00 0STP 0015 057 E00 COUNTIES : BRAXTON DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 04/01/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURF(1"), GDRL 0110 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 55.000 TN AA2 0115 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 1,280.000 TN BB1 0120 308-01S CLASS 1 AGGREGATE, SLAG 1,165.000 TN BB2 0125 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 480.000 TN CC1 0130 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 437.000 TN CC2 0135 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 1,610.000 TN DD1 0140 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 1,465.000 TN DD2 0145 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 1,610.000 TN EE1 0150 402-01(1)S HMA SKID PVT, (W-1) SLAG 1,465.000 TN EE2 1 STATE PROJECT PAGE 28 Call Order : 009 CONTRACT ID : 9805902 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U315-0105/00-004.19 00 COUNTIES : HANCOCK GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/30/99 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ADD TURN LANES(3) 0005 207-01 UNCLASSIFIED EXCAVATION 270.000 CY 0010 408-02 BITUMINOUS MATERIAL 336.000 GA 0015 409-02 BITUMINOUS MATERIAL 267.000 GA 0020 604-01(15)A2 METALLIC COATED CORRUGATED STEEL PIPE 140.000 LF 0025 605-04 TYPE B INLET 3.000 EA 0030 605-19 ADJUSTING TYPE B INLET 1.000 EA 0035 605-24 ADJUSTING TYPE G INLET 1.000 EA 0040 636-11 TRAFFIC CONTROL DEVICES 5,520.000 UN 0045 636-14 FLAGGER 240.000 HR 0050 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0055 660-01 SIGNAL CONTROLLERS LUMP LUMP 0060 660-02(LPS-C) TRAFFIC DETECTORS 6.000 EA 0065 660-03(V-12) SIGNAL SECTIONS 13.000 EA 0070 660-05(H) JUNCTION BOXES, TYPE H 2.000 EA 0075 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0080 663-01-1(II)W EDGE LINE, WHITE 1,524.000 LF 0085 663-02-1(II)W LANE LINE OR CENTERLINE, WHITE 102.000 LF 0090 663-02-1(II)Y LANE LINE OR CENTERLINE YELLOW 1,476.000 LF 0095 663-04(II) TYPE II CHANNELIZING LINES 260.000 LF 0100 663-05(V)W TYPE V STOP LINES, WHITE 83.000 LF 0105 663-06(V) TYPE V CROSSWALK LINES 82.000 LF 1 STATE PROJECT PAGE 29 Call Order : 009 CONTRACT ID : 9805902 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U315-0105/00-004.19 00 COUNTIES : HANCOCK GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/30/99 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ADD TURN LANES(3) 0110 663-07(V)Y TYPE V, STRIPES, YELLOW 166.000 LF 0115 663-10(V) TYPE V, LANE ARROWS 8.000 EA 0120 663-11(V) TYPE V, LANE LETTERS 8.000 EA 0125 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 260.000 TN AA1 0130 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 255.000 TN AA2 0135 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 20.000 TN BB1 0140 308-01S CLASS 1 AGGREGATE, SLAG 18.000 TN BB2 0145 308-01STS CLASS 1 AGGREGATE, STEEL SLAG 22.000 TN BB3 0150 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 246.000 TN CC1 0155 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 224.000 TN CC2 0160 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 287.000 TN DD1 0165 402-01(1)S HMA SKID PVT, (W-1) SLAG 261.000 TN DD2 1 STATE PROJECT PAGE 30 Call Order : 010 CONTRACT ID : 9218032 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S325-0218/00-011.47 00 COUNTIES : MARION GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/22/00 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0015 204-01 MOBILIZATION LUMP LUMP 0020 207-01 UNCLASSIFIED EXCAVATION 1,207.900 M3 0025 207-02 SUBGRADE 368.540 M3 0030 207-34 FABRIC FOR SEPARATION 2,600.410 M2 0035 211-01 UNCLASSIFIED BORROW EXCAVATION 219.900 M3 0040 240-01 CLEANING CULVERTS 36.750 M 0045 307-01 CLASS I AGGREGATE BASE COURSE 621.268 M3 0050 408-02 BITUMINOUS MATERIAL 281.400 L 0055 409-02 BITUMINOUS MATERIAL PRIME 4,202.371 L 0060 502-01300 PORTLAND CEMENT CONCRETE APPRACH SLAB 300MM 141.000 M2 0065 605-04 TYPE B INLET 7.000 EA 0070 605-09 TYPE G INLET 1.000 EA 0075 606-18300 PREFABRICATED EDGE DRAIN 222.168 M 0080 607-012 TYPE 1 GUARDRAIL CLASS II 80.010 M 0085 607-06 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 2.000 EA 0090 609-01 CONCRETE SIDEWALK 255.430 M2 0095 609-02 BED COURSE MATERIAL 38.310 M3 0100 610-031 COMBINATION CONCRETE CURBING AND GUTTER TYPE I 12.546 M 0105 610-032 COMBINED CONCRETE CURBING AND GUTTER TYPE II 32.969 M 1 STATE PROJECT PAGE 31 Call Order : 010 CONTRACT ID : 9218032 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S325-0218/00-011.47 00 COUNTIES : MARION GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/22/00 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 610-033 COMBINED CONCRETE CURBING AND GUTTER TYPE III 3.967 M 0115 610-034 COMBINED CONCRETE CURBING & GUTTER TYPE IV 106.167 M 0120 610-051 BITUMINOUS CURBING TYPE I 83.838 M 0125 610-054 BITUMINOUS CURBING TYPE IV 16.762 M 0130 636-07 ERADICATION PAVEMENT MARKINGS 200.000 M 0135 636-08 TEMP PVMT MARKING-PAINT 500.000 M 0140 636-09 TEMP PVMT MARKING-TAPE 100.000 M 0145 636-11 TRAFFIC CONTROL DEVICE 6,440.000 UN 0150 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 2.000 EA 0155 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 50.000 EA 0160 636-14 FLAGGER 200.000 HR 0165 636-25B WARNING LIGHTS TYPE B 720.000 DA 0170 638-02 RIGHT OF WAY MARKERS 20.000 EA 0175 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0180 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECT LUMP LUMP 0185 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 630.239 MGR AA1 0190 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 660.250 MGR AA2 0195 402-01(1)S HOT MIX ASPHALT SKID PAVEMENT, SLAG 132.509 MGR BB1 0200 402-01(1)SG HOT MIX ASPHALT SKID PAVEMENT, STONE OR GRAVEL 138.819 MGR BB2 0205 604-040450A2 FULL BITUMINOUS COATED AND PAVED INVERT CORRUGATED STEEL PIP 83.244 M CC1 E, 450MM, A2 0210 604-3704502 REINFORCED CONCRETE PIPE, 450MM, CLII 83.244 M CC2 1 STATE PROJECT PAGE 32 Call Order : 010 CONTRACT ID : 9218032 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S325-0218/00-011.47 00 COUNTIES : MARION GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/22/00 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0215 604-760450A2 ALUMINUM COATED CORRUGATED STEEL PIPE, 450MM, A2 83.244 M CC3 SECTION NO. 0002 BRIDGE 0220 203-01 DISMANTLING STRUCTURES LUMP LUMP 0225 211-02 ROCK BORROW EXCAVATION 58.000 M3 0230 212-01 STRUCTURE EXCAVATION 58.000 M3 0235 212-02 WET EXCAVATION 98.000 M3 0240 212-05 SELECT MATERIAL FOR BACKFILLING 24.000 M3 0245 601-02 CLASS B CONCRETE 111.000 M3 0250 601-03 CLASS K CONCRETE 49.000 M3 0255 602-01 REIN STEEL BARS 4,273.000 KG 0260 602-02 EPOXY COATED REINFORCING BARS 9,263.000 KG 0265 603-01 PRESTRESSED CONCRETE BEAMS 60.000 M 0270 617-03 ALUMINUM RAILING 16.000 M 0275 636-05 TEMPORARY STRUCTURES FOR MAINTAINING TRAFFIC LUMP LUMP 0280 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 STATE PROJECT PAGE 33 Call Order : 011 CONTRACT ID : 9722404 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U334-0039/00-034.55 00 COUNTIES : NICHOLAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/15/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 36,279.000 M3 0020 207-02 SUBGRADE 1,446.000 M3 0025 207-34 FABRIC FOR SEPARATION 9,584.000 M2 0030 211-01 UNCLASSIFIED BORROW EXCAVATION 243,480.000 M3 0035 211-02 ROCK BORROW EXCAVATION 20,509.000 M3 0040 307-01 CLASS I AGGREGATE BASE COURSE 734.000 M3 0045 308-01 CLASS 1 AGGREGATE BASE COURSE 956.000 MGR 0050 311-06 OPEN GRADED FREE DRAINING BASE 529.000 M3 0055 409-02 BITUMINOUS MATERIAL PRIME 23,734.000 L 0060 601-02 CLASS B CONCRETE 14.800 M3 0065 604-010450A2 METALLIC COATED CORRUGATED STEEL PIPE, 450MM, A2 73.250 M 0070 604-010600A2 METALLIC COATED CORRUGATED STEEL PIPE, 600MM, A2 14.000 M 0075 604-041800E3 FULL BITUMINUS COATED AND PAVED INVERT CORRUGATED STEEL PIPE 133.000 M 1800MM, E3 0080 605-09 TYPE G INLET 5.000 EA 0085 606-29 FREE DRAINING BASE (FDB) TRENCH 655.000 M 0090 607-011 TYPE 1 GUARDRAIL, CLASS I 1,274.000 M 0095 607-65 FLARED END TERMINAL 3.000 EA 0100 636-07 ERADICATION PAVEMENT MARKINGS 650.000 M 0105 636-08 TEMP PVMT MARKING-PAINT 2,000.000 M 1 STATE PROJECT PAGE 34 Call Order : 011 CONTRACT ID : 9722404 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U334-0039/00-034.55 00 COUNTIES : NICHOLAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/15/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 636-09 TEMP PVMT MARKING-TAPE 500.000 M 0115 636-11 TRAFFIC CONTROL DEVICE 10,740.000 UN 0120 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 3.000 EA 0125 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 100.000 EA 0130 636-14 FLAGGER 600.000 HR 0135 636-25B WARNING LIGHTS TYPE B 900.000 DA 0140 637-01 WATER FOR DUST PALLIATIVE 2,973.000 M3 0145 638-02 RIGHT OF WAY MARKERS 11.000 EA 0150 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0155 640-02 SMALL FIELD OFFICE/STORAGE BUILDING LUMP LUMP 0160 640-03 BUILDING EQUIPMENT LUMP LUMP 0165 642-01 TEMPORARY BERMS 495.000 M 0170 642-02 SLOPE DRAINS 34.000 M 0175 642-031 DITCH CHECKS 30.000 EA 0180 642-033 SEDIMENT TRAP 550.000 M3 0185 642-036 SEDIMENT REMOVAL 275.000 M3 0190 642-041 TEMPORARY SEED 300.000 KG 0195 642-044 SEED MIXTURE L 604.000 KG 0200 642-051 STRAW OR HAY MULCH 20.000 MGR 0205 642-06 FERTILIZER 4.000 MGR 0210 642-07 FIBER MATTING 500.000 M2 1 STATE PROJECT PAGE 35 Call Order : 011 CONTRACT ID : 9722404 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U334-0039/00-034.55 00 COUNTIES : NICHOLAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/15/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0215 642-09 CONTOUR DITCH 1,210.000 M 0220 642-10 AGRICULTURAL LIMESTONE 15.000 MGR 0225 642-12 SILT FENCE 1,210.000 M 0230 652-01 AGRICULTURAL LIMESTONE 15.000 MGR 0235 652-021 FERTILIZER 10-20-10 2.000 MGR 0240 652-022 UREA FORMALDEHYDE FERTILIZER 1.500 MGR 0245 652-035 SEED MIXTURE L 604.000 KG 0250 652-041 STRAW OR HAY MULCH 20.000 MGR 0255 655-02A PERMANENT EROSION MATTING, TYPE A 779.000 M2 0260 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 8,745.000 MGR AA1 0265 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 7,958.000 MGR AA2 0270 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 1,022.000 MGR BB1 0275 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 930.000 MGR BB2 1 STATE PROJECT PAGE 36 Call Order : 012 CONTRACT ID : 9916281A Letting Date : 09/14/99 10:00 A.M. PROJECTS : G020-0MCS/0T-001.00 00 2 G020-0MCS/0T-001.00 00 3 G020-0MCS/0T-001.00 00 4 COUNTIES : KANAWHA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/02 RES. ENG.: RICHARD GENTHNER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 LAB BUILDING - PHASE 1 0005 207-01 UNCLASSIFIED EXCAVATION 1,696.000 CY 0010 672-16 LAB BUILDING LUMP LUMP SECTION NO. 0002 LAB BUILDING - PHASE 2 0015 672-16 LAB BUILDING LUMP LUMP SECTION NO. 0003 LAB BUILDING - PHASE 3 0020 672-16 LAB BUILDING LUMP LUMP 1 STATE PROJECT PAGE 37 Call Order : 013 CONTRACT ID : 9916211 Letting Date : 09/14/99 10:00 A.M. PROJECTS : G009-0DCM/0H-001.00 00 COUNTIES : DODDRIDGE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/15/00 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CONSTRUCT BUILDING & SHOP 672-13 OFFICE BUILDING LUMP LUMP 1 STATE PROJECT PAGE 38 Call Order : 014 CONTRACT ID : 9722605 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S343-0074/03-000.00 00 COUNTIES : RITCHIE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 04/28/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 NEW BRIDGE 0005 204-01 MOBILIZATION LUMP LUMP 0010 207-32 FABRIC FOR SUBSURFACE DRAINAGE 300.000 SY 0015 211-01 UNCLASSIFIED BORROW EXCAVATION 1,261.000 CY 0020 212-05 SELECT MATERIAL FOR BACKFILLING 11.000 CY 0025 218-06 FOUNDATION PROTECTION 497.000 CY 0030 409-02 BITUMINOUS MATERIAL 164.000 GA 0035 601-02 CLASS B CONCRETE 26.000 CY 0040 602-02 EPOXY COATED REINFORCING STEELBARS 4,850.000 LB 0045 603-16(33) PRESTRESSED CONCRETE BOX BEAMS, 36 X 33IN 572.000 LF 0050 607-01(I) TYPE 1 GUARDRAIL 362.500 LF 0055 607-01(III) TYPE 1 GUARDRAIL 212.500 LF 0060 607-65 FLARED END TERMINAL 2.000 EA 0065 616-04HP12X74 STEEL BEARING PILES, DRIVEN 387.000 LF 0070 633-03 DUMPED ROCK GUTTER 246.000 CY 0075 636-01 TRAFFIC CONTROL LUMP LUMP 0080 636-05 TEMPORARY STRUCTURES FOR MAINTAINING TRAFFIC ( 1.00 ) LUMP 0085 638-02 RIGHT OF WAY MARKERS 12.000 EA 0090 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0095 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 0100 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 540.000 TN AA1 0105 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 502.000 TN AA2 1 STATE PROJECT PAGE 39 Call Order : 014 CONTRACT ID : 9722605 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S343-0074/03-000.00 00 COUNTIES : RITCHIE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 04/28/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 NEW BRIDGE 0110 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 176.000 TN BB1 0115 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 164.000 TN BB2 0120 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 36.000 TN CC1 0125 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 34.000 TN CC2 1 STATE PROJECT PAGE 40 Call Order : 015 CONTRACT ID : 9727513 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U341-0002/00-000.00 00 COUNTIES : RALEIGH GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 12/31/99 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 UPGRADE AND WIDEN PAVEMENT 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 2,407.000 CY 0020 408-02 BITUMINOUS MATERIAL 800.000 GA 0025 636-06 PILOT TRUCK AND DRIVER 6.000 DA 0030 636-11 TRAFFIC CONTROL DEVICES 5,382.000 UN 0035 636-14 FLAGGER 276.000 HR 0040 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0045 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0050 652-01 AGRICULTURAL LIMESTONE 0.440 TN 0055 652-02-1 FERTILIZER, 10-20-10 0.110 TN 0060 652-03-2 SEED MIXTURES D 15.000 LB 0065 652-04-2 WOOD CELLULOSE FIBER MULCH 0.170 TN 0070 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 1,200.000 TN AA1 0075 308-01S CLASS 1 AGGREGATE, SLAG 1,092.000 TN AA2 0080 407-2(I)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 1,500.000 TN BB1 0085 407-2(I)S HOT-MIX ASPHALT WEARING COURSE, SLAG 1,365.000 TN BB2 0090 407-7SG SCRATCH COURSE, STONE OR GRAVEL 750.000 TN CC1 0095 407-7S SCRACTH COURSE, SLAG 683.000 TN CC2 1 STATE PROJECT PAGE 41 Call Order : 016 CONTRACT ID : 9730903 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U341-0016/00-015.80 00 COUNTIES : RALEIGH GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 12/31/99 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 UPGRADE AND WIDEN PAVEMENT 0005 204-01 MOBILIZATION LUMP LUMP 0010 207-01 UNCLASSIFIED EXCAVATION 58.000 CY 0015 207-45 CONCRETE MEDIAN REMOVAL 1,870.000 SY 0020 408-02 BITUMINOUS MATERIAL 1,318.000 GA 0025 409-02 BITUMINOUS MATERIAL 769.000 GA 0030 605-53 CONCRETE INLET CAP 18.000 EA 0035 610-10 CONCRETE MEDIAN END TREATMENT 2.000 EA 0040 610-11 CONCRETE MEDIAN CAP 913.000 LF 0045 636-11 TRAFFIC CONTROL DEVICES 17,610.000 UN 0050 636-14 FLAGGER 100.000 HR 0055 636-21 ELECTRIC ARROW 20.000 DA 0060 636-22 CHANGABLE MESSAGE SIGN 20.000 DA 0065 663-01-1(II)W EDGE LINE, WHITE 12,319.000 LF 0070 663-02-1(II)W LANE LINE OR CENTERLINE, WHITE 2,859.000 LF 0075 663-03-1(II) BARRIER LINES 20,354.000 LF 0080 663-04(II) TYPE II CHANNELIZING LINES 104.000 LF 0085 663-05(V) TYPE V, STOP LINES 11.000 LF 0090 663-07(V)Y TYPE V, STRIPES, YELLOW 867.000 LF 0095 663-10(V) TYPE V, LANE ARROWS 2.000 EA 0100 663-12(P-2) RAISED PAVEMENT MARKER, TYPE P-2 455.000 EA 0105 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,015.000 TN AA1 1 STATE PROJECT PAGE 42 Call Order : 016 CONTRACT ID : 9730903 Letting Date : 09/14/99 10:00 A.M. PROJECTS : U341-0016/00-015.80 00 COUNTIES : RALEIGH GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 12/31/99 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 UPGRADE AND WIDEN PAVEMENT 0110 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 924.000 TN AA2 0115 401-7SG SCRATCH COURSE, STONE OR GRAVEL 857.000 TN BB1 0120 401-7S SCRATCH COURSE, SLAG 748.000 TN BB2 0125 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 2,960.000 TN CC1 0130 402-01(1)S HMA SKID PVT, (W-1) SLAG 2,694.000 TN CC2 1 STATE PROJECT PAGE 43 Call Order : 017 CONTRACT ID : 9805001 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S302-0005/00-002.60 00 COUNTIES : BERKELEY GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 12/31/99 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 DEMOLITION 0005 203-01 DISMANTLING STRUCTURES LUMP LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 636-11 TRAFFIC CONTROL DEVICES 1,300.000 UN 0020 636-25(B) WARNING LIGHTS 10.000 DA 1 STATE PROJECT PAGE 44 Call Order : 018 CONTRACT ID : 9532002 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S326-0001/00-001.25 00 COUNTIES : MARSHALL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/14/00 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 203-01 DISMANTLING STRUCTURES LUMP LUMP 0015 204-01 MOBILIZATION LUMP LUMP 0020 207-01 UNCLASSIFIED EXCAVATION 44.000 M3 0025 207-02 SUBGRADE 148.000 M3 0030 211-01 UNCLASSIFIED BORROW EXCAVATION 0.000 M3 0035 212-01 STRUCTURE EXCAVATION 569.000 M3 0040 212-05 SELECT MATERIAL FOR BACKFILLING 237.000 M3 0045 218-03 GABIONS 27.000 M3 0050 307-01 CLASS I AGGREGATE BASE COURSE 168.000 M3 0055 409-02 BITUMINOUS MATERIAL PRIME 1,956.000 L 0060 601-02 CLASS B CONCRETE 419.000 M3 0065 602-02 EPOXY COATED REINFORCING BARS 28,244.000 KG 0070 603-01 PRESTRESSED CONCRETE BEAMS 294.000 M 0075 604-50600 CORRUGATED POLYETHYLENE PIPE 13.000 M 0080 605-09 TYPE G INLET 1.000 EA 0085 607-011 TYPE 1 GUARDRAIL, CLASS I 178.000 M 0090 636-09 TEMP PVMT MARKING-TAPE 850.000 M 0095 636-11 TRAFFIC CONTROL DEVICE 4,945.000 UN 0100 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 2.000 EA 0105 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 50.000 EA 1 STATE PROJECT PAGE 45 Call Order : 018 CONTRACT ID : 9532002 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S326-0001/00-001.25 00 COUNTIES : MARSHALL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/14/00 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0110 636-14 FLAGGER 500.000 HR 0115 636-17 TEMPORARY CONCRETE BARRIERS 200.000 M 0120 636-18 REMOVING AND RESETTING TEMPORARY CONCRETE BARRIERS 200.000 M 0125 636-23 TEMPORARY TRAFFIC SIGNAL LUMP LUMP 0130 636-25B WARNING LIGHTS TYPE B 2,500.000 DA 0135 638-02 RIGHT OF WAY MARKERS 14.000 EA 0140 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0145 640-02 SMALL FIELD OFFICE/STORAGE BUILDING LUMP LUMP 0150 640-03 BUILDING EQUIPMENT LUMP LUMP 0155 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECT LUMP LUMP 0160 661-011 2MM FLAT SHEET SIGNS 0.480 M2 0165 663-0112W EDGE LINE WHITE TYPE II 295.000 M 0170 663-0212Y LANE LINE OR CENTER LINE YELLOW TYPE II 90.000 M 0175 663-055 TYPE V STOP LINES 10.000 M 0180 663-07(II)W TYPE II, STRIPES, WHITE 20.000 M 0185 663-105 TYPE V LANE ARROWS 1.000 EA 0190 663-115 TYPE V LANE LETTERS 4.000 EA 0195 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 255.000 MGR AA1 0200 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 232.000 MGR AA2 0205 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 66.000 MGR BB1 0210 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 60.000 MGR BB2 1 STATE PROJECT PAGE 46 Call Order : 019 CONTRACT ID : 9909912 Letting Date : 09/14/99 10:00 A.M. PROJECTS : S323-0010/00-032.93 00 COUNTIES : LOGAN GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RECONSTRUCTION 0005 204-01 MOBILIZATION LUMP LUMP 0010 604-50(15) CORRUGATED POLYETHYLENE PIPE 112.000 LF 0015 604-50(18) CORRUGATED POLYETHYLENE PIPE 334.000 LF 0020 605-04 TYPE B INLET 2.000 EA 0025 605-04-1 TYPE B INLET, MODIFIED 1.000 EA 0030 605-19 ADJUSTING TYPE B INLET 1.000 EA 0035 608-01(4F) RIGHT-OF-WAY FENCE, CHAIN LINK TYPE 565.000 LF 0040 609-01 CONCRETE SIDEWALK 1,225.000 SY 0045 610-01(I) PLAIN CONCRETE CURBING 815.000 LF 0050 636-11 TRAFFIC CONTROL DEVICES 1,455.000 UN 0055 636-14 FLAGGER 290.000 HR 0060 401-03SG HOT-LAID ASPHALT PATCH & LEVEL COURSE, STONE OR GRAVEL 100.000 TN AA1 2 IN THICKNESS MAXIMUM 0065 401-03S HOT-LAID ASPHALT PATCH & LEVEL COURSE, SLAG 91.000 TN AA2 2 IN THICKNESS MAXIMUM 1 STATE PROJECT PAGE 47 Call Order : 020 CONTRACT ID : 9821101 Letting Date : 09/14/99 10:00 A.M. PROJECTS : X344-0033/02-000.00 00 COUNTIES : ROANE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/30/99 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 ROADWAY CR 33/2 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 485.000 CY 0020 207-02 SUBGRADE 471.000 CY 0025 207-34 FABRIC FOR SEPARATION 2,825.000 SY 0030 228-01 SUBGRADE PREPARATION 2,022.000 SY 0035 307-01 CLASS 1 AGGREGATE BASE COURSE 618.000 CY 0040 308-01 CLASS 1 AGGREGATE BASE COURSE 259.000 TN 0045 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 568.000 TN AA2 0050 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 625.000 TN AA1 0055 402-01(1)S HMA SKID PVT, (W-1) SLAG 97.000 TN BB2 0060 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 107.000 TN BB1 0070 409-02 BITUMINOUS MATERIAL 826.000 GA 0095 607-01(II) TYPE 1 GUARDRAIL 190.000 LF 0105 636-11 TRAFFIC CONTROL DEVICES 5,935.000 UN 0110 636-14 FLAGGER 500.000 HR 0115 636-17 TEMPORARY CONCRETE BARRIERS 150.000 LF 0120 636-18 REMOVING AND RESETTING TEMPORARY CONCRETE BARRIERS 150.000 LF 0125 636-25(B) WARNING LIGHTS 400.000 DA 0130 638-02 RIGHT OF WAY MARKERS 18.000 EA 0135 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 1 STATE PROJECT PAGE 48 Call Order : 020 CONTRACT ID : 9821101 Letting Date : 09/14/99 10:00 A.M. PROJECTS : X344-0033/02-000.00 00 COUNTIES : ROANE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/30/99 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 ROADWAY CR 33/2 0140 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP SECTION NO. 0003 BRIDGE 0145 203-01 DISMANTLING STRUCTURES LUMP LUMP 0150 601-02 CLASS B CONCRETE 5.200 CY 0155 602-01 REINFORCING STEEL BARS 292.000 LB 0160 603-05 INSTALLATION OF DOH FURNISHED PRESTRESSED CONCRETE BEAMS LUMP LUMP 0161 615-03 FABRICATED STRUCTURAL STEEL ( 1.00 ) LUMP SECTION NO. 0004 PAVEMENT MARKINGS 0165 663-01-1(II)W EDGE LINE, WHITE 1,800.000 LF 0170 663-02-1(II)W LANE LINE OR CENTERLINE, WHITE 100.000 LF 0175 663-03-1(II) BARRIER LINES 1,200.000 LF 0180 663-04(V) TYPE V CHANNELIZING LINES 230.000 LF 0185 663-05(V) TYPE V, STOP LINES 120.000 LF 0190 663-07(V)Y TYPE V, STRIPES, YELLOW 100.000 LF 0195 663-11(V) TYPE V, LANE LETTERS 9.000 EA SECTION NO. 0005 NON-STATE FUNDED ITEMS 0200 605-15 ADJUST EXISTING MANHOLE 4.000 EA SECTION NO. 0001 ROADWAY US 33 0204 207-01 UNCLASSIFIED EXCAVATION 819.000 CY 1 STATE PROJECT PAGE 49 Call Order : 020 CONTRACT ID : 9821101 Letting Date : 09/14/99 10:00 A.M. PROJECTS : X344-0033/02-000.00 00 COUNTIES : ROANE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/30/99 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY US 33 0205 207-02 SUBGRADE 301.000 CY 0210 207-34 FABRIC FOR SEPARATION 1,800.000 SY 0215 307-01 CLASS 1 AGGREGATE BASE COURSE 390.000 CY 0220 308-01 CLASS 1 AGGREGATE BASE COURSE 215.000 TN 0225 408-02 BITUMINOUS MATERIAL 462.000 GA 0230 409-02 BITUMINOUS MATERIAL 527.000 GA 0235 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 1,843.000 SY 0240 604-01(15)A2 METALLIC COATED CORRUGATED STEEL PIPE 11.000 LF 0245 605-09 TYPE G INLET 1.000 EA 0250 607-01(II) TYPE 1 GUARDRAIL 467.000 LF 0255 610-01(I) PLAIN CONCRETE CURBING 102.000 LF 0260 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 528.000 TN AA1 0265 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 480.000 TN AA2 0270 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 166.000 TN BB1 0275 402-01(1)S HMA SKID PVT, (W-1) SLAG 151.000 TN BB2