1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- October 26, 1999 LETTING Sealed proposals will be received by the West Virginia Department of Transportation, Division of Highways at its office in Building Five, Room A-148, 1900 Kanawha Boulevard East, Charleston, West Virginia 25305-0430 until 10 A.M. October 26, 1999 and said proposals will be publicly opened and read immediately thereafter for the construction of the following project(s): ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 001 9218039 S328-0052/00-010.72 00 ACBR 0052 085 C00 CONST NEW/RELOC 2 LANE ROAD W/BRIDGE(S) EASLEY BRIDGE #4136 REPLACEMENT US 19 & N & W RR, 0.24 MI. W. US 52 SPUR COUNTY: MERCER BRIDGE : 4136 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 7 ; STRUCTURE STEEL: 746446 KG DBE GOAL: 6 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 002 9907408 S323-0010/00-007.36 04 UPGRADE TO 4 LANE ROAD BUFFALO CREEK BRIDGE - TAPLIN CO 16 - 0.3 MI N CO 16 COUNTY: LOGAN REMARKS : 1,766,453 CY UNCLASSIFIED EXCAVATION ------------------------------------------------------------------------------------------------------------------------------------ 003 9829203 S324-0052/61-000.05 00 00BR 5261 001 E00 STRUCTURE REPLACEMENT BRIDGE STREET BRIDGE OVER ELKHORN CR, 0.05 MI N US 52 COUNTY: MCDOWELL BRIDGE : 4912 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 1 ; DBE GOAL: 3 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 004 *9910904 U354-0014/00-019.08 00 STPG 0014 080 E00 TRAFFIC SIGNAL GRAND CENTRAL AVENUE AT 46TH STREET VIENNA COUNTY: WOOD ------------------------------------------------------------------------------------------------------------------------------------ 005 9830007 S355-0016/39-000.73 00 00BR 1639 002 E00 STRUCTURE REPLACEMENT MORAN AVE ARCH #2 BRIDGE 0.73 MI N WV 16 COUNTY: WYOMING BRIDGE : 4983 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ 006 9816883 S306-0043/00-010.79 00 UPGRADE & WIDEN PAVEMENT HUGHES BRANCH ROAD 0.39 MI. S. CR 54 TO JCT WV 10 COUNTY: CABELL ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- October 26, 1999 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 007 9828202 U350-0011/00-000.00 00 CONST TURN LANE(S) EIGTH STREET JCT WV 152 TO 0.46 MI. N. OF S. JCT CR 11/1 COUNTY: WAYNE ------------------------------------------------------------------------------------------------------------------------------------ 008 9818707 U316-0220/00-000.80 00 CONST NEW/RELOC ROAD WELTON CURVE 0.59 MI N-1.11 MI N CO 10 COUNTY: HARDY ------------------------------------------------------------------------------------------------------------------------------------ 009 9722622 U334-0020/00-030.35 00 TRAFFIC SIGNAL CRAIGSVILLE ROAD BEGIN:0.10 MI S WV 55 END:0.10 MI N WV 55 COUNTY: NICHOLAS ------------------------------------------------------------------------------------------------------------------------------------ 010 9812106 S339-0026/00-022.90 00 BRHI 0026 027 E00 STRUCTURE RENOVATION MUDDY CREEK BRIDGE MUDDY CR, 0.15 MI S CO 26/22 COUNTY: PRESTON BRIDGE : 1681.1 CONCRETE SLAB ON CONCRETE GIRDER SPAN(S): 3 ; DBE GOAL: 4 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 011 9727411 U345-0107/00-000.17 00 CONST TURN LANE(S) BELLEPOINT ROAD BEGIN:0.17 MI N WV 3 END:0.82 MI N WV 3 COUNTY: SUMMERS ------------------------------------------------------------------------------------------------------------------------------------ 012 *9909281 U354-0095/00-002.52 02 TRAFFIC SIGNAL WV95 AT K-MART PARKERSBURG COUNTY: WOOD ------------------------------------------------------------------------------------------------------------------------------------ 013 9905581 U317-0131/00-004.33 00 UPGRADE & WIDEN PAVEMENT MCALPIN - SHINNSTON ROAD CO 73/73 - US 19 COUNTY: HARRISON ------------------------------------------------------------------------------------------------------------------------------------ 014 *9905502 S329-0220/03-000.09 00 STRUCTURE RENOVATION SIGN SHOP BRIDGE NEW CREEK, 0.08 MI N US 50 COUNTY: MINERAL ------------------------------------------------------------------------------------------------------------------------------------ 015 9816802 S355-0014/00-002.08 00 STRUCTURE REPLACEMENT FANROCK ARCH BRIDGE 0.01 MI S CO 12/4 COUNTY: WYOMING BRIDGE : #4812 PRESTRESSED CONCRETE BOX GIRDER SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- October 26, 1999 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 016 9916002 S335-0024/00-001.02 00 BRHI 0024 023 E00 STRUCTURE REPLACEMENT MARKET STREET BRIDGE WHEELING CR, 0.09 MI S WV 2 COUNTY: OHIO BRIDGE : #4770 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 2 ; DBE GOAL: 3 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 017 *9925606 S317-0020/06-000.00 00 RESURFACING BENNETT'S RUN ROAD +1 WV 20 - CO 6 COUNTY: HARRISON ------------------------------------------------------------------------------------------------------------------------------------ 018 *9925607 S331-0100/00-006.00 00 RESURFACING BOWLBY ROAD CO 58 - US 19 COUNTY: MONONGALIA ------------------------------------------------------------------------------------------------------------------------------------ 019 *9734945 U344-0026/08-000.03 00 STRUCTURE REPLACEMENT ROANE COUNTY HIGH SCHOOL BRIDGE LICK FORK, 0.03 MI S CO 26 COUNTY: ROANE BRIDGE : #4668 CONCRETE RIGID FRAME SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ 020 *9920208 S302-0009/00-015.05 00 CLEAN AND PAINT STRUCTURE MARTIN MARIETTA BRIDGE #2638.1 0.07 MILE EAST OF JCT WV 45 COUNTY: BERKELEY BRIDGE : #2638.1 CONCRETE ON ROLLED I BEAM SPAN(S): 1 ; ------------------------------------------------------------------------------------------------------------------------------------ 021 *9920207 S304-0040/00-000.01 00 CLEAN AND PAINT STRUCTURE STRANGE CREEK GIRDER BRIDGE #1483.2 0.01 MILE EAST OF WV RTE 4 COUNTY: BRAXTON BRIDGE : #1483.2 CONCRETE ON ROLLED I BEAM SPAN(S): 4 ; ------------------------------------------------------------------------------------------------------------------------------------ 022 9735031A X302-0011/30-000.84 0 CONST NEW/RELOC ROAD INDUSTRIAL PARK ACCESS ROAD (SWEARINGEN) 0.84 E US 11 - C0 19/1 COUNTY: BERKELEY ------------------------------------------------------------------------------------------------------------------------------------ 023 *9925902 U338-0039/00-022.08 00 DRAINAGE IMPROVEMENTS MARLINTON PUBLIC LIBRARY BEGIN: JCT CO 39/2 END: 0.104 MI S JCT 39/2 COUNTY: POCAHONTAS ------------------------------------------------------------------------------------------------------------------------------------ Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- October 26, 1999 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25304-0430 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virginia Code. All contractors submitting bids on project(s) must include one of the following forms properly executed with each proposal: Proposal Guaranty Bond, Cashier's Check, or Certified Check for $500.00 or 5% of total bid, whichever is greater. Failure to include one of the above forms could result in a bid being declared irregular. Proposals and bid bonds must be submitted on standard forms which may be obtained at the Charleston office. The right is reserved to reject any or all proposals. *These are projects on which any contractor with a Category "W" Prequalification Rating may be eligible to bid. Final award of all Interstate and Federal-Aid Projects, with the exception of exempt projects, is subject to the approval of the Federal Highway Administration. Minimum wage rates for these projects have been predetermined as required by law and are set forth in the bid proposal. Federal-Aid projects are subject to the WHA of 1961 PL-581 approved August 13, 1962. Plans and proposals on all projects will be furnished at twenty-five dollars ($25.00) per set. Extra plans will be furnished at fifteen dollars ($15.00) per set and extra proposals will be furnished at ten dollars ($10.00) per proposal. Cross sections will be furnished at fifty dollars ($50.00) per set. All will be furnished without refund and transmitted at your risk. The above noted project information will be available in the Contract Unit, Construction Section, Division of Highways, Room A-737, Building 5, 1900 Kanawha Boulevard East, Charleston, WV 25305 and may also be ordered by calling (304)558-2874. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid bidding proposals will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. The West Virginia Department of Transportation, Division of Highways hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex or national orign in consideration for an award. No proposals for these projects will be issued after 3:00 P.M. on the day prior to the letting. It is necessary to advise your approximate uncompleted workload when ordering plans and proposals. Announcement, opening and reading of bids received will be in the order as designated in the "Notice to Contractors". Sealed proposals may also be deposited in the bid depository box which will be located near the corner of Piedmont Road and California Avenue between the hours of 9 A.M. and 10 A.M., the day of the letting. Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25305-0430 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division Of Highways John J. Welch, Jr., Director Project Control Division 1 1 FEDERAL PROJECT PAGE 1 Call Order : 001 CONTRACT ID : 9218039 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S328-0052/00-010.72 00 ACBR 0052 085 C00 COUNTIES : MERCER DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/01 RES. ENG.: MIKE WARD, ACTING DESCRIPTION: EASLEY BRIDGE #4136 REPLACEMENT ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN AND PAVE 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0015 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0020 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0025 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0030 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0032 202-01 BUILDING DEMOLITION ( 1.00 ) LUMP 0035 204-01 MOBILIZATION LUMP LUMP 0040 207-01 UNCLASSIFIED EXCAVATION 2,942.000 M3 0045 207-02 SUBGRADE 535.000 M3 0050 207-34 FABRIC FOR SEPARATION 3,565.000 M2 0055 211-01 UNCLASSIFIED BORROW EXCAVATION 2,431.000 M3 0060 211-02 ROCK BORROW EXCAVATION 878.000 M3 0065 307-01 CLASS I AGGREGATE BASE COURSE 716.000 M3 0070 408-02 BITUMINOUS MATERIAL 3,482.000 L 0075 409-02 BITUMINOUS MATERIAL PRIME 8,522.000 L 0080 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 3,387.000 M2 0085 502-01300 PORTLAND CEMENT CONCRETE APPRACH SLAB 300MM 199.000 M2 0090 601-02 CLASS B CONCRETE 1.000 M3 0095 604-3704502 REINFORCED CONCRETE PIPE, 450MM, CLII 745.000 M 1 FEDERAL PROJECT PAGE 2 Call Order : 001 CONTRACT ID : 9218039 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S328-0052/00-010.72 00 ACBR 0052 085 C00 COUNTIES : MERCER DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/01 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN AND PAVE 0100 604-3706002 REINFORCED CONCRETE PIPE, 600MM, CLASS II 6.000 M 0105 604-570250 PRECOATED GALVANIZED STEEL PIPE, 8MM THICKNESS BASE METAL 29.000 M 0110 605-01 TYPE A MANHOLE 10.000 EA 0115 605-011 TYPE A MANHOLE, MODIFIED 1.000 EA 0120 605-03 TYPE A INLET 35.000 EA 0125 605-09 TYPE G INLET 1.000 EA 0130 607-011 TYPE 1 GUARDRAIL, CLASS I 97.000 M 0135 607-30 SPECIAL TRAILING END TERMINAL 1.000 EA 0140 607-65 FLARED END TERMINAL 1.000 EA 0145 609-01 CONCRETE SIDEWALK 958.000 M2 0150 609-02 BED COURSE MATERIAL 96.000 M3 0155 610-012 PLAIN CONCRETE CURBING TYPE II 1,147.000 M 0160 610-08 BED COURSE MATERIAL 18.000 M3 0165 610-21 SINGLE FACE BARRIER, TYPE F 54.000 M 0170 617-01 PIPE RAILING 30.000 M 0175 636-07 ERADICATION PAVEMENT MARKINGS 600.000 M 0180 636-08 TEMP PVMT MARKING-PAINT 1,300.000 M 0185 636-09 TEMP PVMT MARKING-TAPE 1,800.000 M 0190 636-11 TRAFFIC CONTROL DEVICE 32,000.000 UN 0195 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICE 5.000 EA 0200 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICE 225.000 EA 1 FEDERAL PROJECT PAGE 3 Call Order : 001 CONTRACT ID : 9218039 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S328-0052/00-010.72 00 ACBR 0052 085 C00 COUNTIES : MERCER DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/01 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN AND PAVE 0205 636-14 FLAGGER 2,030.000 HR 0210 636-14B TRAFFIC DIRECTOR 320.000 HR 0215 636-23(01) TEMPORARY TRAFFIC SIGNAL LUMP LUMP 0220 636-25A WARNING LIGHTS TYPE A 2,800.000 DA 0225 636-25B WARNING LIGHTS TYPE B 6,660.000 DA 0230 636-28 SHADOW VEHICLE 120.000 DA 0235 638-02 RIGHT OF WAY MARKERS 35.000 EA 0240 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0245 640-01 STANDARD FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0250 640-03 BUILDING EQUIPMENT LUMP LUMP 0255 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0260 652-01 AGRICULTURAL LIMESTONE 1.000 MGR 0265 652-021 FERTILIZER 10-20-10 1.000 MGR 0270 652-022 UREA FORMALDEHYDE FERTILIZER 1.000 MGR 0275 652-031 SEED MIXTURES B, C-1, OR C-2 34.000 KG 0280 652-041 STRAW OR HAY MULCH 2.000 MGR 0285 681-01 ASBESTOS ABATEMENT LUMP LUMP 0290 681-01 ASBESTOS ABATEMENT LUMP LUMP 0295 681-01 ASBESTOS ABATEMENT LUMP LUMP 0300 681-01 ASBESTOS ABATEMENT LUMP LUMP 0305 681-01 ASBESTOS ABATEMENT LUMP LUMP 1 FEDERAL PROJECT PAGE 4 Call Order : 001 CONTRACT ID : 9218039 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S328-0052/00-010.72 00 ACBR 0052 085 C00 COUNTIES : MERCER DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/01 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN AND PAVE 0307 681-01 ASBESTOS ABATEMENT LUMP LUMP 0310 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 2,249.000 MGR AA1 0315 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 2,148.000 MGR AA2 0320 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 178.000 MGR BB1 0325 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 170.000 MGR BB2 0330 401-7SG SRCATCH COURSE, STONE OR GRAVEL 140.000 MGR CC1 0335 401-7S SCRATCH COURSE, SLAG 133.000 MGR CC2 0340 402-01(1)SG HOT MIX ASPHALT SKID PAVEMENT, STONE OR GRAVEL 441.000 MGR DD1 0345 402-01(1)S HOT MIX ASPHALT SKID PAVEMENT, SLAG 419.000 MGR DD2 SECTION NO. 0002 ROADWAY SIGNING 0350 657-08 2.98KG CHANNEL POST 7.000 M 0355 657-10 4.5KG CHANNEL POST 99.000 M 0360 661-011 2MM FLAT SHEET SIGNS 16.000 M2 0365 661-11 INSTALL REUSABLE SIGNS 6.000 EA SECTION NO. 0003 TRAFFIC SIGNALS 0370 660-01 SIGNAL CONTROLLERS LUMP LUMP 0375 660-02LPSC TRAFFIC DETECTORS 6.000 EA 0380 660-03P407 SIGNAL SECTIONS 6.000 EA 0385 660-03V305 SIGNAL SECTIONS 28.000 EA 0390 660-04C1 SIGNAL SUPPORTS 3.000 EA 1 FEDERAL PROJECT PAGE 5 Call Order : 001 CONTRACT ID : 9218039 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S328-0052/00-010.72 00 ACBR 0052 085 C00 COUNTIES : MERCER DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/01 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0003 TRAFFIC SIGNALS 0395 660-04C1L SIGNAL SUPPORTS 1.000 EA 0400 660-05H JUNCTION BOXES TYPE H 6.000 EA 0405 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0410 660-10D3 PRIORITY CONTROL SYSTEM DETECTOR 1.000 EA SECTION NO. 0004 HIGHWAY LIGHTING 0415 662-02 GALVANIZED STEEL CONDUIT LUMP LUMP 0420 662-03 POLYVINYLCHLORIDE CONDUIT ( 1.00 ) LUMP 0425 662-06B JUNCTION BOX 17.000 EA 0430 662-06H450 JUNCTION BOX (450X450MM) 9.000 EA 0435 662-07250W LUMINAIRES (250W.) 12.000 EA 0440 662-07400W LUMINAIRES (400W) 2.000 EA 0445 662-081 CABLE LUMP LUMP 0450 662-101 LIGHTING SUPPORT, TYPE I 1.000 EA 0455 662-102 LIGHTING SUPPORT, TYPE II 2.000 EA 0460 662-102 LIGHTING SUPPORT, TYPE II 6.000 EA 0465 662-102 LIGHTING SUPPORT, TYPE II 4.000 EA 0470 662-13 SERVICE AND CONTROL STATION LUMP LUMP 0475 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0480 662-15 ELECTRICAL TESTS LUMP LUMP 0485 662-15 ELECTRICAL TESTS LUMP LUMP 0490 662-16 SYSTEM MODIFICATION LUMP LUMP SECTION NO. 0005 PAVEMENT MARKINGS 1 FEDERAL PROJECT PAGE 6 Call Order : 001 CONTRACT ID : 9218039 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S328-0052/00-010.72 00 ACBR 0052 085 C00 COUNTIES : MERCER DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/01 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== 0495 663-0112W EDGE LINE WHITE TYPE II 1,950.000 M 0500 663-0312 BARRIER LINES TYPE II 2,130.000 M 0505 663-042 TYPE II CHANNELIZING LINES 365.000 M 0510 663-055 TYPE V STOP LINES 45.000 M 0515 663-062 TYPE II CROSSWALK LINES 120.000 M 0520 663-075Y TYPE V STRIPES YELLOW 185.000 M 0525 663-105 TYPE V LANE ARROWS 19.000 EA 0530 663-115 TYPE V LANE LETTERS 20.000 EA SECTION NO. 0006 SANITARY SEWER RELOCATION 0535 605-01 TYPE A MANHOLE 6.000 EA 0540 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0545 675-07150 PLASTIC SEWER PIPE 150MM 103.000 M 0550 675-18 ADJUSTING MANHOLE 1.000 EA SECTION NO. 0007 BLUEFIELD STATE COLLEGE CONDUITS 0555 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0560 675-21030006 STEEL CASING PIPE 300MM 6.35MM 23.000 M 0565 675-21045006 STEEL CASING PIPE 450MM, 6.35MM 42.000 M 0570 662-06H460 JUNCTION BOX (460X460) 4.000 EA SECTION NO. 0008 CITIZENS COMMUNICATIONS CONDUITS 0575 FB-1 INSTALLATION OF UTILITY CONDUIT SYSTEM LUMP LUMP 0580 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP SECTION NO. 0009 RETAINING WALL A 1 FEDERAL PROJECT PAGE 7 Call Order : 001 CONTRACT ID : 9218039 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S328-0052/00-010.72 00 ACBR 0052 085 C00 COUNTIES : MERCER DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/01 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== 0585 628-01 DRILLED GROUTING HOLES 850.000 M 0590 628-02 PRESSURE INJECTED GROUT 60.000 M3 0595 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0600 626-01 RETAINING WALL, REINFORCED EARTH 640.000 M2 EE1 0605 626-02 RETAINING WALL, VSL RETAINED EARTH 640.000 M2 EE2 0610 626-03 RETAINING WALL, CAST IN PLACE 680.000 M2 EE3 SECTION NO. 0010 RETAINING WALL B 0615 212-01 STRUCTURE EXCAVATION 98.000 M3 0620 212-05 SELECT MATERIAL FOR BACKFILLING 20.000 M3 0625 601-02 CLASS B CONCRETE 24.000 M3 0630 602-01 REIN STEEL BARS 744.000 KG 0635 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP SECTION NO. 0011 RETAINING WALL C 0640 614-1W360110 STEEL PILES, W 360X110 106.000 M 0645 614-3150 CONCRETE LAGGING, 150 MM 44.000 M2 0650 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP SECTION NO. 0012 PEDESTRIAN TUNNEL 0655 212-01 STRUCTURE EXCAVATION 293.000 M3 0660 601-02 CLASS B CONCRETE 122.000 M3 0665 602-02 EPOXY COATED REINFORCING BARS 8,200.000 KG 0670 604-792480193 FULL BIT COATED & FIELD PAVED ELIPTICAL PLATE UNDERPASS PIPE 2.000 M 1.9MM THICKNESS AND 90MMX38MM CORRUGATION 1 FEDERAL PROJECT PAGE 8 Call Order : 001 CONTRACT ID : 9218039 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S328-0052/00-010.72 00 ACBR 0052 085 C00 COUNTIES : MERCER DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/01 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0012 PEDESTRIAN TUNNEL 0675 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP SECTION NO. 0013 TRAINING 0680 699 ON JOB TRAINING 1,000.000 HR SECTION NO. 0014 COMPUTER SYSTEM 0685 640-04 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP SECTION NO. 0015 BRIDGE NO. 4136 0690 203-01 DISMANTLING STRUCTURES LUMP LUMP 0695 212-01 STRUCTURE EXCAVATION 279.000 M3 0700 212-05 SELECT MATERIAL FOR BACKFILLING 181.000 M3 0705 601-02 CLASS B CONCRETE 703.000 M3 0710 601-03 CLASS K CONCRETE 1,037.000 M3 0715 602-01 REIN STEEL BARS 60,439.000 KG 0720 602-02 EPOXY COATED REINFORCING BARS 226,047.000 KG 0725 608-0124 RIGHT OF WAY FENCE CHAIN LINK 2.4M 304.000 M 0730 615-01 STEEL SUPERSTRUCTURE ( 1.00 ) LUMP 0735 625-010910 DRILLED CAISSONS 910MM DIAMETER 84.000 M 0740 625-011060 DRILLED CAISSONS 1060MM DIAMETER 130.000 M 0745 625-011520 DRILLED CAISSONS, 1520 MM DIA 45.000 M 0750 625-011670 DRILLED CAISSONS 1670MM DIAMETER 16.000 M 0755 625-030760 ROCK SOCKET 760MM FOUNDATION 28.000 M 1 FEDERAL PROJECT PAGE 9 Call Order : 001 CONTRACT ID : 9218039 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S328-0052/00-010.72 00 ACBR 0052 085 C00 COUNTIES : MERCER DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/01 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0015 BRIDGE NO. 4136 0760 625-030910 ROCK SOCKET 910MM FOUNDATION 14.000 M 0765 625-031370 ROCK SOCKET, 1370 MM 18.000 M 0770 625-031520 ROCK SOCKET 1520MM FOUNDATION 11.000 M 0775 625-041520 DRILLED CAISSON TEST HOLE, 1520 MM LUMP LUMP 0777 625-05 PREINSTALLATION CORE HOLE 388.000 M 0780 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0785 679-06 TEST SLAB LUMP LUMP 0790 679-02 LATEX MODIFIED PORTLAND CEMENT MORTAR OR CONCRETE 190.000 M3 FF1 OVERLAYMENT OF BRIDGE DECK 0795 679-04 MICROSILICA CONCRETE OVERLAY 190.000 M3 FF2 1 FEDERAL PROJECT PAGE 10 Call Order : 002 CONTRACT ID : 9907408 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S323-0010/00-007.36 04 COUNTIES : LOGAN GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 1,766,453.000 CY 0020 207-02 SUBGRADE 3,716.000 CY 0025 207-34 FABRIC FOR SEPARATION 23,317.000 SY 0030 311-06 OPEN GRADED FREE DRAINING BASE COURSE 1,382.000 CY 0035 409-02 BITUMINOUS MATERIAL 3,446.000 GA 0040 601-02 CLASS B CONCRETE 6.340 CY 0045 604-02(24)A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE 196.000 LF 0050 604-02(30)A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE 347.000 LF 0055 604-02(36)A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE 361.500 LF 0060 604-37(18)III REINFORCED CONCRETE PIPE 97.400 LF 0065 604-37(24)III REINFORCED CONCRETE PIPE 405.900 LF 0070 604-37(30)III REINFORCED CONCRETE PIPE 355.200 LF 0075 604-37(36)III REINFORCED CONCRETE PIPE 619.500 LF 0080 604-54(30)V JACKED CONDUIT, REINFORCED CONCRETE PIPE CLASS V 100.000 LF 0085 604-54(36)V JACKED CONDUIT, REINFORCED CONCRETE PIPE CLASS V 51.900 LF 0090 605-01 TYPE A MANHOLE 4.000 EA 0095 605-03 TYPE A INLET 1.000 EA 0100 605-04 TYPE B INLET 5.000 EA 0105 605-09 TYPE G INLET 21.000 EA 1 FEDERAL PROJECT PAGE 11 Call Order : 002 CONTRACT ID : 9907408 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S323-0010/00-007.36 04 COUNTIES : LOGAN GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 606-22 CRUSHED STONE, GRAVEL,OR SILICA SAND FOR UNDERDRAINS 386.000 CY 0115 606-25(6) UNDERDRAIN PIPE 3,122.000 LF 0120 606-29 FREE DRAINING BASE (FDB) TRENCH 2,240.000 LF 0125 606-30 OUTLET PIPE 183.000 LF 0130 607-01(I) TYPE 1 GUARDRAIL 2,067.000 LF 0135 607-10-1 TYPE 1 GUARDRAIL REMOVED AND STORED 2,723.000 LF 0140 607-25(B) CUT SLOPE TERMINAL, TYPE B 1.000 EA 0145 607-30 SPECIAL TRAILING END TERMINAL 1.000 EA 0150 607-65 FLARED END TERMINAL 1.000 EA 0155 607-66 TANGENT END TERMINAL 1.000 EA 0160 608-02(3F11I) RIGHT-OF-WAY FENCE, FARM FIELD TYPE 2,144.000 LF 0165 609-01 CONCRETE SIDEWALK 518.000 SY 0170 610-01(III) PLAIN CONCRETE CURBING 1,863.000 LF 0175 633-01 CONCRETE GUTTER 1,762.000 SY 0180 633-03 DUMPED ROCK GUTTER 190.000 CY 0185 636-07 ERADICATION OF PAVEMENT MARKINGS 3,200.000 LF 0190 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 11,500.000 LF 0195 636-11 TRAFFIC CONTROL DEVICES 19,910.000 UN 0200 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 4.000 EA 0205 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 140.000 EA 0210 636-14 FLAGGER 1,500.000 HR 1 FEDERAL PROJECT PAGE 12 Call Order : 002 CONTRACT ID : 9907408 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S323-0010/00-007.36 04 COUNTIES : LOGAN GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0215 636-17 TEMPORARY CONCRETE BARRIERS 1,600.000 LF 0220 636-18 REMOVING AND RESETTING TEMPORARY CONCRETE BARRIERS 380.000 LF 0225 636-25(B) WARNING LIGHTS 1,500.000 DA 0230 636-25(C) WARNING LIGHTS 1,500.000 DA 0235 637-01 WATER FOR DUST PALLIATIVE 3,571.000 MG 0240 638-02 RIGHT OF WAY MARKERS 19.000 EA 0245 638-03 SURVEY MARKERS 4.000 EA 0250 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0255 640-01 STANDARD FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0260 640-03 BUILDING EQUIPMENT LUMP LUMP 0265 642-02 SLOPE DRAINS 520.000 LF 0270 642-03-1 DITCH CHECKS 45.000 EA 0275 642-03-2 CHECK DAMS 1.000 EA 0280 642-03-3 SEDIMENT TRAP 4,731.000 CY 0285 642-03-6 SEDIMENT REMOVAL 2,666.000 CY 0290 642-04-1 TEMPORARY SEED 176.000 LB 0295 642-04-2 SEED MIXTURE B 279.000 LB 0300 642-04-04 SEED MIXTURE L 853.000 LB 0305 642-05-1 STRAW OR HAY MULCH 5.900 TN 0310 642-05-2 WOOD CELLULOSE FIBER MULCH 8.800 TN 0315 642-06 FERTILIZER 5.900 TN 1 FEDERAL PROJECT PAGE 13 Call Order : 002 CONTRACT ID : 9907408 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S323-0010/00-007.36 04 COUNTIES : LOGAN GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0320 642-07 FIBER MATTING 8,000.000 SY 0325 642-08 TEMPORARY PIPE 250.000 LF 0330 642-09 CONTOUR DITCH 7,200.000 LF 0335 642-10 AGRICULTURAL LIMESTONE 22.000 TN 0340 642-11 HAY OR STRAW BALES 604.000 EA 0345 642-12 SILT FENCE 5,404.000 LF 0350 652-01 AGRICULTURAL LIMESTONE 22.000 TN 0355 652-02-1 FERTILIZER, 10-20-10 7.300 TN 0360 652-02-2 UREA FORMALDEHYDE FERTILIZER 2.200 TN 0365 652-03-1 SEED MIXTURES B, C-1 OR C-2 348.000 LB 0370 652-03-05 SEED MIXTURE L 736.000 LB 0375 652-04-1 STRAW OR HAY MULCH 5.900 TN 0380 652-04-2 WOOD CELLULOSE FIBER MULCH 5.900 TN 0385 655-02(B) PERMANENT EROSION MATTING-TYPE B 1,218.000 SY 0390 664-01(V) IMPACT ATTENUATING DEVICE, TYPE V 4.000 EA 0395 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 5,824.000 TN AA1 0400 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 5,561.000 TN AA2 0405 401S-1(1)SG SUPERPAVE HMA BASE COURSE,ST/GR 9,865.000 TN AB1 0410 401S-1(1)S SUPERPAVE HMA BASE COURSE, SLAG 9,416.000 TN AB2 0415 401S-7SG SUPERPAVE HMA SCRATCH COURSE,ST/GR 469.000 TN AC1 0420 401S-7S SUPERPAVE HMA SCRATCH COURSE,SLAG 426.000 TN AC2 1 FEDERAL PROJECT PAGE 14 Call Order : 002 CONTRACT ID : 9907408 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S323-0010/00-007.36 04 COUNTIES : LOGAN GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0425 402S-01(1)SG SUPERPAVE HMA SKID RESISTANT PAVEMENT,ST/GR 1,695.000 TN AD1 0430 402S-01(1)S SUPERPAVE HMA SKID RESISTANT PAVEMENT,SLAG 1,619.000 TN AD2 0435 604-02(18)A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE 389.700 LF AE1 0440 604-37(18)III REINFORCED CONCRETE PIPE 389.700 LF AE2 0445 604-02(24)A2 FULL BITUMINOUS COATED CORRUGATED STEEL PIPE 663.900 LF AF1 0450 604-37(24)III REINFORCED CONCRETE PIPE 663.900 LF AF2 SECTION NO. 0002 SIGNING 0455 657-10 (3.00LB) CHANNEL POSTS 330.500 LF 0460 657-18 POST REMOVAL 7.000 EA 0465 661-01(1) (0.080),FLAT SHEET SIGNS 198.520 SF SECTION NO. 0003 PAVEMENT MARKINGS 0470 663-01-1(II)W EDGE LINE, WHITE 5,850.000 LF 0475 663-02-1(II)Y LANE LINE OR CENTERLINE YELLOW 250.000 LF 0480 663-03-1(II) BARRIER LINES 6,880.000 LF 0485 663-07(V)W TYPE V, STRIPES, WHITE 675.000 LF 0490 663-07(V)Y TYPE V, STRIPES, YELLOW 900.000 LF 0495 663-10(V) TYPE V, LANE ARROWS 4.000 EA 0500 663-11(V) TYPE V, LANE LETTERS 8.000 EA SECTION NO. 0004 COMPUTER SYSTEM 0505 640-04 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP SECTION NO. 0005 ROADWAY LIGHTING 1 FEDERAL PROJECT PAGE 15 Call Order : 002 CONTRACT ID : 9907408 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S323-0010/00-007.36 04 COUNTIES : LOGAN GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== 0510 662-02(1) GALVANIZED STEEL CONDUIT ( 1.00 ) LUMP 0515 662-06(H18X18 JUNCTION BOX 6.000 EA 0520 662-07(250)W LUMINAIRES 4.000 EA 0525 662-08(1) CABLE ( 1.00 ) LUMP 0530 662-10(40-15I LIGHTING SUPPORT, TYPE I 3.000 EA 0535 662-10(40-25I LIGHTING SUPPORT, TYPE I 1.000 EA 0540 662-13(1) SERVICE AND CONTROL STATION ( 1.00 ) LUMP 0545 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0550 662-15(1) ELECTRICAL TESTS ( 1.00 ) LUMP SECTION NO. 0006 WATERLINE RELOCATION 0555 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0560 67004(10)II50 DUCTILE IRON PIPE 45.000 LF SECTION NO. 0007 SANITARY SEWER RELOCATION 0565 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0570 675-08(6)I,50 DUCTILE IRON SEWER PIPE CLASS 50 23.000 LF 0575 675-08(10)I50 DUCTILE IRON SEWER PIPE CLASS 50 23.000 LF 1 FEDERAL PROJECT PAGE 16 Call Order : 003 CONTRACT ID : 9829203 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S324-0052/61-000.05 00 00BR 5261 001 E00 COUNTIES : MCDOWELL DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/01/00 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0005 203-01 DISMANTLING STRUCTURES LUMP LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 33.000 CY 0020 207-34 FABRIC FOR SEPARATION 129.000 SY 0025 211-01 UNCLASSIFIED BORROW EXCAVATION 50.000 CY 0030 212-01 STRUCTURE EXCAVATION 1,240.000 CY 0035 212-05 SELECT MATERIAL FOR BACKFILLING 123.000 CY 0040 307-01 CLASS 1 AGGREGATE BASE COURSE 43.000 CY 0045 409-02 BITUMINOUS MATERIAL 34.000 GA 0050 601-02 CLASS B CONCRETE 346.000 CY 0055 601-03 CLASS K CONCRETE 32.000 CY 0060 602-02 EPOXY COATED REINFORCING STEELBARS 54,790.000 LB 0065 603-16(33) PRESTRESSED CONCRETE BOX BEAMS, 36 X 33IN 571.500 LF 0070 607-01(I) TYPE 1 GUARDRAIL 62.500 LF 0075 609-01 CONCRETE SIDEWALK 37.500 SY 0080 610-01(I) PLAIN CONCRETE CURBING 93.000 LF 0085 636-11 TRAFFIC CONTROL DEVICES 1,967.000 UN 0090 636-14 FLAGGER 80.000 HR 0095 638-02 RIGHT OF WAY MARKERS 5.000 EA 0100 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0105 640-02 SMALL FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 1 FEDERAL PROJECT PAGE 17 Call Order : 003 CONTRACT ID : 9829203 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S324-0052/61-000.05 00 00BR 5261 001 E00 COUNTIES : MCDOWELL DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/01/00 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0110 640-03 BUILDING EQUIPMENT LUMP LUMP 0115 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 0120 670-04(4)I,50 DUCTILE IRON PIPE TYPE I, CLASS 50 120.000 LF 0125 670-09(4) GATE VALVE AND VALVE BOX 2.000 EA 0130 670-14 RELOCATED FIRE HYDRANT 1.000 EA 0135 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 40.500 TN AA1 0140 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 38.500 TN AA2 1 FEDERAL PROJECT PAGE 18 Call Order : 004 CONTRACT ID : 9910904 Letting Date : 10/26/99 10:00 A.M. PROJECTS : U354-0014/00-019.08 00 STPG 0014 080 E00 COUNTIES : WOOD GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 03/31/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 TRAFFIC SIGNAL 0005 204-01 MOBILIZATION LUMP LUMP 0010 636-11 TRAFFIC CONTROL DEVICES 4,800.000 UN 0015 636-14 FLAGGER 80.000 HR 0020 660-01 SIGNAL CONTROLLERS LUMP LUMP 0025 660-02(LPS-C) TRAFFIC DETECTORS 6.000 EA 0030 660-03(G-16) SIGNAL SECTIONS 8.000 EA 0035 660-03(V-12) SIGNAL SECTIONS 28.000 EA 0040 660-04(A1)A SIGNAL SUPPORTS, INSTALLATION ONLY 4.000 EA 0045 660-05(H) JUNCTION BOXES, TYPE H 6.000 EA 0050 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0055 660-10(D1) PRIORITY CONTROL SYSTEM DETECTOR 1.000 EA 0060 662-07(250)W LUMINAIRES 2.000 EA 0065 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0070 663-05(V) TYPE V, STOP LINES 90.000 LF 1 FEDERAL PROJECT PAGE 19 Call Order : 005 CONTRACT ID : 9830007 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S355-0016/39-000.73 00 00BR 1639 002 E00 COUNTIES : WYOMING GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/01/00 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 207-01 UNCLASSIFIED EXCAVATION 249.800 CY 0005 203-01 DISMANTLING STRUCTURES LUMP LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0020 207-34 FABRIC FOR SEPARATION 744.000 SY 0025 212-01 STRUCTURE EXCAVATION 1,023.000 CY 0030 212-05 SELECT MATERIAL FOR BACKFILLING 75.000 CY 0035 218-06 FOUNDATION PROTECTION 264.000 CY 0040 307-01 CLASS 1 AGGREGATE BASE COURSE 222.000 CY 0045 409-02 BITUMINOUS MATERIAL 150.000 GA 0050 601-02 CLASS B CONCRETE 222.500 CY 0055 602-02 EPOXY COATED REINFORCING STEELBARS 35,635.500 LB 0060 603-16(33) PRESTRESSED CONCRETE BOX BEAMS, 36 X 33IN 625.500 LF 0065 604-01(15)A2 METALLIC COATED CORRUGATED STEEL PIPE 40.000 LF 0070 607-01(I) TYPE 1 GUARDRAIL 97.500 LF 0075 609-01 CONCRETE SIDEWALK 77.200 SY 0080 610-01(I) PLAIN CONCRETE CURBING 120.000 LF 0085 636-11 TRAFFIC CONTROL DEVICES 1,426.000 UN 0090 636-14 FLAGGER 200.000 HR 0095 638-02 RIGHT OF WAY MARKERS 8.000 EA 0100 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0105 640-02 SMALL FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 1 FEDERAL PROJECT PAGE 20 Call Order : 005 CONTRACT ID : 9830007 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S355-0016/39-000.73 00 00BR 1639 002 E00 COUNTIES : WYOMING GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/01/00 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0110 640-03 BUILDING EQUIPMENT LUMP LUMP 0115 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 0120 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 185.000 TN AA1 0125 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 177.000 TN AA2 1 STATE PROJECT PAGE 21 Call Order : 006 CONTRACT ID : 9816883 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S306-0043/00-010.79 00 COUNTIES : CABELL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 546.000 CY 0020 211-02 ROCK BORROW EXCAVATION 459.000 CY 0025 218-03 GABIONS 500.000 CY 0030 240-01(12) CLEANING CULVERTS 150.000 LF 0035 240-01(15) CLEANING CULVERTS 400.000 LF 0040 240-01(18) CLEANING CULVERTS 150.000 LF 0045 240-01(24) CLEANING CULVERTS 240.000 LF 0050 240-06 CLEANING INLET AND OUTLET DITCHES 75.000 LF 0055 229-01 SHOULDERS AND DITCHES 3.890 LM 0060 408-02 BITUMINOUS MATERIAL 2,055.000 GA 0065 409-02 BITUMINOUS MATERIAL 843.000 GA 0070 601-02 CLASS B CONCRETE 5.500 CY 0075 604-01(12)A2 METALLIC COATED CORRUGATED STEEL PIPE 45.000 LF 0080 604-01(15)A2 METALLIC COATED CORRUGATED STEEL PIPE 900.000 LF 0085 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 300.000 LF 0090 604-01(24)A2 METALLIC COATED CORRUGATED STEEL PIPE 150.000 LF 0095 604-09(24) END SECION FOR CORRUGATED STEEL PIPE 2.000 EA 0100 604-10(58X36) METALLIC COATED CORR. STEEL PIPE (12 GA) 40.000 LF 0105 604-10(81X59) METALLIC COATED CORR STEEL PIPE 40.000 LF 1 STATE PROJECT PAGE 22 Call Order : 006 CONTRACT ID : 9816883 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S306-0043/00-010.79 00 COUNTIES : CABELL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 604-10(95X67) METALLIC COATED CORR. STEEL PIPE (10 GA) 10.000 LF 0115 604-37(48)II REINFORCED CONCRETE PIPE 4.000 LF 0120 604-53(48) RELAID CONDUIT 4.000 LF 0125 605-04 TYPE B INLET 1.000 EA 0130 605-04-10 CONCRETE BOX DITCH 25.000 LF 0135 605-09 TYPE G INLET 7.000 EA 0140 605-09-1 TYPE G INLET, MODIFIED 2.000 EA 0145 605-50 ADJUSTING CONCRETE HEADWALL 22.000 EA 0150 606-20(6) AGGREGATE FILLED FABRIC UNDERDRAINS 400.000 LF 0155 607-01(II) TYPE 1 GUARDRAIL 3,512.500 LF 0160 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 4,950.000 LF 0165 607-35 GUARDRAIL ELEMENT 12.000 EA 0170 607-37 BUFFER END SECTION 52.000 EA 0175 607-39 TREATED WOOD BLOCK (6IX6IX14I) 20.000 EA 0180 622-03 CANTILEVER MAILBOX SUPPORT 125.000 EA 0185 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 41,086.000 LF 0190 636-11 TRAFFIC CONTROL DEVICES 17,000.000 UN 0195 636-14 FLAGGER 1,680.000 HR 0200 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0205 663-01(II)W EDGE LINE WHITE 7.780 MI 0210 663-02(II)Y LANE LINE OR CENTER LINE YELLOW 7.780 MI 1 STATE PROJECT PAGE 23 Call Order : 006 CONTRACT ID : 9816883 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S306-0043/00-010.79 00 COUNTIES : CABELL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0215 307-01 CLASS 1 AGGREGATE BASE COURSE 500.000 CY 0220 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 1,550.000 TN AA1 0225 308-01S CLASS 1 AGGREGATE, SLAG 1,411.000 TN AA2 0230 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 383.000 TN BB1 0235 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 348.000 TN BB2 0240 401-03SG HOT-LAID ASPHALT PATCH & LEVEL COURSE, STONE OR GRAVEL 1,000.000 TN CC1 2 IN THICKNESS MAXIMUM 0245 401-03S HOT-LAID ASPHALT PATCH & LEVEL COURSE, SLAG 910.000 TN CC2 2 IN THICKNESS MAXIMUM 0250 401-11SG HOT-MIX ASPHALT FOR PAVED GUTTER, ST/GR 430.000 TN DD1 0255 401-11S HOT-MIX ASPHALT FOR PAVED GUTTER, SLAG 392.000 TN DD2 0260 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 2,260.000 TN EE1 0265 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 2,256.000 TN EE2 1 STATE PROJECT PAGE 24 Call Order : 007 CONTRACT ID : 9828202 Letting Date : 10/26/99 10:00 A.M. PROJECTS : U350-0011/00-000.00 00 COUNTIES : WAYNE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RELOCATION 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 30,000.000 M3 0020 207-02 SUBGRADE 150.000 M3 0025 211-02 ROCK BORROW EXCAVATION 2,200.000 M3 0030 229-01 SHOULDERS AND DITCHES 0.850 KM 0035 240-010450 CLEANING CULVERTS 450MM 25.000 M 0040 240-010600 CLEANING CULVERTS 600MM 13.000 M 0045 240-010750 CLEANING CULVERTS 750MM 18.000 M 0050 408-02 BITUMINOUS MATERIAL 865.000 L 0055 409-02 BITUMINOUS MATERIAL PRIME 2,269.000 L 0060 601-06 CLASS D CONCRETE 17.000 M3 0065 604-010375A2 METALLIC COATED CORRUGATED STEEL PIPE, 375MM, A2 24.000 M 0070 604-010450A2 METALLIC COATED CORRUGATED STEEL PIPE, 450MM, A2 108.000 M 0075 604-010600A2 METALLIC COATED CORRUGATED STEEL PIPE, 600MM, A2 45.000 M 0080 604-531800 RELAID CONDUIT 1800 MM 4.000 M 0085 604-704200240 CONCRETE BOX CULVERT 4200 X 2400 MM 72.000 M 0090 605-0410 CONCRETE BOX DITCH 12.000 M 0095 605-09 TYPE G INLET 4.000 EA 0100 607-011 TYPE 1 GUARDRAIL, CLASS I 621.000 M 0105 607-101 TYPE 1 GUARDRAIL REMOVED AND STORED 107.000 M 1 STATE PROJECT PAGE 25 Call Order : 007 CONTRACT ID : 9828202 Letting Date : 10/26/99 10:00 A.M. PROJECTS : U350-0011/00-000.00 00 COUNTIES : WAYNE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RELOCATION 0110 607-65 FLARED END TERMINAL 3.000 EA 0115 610-031 COMBINATION CONCRETE CURBING AND GUTTER TYPE I 72.000 M 0120 636-08 TEMP PVMT MARKING-PAINT 3,278.000 M 0125 636-11 TRAFFIC CONTROL DEVICE 9,108.000 UN 0130 636-14 FLAGGER 1,720.000 HR 0135 638-02 RIGHT OF WAY MARKERS 31.000 EA 0140 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0145 642-13 TEMPORARY POLLUTION CONTROL LUMP LUMP 0150 663-0112W EDGE LINE WHITE TYPE II 5,555.000 M 0155 663-0212Y LANE LINE OR CENTER LINE YELLOW TYPE II 960.000 M 0160 663-0312 BARRIER LINES TYPE II 178.000 M 0165 663-055 TYPE V STOP LINES 15.000 M 0170 663-075Y TYPE V STRIPES YELLOW 215.000 M 0175 663-105 TYPE V LANE ARROWS 2.000 EA 0180 663-115 TYPE V LANE LETTERS 4.000 EA 0185 670-07075200 PLASTIC PIPE CLASS 200, 75MM 225.000 M 0190 670-07200150 PLASTIC PIPE CLASS 150, 200MM 73.000 M 0195 670-07200200 PLASTIC PIPE CLASS 200, 200MM 508.000 M 0200 670-09150 GATE VALVE AND VALVE BOX, 150MM 1.000 EA 0205 670-09200 GATE VALVE AND VALVE BOX, 200MM 3.000 EA 0210 670-10040005 STEEL CASING PIPE, 400MM 4.76MM 50.000 M 1 STATE PROJECT PAGE 26 Call Order : 007 CONTRACT ID : 9828202 Letting Date : 10/26/99 10:00 A.M. PROJECTS : U350-0011/00-000.00 00 COUNTIES : WAYNE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: STAN MEADOWS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RELOCATION 0215 675-21015006 STEEL CASING PIPE 150MM 6.35MM 40.000 M 0220 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE/GRAVE 980.000 MGR AA1 0225 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 892.000 MGR AA2 0230 308-01SG CLASS I AGGREGATE BASE COURSE, STONE/GRAVEL 450.000 MGR BB1 0235 308-01S CLASS I AGGREGATE BASE COURSE, SLAG 410.000 MGR BB2 0240 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,810.000 MGR CC1 0245 401-1(1)S HOT-MIX ASPHALT BASE COUSRE, SLAG 1,629.000 MGR CC2 0250 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 300.000 MGR DD1 0255 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 270.000 MGR DD2 0260 402-011SG HOT-MIX ASPHALT SKID PAVEMENT, STONE OR GRAVEL 490.000 MGR EE1 0265 402-011S HOT-MIX ASPHALT SKID PAVEMENT, SLAG 441.000 MGR EE2 1 STATE PROJECT PAGE 27 Call Order : 008 CONTRACT ID : 9818707 Letting Date : 10/26/99 10:00 A.M. PROJECTS : U316-0220/00-000.80 00 COUNTIES : HARDY GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RELOCATION 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 64,982.000 CY 0020 207-34 FABRIC FOR SEPARATION 15,090.000 SY 0025 211-02 ROCK BORROW EXCAVATION 60.000 CY 0030 307-01 CLASS 1 AGGREGATE BASE COURSE 3,793.000 CY 0035 409-02 BITUMINOUS MATERIAL 2,597.000 GA 0040 601-02 CLASS B CONCRETE 18.210 CY 0045 604-37(30)III REINFORCED CONCRETE PIPE 106.000 LF 0050 604-37(60)III REINFORCED CONCRETE PIPE 170.000 LF 0055 604-50(18) CORRUGATED POLYETHYLENE PIPE 146.000 LF 0060 60441(42X27H3 REINFORCED CONCRETE ELLIPTICAL PIPE 6.500 LF 0065 605-04-10 CONCRETE BOX DITCH 56.000 LF 0070 605-09 TYPE G INLET 1.000 EA 0075 606-27(6) CORRUGATED POLYETHYLENE UNDERDRAINAGE PIPE 91.000 LF 0080 607-01(I) TYPE 1 GUARDRAIL 775.000 LF 0085 607-25(A) CUT SLOPE TERMINAL, TYPE A 2.000 EA 0090 607-37 BUFFER END SECTION 2.000 EA 0095 607-65 FLARED END TERMINAL 2.000 EA 0100 608-02(3F11I) RIGHT-OF-WAY FENCE, FARM FIELD TYPE 3,648.000 LF 0105 608-07(12F) VEHICULAR GATE FARM FIELD 2.000 EA 1 STATE PROJECT PAGE 28 Call Order : 008 CONTRACT ID : 9818707 Letting Date : 10/26/99 10:00 A.M. PROJECTS : U316-0220/00-000.80 00 COUNTIES : HARDY GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RELOCATION 0110 636-06 PILOT TRUCK AND DRIVER 25.000 DA 0115 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 11,000.000 LF 0120 636-11 TRAFFIC CONTROL DEVICES 12,409.000 UN 0125 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 12.000 EA 0130 636-14 FLAGGER 1,500.000 HR 0135 636-17 TEMPORARY CONCRETE BARRIERS 1,216.000 LF 0140 636-23 TEMPORARY TRAFFIC SIGNAL ( 1.00 ) LUMP 0145 636-25(B) WARNING LIGHTS 800.000 DA 0150 637-01 WATER FOR DUST PALLIATIVE 30.000 MG 0155 638-02 RIGHT OF WAY MARKERS 25.000 EA 0160 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0165 640-02 SMALL FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0170 642-03-1 DITCH CHECKS 6.000 EA 0175 642-04-04 SEED MIXTURE L 465.000 LB 0180 642-05-1 STRAW OR HAY MULCH 2.000 TN 0185 642-05-2 WOOD CELLULOSE FIBER MULCH 2.500 TN 0190 642-06 FERTILIZER 1.500 TN 0195 642-10 AGRICULTURAL LIMESTONE 5.800 TN 0200 642-11 HAY OR STRAW BALES 100.000 EA 0205 642-12 SILT FENCE 1,500.000 LF 0210 652-01 AGRICULTURAL LIMESTONE 5.000 TN 1 STATE PROJECT PAGE 29 Call Order : 008 CONTRACT ID : 9818707 Letting Date : 10/26/99 10:00 A.M. PROJECTS : U316-0220/00-000.80 00 COUNTIES : HARDY GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RELOCATION 0215 652-02-1 FERTILIZER, 10-20-10 2.000 TN 0220 652-02-2 UREA FORMALDEHYDE FERTILIZER 0.600 TN 0225 652-03-05 SEED MIXTURE L 465.000 LB 0230 652-04-1 STRAW OR HAY MULCH 1.700 TN 0235 652-04-2 WOOD CELLULOSE FIBER MULCH 2.300 TN 0240 655-02(B) PERMANENT EROSION MATTING-TYPE B 334.000 SY 0245 409-01SG PRIME COAT AGGREGATE, STONE OR GRAVEL 62.000 TN AA1 0250 409-01S PRIME COAT AGGREGATE, SLAG 59.000 TN AA2 0255 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 2,189.000 TN BB1 0260 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 2,080.000 TN BB2 0265 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 479.000 TN CC1 0270 402-01(1)S HMA SKID PVT, (W-1) SLAG 452.000 TN CC2 0275 636-02SG AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 1,000.000 TN DD1 0280 636-02S AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 950.000 TN DD2 1 STATE PROJECT PAGE 30 Call Order : 009 CONTRACT ID : 9722622 Letting Date : 10/26/99 10:00 A.M. PROJECTS : U334-0020/00-030.35 00 COUNTIES : NICHOLAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ADD TURN LANES, TRAF SIG 0005 202-01(01) BUILDING DEMOLITION ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 790.000 CY 0020 207-34 FABRIC FOR SEPARATION 1,671.000 SY 0025 211-01 UNCLASSIFIED BORROW EXCAVATION 150.000 CY 0030 307-01 CLASS 1 AGGREGATE BASE COURSE 600.000 CY 0035 408-02 BITUMINOUS MATERIAL 810.000 GA 0040 409-02 BITUMINOUS MATERIAL 790.000 GA 0045 601-02 CLASS B CONCRETE 1.350 CY 0050 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 578.000 LF 0055 604-01(24)A2 METALLIC COATED CORRUGATED STEEL PIPE 5.000 LF 0060 604-09(18) END SECION FOR CORRUGATED STEEL PIPE 1.000 EA 0065 604-37(18)III REINFORCED CONCRETE PIPE 14.000 LF 0070 605-04 TYPE B INLET 8.000 EA 0075 606-20(6) AGGREGATE FILLED FABRIC UNDERDRAINS 851.000 LF 0080 610-03(I) COMBINATION CONCRETE CURB AND GUTTER 382.000 LF 0085 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 1,600.000 LF 0090 636-11 TRAFFIC CONTROL DEVICES 6,210.000 UN 0095 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 1.000 EA 0100 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 15.000 EA 0105 636-14 FLAGGER 600.000 HR 1 STATE PROJECT PAGE 31 Call Order : 009 CONTRACT ID : 9722622 Letting Date : 10/26/99 10:00 A.M. PROJECTS : U334-0020/00-030.35 00 COUNTIES : NICHOLAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ADD TURN LANES, TRAF SIG 0110 636-25(B) WARNING LIGHTS 200.000 DA 0115 637-01 WATER FOR DUST PALLIATIVE 2.000 MG 0120 638-02 RIGHT OF WAY MARKERS 17.000 EA 0125 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0130 657-10 (3.00LB) CHANNEL POSTS 275.000 LF 0135 660-01 SIGNAL CONTROLLERS LUMP LUMP 0140 660-02(LPS-C) TRAFFIC DETECTORS 6.000 EA 0145 660-03(V-12) SIGNAL SECTIONS 26.000 EA 0150 660-03(V-8) SIGNAL SECTIONS 6.000 EA 0155 660-04(C1) SIGNAL SUPPORTS 1.000 EA 0160 660-04(C1L) SIGNAL SUPPORTS 2.000 EA 0165 660-05(H) JUNCTION BOXES, TYPE H 5.000 EA 0170 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0175 661-01(1) (0.080),FLAT SHEET SIGNS 27.000 SF 0180 661-11 INSTALLATION OF REUSABLE SIGNS 33.000 EA 0185 662-07(250)W LUMINAIRES 2.000 EA 0190 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0195 663-01-1(II)W EDGE LINE, WHITE 2,029.000 LF 0200 663-02-1(II)W LANE LINE OR CENTERLINE, WHITE 110.000 LF 0205 663-03-1(II) BARRIER LINES 3,004.000 LF 0210 663-04(II) TYPE II CHANNELIZING LINES 448.000 LF 1 STATE PROJECT PAGE 32 Call Order : 009 CONTRACT ID : 9722622 Letting Date : 10/26/99 10:00 A.M. PROJECTS : U334-0020/00-030.35 00 COUNTIES : NICHOLAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ADD TURN LANES, TRAF SIG 0215 663-05(V) TYPE V, STOP LINES 78.000 LF 0220 663-07(V)W TYPE V, STRIPES, WHITE 89.000 LF 0225 663-07(V)Y TYPE V, STRIPES, YELLOW 40.000 LF 0230 663-10(V) TYPE V, LANE ARROWS 7.000 EA 0235 663-11(V) TYPE V, LANE LETTERS 16.000 EA 0240 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 654.000 TN AA1 0245 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 595.000 TN AA2 0250 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 1,072.000 TN BB1 0255 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 976.000 TN BB2 0260 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 324.000 TN CC1 0265 402-01(1)S HMA SKID PVT, (W-1) SLAG 295.000 TN CC2 1 FEDERAL PROJECT PAGE 33 Call Order : 010 CONTRACT ID : 9812106 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S339-0026/00-022.90 00 BRHI 0026 027 E00 COUNTIES : PRESTON DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/00 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE 0005 203-01 DISMANTLING STRUCTURES LUMP LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 408-02 BITUMINOUS MATERIAL 73.000 GA 0020 415-01 REMOVE BITUMINOUS CONCRETE SURFACE 1,839.000 SY 0025 601-02 CLASS B CONCRETE 3.000 CY 0030 601-03 CLASS K CONCRETE 26.000 CY 0035 601-15B EPOXY RESIN PROTECTIVE COATING LUMP LUMP 0040 602-02 EPOXY COATED REINFORCING STEELBARS 3,819.000 LB 0045 607-01(I) TYPE 1 GUARDRAIL 50.000 LF 0050 607-06 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 4.000 EA 0055 607-65 FLARED END TERMINAL 4.000 EA 0060 615-03 FABRICATED STRUCTURAL STEEL ( 1.00 ) LUMP 0065 625-17 INSTALL SILICONE EXPANSION JOINT SYSTEM 64.000 LF 0070 636-07 ERADICATION OF PAVEMENT MARKINGS 1,000.000 LF 0075 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 2,500.000 LF 0080 636-11 TRAFFIC CONTROL DEVICES 4,350.000 UN 0085 636-14 FLAGGER 100.000 HR 0090 636-14B TRAFFIC DIRECTOR 25.000 HR 0095 636-23(01) TEMPORARY TRAFFIC SIGNAL ( 1.00 ) LUMP 0100 636-25(B) WARNING LIGHTS 400.000 DA 0105 677-02 REPAIR OF CONCRETE MEMBERS WITH CARBON FIBER COMPOSITE ( 1.00 ) LUMP SYSTEM 1 FEDERAL PROJECT PAGE 34 Call Order : 010 CONTRACT ID : 9812106 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S339-0026/00-022.90 00 BRHI 0026 027 E00 COUNTIES : PRESTON DBE GOALS : 4.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/00 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE 0110 679-02 LATEX MODIFED PORTLAND CEMENT CONCRETE OVERLAY BRIDGE DECK 42.000 CY 0115 679-06 TEST SLAB LUMP LUMP 0120 680-07 CLASS 1 BRIDGE DECK REMOVAL 373.000 SY 0125 308-01S CLASS 1 AGGREGATE, SLAG 59.000 TN AA1 0130 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 65.000 TN AA2 0135 407-2(I)S HOT-MIX ASPHALT WEARING COURSE, SLAG 145.000 TN BB1 0140 407-2(I)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 161.000 TN BB2 1 STATE PROJECT PAGE 35 Call Order : 011 CONTRACT ID : 9727411 Letting Date : 10/26/99 10:00 A.M. PROJECTS : U345-0107/00-000.17 00 COUNTIES : SUMMERS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204-01 MOBILIZATION LUMP LUMP 0010 207-01 UNCLASSIFIED EXCAVATION 2,477.000 CY 0015 207-34 FABRIC FOR SEPARATION 4,547.000 SY 0020 307-01 CLASS 1 AGGREGATE BASE COURSE 1,269.000 CY 0025 408-02 BITUMINOUS MATERIAL 2,237.000 GA 0030 409-02 BITUMINOUS MATERIAL 2,052.000 GA 0035 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 936.000 LF 0040 605-04 TYPE B INLET 14.000 EA 0045 605-12 ADJUSTING MISCELLANEOUS TYPE INLETS 8.000 EA 0050 605-15 ADJUST EXISTING MANHOLE 5.000 EA 0055 606-20(6) AGGREGATE FILLED FABRIC UNDERDRAINS 4,195.000 LF 0060 607-01(I) TYPE 1 GUARDRAIL 2,175.000 LF 0065 607-65 FLARED END TERMINAL 2.000 EA 0070 609-01 CONCRETE SIDEWALK 840.000 SY 0075 609-02 BED COURSE MATERIAL 95.000 CY 0080 610-03(I) COMBINATION CONCRETE CURB AND GUTTER 1,863.000 LF 0085 636-09 TEMPORARY PAVEMENT MARKINGS-TAPE 4 IN SOLID LINE 3,200.000 LF 0090 636-11 TRAFFIC CONTROL DEVICES 6,728.000 UN 0095 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 2.000 EA 0100 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 30.000 EA 0105 636-14 FLAGGER 1,200.000 HR 1 STATE PROJECT PAGE 36 Call Order : 011 CONTRACT ID : 9727411 Letting Date : 10/26/99 10:00 A.M. PROJECTS : U345-0107/00-000.17 00 COUNTIES : SUMMERS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 636-25(B) WARNING LIGHTS 400.000 DA 0115 637-01 WATER FOR DUST PALLIATIVE 5.000 MG 0120 638-02 RIGHT OF WAY MARKERS 6.000 EA 0125 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0130 657-10 (3.00LB) CHANNEL POSTS 147.000 LF 0135 661-01(1) (0.080),FLAT SHEET SIGNS 69.000 SF 0140 663-01-1(II)W EDGE LINE, WHITE 6,969.000 LF 0145 663-02-1(II)W LANE LINE OR CENTERLINE, WHITE 527.000 LF 0150 663-02-1(II)Y LANE LINE OR CENTERLINE YELLOW 544.000 LF 0155 663-03-1(II) BARRIER LINES 7,701.000 LF 0160 663-07(V)Y TYPE V, STRIPES, YELLOW 235.000 LF 0165 663-10(V) TYPE V, LANE ARROWS 22.000 EA 0170 663-11(V) TYPE V, LANE LETTERS 28.000 EA 0175 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 1,738.000 TN AA1 0180 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 1,582.000 TN AA2 0185 401-03SG HOT-LAID ASPHALT PATCH & LEVEL COURSE, STONE OR GRAVEL 6,058.000 TN BB1 2 IN THICKNESS MAXIMUM 0190 401-03S HOT-LAID ASPHALT PATCH & LEVEL COURSE, SLAG 5,513.000 TN BB2 2 IN THICKNESS MAXIMUM 0195 401-7SG SCRATCH COURSE, STONE OR GRAVEL 376.000 TN CC1 0200 401-7S SCRATCH COURSE, SLAG 342.000 TN CC2 0205 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 909.000 TN DD1 0210 402-01(1)S HMA SKID PVT, (W-1) SLAG 827.000 TN DD2 1 STATE PROJECT PAGE 37 Call Order : 012 CONTRACT ID : 9909281 Letting Date : 10/26/99 10:00 A.M. PROJECTS : U354-0095/00-002.52 02 COUNTIES : WOOD GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 03/31/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 TRAFFIC SIGNAL 0005 204-01 MOBILIZATION LUMP LUMP 0010 636-11 TRAFFIC CONTROL DEVICES 4,800.000 UN 0015 636-14 FLAGGER 100.000 HR 0020 660-01 SIGNAL CONTROLLERS LUMP LUMP 0025 660-02(LPS-C) TRAFFIC DETECTORS 6.000 EA 0030 660-03(V-12) SIGNAL SECTIONS 30.000 EA 0035 660-04(C1)A SIGNAL SUPPORTS, INSTALLATION ONLY 4.000 EA 0040 660-05(H) JUNCTION BOXES, TYPE H 5.000 EA 0045 660-07 MISCELLANEOUS SIGNAL LUMP LUMP 0050 661-13 PLASTIC DELINEATOR POSTS 8.000 EA 0055 662-07(250)W LUMINAIRES 2.000 EA 0060 662-14 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0065 663-05(V) TYPE V, STOP LINES 75.000 LF 0070 663-12(C-6NR) RAISED PAVEMENT MARKER, TYPE C-6NR 16.000 EA 1 STATE PROJECT PAGE 38 Call Order : 013 CONTRACT ID : 9905581 Letting Date : 10/26/99 10:00 A.M. PROJECTS : U317-0131/00-004.33 00 COUNTIES : HARRISON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/16/00 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SPOT WIDEN, UPGR PVMT 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 207-01 UNCLASSIFIED EXCAVATION 51.000 CY 0015 207-33 FABRIC FOR SUBGRADE STABILIZATION 360.000 SY 0020 218-03 GABIONS 63.000 CY 0025 229-01 SHOULDERS AND DITCHES 6.340 LM 0030 240-01(12) CLEANING CULVERTS 113.000 LF 0035 240-01(15) CLEANING CULVERTS 96.000 LF 0040 240-01(18) CLEANING CULVERTS 279.000 LF 0045 240-01(24) CLEANING CULVERTS 56.000 LF 0050 408-02 BITUMINOUS MATERIAL 3,850.000 GA 0055 604-01(12)A2 METALLIC COATED CORRUGATED STEEL PIPE 14.000 LF 0060 604-01(15)A2 METALLIC COATED CORRUGATED STEEL PIPE 80.000 LF 0065 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 80.000 LF 0070 604-01(24)A2 METALLIC COATED CORRUGATED STEEL PIPE 24.000 LF 0075 604-50(12) CORRUGATED POLYETHYLENE PIPE 11.000 LF 0080 604-50(15) CORRUGATED POLYETHYLENE PIPE 3.000 LF 0085 604-50(24) CORRUGATED POLYETHYLENE PIPE 8.000 LF 0090 604-53(18) RELAID CONDUIT 44.000 LF 0095 605-04 TYPE B INLET 2.000 EA 0100 605-09 TYPE G INLET 28.000 EA 0105 605-20 ADJUSTING TYPE C INLET 2.000 EA 1 STATE PROJECT PAGE 39 Call Order : 013 CONTRACT ID : 9905581 Letting Date : 10/26/99 10:00 A.M. PROJECTS : U317-0131/00-004.33 00 COUNTIES : HARRISON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/16/00 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SPOT WIDEN, UPGR PVMT 0110 605-24 ADJUSTING TYPE G INLET 6.000 EA 0115 605-41(15)(6) SLOT INLET 22.000 LF 0120 605-50 ADJUSTING CONCRETE HEADWALL 1.000 EA 0125 605-51 TYPE U INLET 1.000 EA 0130 606-20(12) AGGREGATE FILLED FABRIC UNDERDRAINS 70.000 LF 0135 607-01(II) TYPE 1 GUARDRAIL 5,300.000 LF 0140 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 1,575.000 LF 0145 607-10-1(A) GUARDRAIL REMOVAL 200.000 LF 0150 636-06 PILOT TRUCK AND DRIVER 36.000 DA 0155 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 61,500.000 LF 0160 636-11 TRAFFIC CONTROL DEVICES 3,940.000 UN 0165 636-14 FLAGGER 800.000 HR 0170 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 65.000 TN AA1 0175 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 56.000 TN AA2 0180 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 1,950.000 TN BB1 0185 308-01S CLASS 1 AGGREGATE, SLAG 1,770.000 TN BB2 0190 308-07SG CLASS 7 AGGREGATE, STONE OR GRAVEL 602.000 TN CC1 0195 308-07S CLASS 7 AGGREGATE, SLAG 550.000 TN CC2 0200 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 30.000 TN DD1 0205 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 27.000 TN DD2 0210 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 6,250.000 TN EE1 1 STATE PROJECT PAGE 40 Call Order : 013 CONTRACT ID : 9905581 Letting Date : 10/26/99 10:00 A.M. PROJECTS : U317-0131/00-004.33 00 COUNTIES : HARRISON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/16/00 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SPOT WIDEN, UPGR PVMT 0215 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 5,690.000 TN EE2 0220 401-3SG HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR GRAVEL 75.000 TN FF1 0225 401-3S HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 68.000 TN FF2 0230 401-11SG HOT-MIX ASPHALT FOR PAVED GUTTER, ST/GR 570.000 TN GG1 0235 401-11S HOT-MIX ASPHALT FOR PAVED GUTTER, SLAG 518.000 TN GG2 0240 402-01(4)SG HOT-MIX ASPHALT SKID RESISTANT PAVEMENT,STONE/GRAVEL 6,400.000 TN HH1 0245 402-01(4)S HOT-MIX ASPHALT SKID RESISTANT PAVEMENT,SLAG 5,824.000 TN HH2 1 STATE PROJECT PAGE 41 Call Order : 014 CONTRACT ID : 9905502 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S329-0220/03-000.09 00 COUNTIES : MINERAL GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/00 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SCOUR REPAIR 0005 204-01 MOBILIZATION LUMP LUMP 0010 601-02-1 CLASS B CONCRETE,MODIFIED 80.000 CY 0015 636-11 TRAFFIC CONTROL DEVICES 1,817.000 UN 0020 636-25(A) WARNING LIGHTS 180.000 DA 0025 636-25(B) WARNING LIGHTS 45.000 DA 0030 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 1 STATE PROJECT PAGE 42 Call Order : 015 CONTRACT ID : 9816802 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S355-0014/00-002.08 00 COUNTIES : WYOMING GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/00 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0005 203-01 DISMANTLING STRUCTURES LUMP LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 113.000 CY 0020 207-34 FABRIC FOR SEPARATION 268.000 SY 0025 212-01 STRUCTURE EXCAVATION 855.000 CY 0030 218-06 FOUNDATION PROTECTION 100.000 CY 0035 307-01 CLASS 1 AGGREGATE BASE COURSE 114.000 CY 0040 408-02 BITUMINOUS MATERIAL 254.000 GA 0045 409-02 BITUMINOUS MATERIAL 94.000 GA 0050 601-02 CLASS B CONCRETE 202.000 CY 0055 602-02 EPOXY COATED REINFORCING STEELBARS 23,526.000 LB 0060 603-16(21) PRESTRESSED CONCRETE BOX BEAMS, 36 X 21IN 427.500 LF 0065 604-01(12)A2 METALLIC COATED CORRUGATED STEEL PIPE 50.000 LF 0070 604-01(24)A2 METALLIC COATED CORRUGATED STEEL PIPE 25.000 LF 0075 604-09(12) END SECION FOR CORRUGATED STEEL PIPE 4.000 EA 0080 605-09 TYPE G INLET 1.000 EA 0085 605-41(12)2.5 SLOT INLET 50.000 LF 0090 607-01(I) TYPE 1 GUARDRAIL 125.000 LF 0095 607-09-1 TYPE 1 GUARDRAIL REMOVED AND RESET 25.000 LF 0100 610-05(IV) BITUMINOUS CURBING 80.000 LF 0105 636-05 TEMPORARY STRUCTURES FOR MAINTAINING TRAFFIC ( 1.00 ) LUMP 1 STATE PROJECT PAGE 43 Call Order : 015 CONTRACT ID : 9816802 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S355-0014/00-002.08 00 COUNTIES : WYOMING GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/00 RES. ENG.: MIKE WARD, ACTING ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0110 636-11 TRAFFIC CONTROL DEVICES 7,705.000 UN 0115 636-14 FLAGGER 400.000 HR 0120 636-25(B) WARNING LIGHTS 684.000 DA 0125 637-01 WATER FOR DUST PALLIATIVE 2.000 MG 0130 638-02 RIGHT OF WAY MARKERS 12.000 EA 0135 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0140 640-02 SMALL FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0145 640-03 BUILDING EQUIPMENT LUMP LUMP 0150 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 0155 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 108.000 TN AA1 0160 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 103.000 TN AA2 0165 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 112.000 TN BB1 0170 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 106.000 TN BB2 0175 401-11SG HOT-MIX ASPHALT FOR PAVED GUTTER, ST/GR 25.000 TN CC1 0180 401-11S HOT-MIX ASPHALT FOR PAVED GUTTER, SLAG 24.000 TN CC2 1 FEDERAL PROJECT PAGE 44 Call Order : 016 CONTRACT ID : 9916002 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S335-0024/00-001.02 00 BRHI 0024 023 E00 COUNTIES : OHIO DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 744.000 CY 0020 207-02 SUBGRADE 73.000 CY 0025 207-34 FABRIC FOR SEPARATION 438.000 SY 0030 211-02 ROCK BORROW EXCAVATION 142.000 CY 0035 307-01 CLASS 1 AGGREGATE BASE COURSE 151.000 CY 0040 408-02 BITUMINOUS MATERIAL 147.000 GA 0045 409-02 BITUMINOUS MATERIAL 263.000 GA 0050 502-01(12I) PORTLAND CEMENT CONCRETE APPROACH SLAB 187.000 SY 0055 601-02 CLASS B CONCRETE 1.000 CY 0060 604-37(18)III REINFORCED CONCRETE PIPE 69.000 LF 0065 605-06 TYPE D INLET 2.000 EA 0070 606-20(18) AGGREGATE FILLED FABRIC UNDERDRAINS 256.000 LF 0075 606-25(6) UNDERDRAIN PIPE 256.000 LF 0080 609-01 CONCRETE SIDEWALK 274.000 SY 0085 609-02 BED COURSE MATERIAL 30.000 CY 0090 610-01(I) PLAIN CONCRETE CURBING 172.000 LF 0095 610-01(I)M PLAIN CONCRETE CURBING (MODIFIED) 84.000 LF 0100 608-01(6F) RIGHT-OF-WAY FENCE, CHAIN LINK TYPE 560.000 LF 0105 608-05(12F) VEHICULAR GATE, CHAIN LINK 2.000 EA 1 FEDERAL PROJECT PAGE 45 Call Order : 016 CONTRACT ID : 9916002 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S335-0024/00-001.02 00 BRHI 0024 023 E00 COUNTIES : OHIO DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 636-09 TEMPORARY PAVEMENT MARKINGS-TAPE 4 IN SOLID LINE 400.000 LF 0115 636-11 TRAFFIC CONTROL DEVICES 3,289.000 UN 0120 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 2.000 EA 0125 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 50.000 EA 0130 636-14 FLAGGER 500.000 HR 0135 636-14B TRAFFIC DIRECTOR 100.000 HR 0140 636-25(B) WARNING LIGHTS 800.000 DA 0145 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0150 640-02 SMALL FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0155 640-03 BUILDING EQUIPMENT LUMP LUMP 0160 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 0165 663-01-1(II)W EDGE LINE, WHITE 440.000 LF 0170 663-02-1(II)W LANE LINE OR CENTERLINE, WHITE 275.000 LF 0175 663-03-1(II) BARRIER LINES 770.000 LF 0180 663-10(II) TYPE II, LANE ARROWS 2.000 EA 0185 663-11(II) TYPE II, LANE LETTERS 4.000 EA 0190 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 217.000 TN AA1 0195 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 239.000 TN AA2 0200 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 67.000 TN BB1 0205 402-01(1)S HMA SKID PVT, (W-1) SLAG 74.000 TN BB2 0210 401-7SG SCRATCH COURSE, STONE OR GRAVEL 22.000 TN CC1 1 FEDERAL PROJECT PAGE 46 Call Order : 016 CONTRACT ID : 9916002 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S335-0024/00-001.02 00 BRHI 0024 023 E00 COUNTIES : OHIO DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0215 401-7S SCRATCH COURSE, SLAG 24.000 TN CC2 SECTION NO. 0002 WATERLINE RELOCATION 0220 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0225 670-04(6)I,52 DUCTILE IRON PIPE TYPE I CLASS52 31.000 LF 0230 670-04(16)I52 DUCTILE IRON PIPE 332.000 LF 0235 670-09(6) GATE VALVE AND VALVE BOX 1.000 EA 0240 670-09(16) GATE VALVE AND VALVE BOX 2.000 EA 0245 670-10(26).25 STEEL CASING PIPE 69.000 LF SECTION NO. 0003 SANITARY SEWER RELOCATION 0250 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0255 605-01-1 TYPE A MANHOLE, MODIFIED 1.000 EA 0260 675-08(8)I,50 DUCTILE IRON SEWER PIPE CLASS 50 45.000 LF SECTION NO. 0004 BRIDGE 0265 203-01 DISMANTLING STRUCTURES LUMP LUMP 0270 211-02 ROCK BORROW EXCAVATION 142.000 CY 0275 212-01 STRUCTURE EXCAVATION 280.000 CY 0280 212-05 SELECT MATERIAL FOR BACKFILLING 60.000 CY 0285 601-02 CLASS B CONCRETE 121.000 CY 0290 601-03 CLASS K CONCRETE 104.000 CY 0295 601-41 INJECTED GROUT 100.000 CF 1 FEDERAL PROJECT PAGE 47 Call Order : 016 CONTRACT ID : 9916002 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S335-0024/00-001.02 00 BRHI 0024 023 E00 COUNTIES : OHIO DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: ROBERT WHIPP ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0004 BRIDGE 0300 602-02 EPOXY COATED REINFORCING STEELBARS 31,331.000 LB 0305 615-01 STEEL SUPERSTRUCTURE ( 1.00 ) LUMP 0310 616-05HP12X53 STEEL BEARING PILES, PRE-DRILLED AND DRIVEN 1,250.000 LF 0315 617-02 FERROUS METAL RAILING 410.000 LF 0320 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0325 677-01 FRP DECK-CREATIVE PULTRUSIONS LUMP LUMP 1 STATE PROJECT PAGE 48 Call Order : 017 CONTRACT ID : 9925606 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S317-0020/06-000.00 00 COUNTIES : HARRISON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 229-01 SHOULDERS AND DITCHES 3.470 LM 0010 408-02 BITUMINOUS MATERIAL 1,520.000 GA 0015 636-11 TRAFFIC CONTROL DEVICES 880.000 UN 0020 636-14 FLAGGER 250.000 HR 0025 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 470.000 TN AA1 0030 308-01S CLASS 1 AGGREGATE, SLAG 423.000 TN AA2 0035 407-2(I)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 2,550.000 TN BB1 0040 407-2(I)S HOT-MIX ASPHALT WEARING COURSE, SLAG 2,295.000 TN BB2 1 STATE PROJECT PAGE 49 Call Order : 018 CONTRACT ID : 9925607 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S331-0100/00-006.00 00 COUNTIES : MONONGALIA GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: DONALD WILLIAMS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 229-01 SHOULDERS AND DITCHES 3.580 LM 0010 408-02 BITUMINOUS MATERIAL 2,110.000 GA 0015 636-06 PILOT TRUCK AND DRIVER 6.000 DA 0020 636-11 TRAFFIC CONTROL DEVICES 2,320.000 UN 0025 636-14 FLAGGER 260.000 HR 0030 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 520.000 TN AA1 0035 308-01S CLASS 1 AGGREGATE, SLAG 468.000 TN AA2 0040 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 2,945.000 TN BB1 0045 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 2,650.000 TN BB2 1 STATE PROJECT PAGE 50 Call Order : 019 CONTRACT ID : 9734945 Letting Date : 10/26/99 10:00 A.M. PROJECTS : U344-0026/08-000.03 00 COUNTIES : ROANE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/01/00 RES. ENG.: RICHARD LOHR ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0005 203-01 DISMANTLING STRUCTURES LUMP LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 688.000 CY 0020 207-32 FABRIC FOR SUBSURFACE DRAINAGE 62.000 SY 0025 211-01 UNCLASSIFIED BORROW EXCAVATION 238.000 CY 0030 212-05 SELECT MATERIAL FOR BACKFILLING 22.000 CY 0035 218-06 FOUNDATION PROTECTION 62.000 CY 0040 409-02 BITUMINOUS MATERIAL 361.000 GA 0045 601-02 CLASS B CONCRETE 18.000 CY 0050 602-02 EPOXY COATED REINFORCING STEELBARS 4,453.000 LB 0055 603-27 PRECAST REINFORCED CONCRETE THREE-SIDED STRUCTURE 28.000 LF 0060 607-01(III) TYPE 1 GUARDRAIL 200.000 LF 0065 636-01 TRAFFIC CONTROL LUMP LUMP 0070 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0075 642-14 TEMPORARY POLLUTION CONTROL BRIDGE PROJECTS LUMP LUMP 0080 307-01SG CLASS 1 AGGREGATE BASE COURSE STONE OR GRAVEL 990.000 TN AA1 0085 307-01S CLASS 1 AGGREGATE BASE COURSE SLAG 931.000 TN AA2 0090 401-1(2)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 224.000 TN BB1 0095 401-1(2)S HOT-MIX ASPHALT BASE COURSE, SLAG 210.000 TN BB2 0100 401-2(1)SG HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL 46.000 TN CC1 0105 401-2(1)S HOT-MIX ASPHALT WEARING COURSE, SLAG 43.000 TN CC2 1 STATE PROJECT PAGE 51 Call Order : 020 CONTRACT ID : 9920208 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S302-0009/00-015.05 00 COUNTIES : BERKELEY GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/00 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CLEAN AND PAINT MARTIN MARIETTA BR # 2638.1 0005 204-01 MOBILIZATION LUMP LUMP 0010 636-11 TRAFFIC CONTROL DEVICES 12,200.000 UN 0015 636-14 FLAGGER 500.000 HR 0020 636-21 ELECTRIC ARROW 90.000 DA 0025 636-23(01) TEMPORARY TRAFFIC SIGNAL ( 1.00 ) LUMP 0030 636-25(B) WARNING LIGHTS 600.000 DA 0035 688-02 CLEANING AND PAINTING EXISTING STEEL BRIDGES COATED WITH LUMP LUMP LEAD BASE PAINT 0040 688-03 CONTAINMENT AND DISPOSAL OF SPENT MATERIAL LUMP LUMP 1 STATE PROJECT PAGE 52 Call Order : 021 CONTRACT ID : 9920207 Letting Date : 10/26/99 10:00 A.M. PROJECTS : S304-0040/00-000.01 00 COUNTIES : BRAXTON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/01/00 RES. ENG.: GARY K CLAYTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CLEAN AND PAINT STRANGE CREEK GIRDER # 1483.2 0005 204-01 MOBILIZATION LUMP LUMP 0010 636-11 TRAFFIC CONTROL DEVICES 6,230.000 UN 0015 636-14 FLAGGER 200.000 HR 0020 636-25(B) WARNING LIGHTS 400.000 DA 0025 688-02 CLEANING AND PAINTING EXISTING STEEL BRIDGES COATED WITH LUMP LUMP LEAD BASE PAINT 0030 688-03 CONTAINMENT AND DISPOSAL OF SPENT MATERIAL LUMP LUMP 1 STATE PROJECT PAGE 53 Call Order : 022 CONTRACT ID : 9735031A Letting Date : 10/26/99 10:00 A.M. PROJECTS : X302-0011/30-000.84 0 COUNTIES : BERKELEY GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/00 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0010 GRARE,DRAIN AND PAVE 0005 201-01 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204-01 MOBILIZATION LUMP LUMP 0015 207-01 UNCLASSIFIED EXCAVATION 58,195.000 CY 0020 207-02 SUBGRADE 802.000 CY 0025 207-34 FABRIC FOR SEPARATION 8,852.000 SY 0030 211-02 ROCK BORROW EXCAVATION 1,342.000 CY 0035 307-01 CLASS 1 AGGREGATE BASE COURSE 206.000 CY 0040 308-01 CLASS 1 AGGREGATE BASE COURSE 2,347.000 TN 0043 311-06 OPEN GRADED FREE DRAINING BASE COURSE 905.000 CY 0045 408-02 BITUMINOUS MATERIAL 1,297.000 GA 0050 601-02 CLASS B CONCRETE 11.320 CY 0055 605-09 TYPE G INLET 2.000 EA 0060 606-22 CRUSHED STONE, GRAVEL,OR SILICA SAND FOR UNDERDRAINS 32.000 CY 0065 606-25(6) UNDERDRAIN PIPE 85.000 LF 0070 606-29 FREE DRAINING BASE (FDB) TRENCH 1,679.000 LF 0075 606-30 OUTLET PIPE 380.000 LF 0080 633-01 CONCRETE GUTTER 26.300 SY 0085 633-03 DUMPED ROCK GUTTER 35.300 CY 0090 636-08 TEMPORARY PAVEMENT MARKINGS-PAINT 4IN SOLID LINE 3,400.000 LF 0095 636-11 TRAFFIC CONTROL DEVICES 5,405.000 UN 0100 636-12 CLEANING OF PROJECT TRAFFIC CONTROL DEVICES 1.000 EA 1 STATE PROJECT PAGE 54 Call Order : 022 CONTRACT ID : 9735031A Letting Date : 10/26/99 10:00 A.M. PROJECTS : X302-0011/30-000.84 0 COUNTIES : BERKELEY GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/00 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0010 GRARE,DRAIN AND PAVE 0105 636-13 CLEANING OF INDIVIDUAL TRAFFIC CONTROL DEVICES 26.000 EA 0110 636-14 FLAGGER 300.000 HR 0115 636-24 TEMPORARY PIPE FOR MAINTAINING TRAFFIC 36.000 LF 0120 636-25(B) WARNING LIGHTS 1,200.000 DA 0125 637-01 WATER FOR DUST PALLIATIVE 60.000 MG 0130 638-02 RIGHT OF WAY MARKERS 24.000 EA 0135 639-01 CONSTRUCTION LAYOUT STAKES LUMP LUMP 0140 640-02 SMALL FIELD OFFICE AND STORAGE BUILDING LUMP LUMP 0145 640-03 BUILDING EQUIPMENT LUMP LUMP 0150 642-01 TEMPORARY BERMS 975.000 LF 0155 642-02 SLOPE DRAINS 15.000 LF 0160 642-03-1 DITCH CHECKS 8.000 EA 0165 642-03-2 CHECK DAMS 1.000 EA 0170 642-04-1 TEMPORARY SEED 269.000 LB 0175 642-04-2 SEED MIXTURE B 84.000 LB 0180 642-04-3 SEED MIXTURE D 227.000 LB 0185 642-05-1 STRAW OR HAY MULCH 10.000 TN 0190 642-06 FERTILIZER 1.800 TN 0195 642-09 CONTOUR DITCH 5,000.000 LF 0200 642-10 AGRICULTURAL LIMESTONE 7.000 TN 0205 642-11 HAY OR STRAW BALES 839.000 EA 1 STATE PROJECT PAGE 55 Call Order : 022 CONTRACT ID : 9735031A Letting Date : 10/26/99 10:00 A.M. PROJECTS : X302-0011/30-000.84 0 COUNTIES : BERKELEY GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/00 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0010 GRARE,DRAIN AND PAVE 0210 642-12 SILT FENCE 2,518.000 LF 0215 652-01 AGRICULTURAL LIMESTONE 5.000 TN 0220 652-02-1 FERTILIZER, 10-20-10 2.400 TN 0225 652-02-2 UREA FORMALDEHYDE FERTILIZER 0.700 TN 0230 652-03-1 SEED MIXTURES B, C-1 OR C-2 96.000 LB 0235 652-03-2 SEED MIXTURES D 250.000 LB 0240 652-04-1 STRAW OR HAY MULCH 9.300 TN 0245 655-01 MATTING 527.000 SY 0250 401-1(1)SG HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL 2,105.000 TN AA1 0255 401-1(1)S HOT-MIX ASPHALT BASE COURSE, SLAG 2,006.000 TN AA2 0260 402-01(1)SG HMA SKID PVT, (W-1) ST OR GR 729.000 TN BB2 0265 402-01(1)S HMA SKID PVT, (W-1) SLAG 696.000 TN BB2 0270 604-01(15)A2 METALLIC COATED CORRUGATED STEEL PIPE 156.000 LF CC1 0275 604-37(15)III REINFORCED CONCRETE PIPE 156.000 LF CC2 0280 604-01(18)A2 METALLIC COATED CORRUGATED STEEL PIPE 180.000 LF DD1 0285 604-37(18)III REINFORCED CONCRETE PIPE 180.000 LF DD2 0290 604-01(60)A3 METALLIC COATED CORRUGATED STEEL PIPE 220.000 LF EE1 0295 604-37(60)IV REINFORCED CONCRETE PIPE 220.000 LF EE2 0300 636-02SG AGGREGATE FOR MAINTAINING TRAFFIC, STONE OR GRAVEL 50.000 TN FF1 0305 636-02S AGGREGATE FOR MAINTAINING TRAFFIC, SLAG 48.000 TN FF2 1 STATE PROJECT PAGE 56 Call Order : 023 CONTRACT ID : 9925902 Letting Date : 10/26/99 10:00 A.M. PROJECTS : U338-0039/00-022.08 00 COUNTIES : POCAHONTAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/00 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 STORM DRAINAGE INLETS, PIPING, SHOULDERS, AND DITCHES 0005 604-50(18) CORRUGATED POLYETHYLENE PIPE 190.000 LF 0010 604-50(24) CORRUGATED POLYETHYLENE PIPE 488.000 LF 0015 605-09 TYPE G INLET 6.000 EA 0020 636-01 TRAFFIC CONTROL LUMP LUMP 0025 308-01SG CLASS 1 AGGREGATE, STONE OR GRAVEL 10.000 TN AA1 0030 308-01S CLASS 1 AGGREGATE, SLAG 9.000 TN AA2 0035 308-08SG CLASS 8 AGGREGATE STONE OR GRAVEL 20.000 TN BB1 0040 308-08S CLASS 8 AGGREGATE, SLAG 18.000 TN BB2