1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- December 18, 2001 LETTING Sealed proposals will be received by the West Virginia Department of Transportation, Division of Highways at its office in Building Five, Room A-148, 1900 Kanawha Boulevard East, Charleston, West Virginia 25305-0430 until 10 A.M. December 18, 2001 and said proposals will be publicly opened and read immediately thereafter for the construction of the following project(s): ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 001 9715023R1 X316-000H/00-117.40 02 ACPD 0484 116 CTC CONST NEW/RELOC 4 LANE ROAD W/BRIDGE(S) CORRIDOR H, BAKER I/C - W BRIDGE #4273 0.08 MI W WV 55 & 259 - 0.23 MI W BR 4273 COUNTY: HARDY BRIDGE : 4271 CONCRETE SLAB ON PRESTRESSED GIRDER SPAN(S): 1 ; STRUCTURE STEEL: 1313 KG BRIDGE : 4272 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 3 ; STRUCTURE STEEL: 1597522 KG DBE GOAL: 6 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. CONTRACT: 9715023 DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. Electronic data files of this project are available on CD to be used FOR INFORMATION ONLY. These electronic files consist of original MicroStation drawings files (*.dgn) and files that are converted to AutoCAD (*.dwg). We make every reasonable effort to provide these files in a cross-platform and complex multi-protocol environment. The West Virginia Department of Transportation does not possess a staff that is available to provide technical support to outside parties who avail themselves of CAD files that are on this CD. It is important, therefore, that all potential users understand that these file are for information only. The Contractor agrees that WVDOT and its Consultants cannot be held responsible for problems arising from files which have been converted for use in non-native applications (e.g. MicroStation design files to AutoCAD.) Call 304-558-0602 or Fax 304-558-4344 ------------------------------------------------------------------------------------------------------------------------------------ 002 9218146R1 S335-0040/00-007.52 00 00BR 8265 004 E00 CONST NEW/RELOC 2 LANE ROAD W/BRIDGE(S) S-BRIDGE OVER VACANT CSX RIG & WHEELING CREEK COUNTY: OHIO BRIDGE : 4137 CONCRETE SLAB ON PRESTRESSED GIRDER SPAN(S): 2 ; DBE GOAL: 12 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. CONTRACT: 9218146 DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. ------------------------------------------------------------------------------------------------------------------------------------ 003 9903201R1 S334-0129/00-000.01 00 STRUCTURE REPLACEMENT PETERS CREEK BRIDGE BEGIN: INTERSECTION WV 39 ENDS: 0.11 M S WV 39 COUNTY: NICHOLAS BRIDGE : 4905 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 2 ; CONTRACT: 9903201 DEFERRED FROM PRIOR LETTING. OUTSTANDING PROPOSALS WILL BE RECEIVED. ------------------------------------------------------------------------------------------------------------------------------------ Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- December 18, 2001 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== CHARLESTON, WEST VIRGINIA 25304-0430 1 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virginia Code. All contractors submitting bids on project(s) must include one of the following forms properly executed with each proposal: Proposal Guaranty Bond, Cashier's Check, or Certified Check for $500.00 or 5% of total bid, whichever is greater. Failure to include one of the above forms could result in a bid being declared irregular. Proposals and bid bonds must be submitted on standard forms which may be obtained at the Charleston office. The right is reserved to reject any or all proposals. *These are projects on which any contractor with a Category "W" Prequalification Rating may be eligible to bid. Final award of all Interstate and Federal-Aid Projects, with the exception of exempt projects, is subject to the approval of the Federal Highway Administration. Minimum wage rates for these projects have been predetermined as required by law and are set forth in the bid proposal. Federal-Aid projects are subject to the WHA of 1961 PL-581 approved August 13, 1962. Plans and proposals on all projects will be furnished at twenty-five dollars ($25.00) per set. Extra plans will be furnished at fifteen dollars ($15.00) per set and extra proposals will be furnished at ten dollars ($10.00) per proposal. Cross sections will be furnished at fifty dollars ($50.00) per set. All will be furnished without refund and transmitted at your risk. The above noted project information will be available in the Contract Unit, Construction Section, Division of Highways, Room A-737, Building 5, 1900 Kanawha Boulevard East, Charleston, WV 25305 and may also be ordered by calling (304)558-2874. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid bidding proposals will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. The West Virginia Department of Transportation, Division of Highways hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex or national orign in consideration for an award. No proposals for these projects will be issued after 3:00 P.M. on the day prior to the letting. It is necessary to advise your approximate uncompleted workload when ordering plans and proposals. Announcement, opening and reading of bids received will be in the order as designated in the "Notice to Contractors". Sealed proposals may also be deposited in the bid depository box which will be located near the corner of Piedmont Road and California Avenue between the hours of 9 A.M. and 10 A.M., the day of the letting. Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25305-0430 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division Of Highways John J. Welch, Jr., Director Project Control Division 1 1 FEDERAL PROJECT PAGE 1 Call Order : 001 CONTRACT ID : 9715023R1 Letting Date : 12/18/01 10:00 A.M. PROJECTS : X316-000H/00-117.40 02 ACPD 0484 116 CTC COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/03/03 RES. ENG.: GARY LONG DESCRIPTION: CORRIDOR H, BAKER I/C - W BRIDGE #4273 ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 202002-000 WATER WELL ABANDONMENT NUMBER, 6/2A LUMP LUMP 0015 202002-000 WATER WELL ABANDONMENT NUMBER, 6/2B LUMP LUMP 0020 202003-000 SEPTIC TANK ABANDONMENT NUMBER, 6/2 LUMP LUMP 0025 204001-000 MOBILIZATION LUMP LUMP 0030 207001-001 UNCLASSIFIED EXCAVATION 2,985,040.000 M3 0035 207002-000 SUBGRADE 7,579.000 M3 0040 207034-000 FABRIC FOR SEPARATION 63,061.000 M2 0045 307001-000 AGGREGATE BASE COURSE, CLASS I 2,166.000 M3 0050 311006-001 OPEN GRADED FREE DRAINING BASE COURSE 5,536.000 M3 0055 501010-001 BRIDGE APPROACH EXPANSION JOINT 8.000 EA 0060 502001-012 300 MM PORTLAND CEMENT CONCRETE APPROACH SLAB 974.000 M2 0065 601002-001 CLASS B CONCRETE 46.000 M3 0070 604002-022 750 MM FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, A2 64.000 M 0080 604002-028 1200 MM FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, D2 189.000 M 0085 604002-030 1350 MM FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, C3 194.000 M 0090 604002-034 1650 MM FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, E3 290.000 M 0094 604009-022 750 MM CORRUGATED STEEL PIPE END SECTION 2.000 EA 0095 604037-022 750 MM REINFORCED CONCRETE PIPE, CLASS IV 115.000 M 0105 605004-001 TYPE B INLET 5.000 EA 1 FEDERAL PROJECT PAGE 2 Call Order : 001 CONTRACT ID : 9715023R1 Letting Date : 12/18/01 10:00 A.M. PROJECTS : X316-000H/00-117.40 02 ACPD 0484 116 CTC COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/03/03 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0110 605009-001 TYPE G INLET 13.000 EA 0115 606022-001 CRUSHED STONE, GRAVEL, OR SILICA SAND FOR UNDERDRAIN 18.000 M3 0120 606025-004 150 MM UNDERDRAIN PIPE 48.000 M 0125 606029-001 FREE DRAINING BASE TRENCH 4,744.000 M 0130 606030-001 OUTLET PIPE 371.000 M 0135 607001-001 TYPE 1 GUARDRAIL, CLASS I 2,602.000 M 0140 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 16.000 EA 0145 607010-020 GUARDRAIL REMOVAL 224.000 M 0150 607025-001 CUT SLOPE TERMINAL, TYPE B 3.000 EA 0155 607030-001 SPECIAL TRAILING END TERMINAL 10.000 EA 0160 607065-001 FLARED END TERMINAL 10.000 EA 0165 608002-001 1.19 M RIGHT OF WAY FENCE, FARM FIELD 4,818.000 M 0170 610001-001 PLAIN CONCRETE CURBING, TYPE I 25.000 M 0175 633003-001 DUMPED ROCK GUTTER 1,018.000 M3 0179 636005-001 TEMPORARY STRUCTURE FOR MAINTAINING TRAFFIC ( 1.00 ) LUMP 0180 636011-001 TRAFFIC CONTROL DEVICE 2,840.000 UN 0185 636012-010 PROJECT TRAFFIC CONTROL DEVICE CLEANING 2.000 EA 0190 636013-001 INDIVIDUAL TRAFFIC CONTROL DEVICE CLEANING 100.000 EA 0195 636014-001 FLAGGER 1,000.000 HR 0200 636017-001 TEMPORARY CONCRETE BARRIER 225.000 M 0205 636025-001 WARNING LIGHTS, TYPE B 3,840.000 DA 1 FEDERAL PROJECT PAGE 3 Call Order : 001 CONTRACT ID : 9715023R1 Letting Date : 12/18/01 10:00 A.M. PROJECTS : X316-000H/00-117.40 02 ACPD 0484 116 CTC COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/03/03 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0210 636025-001 WARNING LIGHTS, TYPE C 14,400.000 DA 0215 637001-001 WATER FOR DUST PALLIATIVE 28,000.000 KL 0220 638002-001 RIGHT OF WAY MARKER 52.000 EA 0225 638003-001 SURVEY MARKER 8.000 EA 0230 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0235 640001-001 STANDARD FIELD OFFICE AND STORAGE BUILDING 25.000 MO 0240 640003-001 BUILDING EQUIPMENT LUMP LUMP 0245 642001-001 TEMPORARY BERM 1,823.000 M 0250 642002-001 SLOPE DRAIN 1,503.000 M 0255 642004-001 SEED MIXTURE, TEMPORARY 2,295.000 KG 0260 642004-002 SEED MIXTURE, B 2,762.000 KG 0265 642004-003 SEED MIXTURE, D 918.000 KG 0270 642005-001 MULCH, STRAW OR HAY 219.000 MGR 0275 642005-002 MULCH, WOOD CELLULOSE FIBER 57.000 MGR 0280 642006-001 FERTILIZER 17.000 MGR 0285 642009-001 CONTOUR DITCH 5,630.000 M 0290 642010-001 AGRICULTURAL LIMESTONE 288.000 MGR 0295 642011-001 HAY OR STRAW BALE 1,705.000 EA 0300 642012-001 SILT FENCE 5,075.000 M 0305 642031-001 DITCH CHECK 1,649.000 EA 0310 642032-001 CHECK DAM 69.000 EA 1 FEDERAL PROJECT PAGE 4 Call Order : 001 CONTRACT ID : 9715023R1 Letting Date : 12/18/01 10:00 A.M. PROJECTS : X316-000H/00-117.40 02 ACPD 0484 116 CTC COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/03/03 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0315 642033-001 SEDIMENT TRAP 156.000 M3 0316 642034-001 SEDIMENT DAM 4,432.000 M3 0317 642035-001 RISER 2.000 EA 0320 642036-001 SEDIMENT REMOVAL 8,295.000 M3 0321 642037-001 SEDIMENT POND 1,786.000 M3 0325 652001-001 AGRICULTURAL LIMESTONE 289.000 MGR 0330 652002-001 FERTILIZER, 10-20-10 23.000 MGR 0335 652002-002 FERTILIZER, UREA FORMALDEHYDE 17.000 MGR 0340 652003-001 SEED MIXTURES, B, C-1, OR C-2 2,762.000 KG 0345 652003-002 SEED MIXTURE, D 918.000 KG 0350 652004-001 STRAW OR HAY MULCH 220.000 MGR 0355 652004-002 WOOD CELLULOSE FIBER MULCH 57.000 MGR 0360 655002-001 PERMANENT EROSION MATTING, TYPE A 20,542.000 M2 0365 655002-001 PERMANENT EROSION MATTING, TYPE B 3,033.000 M2 0370 664001-008 IMPACT ATTENUATING DEVICE, TYPE IV 2.000 EA 0375 665004-001 WATER WELL SURVEY 7.000 EA 0380 401001-011 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, 32,497.000 MGR AA1 TYPE I 0385 401001-012 SUPERPAVE HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE I 30,963.000 MGR AA2 0390 401007-011 SUPERPAVE HOT-MIX ASPHALT SCRATCH COURSE, STONE OR 1,566.000 MGR AB1 GRAVEL I 0395 401007-012 SUPERPAVE HOT-MIX ASPHALT SCRATCH COURSE, SLAG I 1,426.000 MGR AB2 0400 402001-011 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 3,901.000 MGR AC1 GRAVEL, TYPE I 1 FEDERAL PROJECT PAGE 5 Call Order : 001 CONTRACT ID : 9715023R1 Letting Date : 12/18/01 10:00 A.M. PROJECTS : X316-000H/00-117.40 02 ACPD 0484 116 CTC COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/03/03 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0405 402001-012 SUPERPAVE HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, 3,731.000 MGR AC2 SLAG, TYPE I 0410 604002-016 450 MM FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, A2 172.000 M AD1 0415 604076-016 450 MM ALUMINUM COATED CORRUGATED STEEL PIPE, A2 172.000 M AD2 0420 604037-016 450 MM REINFORCED CONCRETE PIPE, CLASS IV 172.000 M AD3 0425 604002-016 450 MM FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, A2 14.000 M AE1 0430 604072-116 450 MM CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 1.000 EA AE1 0435 604076-016 450 MM ALUMINUM COATED CORRUGATED STEEL PIPE, A2 14.000 M AE2 0440 604072-116 450 MM CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 1.000 EA AE2 0445 604037-016 450 MM REINFORCED CONCRETE PIPE, CLASS IV 14.000 M AE3 0450 604071-016 450 MM REINFORCED CONCRETE PIPE SAFETY SLOPE END SECTION 1.000 EA AE3 0455 604002-016 450 MM FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, B2 167.000 M AF1 0460 604076-016 450 MM ALUMINUM COATED CORRUGATED STEEL PIPE, B2 167.000 M AF2 0465 604037-016 450 MM REINFORCED CONCRETE PIPE, CLASS IV 167.000 M AF3 0470 604002-016 450 MM FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, B2 10.000 M AG1 0475 604072-116 450 MM CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 1.000 EA AG1 0480 604076-016 450 MM ALUMINUM COATED CORRUGATED STEEL PIPE, B2 10.000 M AG2 0485 604072-116 450 MM CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 1.000 EA AG2 0490 604037-016 450 MM REINFORCED CONCRETE PIPE, CLASS IV 10.000 M AG3 0495 604071-016 450 MM REINFORCED CONCRETE PIPE SAFETY SLOPE END SECTION 1.000 EA AG3 0500 604002-020 600 MM FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, B2 29.000 M AH1 0505 604076-020 600 MM ALUMINUM COATED CORRUGATED STEEL PIPE, B2 29.000 M AH2 1 FEDERAL PROJECT PAGE 6 Call Order : 001 CONTRACT ID : 9715023R1 Letting Date : 12/18/01 10:00 A.M. PROJECTS : X316-000H/00-117.40 02 ACPD 0484 116 CTC COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/03/03 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0510 604037-020 600 MM REINFORCED CONCRETE PIPE, CLASS IV 29.000 M AH3 0515 604002-022 750 MM FULL BITUMINOUS COATED CORRUGATED STEEL PIPE, A2 94.000 M AJ1 0520 604076-022 750 MM ALUMINUM COATED CORRUGATED STEEL PIPE, A2 94.000 M AJ2 0525 604037-022 750 MM REINFORCED CONCRETE PIPE, CLASS IV 94.000 M AJ3 SECTION NO. 0002 COMPUTER SYSTEM FOR FIELD OFFICE 0530 640004-001 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP SECTION NO. 0003 SIGNING & PAVEMENT MARKINGS 0535 657006-001 S100X11.5, A-441 SUPPORT, GALVANIZED 71.000 M 0540 657006-005 W150X18, A-441 SUPPORT, GALVANIZED 32.000 M 0545 657006-010 W200X26.6, A-441 SUPPORT, GALVANIZED 42.000 M 0550 657008-001 2.98 KG CHANNEL POST 192.000 M 0555 657010-001 4.5 KG CHANNEL POST 136.000 M 0560 657014-001 9.0 KG BACK TO BACK CHANNEL POST 10.000 M 0565 657017-001 CLASS B CONCRETE FOOTING, REINFORCED, ROADSIDE 12.000 M3 0570 661001-001 2 MM FLAT SHEET SIGN 39.000 M2 0575 661002-001 EXTRUDED PANEL SIGN 60.000 M2 0580 661004-001 DELINEATOR, REFLEX REFLECTOR, SINGLE, WHITE 140.000 EA 0585 661008-001 DELINEATOR BRACKET, TYPE A 22.000 EA 0590 661013-001 PLASTIC DELINEATOR POST, YELLOW 5.000 EA 0595 663001-004 EDGE LINE, TYPE II WHITE 6,250.000 M 1 FEDERAL PROJECT PAGE 7 Call Order : 001 CONTRACT ID : 9715023R1 Letting Date : 12/18/01 10:00 A.M. PROJECTS : X316-000H/00-117.40 02 ACPD 0484 116 CTC COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/03/03 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0003 SIGNING & PAVEMENT MARKINGS 0600 663001-004 EDGE LINE, TYPE II YELLOW 5,100.000 M 0605 663002-005 LANE LINE OR CENTERLINE, TYPE II WHITE 1,165.000 M 0610 663005-010 STOP LINE, TYPE V 20.000 M 0615 663007-010 STRIPE, TYPE V WHITE 150.000 M SECTION NO. 0004 ON THE JOB TRAINING 0620 699000-001 ON JOB TRAINING 2,000.000 HR SECTION NO. 0005 BRIDGE #4271 0625 212005-000 SELECT MATERIAL FOR BACKFILLING 52.000 M3 0630 218004-001 200 MM CRUSHED ROCK SLOPE PROTECTION 390.000 M2 0635 218007-000 FABRIC FOR EROSION CONTROL 410.000 M2 0640 601002-001 CLASS B CONCRETE 180.000 M3 0645 601003-001 CLASS K CONCRETE 299.000 M3 0650 601003-003 CLASS K CONCRETE, ARCHITECTURAL 49.000 M3 0655 602001-001 REINFORCING STEEL BAR 3,288.000 KG 0660 602002-001 EPOXY COATED REINFORCING STEEL BAR 38,292.000 KG 0665 615001-001 STEEL SUPERSTRUCTURE ( 1.00 ) LUMP 0670 616005-008 HP310X110 STEEL BEARING PILE, PRE-DRILLED AND DRIVEN 336.000 M 0675 617003-001 ALUMINUM RAILING 124.000 M 0680 627017-001 INSTALL SILICONE EXPANSION JOINT SYSTEM 10.000 M 0685 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 1 FEDERAL PROJECT PAGE 8 Call Order : 001 CONTRACT ID : 9715023R1 Letting Date : 12/18/01 10:00 A.M. PROJECTS : X316-000H/00-117.40 02 ACPD 0484 116 CTC COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/03/03 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0005 BRIDGE #4271 0690 662002-001 GALVANIZED STEEL CONDUIT LUMP LUMP 0695 662003-001 POLYVINYLCHLORIDE CONDUIT ( 1.00 ) LUMP 0700 662006-001 JUNCTION BOX, TYPE A (MODIFIED) 4.000 EA 0705 662014-001 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0710 679002-001 SPECIALIZED CONCRETE OVERLAY 46.000 M3 0715 679006-001 TEST SLAB LUMP LUMP 0720 603018-035 1829 MM PRESTRESSED CONCRETE I BEAM 353.000 M AK1 0725 603018-040 1981 MM PRESTRESSED CONCRETE I BEAM 353.000 M AK2 0730 626001-001 RETAINING WALL, CAST IN PLACE REINFORCED CONCRETE 730.000 M2 AL1 0735 626002-001 MSE RETAINING WALL, RETAINED EARTH 713.000 M2 AL2 0740 626002-002 MSE RETAINING WALL, REINFORCED EARTH 713.000 M2 AL3 0745 626002-003 MSE RETAINING WALL, ISOGRID 713.000 M2 AL4 0750 626002-004 MSE RETAINING WALL, MSE PLUS 713.000 M2 AL5 SECTION NO. 0006 BRIDGE #4272 0755 212001-000 STRUCTURE EXCAVATION 3,740.000 M3 0760 212002-000 WET EXCAVATION 1,219.000 M3 0765 212004-000 COFFERDAM 4.000 EA 0770 212005-000 SELECT MATERIAL FOR BACKFILLING 3,805.000 M3 0775 601002-001 CLASS B CONCRETE 200.000 M3 0780 601002-003 CLASS B CONCRETE, ARCHITECTURAL 267.000 M3 0785 601003-001 CLASS K CONCRETE 1,429.000 M3 1 FEDERAL PROJECT PAGE 9 Call Order : 001 CONTRACT ID : 9715023R1 Letting Date : 12/18/01 10:00 A.M. PROJECTS : X316-000H/00-117.40 02 ACPD 0484 116 CTC COUNTIES : HARDY DBE GOALS : 6.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 11/03/03 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0006 BRIDGE #4272 0790 601003-003 CLASS K CONCRETE, ARCHITECTURAL 193.000 M3 0795 601005-001 CLASS C CONCRETE 86.000 M3 0800 601025-001 MODIFIED CONCRETE, CLASS B, 28 MPA 688.000 M3 0805 601026-001 MODIFIED ARCHITECTURAL CONCRETE, CLASS B,- 28 MPA 1,167.000 M3 0810 602001-001 REINFORCING STEEL BAR 224,103.000 KG 0815 602002-001 EPOXY COATED REINFORCING STEEL BAR 160,296.000 KG 0820 615001-001 STEEL SUPERSTRUCTURE ( 1.00 ) LUMP 0825 615029-001 NON-GUIDED BEARING 23.000 EA 0830 615030-001 FIXED BEARING 22.000 EA 0835 617003-001 ALUMINUM RAILING 441.000 M 0840 627017-001 INSTALL SILICONE EXPANSION JOINT SYSTEM 8.000 M 0842 628004-001 EXPLORATORY DRILLING AND SAMPLING 68.000 M 0845 631001-001 ELECTRICAL WORK LUMP LUMP 0850 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0855 662002-001 GALVANIZED STEEL CONDUIT LUMP LUMP 0860 662003-001 POLYVINYLCHLORIDE CONDUIT ( 1.00 ) LUMP 0865 662006-001 JUNCTION BOX, TYPE A (MODIFIED) 6.000 EA 0870 662014-001 INCIDENTAL ELECTRICAL WORK LUMP LUMP 0875 679002-001 SPECIALIZED CONCRETE OVERLAY 303.000 M3 0880 679006-001 TEST SLAB LUMP LUMP 1 FEDERAL PROJECT PAGE 10 Call Order : 002 CONTRACT ID : 9218146R1 Letting Date : 12/18/01 10:00 A.M. PROJECTS : S335-0040/00-007.52 00 00BR 8265 004 E00 COUNTIES : OHIO DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/03 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 1,400.000 M3 0020 207002-000 SUBGRADE 1,084.000 M3 0025 207034-000 FABRIC FOR SEPARATION 6,738.000 M2 0030 211001-000 UNCLASSIFIED BORROW EXCAVATION 4,755.000 M3 0035 211002-000 ROCK BORROW EXCAVATION 2,582.000 M3 0040 307001-000 AGGREGATE BASE COURSE, CLASS 1 1,936.000 M3 0045 408002-001 BITUMINOUS MATERIAL 423.000 L 0055 502001-012 300 MM PORTLAND CEMENT CONCRETE APPROACH SLAB 176.000 M2 0060 604001-016 450 MM METALLIC COATED CORRUGATED STEEL PIPE, A2 108.300 M 0065 604001-026 1050 MM METALLIC COATED CORRUGATED STEEL PIPE, B2 58.000 M 0070 605001-001 TYPE A MANHOLE 4.000 EA 0075 605004-001 TYPE B INLET 5.000 EA 0080 605009-001 TYPE G INLET 3.000 EA 0085 607001-001 TYPE 1 GUARDRAIL, CLASS 1 320.000 M 0090 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 4.000 EA 0100 607065-001 FLARED END TERMINAL 3.000 EA 0105 609001-001 CONCRETE SIDEWALK 473.000 M2 0107 609002-001 BED COURSE MATERIAL 48.000 M3 0110 610001-001 PLAIN CONCRETE CURBING, TYPE I 219.000 M 1 FEDERAL PROJECT PAGE 11 Call Order : 002 CONTRACT ID : 9218146R1 Letting Date : 12/18/01 10:00 A.M. PROJECTS : S335-0040/00-007.52 00 00BR 8265 004 E00 COUNTIES : OHIO DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/03 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0115 610003-001 COMBINATION CONCRETE CURB AND GUTTER, TYPE I 127.000 M 0120 610005-001 BITUMINOUS CURB, TYPE I 28.000 M 0125 636007-001 ERADICATION OF PAVEMENT MARKING 2,280.000 M 0130 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 2,280.000 M 0135 636009-001 TEMPORARY PAVEMENT MARKING-TAPE 4 IN SOLID LINE TYPE VII B 2,280.000 M 0140 636011-001 TRAFFIC CONTROL DEVICE 22,828.000 UN 0145 636012-010 PROJECT TRAFFIC CONTROL DEVICE CLEANING 6.000 EA 0150 636013-001 INDIVIDUAL TRAFFIC CONTROL DEVICE CLEANING 306.000 EA 0155 636014-001 FLAGGER 800.000 HR 0160 636017-001 TEMPORARY CONCRETE BARRIER 120.000 M 0162 636019-001 TEMPORARY GUARDRAIL BARRIER 72.000 M 0170 636025-001 WARNING LIGHTS, TYPE B 1,200.000 DA 0175 638002-001 RIGHT OF WAY MARKER 6.000 EA 0180 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0185 640001-001 STANDARD FIELD OFFICE AND STORAGE BUILDING 20.000 MO 0190 640003-001 BUILDING EQUIPMENT LUMP LUMP 0192 642004-004 SEED MIXTURE, L 3.200 KG 0193 642005-001 MULCH, STRAW OR HAY 12.000 MGR 0194 642006-001 FERTILIZER 3.200 MGR 0195 642010-001 AGRICULTURAL LIMESTONE 3.200 MGR 0196 642011-001 HAY OR STRAW BALE 16.000 EA 1 FEDERAL PROJECT PAGE 12 Call Order : 002 CONTRACT ID : 9218146R1 Letting Date : 12/18/01 10:00 A.M. PROJECTS : S335-0040/00-007.52 00 00BR 8265 004 E00 COUNTIES : OHIO DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/03 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ROADWAY 0198 642012-001 SILT FENCE 564.000 M 0200 652001-001 AGRICULTURAL LIMESTONE 0.630 MGR 0205 652002-001 FERTILIZER, 10-20-10 0.630 MGR 0210 652003-001 SEED MIXTURES, B, C-1, OR C-2 31.000 KG 0215 652004-001 STRAW OR HAY MULCH 0.960 MGR 0225 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE II 2,061.000 MGR AA1 0230 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE II 1,854.000 MGR AA2 0235 402001-001 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, STONE OR 349.000 MGR BB1 GRAVEL, TYPE 1 0240 402001-002 MARSHALL HOT-MIX ASPHALT SKID RESISTANT PAVEMENT, SLAG, TYPE I 317.000 MGR BB2 0245 401007-001 MARSHALL SCRATCH COURSE, STONE OR GRAVEL 164.000 MGR CC1 0250 401007-002 MARSHALL SCRATCH COURSE, SLAG 148.000 MGR CC2 0255 401003-001 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, STONE OR 57.000 MGR DD1 GRAVEL 0260 401003-002 MARSHALL HOT-MIX ASPHALT PATCH AND LEVEL COURSE, SLAG 52.000 MGR DD2 SECTION NO. 0003 SIGNING AND PAVEMENT MARKINGS 0270 657008-001 2.98 KG CHANNEL POST 14.000 M 0275 657010-001 4.5 KG CHANNEL POST 54.000 M 0280 657012-001 5.96 KG BACK TO BACK CHANNEL POST 10.000 M 0285 657018-001 POST REMOVAL 6.000 EA 0290 661001-001 2 MM FLAT SHEET SIGN 8.000 M2 0295 661011-001 INSTALLATION OF REUSABLE SIGN 12.000 EA 0300 663001-004 EDGE LINE, TYPE II WHITE 1,202.000 M 1 FEDERAL PROJECT PAGE 13 Call Order : 002 CONTRACT ID : 9218146R1 Letting Date : 12/18/01 10:00 A.M. PROJECTS : S335-0040/00-007.52 00 00BR 8265 004 E00 COUNTIES : OHIO DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/03 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0003 SIGNING AND PAVEMENT MARKINGS 0305 663002-005 LANE LINE OR CENTERLINE, TYPE II WHITE 100.000 M 0310 663003-005 BARRIER LINE, TYPE II 1,200.000 M 0315 663004-004 CHANNELIZING LINE, TYPE II 200.000 M 0320 663005-010 STOP LINE, TYPE V 56.000 M 0325 663007-004 STRIPE, TYPE II YELLOW 156.000 M 0330 663010-010 LANE ARROW, TYPE V 9.000 EA 0335 663011-010 LANE LETTER, TYPE V 32.000 EA 0337 664001-008 IMPACT ATTENUATING DEVICE, TYPE IV 2.000 EA SECTION NO. 0005 WATERLINE RELOCATION 0340 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0345 670004-205 150 MM DUCTILE IRON PIPE, TYPE V, CLASS 52 3.000 M 0350 670004-221 200 MM DUCTILE IRON PIPE, TYPE I, CLASS 52 68.000 M 0355 670004-241 250 MM DUCTILE IRON PIPE TYPE I CLASS, 52 83.400 M 0360 670009-200 150 MM GATE VALVE AND VALVE BOX 1.000 EA 0365 670009-220 200 MM GATE VALVE AND VALVE BOX 2.000 EA 0370 670009-240 250 MM GATE VALVE AND VALVE BOX 1.000 EA 0375 670010-320 450 MM STEEL CASING PIPE, THICKNESS 9.53MM 30.000 M 0380 670013-200 150 MM FIRE HYDRANT 1.000 EA 0385 670021-040 19 MM HOUSE CONNECTION 1.000 M SECTION NO. 0006 SANITARY SEWER RELOCATION 1 FEDERAL PROJECT PAGE 14 Call Order : 002 CONTRACT ID : 9218146R1 Letting Date : 12/18/01 10:00 A.M. PROJECTS : S335-0040/00-007.52 00 00BR 8265 004 E00 COUNTIES : OHIO DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/03 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0006 SANITARY SEWER RELOCATION 0389 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0390 675008-202 150 MM DUCTILE IRON SEWER PIPE, TYPE II, CLASS 51 54.500 M 0395 675008-260 300 MM DUCTILE IRON SEWER PIPE, TYPE I, CLASS 52 12.500 M 0400 675008-291 380 MM DUCTILE IRON SEWER PIPE, TYPE I, CLASS 52 70.000 M 0405 675014-001 MANHOLE COMPLETE, INCLUDING CASTING 3.000 EA 0407 675021-240 250 MM STEEL CASING PIPE, THICKNESS 4.76MM 27.000 M 0410 675025-001 SPECIAL STRUCTURE (2400MM X 1800MM) 1.000 EA SECTION NO. 0007 BRIDGE #4137 0420 203001-000 DISMANTLING STRUCTURE LUMP LUMP 0423 211002-000 ROCK BORROW EXCAVATION 834.000 M3 0425 212001-000 STRUCTURE EXCAVATION 2,870.000 M3 0430 212005-000 SELECT MATERIAL FOR BACKFILLING 311.000 M3 0435 601002-001 CLASS B CONCRETE 991.000 M3 0440 601003-001 CLASS K CONCRETE 393.000 M3 0443 601003-003 CLASS K CONCRETE, ARCHITECTURAL 31.000 M3 0445 602002-001 EPOXY COATED REINFORCING STEEL BAR 238,670.000 KG 0450 603018-035 1829 MM PRESTRESSED CONCRETE I BEAM 445.000 M 0460 617003-001 ALUMINUM RAILING 87.000 M 0465 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0475 679002-001 SPECIALIZED CONCRETE OVERLAY 46.000 M3 0480 679006-001 TEST SLAB LUMP LUMP SECTION NO. 0008 BOX CULVER #7599-1 1 FEDERAL PROJECT PAGE 15 Call Order : 002 CONTRACT ID : 9218146R1 Letting Date : 12/18/01 10:00 A.M. PROJECTS : S335-0040/00-007.52 00 00BR 8265 004 E00 COUNTIES : OHIO DBE GOALS : 12.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 06/30/03 RES. ENG.: DANIEL SIKORA ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== 0485 212001-000 STRUCTURE EXCAVATION 360.000 M3 0490 601002-001 CLASS B CONCRETE 49.000 M3 0495 602002-001 EPOXY COATED REINFORCING STEEL BAR 4,670.000 KG 0500 604070-128 4.5X2.4 M PRECAST CONCRETE BOX CULVERT 17.150 M 0505 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP SECTION NO. 0009 ON THE JOB TRAINING 0510 699000-001 ON JOB TRAINING 1,000.000 HR SECTION NO. 0010 COMPUTER SYSTEM 0515 640004-001 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP 1 STATE PROJECT PAGE 16 Call Order : 003 CONTRACT ID : 9903201R1 Letting Date : 12/18/01 10:00 A.M. PROJECTS : S334-0129/00-000.01 00 COUNTIES : NICHOLAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/02 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 202001-000 BUILDING DEMOLITION NUMBER, ( 1.00 ) LUMP 0015 203001-000 DISMANTLING STRUCTURE LUMP LUMP 0020 204001-000 MOBILIZATION LUMP LUMP 0025 207001-001 UNCLASSIFIED EXCAVATION 984.000 CY 0030 207002-000 SUBGRADE 151.000 CY 0035 207034-000 FABRIC FOR SEPARATION 206.000 SY 0040 208001-000 STORAGE TANK REMOVAL 1.000 EA 0045 211001-000 UNCLASSIFIED BORROW EXCAVATION 515.000 CY 0050 211003-000 SELECT BORROW EXCAVATION 387.000 CY 0055 212001-000 STRUCTURE EXCAVATION 300.000 CY 0060 212005-000 SELECT MATERIAL FOR BACKFILLING 198.000 CY 0065 218003-000 GABION 191.000 CY 0070 307001-000 AGGREGATE BASE COURSE, CLASS 1 174.000 CY 0075 308001-000 AGGREGATE BASE COURSE, CLASS 1 108.000 TN 0080 401001-001 MARSHALL HOT-MIX ASPHALT BASE COURSE, STONE OR GRAVEL, TYPE 474.000 TN AA1 0085 401001-002 MARSHALL HOT-MIX ASPHALT BASE COURSE, SLAG, TYPE 427.000 TN AA2 0090 401002-001 MARSHALL HOT-MIX ASPHALT WEARING COURSE, STONE OR GRAVEL, 133.000 TN BB1 TYPE 0095 401002-002 MARSHALL HOT-MIX ASPHALT WEARING COURSE, SLAG, TYPE 120.000 TN BB2 0100 408002-001 BITUMINOUS MATERIAL 50.000 GA 0105 415005-001 REMOVE EXISTING PAVEMENT SURFACE 34.000 SY 1 STATE PROJECT PAGE 17 Call Order : 003 CONTRACT ID : 9903201R1 Letting Date : 12/18/01 10:00 A.M. PROJECTS : S334-0129/00-000.01 00 COUNTIES : NICHOLAS GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/30/02 RES. ENG.: ROGER PATTERSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE REPLACEMENT 0110 601002-001 CLASS B CONCRETE 303.000 CY 0115 602001-001 REINFORCING STEEL BAR 13,769.000 LB 0120 602002-001 EPOXY COATED REINFORCING STEEL BAR 6,643.000 LB 0125 603016-011 21X36 INCH PRESTRESSED CONCRETE BOX BEAM 1,235.000 LF 0130 604001-012 15 INCH METALLIC COATED CORRUGATED STEEL PIPE, 7.000 LF 0135 604001-020 24 INCH METALLIC COATED CORRUGATED STEEL PIPE, 30.000 LF 0140 604054-124 36 INCH JACKED CONDUIT, A36 STEEL PIPE, 37.000 LF 0145 605009-001 TYPE G INLET 2.000 EA 0150 605041-012 15 INCH SLOT INLET RISER 30.000 LF 0155 606002-004 6 INCH BITUMINOUS COATED CORRUGATED STEEL PIPE FOR 205.000 LF CC1 UNDERDRAIN 0160 606027-004 6 INCH CORRUGATED POLYETHYLENE UNDERDRAINAGE PIPE 205.000 LF CC2 0165 607001-001 TYPE 1 GUARDRAIL, CLASS 25.000 LF 0170 607001-002 TYPE 1 GUARDRAIL AT BRIDGE, CLASS 400.000 LF 0175 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 137.500 LF 0180 607010-020 GUARDRAIL REMOVAL 175.000 LF 0183 616005-003 HP10X42 STEEL BEARING PILE, PRE-DRILLED AND DRIVEN 1,140.000 LF 0190 636001-001 TRAFFIC CONTROL LUMP LUMP 0195 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0200 642011-001 HAY OR STRAW BALE 221.000 EA 0205 642012-001 SILT FENCE 663.000 LF