WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 001 -1 VENDOR RANKING CALL ORDER : 001 CONTRACT ID : 1019663 COUNTIES : BROOKE LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 CONTRACT DESCRIPTION : HARMON CREEK ROAD +30 PROJECT(S) : E305-0TRE/E0-002.10 00 FEMA 1903 000 000 LOCATION: BEG:MP2.81 .18MIE JCT CR 1/2 END:MP4.14 .01MIE JCT CR 1/7 ------------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID ------------------------------------------------------------------------------------------------------------------------------- 1 61-1584805 MARKS DRILLING $ 69,862.50 100.0000% 2 27-0738567 R.K. CONSTRUCTION, INC. $ 109,866.13 157.2605% 3 55-0434699 SAVAGE CONSTRUCTION COMPANY, INC. $ 139,946.25 200.3167% 4 55-0346067 JAMES WHITE CONSTRUCTION COMPANY, THE $ 173,017.50 247.6543% 5 34-1421920 OHIO-WEST VIRGINIA EXCAVATING CO. $ 188,421.86 269.7039% WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 001 -2 TABULATION OF BIDS CALL ORDER : 001 CONTRACT ID : 1019663 COUNTIES : BROOKE LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 1 ) 61-1584805 |( 2 ) 27-0738567 |( 3 ) 55-0434699 |MARKS DRILLING |R.K. CONSTRUCTION, INC. |SAVAGE CONSTRUCTION COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 DEBRIS REMOVAL | | | 0005 201008-001 LUMP | 2000.00000 2000.00| 2083.73000 2083.73| 3000.00000 3000.00 DEBRIS REMOVAL CR 1 | | | 0010 201008-001 LUMP | 2000.00000 2000.00| 800.00000 800.00| 100.00000 100.00 DEBRIS REMOVAL CR 1/2 | | | 0015 201008-001 LUMP | 2000.00000 2000.00| 800.00000 800.00| 100.00000 100.00 DEBRIS REMOVAL CR 1/5 | | | 0020 201008-001 LUMP | 2000.00000 2000.00| 800.00000 800.00| 100.00000 100.00 DEBRIS REMOVAL CR 10/1 | | | 0025 201008-001 LUMP | 2000.00000 2000.00| 1172.68000 1172.68| 2000.00000 2000.00 DEBRIS REMOVAL CR 12 | | | 0030 201008-001 LUMP | 2000.00000 2000.00| 802.36000 802.36| 1500.00000 1500.00 DEBRIS REMOVAL CR 14 | | | 0035 201008-001 LUMP | 1000.00000 1000.00| 800.00000 800.00| 500.00000 500.00 DEBRIS REMOVAL CR 16 | | | 0040 201008-001 LUMP | 1000.00000 1000.00| 1681.87000 1681.87| 2500.00000 2500.00 DEBRIS REMOVAL CR 2/1 | | | 0045 201008-001 LUMP | 1000.00000 1000.00| 848.65000 848.65| 1500.00000 1500.00 DEBRIS REMOVAL CR 2/2 | | | 0050 201008-001 LUMP | 5000.00000 5000.00| 6079.42000 6079.42| 8500.00000 8500.00 DEBRIS REMOVAL CR 20 | | | 0055 201008-001 LUMP | 1000.00000 1000.00| 941.23000 941.23| 1500.00000 1500.00 DEBRIS REMOVAL CR 24 | | | 0060 201008-001 LUMP | 2500.00000 2500.00| 3163.15000 3163.15| 4500.00000 4500.00 DEBRIS REMOVAL CR 26 | | | 0065 201008-001 LUMP | 1500.00000 1500.00| 1836.17000 1836.17| 2500.00000 2500.00 DEBRIS REMOVAL CR 27/3 | | | 0070 201008-001 LUMP | 1000.00000 1000.00| 800.00000 800.00| 200.00000 200.00 DEBRIS REMOVAL CR 27/4 | | | 0075 201008-001 LUMP | 1500.00000 1500.00| 1836.17000 1836.17| 1500.00000 1500.00 DEBRIS REMOVAL CR 27/5 | | | 0080 201008-001 LUMP | 6000.00000 6000.00| 6866.35000 6866.35| 9000.00000 9000.00 DEBRIS REMOVAL CR 28 | | | 0085 201008-001 LUMP | 1000.00000 1000.00| 800.00000 800.00| 1000.00000 1000.00 DEBRIS REMOVAL CR 28/1 | | | 0090 201008-001 LUMP | 6000.00000 6000.00| 8471.07000 8471.07| 11000.00000 11000.00 DEBRIS REMOVAL CR 30 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 001 -3 TABULATION OF BIDS CALL ORDER : 001 CONTRACT ID : 1019663 COUNTIES : BROOKE LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 1 ) 61-1584805 |( 2 ) 27-0738567 |( 3 ) 55-0434699 |MARKS DRILLING |R.K. CONSTRUCTION, INC. |SAVAGE CONSTRUCTION COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0095 201008-001 LUMP | 1000.00000 1000.00| 800.00000 800.00| 100.00000 100.00 DEBRIS REMOVAL CR 30/2 | | | 0100 201008-001 LUMP | 3500.00000 3500.00| 4567.28000 4567.28| 6000.00000 6000.00 DEBRIS REMOVAL CR 32 | | | 0105 201008-001 LUMP | 2000.00000 2000.00| 1512.14000 1512.14| 2500.00000 2500.00 DEBRIS REMOVAL CR 32/2 | | | 0110 201008-001 LUMP | 1000.00000 1000.00| 800.00000 800.00| 200.00000 200.00 DEBRIS REMOVAL CR 32/5 | | | 0115 201008-001 LUMP | 1500.00000 1500.00| 2885.41000 2885.41| 4000.00000 4000.00 DEBRIS REMOVAL CR 67/1 | | | 0120 201008-001 LUMP | 2000.00000 2000.00| 1789.88000 1789.88| 2500.00000 2500.00 DEBRIS REMOVAL CR 67/2 | | | 0125 201008-001 LUMP | 4950.00000 4950.00| 4644.43000 4644.43| 6500.00000 6500.00 DEBRIS REMOVAL CR 7 | | | 0130 201008-001 LUMP | 1000.00000 1000.00| 800.00000 800.00| 100.00000 100.00 DEBRIS REMOVAL CR 7/3 | | | 0135 201008-001 LUMP | 1000.00000 1000.00| 800.00000 800.00| 100.00000 100.00 DEBRIS REMOVAL CR 8 | | | 0140 201008-001 LUMP | 5000.00000 5000.00| 15183.12000 15183.12| 18000.00000 18000.00 DEBRIS REMOVAL WV 2 | | | 0145 201008-001 LUMP | 2000.00000 2000.00| 2669.39000 2669.39| 4000.00000 4000.00 DEBRIS REMOVAL WV 27 | | | 0150 201008-001 LUMP | 1500.00000 1500.00| 12899.48000 12899.48| 17000.00000 17000.00 DEBRIS REMOVAL WV 67 | | | 0155 201008-001 LUMP | 1500.00000 1500.00| 3934.65000 3934.65| 5500.00000 5500.00 DEBRIS REMOVAL WV 88 | | | 0160 636011-001 2345.000 UN | 0.50000 1172.50| 1.50000 3517.50| 4.25000 9966.25 TRAFFIC CONTROL DEVICE | | | 0165 636014-001 240.000 HR | 1.00000 240.00| 52.00000 12480.00| 52.00000 12480.00 FLAGGER | | | SECTION TOTALS | $ 69,862.50| $ 109,866.13| $ 139,946.25 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 69,862.50| $ 109,866.13| $ 139,946.25 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 001 -4 TABULATION OF BIDS CALL ORDER : 001 CONTRACT ID : 1019663 COUNTIES : BROOKE LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 4 ) 55-0346067 |( 5 ) 34-1421920 |( ) |JAMES WHITE CONSTRUCTION CO. |OHIO-WEST VIRGINIA EXCAVATIN | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 DEBRIS REMOVAL | | | 0005 201008-001 LUMP | 4900.00000 4900.00| 1730.93000 1730.93| DEBRIS REMOVAL CR 1 | | | 0010 201008-001 LUMP | 850.00000 850.00| 865.49000 865.49| DEBRIS REMOVAL CR 1/2 | | | 0015 201008-001 LUMP | 850.00000 850.00| 865.49000 865.49| DEBRIS REMOVAL CR 1/5 | | | 0020 201008-001 LUMP | 850.00000 850.00| 3461.90000 3461.90| DEBRIS REMOVAL CR 10/1 | | | 0025 201008-001 LUMP | 1650.00000 1650.00| 1448.62000 1448.62| DEBRIS REMOVAL CR 12 | | | 0030 201008-001 LUMP | 1650.00000 1650.00| 3461.90000 3461.90| DEBRIS REMOVAL CR 14 | | | 0035 201008-001 LUMP | 1700.00000 1700.00| 3461.90000 3461.90| DEBRIS REMOVAL CR 16 | | | 0040 201008-001 LUMP | 3300.00000 3300.00| 6923.79000 6923.79| DEBRIS REMOVAL CR 2/1 | | | 0045 201008-001 LUMP | 1650.00000 1650.00| 1730.93000 1730.93| DEBRIS REMOVAL CR 2/2 | | | 0050 201008-001 LUMP | 16500.00000 16500.00| 13847.56000 13847.56| DEBRIS REMOVAL CR 20 | | | 0055 201008-001 LUMP | 1650.00000 1650.00| 5192.83000 5192.83| DEBRIS REMOVAL CR 24 | | | 0060 201008-001 LUMP | 9900.00000 9900.00| 12116.63000 12116.63| DEBRIS REMOVAL CR 26 | | | 0065 201008-001 LUMP | 3300.00000 3300.00| 3461.90000 3461.90| DEBRIS REMOVAL CR 27/3 | | | 0070 201008-001 LUMP | 850.00000 850.00| 865.49000 865.49| DEBRIS REMOVAL CR 27/4 | | | 0075 201008-001 LUMP | 1650.00000 1650.00| 3461.90000 3461.90| DEBRIS REMOVAL CR 27/5 | | | 0080 201008-001 LUMP | 9900.00000 9900.00| 10385.68000 10385.68| DEBRIS REMOVAL CR 28 | | | 0085 201008-001 LUMP | 1650.00000 1650.00| 1741.94000 1741.94| DEBRIS REMOVAL CR 28/1 | | | 0090 201008-001 LUMP | 23000.00000 23000.00| 12116.63000 12116.63| DEBRIS REMOVAL CR 30 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 001 -5 TABULATION OF BIDS CALL ORDER : 001 CONTRACT ID : 1019663 COUNTIES : BROOKE LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 4 ) 55-0346067 |( 5 ) 34-1421920 |( ) |JAMES WHITE CONSTRUCTION CO. |OHIO-WEST VIRGINIA EXCAVATIN | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0095 201008-001 LUMP | 500.00000 500.00| 865.49000 865.49| DEBRIS REMOVAL CR 30/2 | | | 0100 201008-001 LUMP | 6600.00000 6600.00| 12116.63000 12116.63| DEBRIS REMOVAL CR 32 | | | 0105 201008-001 LUMP | 3400.00000 3400.00| 3461.90000 3461.90| DEBRIS REMOVAL CR 32/2 | | | 0110 201008-001 LUMP | 850.00000 850.00| 865.49000 865.49| DEBRIS REMOVAL CR 32/5 | | | 0115 201008-001 LUMP | 6600.00000 6600.00| 6911.51000 6911.51| DEBRIS REMOVAL CR 67/1 | | | 0120 201008-001 LUMP | 5000.00000 5000.00| 6923.79000 6923.79| DEBRIS REMOVAL CR 67/2 | | | 0125 201008-001 LUMP | 6600.00000 6600.00| 12193.73000 12193.73| DEBRIS REMOVAL CR 7 | | | 0130 201008-001 LUMP | 500.00000 500.00| 865.49000 865.49| DEBRIS REMOVAL CR 7/3 | | | 0135 201008-001 LUMP | 850.00000 850.00| 865.49000 865.49| DEBRIS REMOVAL CR 8 | | | 0140 201008-001 LUMP | 6600.00000 6600.00| 13847.56000 13847.56| DEBRIS REMOVAL WV 2 | | | 0145 201008-001 LUMP | 6600.00000 6600.00| 8654.74000 8654.74| DEBRIS REMOVAL WV 27 | | | 0150 201008-001 LUMP | 19800.00000 19800.00| 8654.74000 8654.74| DEBRIS REMOVAL WV 67 | | | 0155 201008-001 LUMP | 6600.00000 6600.00| 6923.79000 6923.79| DEBRIS REMOVAL WV 88 | | | 0160 636011-001 2345.000 UN | 1.50000 3517.50| 2.00000 4690.00| TRAFFIC CONTROL DEVICE | | | 0165 636014-001 240.000 HR | 55.00000 13200.00| 56.00000 13440.00| FLAGGER | | | SECTION TOTALS | $ 173,017.50| $ 188,421.86| $ ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 173,017.50| $ 188,421.86| $ ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 002 -1 VENDOR RANKING CALL ORDER : 002 CONTRACT ID : 1016184 COUNTIES : CALHOUN LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 03 CONTRACT DESCRIPTION : ORMA - ARNOLDSBURG SLIP REPAIR PROJECT(S) : S307-0016/00-013.17 00 LOCATION: BEGIN:0.23 MI. S. OF CR 16/25 END:0.30 MI. S. OF CR 16/25 ------------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID ------------------------------------------------------------------------------------------------------------------------------- 1 61-1584805 MARKS DRILLING $ 119,869.88 100.0000% 2 20-3991479 BBR DRILLING COMPANY, INC. $ 133,366.00 111.2590% 3 62-1345425 BILCO CONSTRUCTION CO., INC. $ 165,980.00 138.4668% 4 31-4444098 ALAN STONE CO., INC. $ 178,900.50 149.2456% 5 55-0484695 PAULS CONCRETE, INC. $ 189,686.25 158.2435% 6 55-0743840 THAXTON CONSTRUCTION COMPANY, INC., OF SISSONVILLE $ 191,658.00 159.8884% 7 25-1696132 BRAYMAN CONSTRUCTION CORPORATION $ 307,967.30 256.9180% WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 002 -2 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 1016184 COUNTIES : CALHOUN LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 03 SET-ASIDE : ==================================================================================================================================== |( 1 ) 61-1584805 |( 2 ) 20-3991479 |( 3 ) 62-1345425 |MARKS DRILLING |BBR DRILLING COMPANY, INC. |BILCO CONSTRUCTION CO., INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 SLIP REPAIR | | | 0005 204001-000 LUMP | 12750.00000 12750.00| 11000.00000 11000.00| 28000.00000 28000.00 MOBILIZATION | | | 0010 207001-001 162.000 CY | 10.00000 1620.00| 10.00000 1620.00| 6.00000 972.00 UNCLASSIFIED EXCAVATION | | | 0015 211002-000 174.000 CY | 25.00000 4350.00| 70.00000 12180.00| 42.00000 7308.00 ROCK BORROW EXCAVATION | | | 0020 307001-000 31.000 CY | 60.00000 1860.00| 70.00000 2170.00| 30.00000 930.00 AGGREGATE BASE COURSE, CLASS 1 | | | 0025 607001-001 37.500 LF | 23.25000 871.88| 40.00000 1500.00| 36.00000 1350.00 TYPE 1 GUARDRAIL, CLASS 1 | | | 0030 607009-001 300.000 LF | 12.50000 3750.00| 20.00000 6000.00| 10.00000 3000.00 TYPE 1 GUARDRAIL REMOVED AND RESET | | | 0035 607065-001 1.000 EA | 1850.00000 1850.00| 2000.00000 2000.00| 2000.00000 2000.00 FLARED END TERMINAL | | | 0040 614001-003 1320.000 LF | 60.00000 79200.00| 57.00000 75240.00| 38.00000 50160.00 HP10X42 STEEL PILE | | | 0045 614003-001 1530.000 SF | 8.00000 12240.00| 12.00000 18360.00| 15.00000 22950.00 CONCRETE LAGGING, THICKNESS 6" | | | 0050 636011-001 1680.000 UN | 0.50000 840.00| 1.00000 1680.00| 1.00000 1680.00 TRAFFIC CONTROL DEVICE | | | 0055 636014-001 600.000 HR | 0.01000 6.00| 1.00000 600.00| 0.01000 6.00 FLAGGER | | | 0060 636025-001 16.000 DA | 2.00000 32.00| 1.00000 16.00| 7.75000 124.00 WARNING LIGHTS, TYPE B | | | 0065 639001-001 LUMP | 500.00000 500.00| 1000.00000 1000.00| 47500.00000 47500.00 CONSTRUCTION LAYOUT STAKE | | | SECTION TOTALS | $ 119,869.88| $ 133,366.00| $ 165,980.00 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 119,869.88| $ 133,366.00| $ 165,980.00 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 002 -3 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 1016184 COUNTIES : CALHOUN LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 03 SET-ASIDE : ==================================================================================================================================== |( 4 ) 31-4444098 |( 5 ) 55-0484695 |( 6 ) 55-0743840 |ALAN STONE CO., INC. |PAULS CONCRETE, INC. |THAXTON CONSTRUCTION COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 SLIP REPAIR | | | 0005 204001-000 LUMP | 25000.00000 25000.00| 15000.00000 15000.00| 500.00000 500.00 MOBILIZATION | | | 0010 207001-001 162.000 CY | 15.00000 2430.00| 12.00000 1944.00| 50.00000 8100.00 UNCLASSIFIED EXCAVATION | | | 0015 211002-000 174.000 CY | 75.00000 13050.00| 60.00000 10440.00| 50.00000 8700.00 ROCK BORROW EXCAVATION | | | 0020 307001-000 31.000 CY | 66.00000 2046.00| 70.00000 2170.00| 50.00000 1550.00 AGGREGATE BASE COURSE, CLASS 1 | | | 0025 607001-001 37.500 LF | 37.00000 1387.50| 27.50000 1031.25| 40.00000 1500.00 TYPE 1 GUARDRAIL, CLASS 1 | | | 0030 607009-001 300.000 LF | 10.00000 3000.00| 10.00000 3000.00| 30.00000 9000.00 TYPE 1 GUARDRAIL REMOVED AND RESET | | | 0035 607065-001 1.000 EA | 1995.00000 1995.00| 1755.00000 1755.00| 1000.00000 1000.00 FLARED END TERMINAL | | | 0040 614001-003 1320.000 LF | 60.50000 79860.00| 75.00000 99000.00| 80.00000 105600.00 HP10X42 STEEL PILE | | | 0045 614003-001 1530.000 SF | 24.00000 36720.00| 15.00000 22950.00| 10.00000 15300.00 CONCRETE LAGGING, THICKNESS 6" | | | 0050 636011-001 1680.000 UN | 1.00000 1680.00| 0.70000 1176.00| 2.00000 3360.00 TRAFFIC CONTROL DEVICE | | | 0055 636014-001 600.000 HR | 17.00000 10200.00| 50.00000 30000.00| 45.00000 27000.00 FLAGGER | | | 0060 636025-001 16.000 DA | 2.00000 32.00| 1.25000 20.00| 3.00000 48.00 WARNING LIGHTS, TYPE B | | | 0065 639001-001 LUMP | 1500.00000 1500.00| 1200.00000 1200.00| 10000.00000 10000.00 CONSTRUCTION LAYOUT STAKE | | | SECTION TOTALS | $ 178,900.50| $ 189,686.25| $ 191,658.00 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 178,900.50| $ 189,686.25| $ 191,658.00 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 002 -4 TABULATION OF BIDS CALL ORDER : 002 CONTRACT ID : 1016184 COUNTIES : CALHOUN LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 03 SET-ASIDE : ==================================================================================================================================== |( 7 ) 25-1696132 |( ) |( ) |BRAYMAN CONSTRUCTION CORPORA | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 SLIP REPAIR | | | 0005 204001-000 LUMP | 50000.00000 50000.00| | MOBILIZATION | | | 0010 207001-001 162.000 CY | 100.00000 16200.00| | UNCLASSIFIED EXCAVATION | | | 0015 211002-000 174.000 CY | 100.00000 17400.00| | ROCK BORROW EXCAVATION | | | 0020 307001-000 31.000 CY | 100.00000 3100.00| | AGGREGATE BASE COURSE, CLASS 1 | | | 0025 607001-001 37.500 LF | 35.00000 1312.50| | TYPE 1 GUARDRAIL, CLASS 1 | | | 0030 607009-001 300.000 LF | 10.00000 3000.00| | TYPE 1 GUARDRAIL REMOVED AND RESET | | | 0035 607065-001 1.000 EA | 2000.00000 2000.00| | FLARED END TERMINAL | | | 0040 614001-003 1320.000 LF | 110.00000 145200.00| | HP10X42 STEEL PILE | | | 0045 614003-001 1530.000 SF | 25.00000 38250.00| | CONCRETE LAGGING, THICKNESS 6" | | | 0050 636011-001 1680.000 UN | 1.00000 1680.00| | TRAFFIC CONTROL DEVICE | | | 0055 636014-001 600.000 HR | 40.00000 24000.00| | FLAGGER | | | 0060 636025-001 16.000 DA | 1.55000 24.80| | WARNING LIGHTS, TYPE B | | | 0065 639001-001 LUMP | 5800.00000 5800.00| | CONSTRUCTION LAYOUT STAKE | | | SECTION TOTALS | $ 307,967.30| $ | $ ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 307,967.30| $ 0.00| $ ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 003 -1 VENDOR RANKING CALL ORDER : 003 CONTRACT ID : 0633442 COUNTIES : GREENBRIER LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 09 CONTRACT DESCRIPTION : WHITE SULPHUR SPRINGS TRAFFIC SIGNAL RENOVATION PROJECT(S) : S313-0060/00-041.34 00 STPG 0060 241 D00 LOCATION: I/S MAIN ST (US 60) AT BIG DRAFT RD - I/S MAIN ST AT MTN AVE ------------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID ------------------------------------------------------------------------------------------------------------------------------- 1 54-0458233 DAVIS H. ELLIOT CONSTRUCTION COMPANY, INC. $ 174,681.00 100.0000% 2 27-0124040 EIGHT TREASURES OF KENTUCKY, LLC $ 189,696.00 108.5957% 3 55-0646159 WEST VIRGINIA SIGNAL AND LIGHT, INC. $ 204,705.20 117.1880% WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 003 -2 TABULATION OF BIDS CALL ORDER : 003 CONTRACT ID : 0633442 COUNTIES : GREENBRIER LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 09 SET-ASIDE : ==================================================================================================================================== |( 1 ) 54-0458233 |( 2 ) 27-0124040 |( 3 ) 55-0646159 |DAVIS H. ELLIOT CONSTRUCTION |EIGHT TREASURES OF KENTUCKY, |WEST VIRGINIA SIGNAL & LIGHT, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 TRAFFIC SIGNAL | | | 0005 204001-000 LUMP | 5000.00000 5000.00| 4500.00000 4500.00| 7500.00000 7500.00 MOBILIZATION | | | 0010 609005-001 1.000 EA | 800.00000 800.00| 2500.00000 2500.00| 2750.00000 2750.00 CURB RAMP TYPE I | | | 0015 609005-001 1.000 EA | 1000.00000 1000.00| 4500.00000 4500.00| 3000.00000 3000.00 CURB RAMP TYPE III | | | 0020 609006-001 4.000 EA | 715.00000 2860.00| 800.00000 3200.00| 1500.00000 6000.00 DETECTABLE WARNING SURFACE | | | 0025 636011-001 3520.000 UN | 0.01000 35.20| 0.10000 352.00| 0.01000 35.20 TRAFFIC CONTROL DEVICE | | | 0030 636014-001 200.000 HR | 0.10000 20.00| 1.00000 200.00| 0.01000 2.00 FLAGGER | | | 0035 660001-001 LUMP | 18000.00000 18000.00| 10000.00000 10000.00| 9500.00000 9500.00 SIGNAL CONTROLLER ,01 | | | 0040 660001-001 LUMP | 18000.00000 18000.00| 10000.00000 10000.00| 9500.00000 9500.00 SIGNAL CONTROLLER ,02 | | | 0045 660002-020 LUMP | 19000.00000 19000.00| 18000.00000 18000.00| 22500.00000 22500.00 TRAFFIC DETECTOR, VTDS ,01 | | | 0050 660002-020 LUMP | 19000.00000 19000.00| 16000.00000 16000.00| 22500.00000 22500.00 TRAFFIC DETECTOR, VTDS ,02 | | | 0055 660003-001 4.000 EA | 800.00000 3200.00| 900.00000 3600.00| 750.00000 3000.00 SIGNAL SECTION, G-16 | | | 0060 660003-006 48.000 EA | 547.75000 26292.00| 280.00000 13440.00| 325.00000 15600.00 SIGNAL SECTION, V-12 | | | 0065 660004-040 6.000 EA | 5935.00000 35610.00| 6000.00000 36000.00| 5500.00000 33000.00 SIGNAL SUPPORT, C1 , PAINTED | | | 0070 660004-050 1.000 EA | 1000.00000 1000.00| 2000.00000 2000.00| 2500.00000 2500.00 SIGNAL SUPPORT, E1 , PAINTED | | | 0075 660005-010 1.000 EA | 794.80000 794.80| 1000.00000 1000.00| 1000.00000 1000.00 JUNCTION BOX, TYPE H | | | 0080 660007-001 LUMP | 3200.00000 3200.00| 26000.00000 26000.00| 29500.00000 29500.00 MISCELLANEOUS SIGNAL ,01 | | | 0085 660007-001 LUMP | 3200.00000 3200.00| 20000.00000 20000.00| 22500.00000 22500.00 MISCELLANEOUS SIGNAL ,02 | | | 0090 660010-001 2.000 EA | 3500.00000 7000.00| 3000.00000 6000.00| 3000.00000 6000.00 PRIORITY CONTROL SYSTEM DETECTOR ,D2 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 003 -3 TABULATION OF BIDS CALL ORDER : 003 CONTRACT ID : 0633442 COUNTIES : GREENBRIER LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 09 SET-ASIDE : ==================================================================================================================================== |( 1 ) 54-0458233 |( 2 ) 27-0124040 |( 3 ) 55-0646159 |DAVIS H. ELLIOT CONSTRUCTION |EIGHT TREASURES OF KENTUCKY, |WEST VIRGINIA SIGNAL & LIGHT, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0095 660010-010 1.000 EA | 1000.00000 1000.00| 1500.00000 1500.00| 1000.00000 1000.00 PRIORITY CONTROL SYSTEM EMITTER | | | 0100 661001-001 16.000 SF | 60.00000 960.00| 100.00000 1600.00| 20.00000 320.00 0.080 IN FLAT SHEET SIGN | | | 0105 663005-011 160.000 LF | 21.00000 3360.00| 17.00000 2720.00| 13.00000 2080.00 STOP LINE, TYPE V - 24 IN | | | 0110 663006-010 342.000 LF | 9.50000 3249.00| 12.00000 4104.00| 9.00000 3078.00 CROSSWALK LINE, TYPE V - 12 IN X 6 FT | | | 0115 663010-010 8.000 EA | 192.50000 1540.00| 210.00000 1680.00| 185.00000 1480.00 ONE DIRECTION LANE ASSIGNMENT ARROW, TY | | | V | | | 0120 663011-010 8.000 EA | 70.00000 560.00| 100.00000 800.00| 45.00000 360.00 LANE LETTER, TYPE V | | | SECTION TOTALS | $ 174,681.00| $ 189,696.00| $ 204,705.20 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 174,681.00| $ 189,696.00| $ 204,705.20 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 004 -1 VENDOR RANKING CALL ORDER : 004 CONTRACT ID : 1019664 COUNTIES : HANCOCK LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 CONTRACT DESCRIPTION : SIXTH ST - NEWELL ROAD +49 PROJECT(S) : E315-0TRE/E0-002.10 00 FEMA 1903 000 000 LOCATION: BEG:MP.99 .04MIN JCT CR66/9 END:MP1.64 .05MIS JCT CR66/21 ------------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID ------------------------------------------------------------------------------------------------------------------------------- 1 61-1584805 MARKS DRILLING $ 168,682.50 100.0000% 2 55-0434699 SAVAGE CONSTRUCTION COMPANY, INC. $ 185,266.25 109.8313% 3 34-1421920 OHIO-WEST VIRGINIA EXCAVATING CO. $ 288,171.68 170.8367% 4 55-0346067 JAMES WHITE CONSTRUCTION COMPANY, THE $ 319,969.25 189.6873% WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 004 -2 TABULATION OF BIDS CALL ORDER : 004 CONTRACT ID : 1019664 COUNTIES : HANCOCK LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 1 ) 61-1584805 |( 2 ) 55-0434699 |( 3 ) 34-1421920 |MARKS DRILLING |SAVAGE CONSTRUCTION COMPANY, |OHIO-WEST VIRGINIA EXCAVATING LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 DEBRIS REMOVAL | | | 0005 201008-001 LUMP | 1000.00000 1000.00| 2000.00000 2000.00| 3451.80000 3451.80 DEBRIS REMOVAL CR 1 | | | 0010 201008-001 LUMP | 10000.00000 10000.00| 8500.00000 8500.00| 17258.99000 17258.99 DEBRIS REMOVAL CR 11 | | | 0015 201008-001 LUMP | 2000.00000 2000.00| 3000.00000 3000.00| 5177.70000 5177.70 DEBRIS REMOVAL CR 11/1 | | | 0020 201008-001 LUMP | 1000.00000 1000.00| 100.00000 100.00| 862.98000 862.98 DEBRIS REMOVAL CR 11/2 | | | 0025 201008-001 LUMP | 1500.00000 1500.00| 3000.00000 3000.00| 3521.69000 3521.69 DEBRIS REMOVAL CR 11/3 | | | 0030 201008-001 LUMP | 2000.00000 2000.00| 3000.00000 3000.00| 6903.61000 6903.61 DEBRIS REMOVAL CR 12 | | | 0035 201008-001 LUMP | 2000.00000 2000.00| 2000.00000 2000.00| 6903.61000 6903.61 DEBRIS REMOVAL CR 14 | | | 0040 201008-001 LUMP | 1000.00000 1000.00| 100.00000 100.00| 862.98000 862.98 DEBRIS REMOVAL CR 14/2 | | | 0045 201008-001 LUMP | 2000.00000 2000.00| 700.00000 700.00| 1725.89000 1725.89 DEBRIS REMOVAL CR 15 | | | 0050 201008-001 LUMP | 1000.00000 1000.00| 500.00000 500.00| 1378.26000 1378.26 DEBRIS REMOVAL CR 18 | | | 0055 201008-001 LUMP | 1000.00000 1000.00| 2000.00000 2000.00| 3451.80000 3451.80 DEBRIS REMOVAL CR 2/3 | | | 0060 201008-001 LUMP | 1000.00000 1000.00| 2000.00000 2000.00| 6903.61000 6903.61 DEBRIS REMOVAL CR 2/6 | | | 0065 201008-001 LUMP | 1000.00000 1000.00| 2000.00000 2000.00| 3451.80000 3451.80 DEBRIS REMOVAL CR 2/7 | | | 0070 201008-001 LUMP | 1000.00000 1000.00| 2000.00000 2000.00| 1725.89000 1725.89 DEBRIS REMOVAL CR 2/8 | | | 0075 201008-001 LUMP | 1000.00000 1000.00| 600.00000 600.00| 1725.89000 1725.89 DEBRIS REMOVAL CR 20 | | | 0080 201008-001 LUMP | 5000.00000 5000.00| 8000.00000 8000.00| 10355.38000 10355.38 DEBRIS REMOVAL CR 208 | | | 0085 201008-001 LUMP | 1000.00000 1000.00| 100.00000 100.00| 862.98000 862.98 DEBRIS REMOVAL CR 24 | | | 0090 201008-001 LUMP | 2000.00000 2000.00| 2000.00000 2000.00| 3451.80000 3451.80 DEBRIS REMOVAL CR 26 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 004 -3 TABULATION OF BIDS CALL ORDER : 004 CONTRACT ID : 1019664 COUNTIES : HANCOCK LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 1 ) 61-1584805 |( 2 ) 55-0434699 |( 3 ) 34-1421920 |MARKS DRILLING |SAVAGE CONSTRUCTION COMPANY, |OHIO-WEST VIRGINIA EXCAVATING LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0095 201008-001 LUMP | 1000.00000 1000.00| 2000.00000 2000.00| 3451.80000 3451.80 DEBRIS REMOVAL CR 3 | | | 0100 201008-001 LUMP | 3500.00000 3500.00| 4000.00000 4000.00| 5177.70000 5177.70 DEBRIS REMOVAL CR 3/6 | | | 0105 201008-001 LUMP | 1000.00000 1000.00| 800.00000 800.00| 1725.89000 1725.89 DEBRIS REMOVAL CR 30/1 | | | 0110 201008-001 LUMP | 2000.00000 2000.00| 700.00000 700.00| 1725.89000 1725.89 DEBRIS REMOVAL CR 30/14 | | | 0115 201008-001 LUMP | 1000.00000 1000.00| 800.00000 800.00| 3451.80000 3451.80 DEBRIS REMOVAL CR 30/8 | | | 0120 201008-001 LUMP | 1000.00000 1000.00| 2000.00000 2000.00| 3451.80000 3451.80 DEBRIS REMOVAL CR 5 | | | 0125 201008-001 LUMP | 1000.00000 1000.00| 2000.00000 2000.00| 3451.80000 3451.80 DEBRIS REMOVAL CR 66/2 | | | 0130 201008-001 LUMP | 1000.00000 1000.00| 1000.00000 1000.00| 3451.80000 3451.80 DEBRIS REMOVAL CR 66/7 | | | 0135 201008-001 LUMP | 1000.00000 1000.00| 100.00000 100.00| 581.47000 581.47 DEBRIS REMOVAL CR 66/9 | | | 0140 201008-001 LUMP | 8000.00000 8000.00| 8000.00000 8000.00| 12081.29000 12081.29 DEBRIS REMOVAL CR 7 | | | 0145 201008-001 LUMP | 2000.00000 2000.00| 2000.00000 2000.00| 3451.80000 3451.80 DEBRIS REMOVAL CR 7/1 | | | 0150 201008-001 LUMP | 1000.00000 1000.00| 1000.00000 1000.00| 1725.89000 1725.89 DEBRIS REMOVAL CR 7/3 | | | 0155 201008-001 LUMP | 1000.00000 1000.00| 500.00000 500.00| 862.98000 862.98 DEBRIS REMOVAL CR 7/4 | | | 0160 201008-001 LUMP | 2000.00000 2000.00| 100.00000 100.00| 862.98000 862.98 DEBRIS REMOVAL CR 7/5 | | | 0165 201008-001 LUMP | 5000.00000 5000.00| 3000.00000 3000.00| 3451.80000 3451.80 DEBRIS REMOVAL CR 7/6 | | | 0170 201008-001 LUMP | 2000.00000 2000.00| 1000.00000 1000.00| 2034.89000 2034.89 DEBRIS REMOVAL CR 7/8 | | | 0175 201008-001 LUMP | 1000.00000 1000.00| 100.00000 100.00| 862.98000 862.98 DEBRIS REMOVAL CR 8/5 | | | 0180 201008-001 LUMP | 15000.00000 15000.00| 13000.00000 13000.00| 17258.99000 17258.99 DEBRIS REMOVAL CR 9 | | | 0185 201008-001 LUMP | 3000.00000 3000.00| 1000.00000 1000.00| 1725.89000 1725.89 DEBRIS REMOVAL CR 9/11 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 004 -4 TABULATION OF BIDS CALL ORDER : 004 CONTRACT ID : 1019664 COUNTIES : HANCOCK LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 1 ) 61-1584805 |( 2 ) 55-0434699 |( 3 ) 34-1421920 |MARKS DRILLING |SAVAGE CONSTRUCTION COMPANY, |OHIO-WEST VIRGINIA EXCAVATING LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0190 201008-001 LUMP | 3000.00000 3000.00| 100.00000 100.00| 862.98000 862.98 DEBRIS REMOVAL CR 9/22 | | | 0195 201008-001 LUMP | 3000.00000 3000.00| 3000.00000 3000.00| 3451.80000 3451.80 DEBRIS REMOVAL CR 9/3 | | | 0200 201008-001 LUMP | 5000.00000 5000.00| 4000.00000 4000.00| 6903.61000 6903.61 DEBRIS REMOVAL CR 9/4 | | | 0205 201008-001 LUMP | 5000.00000 5000.00| 4000.00000 4000.00| 5177.70000 5177.70 DEBRIS REMOVAL CR 9/5 | | | 0210 201008-001 LUMP | 7500.00000 7500.00| 6000.00000 6000.00| 4651.67000 4651.67 DEBRIS REMOVAL CR 9/8 | | | 0215 201008-001 LUMP | 2000.00000 2000.00| 2000.00000 2000.00| 5177.70000 5177.70 DEBRIS REMOVAL CR 9/9 | | | 0220 201008-001 LUMP | 2000.00000 2000.00| 200.00000 200.00| 862.98000 862.98 DEBRIS REMOVAL HA 912 | | | 0225 201008-001 LUMP | 2000.00000 2000.00| 500.00000 500.00| 1564.94000 1564.94 DEBRIS REMOVAL HA 930 | | | 0230 201008-001 LUMP | 2000.00000 2000.00| 100.00000 100.00| 862.98000 862.98 DEBRIS REMOVAL HA 931 | | | 0235 201008-001 LUMP | 5000.00000 5000.00| 3000.00000 3000.00| 6903.61000 6903.61 DEBRIS REMOVAL P&F 801 | | | 0240 201008-001 LUMP | 2000.00000 2000.00| 700.00000 700.00| 2325.83000 2325.83 DEBRIS REMOVAL US 30 | | | 0245 201008-001 LUMP | 25000.00000 25000.00| 14000.00000 14000.00| 20710.79000 20710.79 DEBRIS REMOVAL WV 2 | | | 0250 201008-001 LUMP | 15000.00000 15000.00| 15000.00000 15000.00| 17258.99000 17258.99 DEBRIS REMOVAL WV 8 | | | 0255 636011-001 2345.000 UN | 0.50000 1172.50| 4.25000 9966.25| 2.00000 4690.00 TRAFFIC CONTROL DEVICE | | | 0260 636014-001 1000.000 HR | 0.01000 10.00| 38.00000 38000.00| 56.00000 56000.00 FLAGGER | | | SECTION TOTALS | $ 168,682.50| $ 185,266.25| $ 288,171.68 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 168,682.50| $ 185,266.25| $ 288,171.68 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 004 -5 TABULATION OF BIDS CALL ORDER : 004 CONTRACT ID : 1019664 COUNTIES : HANCOCK LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 4 ) 55-0346067 |( ) |( ) |JAMES WHITE CONSTRUCTION CO. | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 DEBRIS REMOVAL | | | 0005 201008-001 LUMP | 3500.00000 3500.00| | DEBRIS REMOVAL CR 1 | | | 0010 201008-001 LUMP | 8500.00000 8500.00| | DEBRIS REMOVAL CR 11 | | | 0015 201008-001 LUMP | 1300.00000 1300.00| | DEBRIS REMOVAL CR 11/1 | | | 0020 201008-001 LUMP | 500.00000 500.00| | DEBRIS REMOVAL CR 11/2 | | | 0025 201008-001 LUMP | 3500.00000 3500.00| | DEBRIS REMOVAL CR 11/3 | | | 0030 201008-001 LUMP | 6900.00000 6900.00| | DEBRIS REMOVAL CR 12 | | | 0035 201008-001 LUMP | 6900.00000 6900.00| | DEBRIS REMOVAL CR 14 | | | 0040 201008-001 LUMP | 1300.00000 1300.00| | DEBRIS REMOVAL CR 14/2 | | | 0045 201008-001 LUMP | 1800.00000 1800.00| | DEBRIS REMOVAL CR 15 | | | 0050 201008-001 LUMP | 1300.00000 1300.00| | DEBRIS REMOVAL CR 18 | | | 0055 201008-001 LUMP | 6900.00000 6900.00| | DEBRIS REMOVAL CR 2/3 | | | 0060 201008-001 LUMP | 3500.00000 3500.00| | DEBRIS REMOVAL CR 2/6 | | | 0065 201008-001 LUMP | 3500.00000 3500.00| | DEBRIS REMOVAL CR 2/7 | | | 0070 201008-001 LUMP | 3500.00000 3500.00| | DEBRIS REMOVAL CR 2/8 | | | 0075 201008-001 LUMP | 1800.00000 1800.00| | DEBRIS REMOVAL CR 20 | | | 0080 201008-001 LUMP | 17500.00000 17500.00| | DEBRIS REMOVAL CR 208 | | | 0085 201008-001 LUMP | 850.00000 850.00| | DEBRIS REMOVAL CR 24 | | | 0090 201008-001 LUMP | 5200.00000 5200.00| | DEBRIS REMOVAL CR 26 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 004 -6 TABULATION OF BIDS CALL ORDER : 004 CONTRACT ID : 1019664 COUNTIES : HANCOCK LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 4 ) 55-0346067 |( ) |( ) |JAMES WHITE CONSTRUCTION CO. | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0095 201008-001 LUMP | 5200.00000 5200.00| | DEBRIS REMOVAL CR 3 | | | 0100 201008-001 LUMP | 3500.00000 3500.00| | DEBRIS REMOVAL CR 3/6 | | | 0105 201008-001 LUMP | 1800.00000 1800.00| | DEBRIS REMOVAL CR 30/1 | | | 0110 201008-001 LUMP | 1300.00000 1300.00| | DEBRIS REMOVAL CR 30/14 | | | 0115 201008-001 LUMP | 3500.00000 3500.00| | DEBRIS REMOVAL CR 30/8 | | | 0120 201008-001 LUMP | 5200.00000 5200.00| | DEBRIS REMOVAL CR 5 | | | 0125 201008-001 LUMP | 5200.00000 5200.00| | DEBRIS REMOVAL CR 66/2 | | | 0130 201008-001 LUMP | 1700.00000 1700.00| | DEBRIS REMOVAL CR 66/7 | | | 0135 201008-001 LUMP | 1700.00000 1700.00| | DEBRIS REMOVAL CR 66/9 | | | 0140 201008-001 LUMP | 17000.00000 17000.00| | DEBRIS REMOVAL CR 7 | | | 0145 201008-001 LUMP | 8500.00000 8500.00| | DEBRIS REMOVAL CR 7/1 | | | 0150 201008-001 LUMP | 1300.00000 1300.00| | DEBRIS REMOVAL CR 7/3 | | | 0155 201008-001 LUMP | 1800.00000 1800.00| | DEBRIS REMOVAL CR 7/4 | | | 0160 201008-001 LUMP | 1300.00000 1300.00| | DEBRIS REMOVAL CR 7/5 | | | 0165 201008-001 LUMP | 3500.00000 3500.00| | DEBRIS REMOVAL CR 7/6 | | | 0170 201008-001 LUMP | 6900.00000 6900.00| | DEBRIS REMOVAL CR 7/8 | | | 0175 201008-001 LUMP | 850.00000 850.00| | DEBRIS REMOVAL CR 8/5 | | | 0180 201008-001 LUMP | 24000.00000 24000.00| | DEBRIS REMOVAL CR 9 | | | 0185 201008-001 LUMP | 3500.00000 3500.00| | DEBRIS REMOVAL CR 9/11 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 004 -7 TABULATION OF BIDS CALL ORDER : 004 CONTRACT ID : 1019664 COUNTIES : HANCOCK LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 4 ) 55-0346067 |( ) |( ) |JAMES WHITE CONSTRUCTION CO. | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0190 201008-001 LUMP | 850.00000 850.00| | DEBRIS REMOVAL CR 9/22 | | | 0195 201008-001 LUMP | 6900.00000 6900.00| | DEBRIS REMOVAL CR 9/3 | | | 0200 201008-001 LUMP | 10200.00000 10200.00| | DEBRIS REMOVAL CR 9/4 | | | 0205 201008-001 LUMP | 3500.00000 3500.00| | DEBRIS REMOVAL CR 9/5 | | | 0210 201008-001 LUMP | 13500.00000 13500.00| | DEBRIS REMOVAL CR 9/8 | | | 0215 201008-001 LUMP | 850.00000 850.00| | DEBRIS REMOVAL CR 9/9 | | | 0220 201008-001 LUMP | 500.00000 500.00| | DEBRIS REMOVAL HA 912 | | | 0225 201008-001 LUMP | 1300.00000 1300.00| | DEBRIS REMOVAL HA 930 | | | 0230 201008-001 LUMP | 500.00000 500.00| | DEBRIS REMOVAL HA 931 | | | 0235 201008-001 LUMP | 13700.00000 13700.00| | DEBRIS REMOVAL P&F 801 | | | 0240 201008-001 LUMP | 1300.00000 1300.00| | DEBRIS REMOVAL US 30 | | | 0245 201008-001 LUMP | 20400.00000 20400.00| | DEBRIS REMOVAL WV 2 | | | 0250 201008-001 LUMP | 13600.00000 13600.00| | DEBRIS REMOVAL WV 8 | | | 0255 636011-001 2345.000 UN | 1.65000 3869.25| | TRAFFIC CONTROL DEVICE | | | 0260 636014-001 1000.000 HR | 53.00000 53000.00| | FLAGGER | | | SECTION TOTALS | $ 319,969.25| $ | $ ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 319,969.25| $ 0.00| $ ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 005 -1 VENDOR RANKING CALL ORDER : 005 CONTRACT ID : 0813704 COUNTIES : HARRISON LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 04 CONTRACT DESCRIPTION : LIMESTONE PRECAST BR PROJECT(S) : S317-0019/00-017.07 00 ACBR 0019 345 D00 LOCATION: /LIMESTONECR,0.03 MI S CO 9/8 ------------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID ------------------------------------------------------------------------------------------------------------------------------- 1 34-1421920 OHIO-WEST VIRGINIA EXCAVATING CO. $ 318,160.34 100.0000% 2 27-2000626 TRITON CONSTRUCTION INC $ 325,170.00 102.2032% 3 55-0640963 LAURITA EXCAVATING, INC. $ 380,359.13 119.5495% 4 31-1023518 KOKOSING CONSTRUCTION COMPANY, INC. $ 395,800.00 124.4027% 5 62-1345425 BILCO CONSTRUCTION CO., INC. $ 428,048.00 134.5385% WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 005 -2 TABULATION OF BIDS CALL ORDER : 005 CONTRACT ID : 0813704 COUNTIES : HARRISON LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 04 SET-ASIDE : ==================================================================================================================================== |( 1 ) 34-1421920 |( 2 ) 27-2000626 |( 3 ) 55-0640963 |OHIO-WEST VIRGINIA EXCAVATIN |TRITON CONSTRUCTION INC |LAURITA EXCAVATING, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 ROADWAY | | | 0005 204001-000 LUMP | 16500.00000 16500.00| 16258.00000 16258.00| 34902.20000 34902.20 MOBILIZATION | | | 0010 408002-001 229.000 GA | 5.00000 1145.00| 3.00000 687.00| 3.18000 728.22 BITUMINOUS MATERIAL | | | 0015 415005-001 1184.000 SY | 10.00000 11840.00| 8.00000 9472.00| 6.92000 8193.28 REMOVE EXISTING PAVEMENT SURFACE | | | 0020 605012-001 1.000 EA | 2100.00000 2100.00| 3000.00000 3000.00| 1363.06000 1363.06 ADJUST INLET TYPE, E | | | 0025 607001-001 37.500 LF | 40.00000 1500.00| 35.00000 1312.50| 38.17000 1431.38 TYPE 1 GUARDRAIL, CLASS I | | | 0030 607006-001 2.000 EA | 1800.00000 3600.00| 1700.00000 3400.00| 1854.18000 3708.36 THRIE BEAM GUARDRAIL BRIDGE TRANSITION | | | 0035 609001-001 13.000 SY | 135.00000 1755.00| 110.00000 1430.00| 255.07000 3315.91 CONCRETE SIDEWALK | | | 0040 610006-001 60.000 LF | 145.00000 8700.00| 66.00000 3960.00| 72.61000 4356.60 MEDIAN, TYPE I | | | 0045 636007-001 3431.000 LF | 0.60000 2058.60| 0.55000 1887.05| 0.27000 926.37 ERADICATION OF PAVEMENT MARKING | | | 0050 636008-001 3312.000 LF | 0.25000 828.00| 0.22000 728.64| 0.24000 794.88 TEMPORARY PAVEMENT MARKING-PAINT 4 IN | | | 0055 636011-001 4540.000 UN | 0.90000 4086.00| 0.80000 3632.00| 0.76000 3450.40 TRAFFIC CONTROL DEVICE | | | 0060 636014-001 240.000 HR | 60.00000 14400.00| 1.00000 240.00| 44.08000 10579.20 FLAGGER | | | 0065 636017-001 108.000 LF | 35.00000 3780.00| 40.00000 4320.00| 43.63000 4712.04 TEMPORARY CONCRETE BARRIER | | | 0070 636022-001 75.000 DA | 65.00000 4875.00| 57.00000 4275.00| 43.63000 3272.25 CHANGEABLE MESSAGE SIGN | | | 0075 636025-001 375.000 DA | 1.75000 656.25| 1.55000 581.25| 1.36000 510.00 WARNING LIGHTS, TYPE A | | | 0080 636025-001 525.000 DA | 1.75000 918.75| 1.55000 813.75| 1.36000 714.00 WARNING LIGHTS, TYPE B | | | 0085 640005-001 5.000 MO | 1200.00000 6000.00| 500.00000 2500.00| 1090.69000 5453.45 MINIMAL FIELD OFFICE | | | 0090 660005-011 1.000 EA | 750.00000 750.00| 800.00000 800.00| 1363.06000 1363.06 ADJ JUNCTION BOX, TYPE H | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 005 -3 TABULATION OF BIDS CALL ORDER : 005 CONTRACT ID : 0813704 COUNTIES : HARRISON LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 04 SET-ASIDE : ==================================================================================================================================== |( 1 ) 34-1421920 |( 2 ) 27-2000626 |( 3 ) 55-0640963 |OHIO-WEST VIRGINIA EXCAVATIN |TRITON CONSTRUCTION INC |LAURITA EXCAVATING, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0095 663001-004 104.000 LF | 0.26000 27.04| 0.24000 24.96| 0.26000 27.04 EDGE LINE, TYPE II - 4 IN DOTTED WHITE | | | 0100 663001-004 1020.000 LF | 0.26000 265.20| 0.24000 244.80| 0.26000 265.20 EDGE LINE, TYPE II - 4 IN WHITE | | | 0105 663001-004 400.000 LF | 0.26000 104.00| 0.24000 96.00| 0.26000 104.00 EDGE LINE, TYPE II - 4 IN YELLOW | | | 0110 663002-005 30.000 LF | 0.26000 7.80| 0.24000 7.20| 0.26000 7.80 LANE LINE, TYPE II - 4 IN | | | 0115 663002-038 370.000 LF | 0.26000 96.20| 0.24000 88.80| 0.27000 99.90 CENTERLINE, TYPE II - 4 IN | | | 0120 663004-011 400.000 LF | 8.00000 3200.00| 7.00000 2800.00| 8.73000 3492.00 CHANNELIZING LINE, TYPE V - 8 IN | | | 0125 663005-011 44.000 LF | 15.00000 660.00| 13.00000 572.00| 14.18000 623.92 STOP LINE, TYPE V - 24 IN | | | 0130 663010-010 3.000 EA | 200.00000 600.00| 190.00000 570.00| 190.87000 572.61 ONE DIRECTION LANE ASSIGNMENT ARROW, TY | | | V | | | 0135 664011-001 2.000 EA | 2650.00000 5300.00| 2950.00000 5900.00| 3217.55000 6435.10 TEMPORARY IMPACT ATTENUATING DEVICE, | | | TYPE V | | | 0140 402001-001 AA1 114.000 TN | 150.00000 17100.00| 114.92000 13100.88| 118.41000 13498.74 MARSHALL HOT-MIX ASPHALT SKID RESISTANT | | | PAVEMENT, STONE OR GRAVEL, TYPE I | | | 0145 402001-002 AA2 109.000 TN | | | MARSHALL HOT-MIX ASPHALT SKID RESISTANT | | | PAVEMENT, SLAG, TYPE I | | | SECTION TOTALS | $ 112,852.84| $ 82,701.83| $ 114,900.97 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0002 BRIDGE | | | 0150 203001-000 LUMP | 30000.00000 30000.00| 36061.17000 36061.17| 32194.24000 32194.24 DISMANTLING STRUCTURE | | | 0155 601003-001 10.000 CY | 2000.00000 20000.00| 1000.00000 10000.00| 1609.59000 16095.90 CLASS K CONCRETE | | | 0160 601013-001 LUMP | 7500.00000 7500.00| 4000.00000 4000.00| 13584.82000 13584.82 EPOXY RESIN PROTECTIVE COATING | | | 0165 601030-000 46.400 SF | 150.00000 6960.00| 185.00000 8584.00| 450.63000 20909.23 PATCHING CONCRETE STRUCTURES TYPE 1 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 005 -4 TABULATION OF BIDS CALL ORDER : 005 CONTRACT ID : 0813704 COUNTIES : HARRISON LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 04 SET-ASIDE : ==================================================================================================================================== |( 1 ) 34-1421920 |( 2 ) 27-2000626 |( 3 ) 55-0640963 |OHIO-WEST VIRGINIA EXCAVATIN |TRITON CONSTRUCTION INC |LAURITA EXCAVATING, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0170 601030-000 10.300 SF | 275.00000 2832.50| 240.00000 2472.00| 910.48000 9377.94 PATCHING CONCRETE STRUCTURES TYPE 2 | | | 0175 602002-001 1545.000 LB | 3.00000 4635.00| 3.00000 4635.00| 7.73000 11942.85 EPOXY COATED REINFORCING STEEL BAR | | | 0180 603016-204 240.000 LF | 450.00000 108000.00| 570.00000 136800.00| 559.02000 134164.80 15X48 INCH PRESTRESSED CONCRETE BOX BEA | | | 0185 619002-001 450.000 SY | 35.00000 15750.00| 44.00000 19800.00| 24.79000 11155.50 MEMBRANE WATERPROOFING WITHOUT | | | PROTECTION COURSE | | | 0190 679001-001 107.000 SY | 90.00000 9630.00| 188.00000 20116.00| 149.84000 16032.88 CONCRETE DECK OVERLAY | | | SECTION TOTALS | $ 205,307.50| $ 242,468.17| $ 265,458.16 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 318,160.34| $ 325,170.00| $ 380,359.13 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 005 -5 TABULATION OF BIDS CALL ORDER : 005 CONTRACT ID : 0813704 COUNTIES : HARRISON LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 04 SET-ASIDE : ==================================================================================================================================== |( 4 ) 31-1023518 |( 5 ) 62-1345425 |( ) |KOKOSING CONSTRUCTION COMPAN |BILCO CONSTRUCTION CO., INC. | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 ROADWAY | | | 0005 204001-000 LUMP | 34694.69000 34694.69| 21000.00000 21000.00| MOBILIZATION | | | 0010 408002-001 229.000 GA | 3.04000 696.16| 3.30000 755.70| BITUMINOUS MATERIAL | | | 0015 415005-001 1184.000 SY | 9.00000 10656.00| 16.00000 18944.00| REMOVE EXISTING PAVEMENT SURFACE | | | 0020 605012-001 1.000 EA | 4400.00000 4400.00| 1370.00000 1370.00| ADJUST INLET TYPE, E | | | 0025 607001-001 37.500 LF | 35.00000 1312.50| 51.00000 1912.50| TYPE 1 GUARDRAIL, CLASS I | | | 0030 607006-001 2.000 EA | 1700.00000 3400.00| 1750.00000 3500.00| THRIE BEAM GUARDRAIL BRIDGE TRANSITION | | | 0035 609001-001 13.000 SY | 350.00000 4550.00| 140.00000 1820.00| CONCRETE SIDEWALK | | | 0040 610006-001 60.000 LF | 155.00000 9300.00| 140.00000 8400.00| MEDIAN, TYPE I | | | 0045 636007-001 3431.000 LF | 0.55000 1887.05| 0.60000 2058.60| ERADICATION OF PAVEMENT MARKING | | | 0050 636008-001 3312.000 LF | 0.22000 728.64| 0.25000 828.00| TEMPORARY PAVEMENT MARKING-PAINT 4 IN | | | 0055 636011-001 4540.000 UN | 0.80000 3632.00| 0.90000 4086.00| TRAFFIC CONTROL DEVICE | | | 0060 636014-001 240.000 HR | 60.00000 14400.00| 55.00000 13200.00| FLAGGER | | | 0065 636017-001 108.000 LF | 30.00000 3240.00| 30.00000 3240.00| TEMPORARY CONCRETE BARRIER | | | 0070 636022-001 75.000 DA | 57.00000 4275.00| 63.00000 4725.00| CHANGEABLE MESSAGE SIGN | | | 0075 636025-001 375.000 DA | 1.55000 581.25| 1.70000 637.50| WARNING LIGHTS, TYPE A | | | 0080 636025-001 525.000 DA | 1.55000 813.75| 1.70000 892.50| WARNING LIGHTS, TYPE B | | | 0085 640005-001 5.000 MO | 4400.00000 22000.00| 1510.00000 7550.00| MINIMAL FIELD OFFICE | | | 0090 660005-011 1.000 EA | 800.00000 800.00| 1420.00000 1420.00| ADJ JUNCTION BOX, TYPE H | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 005 -6 TABULATION OF BIDS CALL ORDER : 005 CONTRACT ID : 0813704 COUNTIES : HARRISON LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 04 SET-ASIDE : ==================================================================================================================================== |( 4 ) 31-1023518 |( 5 ) 62-1345425 |( ) |KOKOSING CONSTRUCTION COMPAN |BILCO CONSTRUCTION CO., INC. | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0095 663001-004 104.000 LF | 0.24000 24.96| 0.25000 26.00| EDGE LINE, TYPE II - 4 IN DOTTED WHITE | | | 0100 663001-004 1020.000 LF | 0.24000 244.80| 0.25000 255.00| EDGE LINE, TYPE II - 4 IN WHITE | | | 0105 663001-004 400.000 LF | 0.24000 96.00| 0.25000 100.00| EDGE LINE, TYPE II - 4 IN YELLOW | | | 0110 663002-005 30.000 LF | 0.24000 7.20| 0.25000 7.50| LANE LINE, TYPE II - 4 IN | | | 0115 663002-038 370.000 LF | 0.24000 88.80| 0.25000 92.50| CENTERLINE, TYPE II - 4 IN | | | 0120 663004-011 400.000 LF | 7.00000 2800.00| 7.70000 3080.00| CHANNELIZING LINE, TYPE V - 8 IN | | | 0125 663005-011 44.000 LF | 13.00000 572.00| 14.00000 616.00| STOP LINE, TYPE V - 24 IN | | | 0130 663010-010 3.000 EA | 190.00000 570.00| 210.00000 630.00| ONE DIRECTION LANE ASSIGNMENT ARROW, TY | | | V | | | 0135 664011-001 2.000 EA | 2950.00000 5900.00| 4290.00000 8580.00| TEMPORARY IMPACT ATTENUATING DEVICE, | | | TYPE V | | | 0140 402001-001 AA1 114.000 TN | 128.05000 14597.70| 145.00000 16530.00| MARSHALL HOT-MIX ASPHALT SKID RESISTANT | | | PAVEMENT, STONE OR GRAVEL, TYPE I | | | 0145 402001-002 AA2 109.000 TN | | | MARSHALL HOT-MIX ASPHALT SKID RESISTANT | | | PAVEMENT, SLAG, TYPE I | | | SECTION TOTALS | $ 146,268.50| $ 126,256.80| $ ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0002 BRIDGE | | | 0150 203001-000 LUMP | 40000.00000 40000.00| 89000.70000 89000.70| DISMANTLING STRUCTURE | | | 0155 601003-001 10.000 CY | 2300.00000 23000.00| 2000.00000 20000.00| CLASS K CONCRETE | | | 0160 601013-001 LUMP | 4500.00000 4500.00| 29000.00000 29000.00| EPOXY RESIN PROTECTIVE COATING | | | 0165 601030-000 46.400 SF | 230.00000 10672.00| 165.00000 7656.00| PATCHING CONCRETE STRUCTURES TYPE 1 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 005 -7 TABULATION OF BIDS CALL ORDER : 005 CONTRACT ID : 0813704 COUNTIES : HARRISON LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 04 SET-ASIDE : ==================================================================================================================================== |( 4 ) 31-1023518 |( 5 ) 62-1345425 |( ) |KOKOSING CONSTRUCTION COMPAN |BILCO CONSTRUCTION CO., INC. | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0170 601030-000 10.300 SF | 315.00000 3244.50| 260.00000 2678.00| PATCHING CONCRETE STRUCTURES TYPE 2 | | | 0175 602002-001 1545.000 LB | 5.00000 7725.00| 2.70000 4171.50| EPOXY COATED REINFORCING STEEL BAR | | | 0180 603016-204 240.000 LF | 480.00000 115200.00| 390.00000 93600.00| 15X48 INCH PRESTRESSED CONCRETE BOX BEA | | | 0185 619002-001 450.000 SY | 60.00000 27000.00| 75.00000 33750.00| MEMBRANE WATERPROOFING WITHOUT | | | PROTECTION COURSE | | | 0190 679001-001 107.000 SY | 170.00000 18190.00| 205.00000 21935.00| CONCRETE DECK OVERLAY | | | SECTION TOTALS | $ 249,531.50| $ 301,791.20| $ ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 395,800.00| $ 428,048.00| $ ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 006 -1 VENDOR RANKING CALL ORDER : 006 CONTRACT ID : 0430345 COUNTIES : KANAWHA LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 01 CONTRACT DESCRIPTION : HOLLY GROVE BRIDGE PROJECT(S) : S320-0083/02-000.01 00 LOCATION: / PAINT CREEK, 0.01 MI E CO 83 ------------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID ------------------------------------------------------------------------------------------------------------------------------- 1 27-2000626 TRITON CONSTRUCTION INC $ 1,330,550.00 100.0000% 2 55-0484695 PAULS CONCRETE, INC. $ 1,385,000.00 104.0923% 3 55-0710073 TEAYS RIVER CONSTRUCTION COMPANY $ 1,499,000.00 112.6602% 4 55-0487806 ORDERS CONSTRUCTION COMPANY, INC. $ 1,508,900.00 113.4042% 5 62-1345425 BILCO CONSTRUCTION CO., INC. $ 1,514,900.00 113.8552% 6 25-1696132 BRAYMAN CONSTRUCTION CORPORATION $ 1,785,000.00 134.1550% WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 006 -2 TABULATION OF BIDS CALL ORDER : 006 CONTRACT ID : 0430345 COUNTIES : KANAWHA LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |( 1 ) 27-2000626 |( 2 ) 55-0484695 |( 3 ) 55-0710073 |TRITON CONSTRUCTION INC |PAULS CONCRETE, INC. |TEAYS RIVER CONSTRUCTION COMP LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 BRIDGE #10873 | | | 0005 627010-001 LUMP | 1330550.00000 1330550.00| 1385000.00000 1385000.00| 1499000.00000 1499000.00 ASAP BRIDGE, HOLLY GROVE BRIDGE | | | SECTION TOTALS | $ 1,330,550.00| $ 1,385,000.00| $ 1,499,000.00 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 1,330,550.00| $ 1,385,000.00| $ 1,499,000.00 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 006 -3 TABULATION OF BIDS CALL ORDER : 006 CONTRACT ID : 0430345 COUNTIES : KANAWHA LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |( 4 ) 55-0487806 |( 5 ) 62-1345425 |( 6 ) 25-1696132 |ORDERS CONSTRUCTION COMPANY, |BILCO CONSTRUCTION CO., INC. |BRAYMAN CONSTRUCTION CORPORAT LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 BRIDGE #10873 | | | 0005 627010-001 LUMP | 1508900.00000 1508900.00| 1514900.00000 1514900.00| 1785000.00000 1785000.00 ASAP BRIDGE, HOLLY GROVE BRIDGE | | | SECTION TOTALS | $ 1,508,900.00| $ 1,514,900.00| $ 1,785,000.00 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 1,508,900.00| $ 1,514,900.00| $ 1,785,000.00 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 007 -1 VENDOR RANKING CALL ORDER : 007 CONTRACT ID : 0920271 COUNTIES : KANAWHA LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 01 CONTRACT DESCRIPTION : LOWER FALLS ROAD PROJECT(S) : S320-0006/04-002.13 00 LOCATION: 2.13 MI N OF CR 6/6 ------------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID ------------------------------------------------------------------------------------------------------------------------------- 1 27-0738567 R.K. CONSTRUCTION, INC. $ 239,474.93 100.0000% 2 55-0481221 MOUNTAINEER CONTRACTORS, INC. $ 283,538.61 118.4001% 3 55-0710073 TEAYS RIVER CONSTRUCTION COMPANY $ 293,647.50 122.6214% 4 55-0487806 ORDERS CONSTRUCTION COMPANY, INC. $ 317,482.80 132.5745% 5 55-0570769 WEST VIRGINIA PAVING, INC. $ 368,864.00 154.0303% 6 55-0756636 JIM CONSTRUCTION, INC. $ 370,400.06 154.6717% 7 62-1345425 BILCO CONSTRUCTION CO., INC. $ 446,186.00 186.3185% WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 007 -2 TABULATION OF BIDS CALL ORDER : 007 CONTRACT ID : 0920271 COUNTIES : KANAWHA LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |( 1 ) 27-0738567 |( 2 ) 55-0481221 |( 3 ) 55-0710073 |R.K. CONSTRUCTION, INC. |MOUNTAINEER CONTRACTORS, INC |TEAYS RIVER CONSTRUCTION COMP LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 STORM DRAINAGE IMPROVEMENTS | | | 0005 201001-000 1.000 LS | 3500.00000 3500.00| 7500.00000 7500.00| 17000.00000 17000.00 CLEARING AND GRUBBING | | | 0010 204001-000 LUMP | 20503.42000 20503.42| 28500.00000 28500.00| 10000.00000 10000.00 MOBILIZATION | | | 0015 207001-001 139.000 CY | 8.00000 1112.00| 36.00000 5004.00| 20.00000 2780.00 UNCLASSIFIED EXCAVATION | | | 0020 218001-000 50.000 CY | 69.93000 3496.50| 83.00000 4150.00| 70.00000 3500.00 RIPRAP | | | 0025 229001-000 0.280 MI | 7466.00000 2090.48| 7600.00000 2128.00| 10000.00000 2800.00 SHOULDER AND DITCH | | | 0030 240001-000 80.000 LF | 30.00000 2400.00| 65.50000 5240.00| 60.00000 4800.00 CLEAN CULVERT | | | 0035 408002-001 71.000 GA | 7.00000 497.00| 6.00000 426.00| 6.00000 426.00 BITUMINOUS MATERIAL | | | 0040 601002-001 2.050 CY | 700.00000 1435.00| 1672.50000 3428.63| 2000.00000 4100.00 CLASS B CONCRETE | | | 0045 604050-012 144.000 LF | 99.82000 14374.08| 110.00000 15840.00| 230.00000 33120.00 15 INCH CORRUGATED POLYETHYLENE PIPE | | | SMTH FLOW | | | 0050 604050-016 172.000 LF | 76.78000 13206.16| 68.00000 11696.00| 110.00000 18920.00 18 INCH CORRUGATED POLYETHYLENE PIPE | | | SMTH FLOW | | | 0055 604050-020 769.000 LF | 74.56000 57336.64| 105.50000 81129.50| 100.00000 76900.00 24 INCH CORRUGATED POLYETHYLENE PIPE | | | SMTH FLOW | | | 0060 604050-022 22.000 LF | 151.77000 3338.94| 185.00000 4070.00| 165.00000 3630.00 30 INCH CORRUGATED POLYETHYLENE PIPE | | | SMTH FLOW | | | 0065 605001-001 2.000 EA | 4000.00000 8000.00| 5065.00000 10130.00| 2500.00000 5000.00 TYPE A MANHOLE | | | 0070 605009-001 8.000 EA | 3500.00000 28000.00| 3034.00000 24272.00| 2500.00000 20000.00 TYPE G INLET | | | 0075 608001-002 160.000 LF | 15.00000 2400.00| 40.00000 6400.00| 50.00000 8000.00 4 FT RIGHT-OF-WAY FENCE, CHAIN LINK | | | 0080 622003-001 9.000 EA | 200.00000 1800.00| 350.00000 3150.00| 300.00000 2700.00 CANTILEVER MAILBOX SUPPORT | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 007 -3 TABULATION OF BIDS CALL ORDER : 007 CONTRACT ID : 0920271 COUNTIES : KANAWHA LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |( 1 ) 27-0738567 |( 2 ) 55-0481221 |( 3 ) 55-0710073 |R.K. CONSTRUCTION, INC. |MOUNTAINEER CONTRACTORS, INC |TEAYS RIVER CONSTRUCTION COMP LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0085 636011-001 4260.000 UN | 1.54000 6560.40| 0.78000 3322.80| 1.00000 4260.00 TRAFFIC CONTROL DEVICE | | | 0090 636014-001 400.000 HR | 52.00000 20800.00| 55.00000 22000.00| 55.00000 22000.00 FLAGGER | | | 0095 639001-001 LUMP | 4000.00000 4000.00| 7377.48000 7377.48| 5000.00000 5000.00 CONSTRUCTION LAYOUT STAKE | | | 0100 642040-001 9.000 EA | 200.00000 1800.00| 140.00000 1260.00| 150.00000 1350.00 INLET PROTECTION | | | 0105 652002-001 0.110 TN | 520.00000 57.20| 800.00000 88.00| 2500.00000 275.00 FERTILIZER, 10-20-10 | | | 0110 652003-001 69.300 LB | 23.00000 1593.90| 14.00000 970.20| 45.00000 3118.50 SEED MIXTURES, B, C-1, OR C-2 | | | 0115 652004-001 1.540 TN | 700.00000 1078.00| 850.00000 1309.00| 1200.00000 1848.00 STRAW OR HAY MULCH | | | 0120 663001-004 2100.000 LF | 0.30000 630.00| 0.22000 462.00| 0.50000 1050.00 EDGE LINE, TYPE II - 4 IN W | | | 0125 663002-038 2100.000 LF | 0.30000 630.00| 0.22000 462.00| 0.50000 1050.00 CENTERLINE, TYPE II - 4 IN Y | | | 0130 307005-001 AA1 22.000 TN | 96.10000 2114.20| 48.50000 1067.00| 50.00000 1100.00 AGGREGATE BASE COURSE, STONE OR GRAVEL, | | | CLASS 10 | | | 0135 307005-002 AA2 22.000 TN | | | AGGREGATE BASE COURSE, SLAG, CLASS 10 | | | 0140 401001-001 BB1 51.000 TN | 209.51000 10685.01| 120.00000 6120.00| 125.00000 6375.00 MARSHALL HOT-MIX ASPHALT BASE COURSE, | | | STONE OR GRAVEL, TYPE 1 | | | 0145 401001-002 BB2 51.000 TN | | | MARSHALL HOT-MIX ASPHALT BASE COURSE, | | | SLAG, TYPE 1 | | | 0150 401002-001 CC1 218.000 TN | 92.00000 20056.00| 92.00000 20056.00| 115.00000 25070.00 MARSHALL HOT-MIX ASPHALT WEARING COURSE | | | STONE OR GRAVEL, TYPE 1 | | | 0155 401002-002 CC2 218.000 TN | | | MARSHALL HOT-MIX ASPHALT WEARING COURSE | | | SLAG, TYPE 1 | | | 0160 401007-001 DD1 65.000 TN | 92.00000 5980.00| 92.00000 5980.00| 115.00000 7475.00 MARSHALL SCRATCH COURSE, STONE OR GRAVE | | | 0165 401007-002 DD2 65.000 TN | | | MARSHALL SCRATCH COURSE, SLAG | | | SECTION TOTALS | $ 239,474.93| $ 283,538.61| $ 293,647.50 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 239,474.93| $ 283,538.61| $ 293,647.50 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 007 -4 TABULATION OF BIDS CALL ORDER : 007 CONTRACT ID : 0920271 COUNTIES : KANAWHA LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |( 4 ) 55-0487806 |( 5 ) 55-0570769 |( 6 ) 55-0756636 |ORDERS CONSTRUCTION COMPANY, |WEST VIRGINIA PAVING, INC. |JIM CONSTRUCTION, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 STORM DRAINAGE IMPROVEMENTS | | | 0005 201001-000 1.000 LS | 21000.00000 21000.00| 15150.00000 15150.00| 23500.00000 23500.00 CLEARING AND GRUBBING | | | 0010 204001-000 LUMP | 8300.00000 8300.00| 20000.00000 20000.00| 15500.00000 15500.00 MOBILIZATION | | | 0015 207001-001 139.000 CY | 30.00000 4170.00| 25.00000 3475.00| 20.00000 2780.00 UNCLASSIFIED EXCAVATION | | | 0020 218001-000 50.000 CY | 78.00000 3900.00| 100.00000 5000.00| 106.00000 5300.00 RIPRAP | | | 0025 229001-000 0.280 MI | 15000.00000 4200.00| 11200.00000 3136.00| 25000.00000 7000.00 SHOULDER AND DITCH | | | 0030 240001-000 80.000 LF | 10.00000 800.00| 30.00000 2400.00| 61.00000 4880.00 CLEAN CULVERT | | | 0035 408002-001 71.000 GA | 7.80000 553.80| 6.00000 426.00| 7.00000 497.00 BITUMINOUS MATERIAL | | | 0040 601002-001 2.050 CY | 1300.00000 2665.00| 7900.00000 16195.00| 6700.00000 13735.00 CLASS B CONCRETE | | | 0045 604050-012 144.000 LF | 150.00000 21600.00| 145.00000 20880.00| 132.00000 19008.00 15 INCH CORRUGATED POLYETHYLENE PIPE | | | SMTH FLOW | | | 0050 604050-016 172.000 LF | 110.00000 18920.00| 125.00000 21500.00| 147.00000 25284.00 18 INCH CORRUGATED POLYETHYLENE PIPE | | | SMTH FLOW | | | 0055 604050-020 769.000 LF | 130.00000 99970.00| 150.00000 115350.00| 173.50000 133421.50 24 INCH CORRUGATED POLYETHYLENE PIPE | | | SMTH FLOW | | | 0060 604050-022 22.000 LF | 130.00000 2860.00| 335.00000 7370.00| 310.00000 6820.00 30 INCH CORRUGATED POLYETHYLENE PIPE | | | SMTH FLOW | | | 0065 605001-001 2.000 EA | 5100.00000 10200.00| 9500.00000 19000.00| 4500.00000 9000.00 TYPE A MANHOLE | | | 0070 605009-001 8.000 EA | 3600.00000 28800.00| 4000.00000 32000.00| 2100.00000 16800.00 TYPE G INLET | | | 0075 608001-002 160.000 LF | 44.00000 7040.00| 45.00000 7200.00| 54.00000 8640.00 4 FT RIGHT-OF-WAY FENCE, CHAIN LINK | | | 0080 622003-001 9.000 EA | 300.00000 2700.00| 275.00000 2475.00| 400.00000 3600.00 CANTILEVER MAILBOX SUPPORT | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 007 -5 TABULATION OF BIDS CALL ORDER : 007 CONTRACT ID : 0920271 COUNTIES : KANAWHA LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |( 4 ) 55-0487806 |( 5 ) 55-0570769 |( 6 ) 55-0756636 |ORDERS CONSTRUCTION COMPANY, |WEST VIRGINIA PAVING, INC. |JIM CONSTRUCTION, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0085 636011-001 4260.000 UN | 1.20000 5112.00| 1.00000 4260.00| 0.90000 3834.00 TRAFFIC CONTROL DEVICE | | | 0090 636014-001 400.000 HR | 56.00000 22400.00| 60.00000 24000.00| 61.25000 24500.00 FLAGGER | | | 0095 639001-001 LUMP | 3900.00000 3900.00| 5000.00000 5000.00| 2300.00000 2300.00 CONSTRUCTION LAYOUT STAKE | | | 0100 642040-001 9.000 EA | 160.00000 1440.00| 200.00000 1800.00| 125.00000 1125.00 INLET PROTECTION | | | 0105 652002-001 0.110 TN | 1100.00000 121.00| 2000.00000 220.00| 28766.00000 3164.26 FERTILIZER, 10-20-10 | | | 0110 652003-001 69.300 LB | 22.00000 1524.60| 40.00000 2772.00| 11.00000 762.30 SEED MIXTURES, B, C-1, OR C-2 | | | 0115 652004-001 1.540 TN | 560.00000 862.40| 1000.00000 1540.00| 450.00000 693.00 STRAW OR HAY MULCH | | | 0120 663001-004 2100.000 LF | 0.33000 693.00| 0.45000 945.00| 0.25000 525.00 EDGE LINE, TYPE II - 4 IN W | | | 0125 663002-038 2100.000 LF | 0.33000 693.00| 0.45000 945.00| 0.25000 525.00 CENTERLINE, TYPE II - 4 IN Y | | | 0130 307005-001 AA1 22.000 TN | 89.00000 1958.00| 105.00000 2310.00| 60.00000 1320.00 AGGREGATE BASE COURSE, STONE OR GRAVEL, | | | CLASS 10 | | | 0135 307005-002 AA2 22.000 TN | | | AGGREGATE BASE COURSE, SLAG, CLASS 10 | | | 0140 401001-001 BB1 51.000 TN | 140.00000 7140.00| 130.00000 6630.00| 121.00000 6171.00 MARSHALL HOT-MIX ASPHALT BASE COURSE, | | | STONE OR GRAVEL, TYPE 1 | | | 0145 401001-002 BB2 51.000 TN | | | MARSHALL HOT-MIX ASPHALT BASE COURSE, | | | SLAG, TYPE 1 | | | 0150 401002-001 CC1 218.000 TN | 120.00000 26160.00| 95.00000 20710.00| 105.00000 22890.00 MARSHALL HOT-MIX ASPHALT WEARING COURSE | | | STONE OR GRAVEL, TYPE 1 | | | 0155 401002-002 CC2 218.000 TN | | | MARSHALL HOT-MIX ASPHALT WEARING COURSE | | | SLAG, TYPE 1 | | | 0160 401007-001 DD1 65.000 TN | 120.00000 7800.00| 95.00000 6175.00| 105.00000 6825.00 MARSHALL SCRATCH COURSE, STONE OR GRAVE | | | 0165 401007-002 DD2 65.000 TN | | | MARSHALL SCRATCH COURSE, SLAG | | | SECTION TOTALS | $ 317,482.80| $ 368,864.00| $ 370,400.06 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 317,482.80| $ 368,864.00| $ 370,400.06 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 007 -6 TABULATION OF BIDS CALL ORDER : 007 CONTRACT ID : 0920271 COUNTIES : KANAWHA LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |( 7 ) 62-1345425 |( ) |( ) |BILCO CONSTRUCTION CO., INC. | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 STORM DRAINAGE IMPROVEMENTS | | | 0005 201001-000 1.000 LS | 45000.00000 45000.00| | CLEARING AND GRUBBING | | | 0010 204001-000 LUMP | 20000.00000 20000.00| | MOBILIZATION | | | 0015 207001-001 139.000 CY | 41.00000 5699.00| | UNCLASSIFIED EXCAVATION | | | 0020 218001-000 50.000 CY | 71.00000 3550.00| | RIPRAP | | | 0025 229001-000 0.280 MI | 9510.00000 2662.80| | SHOULDER AND DITCH | | | 0030 240001-000 80.000 LF | 21.00000 1680.00| | CLEAN CULVERT | | | 0035 408002-001 71.000 GA | 6.60000 468.60| | BITUMINOUS MATERIAL | | | 0040 601002-001 2.050 CY | 1890.00000 3874.50| | CLASS B CONCRETE | | | 0045 604050-012 144.000 LF | 190.00000 27360.00| | 15 INCH CORRUGATED POLYETHYLENE PIPE | | | SMTH FLOW | | | 0050 604050-016 172.000 LF | 180.00000 30960.00| | 18 INCH CORRUGATED POLYETHYLENE PIPE | | | SMTH FLOW | | | 0055 604050-020 769.000 LF | 200.00000 153800.00| | 24 INCH CORRUGATED POLYETHYLENE PIPE | | | SMTH FLOW | | | 0060 604050-022 22.000 LF | 140.00000 3080.00| | 30 INCH CORRUGATED POLYETHYLENE PIPE | | | SMTH FLOW | | | 0065 605001-001 2.000 EA | 3920.00000 7840.00| | TYPE A MANHOLE | | | 0070 605009-001 8.000 EA | 2650.00000 21200.00| | TYPE G INLET | | | 0075 608001-002 160.000 LF | 44.00000 7040.00| | 4 FT RIGHT-OF-WAY FENCE, CHAIN LINK | | | 0080 622003-001 9.000 EA | 195.00000 1755.00| | CANTILEVER MAILBOX SUPPORT | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 007 -7 TABULATION OF BIDS CALL ORDER : 007 CONTRACT ID : 0920271 COUNTIES : KANAWHA LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |( 7 ) 62-1345425 |( ) |( ) |BILCO CONSTRUCTION CO., INC. | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0085 636011-001 4260.000 UN | 1.70000 7242.00| | TRAFFIC CONTROL DEVICE | | | 0090 636014-001 400.000 HR | 60.00000 24000.00| | FLAGGER | | | 0095 639001-001 LUMP | 39525.90000 39525.90| | CONSTRUCTION LAYOUT STAKE | | | 0100 642040-001 9.000 EA | 95.00000 855.00| | INLET PROTECTION | | | 0105 652002-001 0.110 TN | 1610.00000 177.10| | FERTILIZER, 10-20-10 | | | 0110 652003-001 69.300 LB | 14.00000 970.20| | SEED MIXTURES, B, C-1, OR C-2 | | | 0115 652004-001 1.540 TN | 785.00000 1208.90| | STRAW OR HAY MULCH | | | 0120 663001-004 2100.000 LF | 0.20000 420.00| | EDGE LINE, TYPE II - 4 IN W | | | 0125 663002-038 2100.000 LF | 0.20000 420.00| | CENTERLINE, TYPE II - 4 IN Y | | | 0130 307005-001 AA1 22.000 TN | 56.00000 1232.00| | AGGREGATE BASE COURSE, STONE OR GRAVEL, | | | CLASS 10 | | | 0135 307005-002 AA2 22.000 TN | | | AGGREGATE BASE COURSE, SLAG, CLASS 10 | | | 0140 401001-001 BB1 51.000 TN | 115.00000 5865.00| | MARSHALL HOT-MIX ASPHALT BASE COURSE, | | | STONE OR GRAVEL, TYPE 1 | | | 0145 401001-002 BB2 51.000 TN | | | MARSHALL HOT-MIX ASPHALT BASE COURSE, | | | SLAG, TYPE 1 | | | 0150 401002-001 CC1 218.000 TN | 100.00000 21800.00| | MARSHALL HOT-MIX ASPHALT WEARING COURSE | | | STONE OR GRAVEL, TYPE 1 | | | 0155 401002-002 CC2 218.000 TN | | | MARSHALL HOT-MIX ASPHALT WEARING COURSE | | | SLAG, TYPE 1 | | | 0160 401007-001 DD1 65.000 TN | 100.00000 6500.00| | MARSHALL SCRATCH COURSE, STONE OR GRAVE | | | 0165 401007-002 DD2 65.000 TN | | | MARSHALL SCRATCH COURSE, SLAG | | | SECTION TOTALS | $ 446,186.00| $ | $ ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 446,186.00| $ 0.00| $ ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 008 -1 VENDOR RANKING CALL ORDER : 008 CONTRACT ID : 1019662 COUNTIES : MARSHALL LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 CONTRACT DESCRIPTION : BOGGS RUN ROAD +32 PROJECT(S) : E326-0TRE/E0-002.10 00 FEMA 1903 000 000 LOCATION: BEG:MP3.37 2.14MIE JCT CR4 END:MP4.17 2.94MIE JCT CR4 ------------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID ------------------------------------------------------------------------------------------------------------------------------- 1 61-1584805 MARKS DRILLING $ 98,879.30 100.0000% 2 55-0434699 SAVAGE CONSTRUCTION COMPANY, INC. $ 165,906.25 167.7866% 3 34-1421920 OHIO-WEST VIRGINIA EXCAVATING CO. $ 299,246.22 302.6379% 4 25-1428005 CAST & BAKER CORPORATION $ 446,762.50 451.8261% WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 008 -2 TABULATION OF BIDS CALL ORDER : 008 CONTRACT ID : 1019662 COUNTIES : MARSHALL LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 1 ) 61-1584805 |( 2 ) 55-0434699 |( 3 ) 34-1421920 |MARKS DRILLING |SAVAGE CONSTRUCTION COMPANY, |OHIO-WEST VIRGINIA EXCAVATING LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 DEBRIS REMOVAL | | | 0005 201008-001 LUMP | 800.00000 800.00| 2000.00000 2000.00| 6749.64000 6749.64 DEBRIS REMOVAL CR 1 | | | 0010 201008-001 LUMP | 1000.00000 1000.00| 500.00000 500.00| 6749.64000 6749.64 DEBRIS REMOVAL CR 14 | | | 0015 201008-001 LUMP | 1500.00000 1500.00| 3000.00000 3000.00| 6749.64000 6749.64 DEBRIS REMOVAL CR 15 | | | 0020 201008-001 LUMP | 2000.00000 2000.00| 5000.00000 5000.00| 11811.85000 11811.85 DEBRIS REMOVAL CR 15/1 | | | 0025 201008-001 LUMP | 3000.00000 3000.00| 6000.00000 6000.00| 13499.28000 13499.28 DEBRIS REMOVAL CR 16 | | | 0030 201008-001 LUMP | 3000.00000 3000.00| 3000.00000 3000.00| 6749.64000 6749.64 DEBRIS REMOVAL CR 18 | | | 0035 201008-001 LUMP | 1000.00000 1000.00| 100.00000 100.00| 1687.40000 1687.40 DEBRIS REMOVAL CR 2/4 | | | 0040 201008-001 LUMP | 1000.00000 1000.00| 200.00000 200.00| 1687.40000 1687.40 DEBRIS REMOVAL CR 21 | | | 0045 201008-001 LUMP | 1000.00000 1000.00| 100.00000 100.00| 1349.93000 1349.93 DEBRIS REMOVAL CR 24 | | | 0050 201008-001 LUMP | 1000.00000 1000.00| 100.00000 100.00| 1349.93000 1349.93 DEBRIS REMOVAL CR 25 | | | 0055 201008-001 LUMP | 2500.00000 2500.00| 6000.00000 6000.00| 13499.28000 13499.28 DEBRIS REMOVAL CR 250/11 | | | 0060 201008-001 LUMP | 2000.00000 2000.00| 3000.00000 3000.00| 5062.24000 5062.24 DEBRIS REMOVAL CR 250/14 | | | 0065 201008-001 LUMP | 1000.00000 1000.00| 300.00000 300.00| 1687.40000 1687.40 DEBRIS REMOVAL CR 250/15 | | | 0070 201008-001 LUMP | 1000.00000 1000.00| 500.00000 500.00| 1687.40000 1687.40 DEBRIS REMOVAL CR 250/17 | | | 0075 201008-001 LUMP | 4000.00000 4000.00| 9000.00000 9000.00| 13499.28000 13499.28 DEBRIS REMOVAL CR 26 | | | 0080 201008-001 LUMP | 2000.00000 2000.00| 3000.00000 3000.00| 6749.64000 6749.64 DEBRIS REMOVAL CR 26/1 | | | 0085 201008-001 LUMP | 1000.00000 1000.00| 100.00000 100.00| 1349.93000 1349.93 DEBRIS REMOVAL CR 29 | | | 0090 201008-001 LUMP | 7000.00000 7000.00| 12000.00000 12000.00| 16874.09000 16874.09 DEBRIS REMOVAL CR 34 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 008 -3 TABULATION OF BIDS CALL ORDER : 008 CONTRACT ID : 1019662 COUNTIES : MARSHALL LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 1 ) 61-1584805 |( 2 ) 55-0434699 |( 3 ) 34-1421920 |MARKS DRILLING |SAVAGE CONSTRUCTION COMPANY, |OHIO-WEST VIRGINIA EXCAVATING LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0095 201008-001 LUMP | 1000.00000 1000.00| 100.00000 100.00| 3374.81000 3374.81 DEBRIS REMOVAL CR 34/4 | | | 0100 201008-001 LUMP | 2500.00000 2500.00| 5000.00000 5000.00| 6749.64000 6749.64 DEBRIS REMOVAL CR 38 | | | 0105 201008-001 LUMP | 1000.00000 1000.00| 2000.00000 2000.00| 3374.81000 3374.81 DEBRIS REMOVAL CR 46 | | | 0110 201008-001 LUMP | 7000.00000 7000.00| 11000.00000 11000.00| 13499.28000 13499.28 DEBRIS REMOVAL CR 5 | | | 0115 201008-001 LUMP | 1500.00000 1500.00| 2000.00000 2000.00| 3374.81000 3374.81 DEBRIS REMOVAL CR 50 | | | 0120 201008-001 LUMP | 1500.00000 1500.00| 3000.00000 3000.00| 5062.24000 5062.24 DEBRIS REMOVAL CR 52 | | | 0125 201008-001 LUMP | 3000.00000 3000.00| 5000.00000 5000.00| 8437.05000 8437.05 DEBRIS REMOVAL CR 7 | | | 0130 201008-001 LUMP | 2000.00000 2000.00| 3000.00000 3000.00| 3374.81000 3374.81 DEBRIS REMOVAL CR 7/1 | | | 0135 201008-001 LUMP | 2000.00000 2000.00| 100.00000 100.00| 1687.40000 1687.40 DEBRIS REMOVAL CR 72 | | | 0140 201008-001 LUMP | 7000.00000 7000.00| 15000.00000 15000.00| 28685.94000 28685.94 DEBRIS REMOVAL CR 74 | | | 0145 201008-001 LUMP | 1900.00000 1900.00| 2000.00000 2000.00| 1687.40000 1687.40 DEBRIS REMOVAL CR 8/1 | | | 0150 201008-001 LUMP | 2000.00000 2000.00| 3000.00000 3000.00| 6749.64000 6749.64 DEBRIS REMOVAL CR 86/1 | | | 0155 201008-001 LUMP | 3000.00000 3000.00| 4000.00000 4000.00| 6749.64000 6749.64 DEBRIS REMOVAL CR 89 | | | 0160 201008-001 LUMP | 1500.00000 1500.00| 2000.00000 2000.00| 6749.64000 6749.64 DEBRIS REMOVAL CR 98 | | | 0165 201008-001 LUMP | 25000.00000 25000.00| 19000.00000 19000.00| 37123.00000 37123.00 DEBRIS REMOVAL US 250 | | | 0170 636011-001 2345.000 UN | 0.50000 1172.50| 4.25000 9966.25| 2.50000 5862.50 TRAFFIC CONTROL DEVICE | | | 0175 636014-001 680.000 HR | 0.01000 6.80| 38.00000 25840.00| 55.75000 37910.00 FLAGGER | | | SECTION TOTALS | $ 98,879.30| $ 165,906.25| $ 299,246.22 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 98,879.30| $ 165,906.25| $ 299,246.22 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 008 -4 TABULATION OF BIDS CALL ORDER : 008 CONTRACT ID : 1019662 COUNTIES : MARSHALL LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 4 ) 25-1428005 |( ) |( ) |CAST & BAKER CORPORATION | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 DEBRIS REMOVAL | | | 0005 201008-001 LUMP | 5000.00000 5000.00| | DEBRIS REMOVAL CR 1 | | | 0010 201008-001 LUMP | 3500.00000 3500.00| | DEBRIS REMOVAL CR 14 | | | 0015 201008-001 LUMP | 6000.00000 6000.00| | DEBRIS REMOVAL CR 15 | | | 0020 201008-001 LUMP | 12500.00000 12500.00| | DEBRIS REMOVAL CR 15/1 | | | 0025 201008-001 LUMP | 15000.00000 15000.00| | DEBRIS REMOVAL CR 16 | | | 0030 201008-001 LUMP | 8000.00000 8000.00| | DEBRIS REMOVAL CR 18 | | | 0035 201008-001 LUMP | 3000.00000 3000.00| | DEBRIS REMOVAL CR 2/4 | | | 0040 201008-001 LUMP | 1500.00000 1500.00| | DEBRIS REMOVAL CR 21 | | | 0045 201008-001 LUMP | 1500.00000 1500.00| | DEBRIS REMOVAL CR 24 | | | 0050 201008-001 LUMP | 2000.00000 2000.00| | DEBRIS REMOVAL CR 25 | | | 0055 201008-001 LUMP | 15000.00000 15000.00| | DEBRIS REMOVAL CR 250/11 | | | 0060 201008-001 LUMP | 10000.00000 10000.00| | DEBRIS REMOVAL CR 250/14 | | | 0065 201008-001 LUMP | 2500.00000 2500.00| | DEBRIS REMOVAL CR 250/15 | | | 0070 201008-001 LUMP | 3500.00000 3500.00| | DEBRIS REMOVAL CR 250/17 | | | 0075 201008-001 LUMP | 25000.00000 25000.00| | DEBRIS REMOVAL CR 26 | | | 0080 201008-001 LUMP | 9000.00000 9000.00| | DEBRIS REMOVAL CR 26/1 | | | 0085 201008-001 LUMP | 2500.00000 2500.00| | DEBRIS REMOVAL CR 29 | | | 0090 201008-001 LUMP | 35000.00000 35000.00| | DEBRIS REMOVAL CR 34 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 008 -5 TABULATION OF BIDS CALL ORDER : 008 CONTRACT ID : 1019662 COUNTIES : MARSHALL LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 4 ) 25-1428005 |( ) |( ) |CAST & BAKER CORPORATION | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0095 201008-001 LUMP | 1500.00000 1500.00| | DEBRIS REMOVAL CR 34/4 | | | 0100 201008-001 LUMP | 12000.00000 12000.00| | DEBRIS REMOVAL CR 38 | | | 0105 201008-001 LUMP | 5000.00000 5000.00| | DEBRIS REMOVAL CR 46 | | | 0110 201008-001 LUMP | 30000.00000 30000.00| | DEBRIS REMOVAL CR 5 | | | 0115 201008-001 LUMP | 5000.00000 5000.00| | DEBRIS REMOVAL CR 50 | | | 0120 201008-001 LUMP | 8000.00000 8000.00| | DEBRIS REMOVAL CR 52 | | | 0125 201008-001 LUMP | 9500.00000 9500.00| | DEBRIS REMOVAL CR 7 | | | 0130 201008-001 LUMP | 5000.00000 5000.00| | DEBRIS REMOVAL CR 7/1 | | | 0135 201008-001 LUMP | 1500.00000 1500.00| | DEBRIS REMOVAL CR 72 | | | 0140 201008-001 LUMP | 34500.00000 34500.00| | DEBRIS REMOVAL CR 74 | | | 0145 201008-001 LUMP | 4000.00000 4000.00| | DEBRIS REMOVAL CR 8/1 | | | 0150 201008-001 LUMP | 6000.00000 6000.00| | DEBRIS REMOVAL CR 86/1 | | | 0155 201008-001 LUMP | 8000.00000 8000.00| | DEBRIS REMOVAL CR 89 | | | 0160 201008-001 LUMP | 5000.00000 5000.00| | DEBRIS REMOVAL CR 98 | | | 0165 201008-001 LUMP | 108000.00000 108000.00| | DEBRIS REMOVAL US 250 | | | 0170 636011-001 2345.000 UN | 2.50000 5862.50| | TRAFFIC CONTROL DEVICE | | | 0175 636014-001 680.000 HR | 55.00000 37400.00| | FLAGGER | | | SECTION TOTALS | $ 446,762.50| $ | $ ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 446,762.50| $ 0.00| $ ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 009 -1 VENDOR RANKING CALL ORDER : 009 CONTRACT ID : 9805905 COUNTIES : MASON LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 01 CONTRACT DESCRIPTION : POST OFFICE ROAD PROJECT(S) : U327-0033/00-003.95 00 OCRO 0033 209 D00 LOCATION: POST OFFICE ROAD ------------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID ------------------------------------------------------------------------------------------------------------------------------- 1 55-0570769 WEST VIRGINIA PAVING, INC. $ 217,228.15 100.0000% 2 55-0481221 MOUNTAINEER CONTRACTORS, INC. $ 242,395.51 111.5857% WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 009 -2 TABULATION OF BIDS CALL ORDER : 009 CONTRACT ID : 9805905 COUNTIES : MASON LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |( 1 ) 55-0570769 |( 2 ) 55-0481221 |( ) |WEST VIRGINIA PAVING, INC. |MOUNTAINEER CONTRACTORS, INC | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 ROADWAY ITEMS | | | 0005 201001-000 1.000 LS | 10000.00000 10000.00| 5100.00000 5100.00| CLEARING AND GRUBBING | | | 0010 204001-000 LUMP | 12800.00000 12800.00| 23000.00000 23000.00| MOBILIZATION | | | 0015 207001-001 506.000 CY | 40.00000 20240.00| 43.25000 21884.50| UNCLASSIFIED EXCAVATION | | | 0020 207002-000 234.000 CY | 71.00000 16614.00| 79.25000 18544.50| SUBGRADE | | | 0025 207034-000 687.000 SY | 1.00000 687.00| 1.55000 1064.85| FABRIC FOR SEPARATION | | | 0030 211001-000 472.000 CY | 10.00000 4720.00| 20.00000 9440.00| UNCLASSIFIED BORROW EXCAVATION | | | 0035 307001-000 423.000 CY | 71.00000 30033.00| 78.30000 33120.90| AGGREGATE BASE COURSE, CLASS 1 | | | 0040 408002-001 83.000 GA | 7.50000 622.50| 7.50000 622.50| BITUMINOUS MATERIAL | | | 0045 415005-001 330.000 SY | 12.00000 3960.00| 12.00000 3960.00| REMOVE EXISTING PAVEMENT SURFACE | | | 0050 636006-001 3.000 DA | 750.00000 2250.00| 500.00000 1500.00| PILOT TRUCK AND DRIVER | | | 0055 636011-001 5270.000 UN | 0.85000 4479.50| 0.78000 4110.60| TRAFFIC CONTROL DEVICE | | | 0060 636014-001 111.000 HR | 55.00000 6105.00| 47.00000 5217.00| FLAGGER | | | 0065 636022-001 3.000 DA | 50.00000 150.00| 60.00000 180.00| CHANGEABLE MESSAGE SIGN | | | 0070 636025-001 18.000 DA | 1.25000 22.50| 1.55000 27.90| WARNING LIGHTS, TYPE B | | | 0075 639001-001 LUMP | 5545.00000 5545.00| 11075.46000 11075.46| CONSTRUCTION LAYOUT STAKE | | | 0080 642004-002 26.000 LB | 5.00000 130.00| 5.00000 130.00| SEED MIXTURE, B | | | 0085 642004-003 18.000 LB | 10.00000 180.00| 10.00000 180.00| SEED MIXTURE, D | | | 0090 642005-001 0.130 TN | 2800.00000 364.00| 2770.00000 360.10| MULCH, STRAW OR HAY | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 009 -3 TABULATION OF BIDS CALL ORDER : 009 CONTRACT ID : 9805905 COUNTIES : MASON LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |( 1 ) 55-0570769 |( 2 ) 55-0481221 |( ) |WEST VIRGINIA PAVING, INC. |MOUNTAINEER CONTRACTORS, INC | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0095 642005-002 0.200 TN | 4500.00000 900.00| 4500.00000 900.00| MULCH, WOOD CELLULOSE FIBER | | | 0100 642006-001 0.130 TN | 15500.00000 2015.00| 15500.00000 2015.00| FERTILIZER | | | 0105 642010-001 0.260 TN | 70.00000 18.20| 70.00000 18.20| AGRICULTURAL LIMESTONE | | | 0110 652001-001 0.260 TN | 70.00000 18.20| 70.00000 18.20| AGRICULTURAL LIMESTONE | | | 0115 652002-001 0.130 TN | 7700.00000 1001.00| 7700.00000 1001.00| FERTILIZER, 10-20-10 | | | 0120 652002-002 0.040 TN | 25000.00000 1000.00| 25000.00000 1000.00| FERTILIZER, UREA FORMALDEHYDE | | | 0125 652003-001 26.000 LB | 5.00000 130.00| 5.00000 130.00| SEED MIXTURES, B, C-1, OR C-2 | | | 0130 652003-002 18.000 LB | 10.00000 180.00| 10.00000 180.00| SEED MIXTURE, D | | | 0135 652004-001 0.130 TN | 3325.00000 432.25| 3310.00000 430.30| STRAW OR HAY MULCH | | | 0140 652004-002 0.200 TN | 4500.00000 900.00| 4500.00000 900.00| WOOD CELLULOSE FIBER MULCH | | | 0145 663005-010 32.000 LF | 28.00000 896.00| 9.00000 288.00| STOP LINE, TYPE V - 12 IN 24 INCH | | | 0150 307005-001 AA1 39.000 TN | 65.00000 2535.00| 43.50000 1696.50| AGGREGATE BASE COURSE, STONE OR GRAVEL, | | | CLASS 10 | | | 0155 307005-002 AA2 36.000 TN | | | AGGREGATE BASE COURSE, SLAG, CLASS 10 | | | 0160 401001-001 BB1 700.000 TN | 89.50000 62650.00| 100.00000 70000.00| MARSHALL HOT-MIX ASPHALT BASE COURSE, | | | STONE OR GRAVEL, TYPE 1 | | | 0165 401001-002 BB2 637.000 TN | | | MARSHALL HOT-MIX ASPHALT BASE COURSE, | | | SLAG, TYPE 1 | | | 0170 401003-001 CC1 44.000 TN | 95.00000 4180.00| 90.00000 3960.00| MARSHALL HOT-MIX ASPHALT PATCH AND | | | LEVEL COURSE, STONE OR GRAVEL | | | 0175 401003-002 CC2 41.000 TN | | | MARSHALL HOT-MIX ASPHALT PATCH AND | | | LEVEL COURSE, SLAG | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 009 -4 TABULATION OF BIDS CALL ORDER : 009 CONTRACT ID : 9805905 COUNTIES : MASON LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |( 1 ) 55-0570769 |( 2 ) 55-0481221 |( ) |WEST VIRGINIA PAVING, INC. |MOUNTAINEER CONTRACTORS, INC | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0180 402001-001 DD1 248.000 TN | | | MARSHALL HOT-MIX ASPHALT SKID RESISTANT | | | PAVEMENT, STONE OR GRAVEL, TYPE 9.5 | | | 0185 402001-002 DD2 226.000 TN | 95.00000 21470.00| 90.00000 20340.00| MARSHALL HOT-MIX ASPHALT SKID RESISTANT | | | PAVEMENT, SLAG, TYPE 9.5 | | | SECTION TOTALS | $ 217,228.15| $ 242,395.51| $ ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 217,228.15| $ 242,395.51| $ ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 010 -1 VENDOR RANKING CALL ORDER : 010 CONTRACT ID : 0008101 COUNTIES : MASON LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 01 CONTRACT DESCRIPTION : PAXTON LOWER FIVEMILE BRIDGE PROJECT(S) : S327-0036/00-009.01 0 LOCATION: / LOWER FIVEMILE CREEK, 2.47 MI E CO 25 ------------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID ------------------------------------------------------------------------------------------------------------------------------- 1 62-1345425 BILCO CONSTRUCTION CO., INC. $ 260,485.00 100.0000% 2 55-0778477 HOKE BROTHERS CONTRACTING, INC. $ 268,766.21 103.1792% 3 55-0710073 TEAYS RIVER CONSTRUCTION COMPANY $ 282,500.00 108.4515% 4 38-3667285 MCCOY CONSTRUCTION COMPANY $ 315,000.00 120.9283% 5 34-1199322 VELOTTA COMPANY, THE $ 425,365.63 163.2976% 6 55-0756636 JIM CONSTRUCTION, INC. $ 447,509.00 171.7984% WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 010 -2 TABULATION OF BIDS CALL ORDER : 010 CONTRACT ID : 0008101 COUNTIES : MASON LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |( 1 ) 62-1345425 |( 2 ) 55-0778477 |( 3 ) 55-0710073 |BILCO CONSTRUCTION CO., INC. |HOKE BROTHERS CONTRACTING, I |TEAYS RIVER CONSTRUCTION COMP LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 BRIDGE #10881 | | | 0005 627010-001 LUMP | 260485.00000 260485.00| 268766.21000 268766.21| 282500.00000 282500.00 ASAP BRIDGE, PAXTON LOWER FIVEMILE | | | BRIDGE | | | SECTION TOTALS | $ 260,485.00| $ 268,766.21| $ 282,500.00 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 260,485.00| $ 268,766.21| $ 282,500.00 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 010 -3 TABULATION OF BIDS CALL ORDER : 010 CONTRACT ID : 0008101 COUNTIES : MASON LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 01 SET-ASIDE : ==================================================================================================================================== |( 4 ) 38-3667285 |( 5 ) 34-1199322 |( 6 ) 55-0756636 |MCCOY CONSTRUCTION COMPANY |VELOTTA COMPANY, THE |JIM CONSTRUCTION, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 BRIDGE #10881 | | | 0005 627010-001 LUMP | 315000.00000 315000.00| 425365.63000 425365.63| 447509.00000 447509.00 ASAP BRIDGE, PAXTON LOWER FIVEMILE | | | BRIDGE | | | SECTION TOTALS | $ 315,000.00| $ 425,365.63| $ 447,509.00 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 315,000.00| $ 425,365.63| $ 447,509.00 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 011 -1 VENDOR RANKING CALL ORDER : 011 CONTRACT ID : 1021886 COUNTIES : MERCER LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 10 CONTRACT DESCRIPTION : WIMMER HOLLOW SLIP PROJECT(S) : E328-0902/32-000.06 00 FEMA 1893 000 000 LOCATION: 0.11 MILE - 0.12 MILE WEST OF JCT. CO 219/6 ------------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID ------------------------------------------------------------------------------------------------------------------------------- 1 61-1584805 MARKS DRILLING $ 68,364.71 100.0000% 2 55-0743840 THAXTON CONSTRUCTION COMPANY, INC., OF SISSONVILLE $ 74,377.00 108.7944% 3 62-1345425 BILCO CONSTRUCTION CO., INC. $ 78,477.00 114.7917% 4 55-0581702 CLAUDE ERPS CONSTRUCTION, INC. $ 88,916.50 130.0620% 5 20-3991479 BBR DRILLING COMPANY, INC. $ 162,675.00 237.9517% WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 011 -2 TABULATION OF BIDS CALL ORDER : 011 CONTRACT ID : 1021886 COUNTIES : MERCER LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 10 SET-ASIDE : ==================================================================================================================================== |( 1 ) 61-1584805 |( 2 ) 55-0743840 |( 3 ) 62-1345425 |MARKS DRILLING |THAXTON CONSTRUCTION COMPANY |BILCO CONSTRUCTION CO., INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 PILING WALL | | | 0005 204001-000 LUMP | 40000.00000 40000.00| 25000.00000 25000.00| 62250.50000 62250.50 MOBILIZATION | | | 0010 207001-001 28.000 CY | 50.00000 1400.00| 50.00000 1400.00| 10.00000 280.00 UNCLASSIFIED EXCAVATION | | | 0015 212005-000 28.000 CY | 60.00000 1680.00| 50.00000 1400.00| 40.00000 1120.00 SELECT MATERIAL FOR BACKFILLING GABION | | | 0020 229001-000 0.010 MI | 1.00000 0.01| 1000.00000 10.00| 10000.00000 100.00 SHOULDER AND DITCH | | | 0025 607001-001 87.500 LF | 46.00000 4025.00| 50.00000 4375.00| 36.00000 3150.00 TYPE 1 GUARDRAIL, CLASS III | | | 0030 607037-001 2.000 EA | 100.00000 200.00| 500.00000 1000.00| 36.00000 72.00 BUFFER END SECTION | | | 0035 614001-003 280.000 LF | 60.00000 16800.00| 90.00000 25200.00| 22.00000 6160.00 HP10X42 STEEL PILE 50 KSI | | | 0040 614003-001 312.000 SF | 10.00000 3120.00| 10.00000 3120.00| 12.00000 3744.00 CONCRETE LAGGING, THICKNESS 6 INCH | | | 0045 636011-001 1040.000 UN | 0.50000 520.00| 3.00000 3120.00| 1.00000 1040.00 TRAFFIC CONTROL DEVICE | | | 0050 636014-001 170.000 HR | 0.01000 1.70| 45.00000 7650.00| 0.05000 8.50 FLAGGER | | | 0055 636025-001 34.000 DA | 2.00000 68.00| 3.00000 102.00| 3.00000 102.00 WARNING LIGHTS, TYPE B | | | 0060 642012-001 100.000 LF | 0.50000 50.00| 15.00000 1500.00| 2.00000 200.00 SILT FENCE | | | 0065 307005-001 AA1 10.000 TN | 50.00000 500.00| 50.00000 500.00| 25.00000 250.00 AGGREGATE BASE COURSE, STONE OR GRAVEL, | | | CLASS 1 | | | 0070 307005-002 AA2 9.000 TN | | | AGGREGATE BASE COURSE, SLAG, CLASS 1 | | | SECTION TOTALS | $ 68,364.71| $ 74,377.00| $ 78,477.00 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 68,364.71| $ 74,377.00| $ 78,477.00 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 011 -3 TABULATION OF BIDS CALL ORDER : 011 CONTRACT ID : 1021886 COUNTIES : MERCER LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 10 SET-ASIDE : ==================================================================================================================================== |( 4 ) 55-0581702 |( 5 ) 20-3991479 |( ) |CLAUDE ERPS CONSTRUCTION, IN |BBR DRILLING COMPANY, INC. | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 PILING WALL | | | 0005 204001-000 LUMP | 22500.00000 22500.00| 80000.00000 80000.00| MOBILIZATION | | | 0010 207001-001 28.000 CY | 95.00000 2660.00| 50.00000 1400.00| UNCLASSIFIED EXCAVATION | | | 0015 212005-000 28.000 CY | 70.00000 1960.00| 100.00000 2800.00| SELECT MATERIAL FOR BACKFILLING GABION | | | 0020 229001-000 0.010 MI | 40000.00000 400.00| 1000.00000 10.00| SHOULDER AND DITCH | | | 0025 607001-001 87.500 LF | 85.00000 7437.50| 50.00000 4375.00| TYPE 1 GUARDRAIL, CLASS III | | | 0030 607037-001 2.000 EA | 175.00000 350.00| 50.00000 100.00| BUFFER END SECTION | | | 0035 614001-003 280.000 LF | 124.00000 34720.00| 170.00000 47600.00| HP10X42 STEEL PILE 50 KSI | | | 0040 614003-001 312.000 SF | 18.00000 5616.00| 30.00000 9360.00| CONCRETE LAGGING, THICKNESS 6 INCH | | | 0045 636011-001 1040.000 UN | 1.50000 1560.00| 4.00000 4160.00| TRAFFIC CONTROL DEVICE | | | 0050 636014-001 170.000 HR | 50.00000 8500.00| 60.00000 10200.00| FLAGGER | | | 0055 636025-001 34.000 DA | 80.00000 2720.00| 5.00000 170.00| WARNING LIGHTS, TYPE B | | | 0060 642012-001 100.000 LF | 2.50000 250.00| 5.00000 500.00| SILT FENCE | | | 0065 307005-001 AA1 10.000 TN | 24.30000 243.00| 200.00000 2000.00| AGGREGATE BASE COURSE, STONE OR GRAVEL, | | | CLASS 1 | | | 0070 307005-002 AA2 9.000 TN | | | AGGREGATE BASE COURSE, SLAG, CLASS 1 | | | SECTION TOTALS | $ 88,916.50| $ 162,675.00| $ ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 88,916.50| $ 162,675.00| $ ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 012 -1 VENDOR RANKING CALL ORDER : 012 CONTRACT ID : 1011887 COUNTIES : MERCER LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 10 CONTRACT DESCRIPTION : SOUTHERN HOLLOW SLIP PROJECT(S) : E328-0009/00-004.40 00 FEMA 1893 000 000 LOCATION: 4.40 MI. EAST OFJCT. WV 20 - 4.42 MI. EAST OF JCT. WV 20 ------------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID ------------------------------------------------------------------------------------------------------------------------------- 1 62-1345425 BILCO CONSTRUCTION CO., INC. $ 108,001.00 100.0000% 2 55-0743840 THAXTON CONSTRUCTION COMPANY, INC., OF SISSONVILLE $ 109,664.00 101.5398% 3 61-1584805 MARKS DRILLING $ 109,831.32 101.6947% 4 55-0581702 CLAUDE ERPS CONSTRUCTION, INC. $ 141,619.00 131.1275% 5 20-3991479 BBR DRILLING COMPANY, INC. $ 182,360.00 168.8503% WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 012 -2 TABULATION OF BIDS CALL ORDER : 012 CONTRACT ID : 1011887 COUNTIES : MERCER LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 10 SET-ASIDE : ==================================================================================================================================== |( 1 ) 62-1345425 |( 2 ) 55-0743840 |( 3 ) 61-1584805 |BILCO CONSTRUCTION CO., INC. |THAXTON CONSTRUCTION COMPANY |MARKS DRILLING LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 SLIP REPAIR | | | 0005 201001-000 1.000 LS | 11000.00000 11000.00| 20000.00000 20000.00| 500.00000 500.00 CLEARING AND GRUBBING | | | 0010 204001-000 LUMP | 53500.00000 53500.00| 5000.00000 5000.00| 50000.00000 50000.00 MOBILIZATION | | | 0015 207001-001 50.000 CY | 10.00000 500.00| 50.00000 2500.00| 10.00000 500.00 UNCLASSIFIED EXCAVATION | | | 0020 212005-000 70.000 CY | 42.00000 2940.00| 50.00000 3500.00| 70.00000 4900.00 SELECT MATERIAL FOR BACKFILLING | | | 0025 229001-000 0.020 MI | 10000.00000 200.00| 1000.00000 20.00| 1.00000 0.02 SHOULDER AND DITCH | | | 0030 607001-001 87.500 LF | 36.00000 3150.00| 50.00000 4375.00| 40.00000 3500.00 TYPE 1 GUARDRAIL, CLASS 3 | | | 0035 607037-001 2.000 EA | 36.00000 72.00| 500.00000 1000.00| 100.00000 200.00 BUFFER END SECTION | | | 0040 614001-003 520.000 LF | 35.00000 18200.00| 90.00000 46800.00| 79.75000 41470.00 HP10X42 STEEL PILE | | | 0045 614003-001 480.000 SF | 12.00000 5760.00| 10.00000 4800.00| 10.00000 4800.00 CONCRETE LAGGING, THICKNESS 6 INCH | | | 0050 636011-001 1295.000 UN | 1.00000 1295.00| 3.00000 3885.00| 0.50000 647.50 TRAFFIC CONTROL DEVICE | | | 0055 636014-001 280.000 HR | 35.00000 9800.00| 45.00000 12600.00| 0.01000 2.80 FLAGGER | | | 0060 636025-001 28.000 DA | 3.00000 84.00| 3.00000 84.00| 2.00000 56.00 WARNING LIGHTS, TYPE B | | | 0065 642012-001 110.000 LF | 2.00000 220.00| 10.00000 1100.00| 0.50000 55.00 SILT FENCE | | | 0070 307005-001 AA1 80.000 TN | 16.00000 1280.00| 50.00000 4000.00| 40.00000 3200.00 AGGREGATE BASE COURSE, STONE OR GRAVEL, | | | CLASS 1 | | | 0075 307005-002 AA2 68.000 TN | | | AGGREGATE BASE COURSE, SLAG, CLASS 1 | | | SECTION TOTALS | $ 108,001.00| $ 109,664.00| $ 109,831.32 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 108,001.00| $ 109,664.00| $ 109,831.32 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 012 -3 TABULATION OF BIDS CALL ORDER : 012 CONTRACT ID : 1011887 COUNTIES : MERCER LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 10 SET-ASIDE : ==================================================================================================================================== |( 4 ) 55-0581702 |( 5 ) 20-3991479 |( ) |CLAUDE ERPS CONSTRUCTION, IN |BBR DRILLING COMPANY, INC. | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 SLIP REPAIR | | | 0005 201001-000 1.000 LS | 3500.00000 3500.00| 5000.00000 5000.00| CLEARING AND GRUBBING | | | 0010 204001-000 LUMP | 26500.00000 26500.00| 40000.00000 40000.00| MOBILIZATION | | | 0015 207001-001 50.000 CY | 95.00000 4750.00| 50.00000 2500.00| UNCLASSIFIED EXCAVATION | | | 0020 212005-000 70.000 CY | 70.00000 4900.00| 200.00000 14000.00| SELECT MATERIAL FOR BACKFILLING | | | 0025 229001-000 0.020 MI | 40000.00000 800.00| 1000.00000 20.00| SHOULDER AND DITCH | | | 0030 607001-001 87.500 LF | 85.00000 7437.50| 50.00000 4375.00| TYPE 1 GUARDRAIL, CLASS 3 | | | 0035 607037-001 2.000 EA | 175.00000 350.00| 50.00000 100.00| BUFFER END SECTION | | | 0040 614001-003 520.000 LF | 124.00000 64480.00| 150.00000 78000.00| HP10X42 STEEL PILE | | | 0045 614003-001 480.000 SF | 18.00000 8640.00| 20.00000 9600.00| CONCRETE LAGGING, THICKNESS 6 INCH | | | 0050 636011-001 1295.000 UN | 1.50000 1942.50| 5.00000 6475.00| TRAFFIC CONTROL DEVICE | | | 0055 636014-001 280.000 HR | 50.00000 14000.00| 60.00000 16800.00| FLAGGER | | | 0060 636025-001 28.000 DA | 75.00000 2100.00| 5.00000 140.00| WARNING LIGHTS, TYPE B | | | 0065 642012-001 110.000 LF | 2.50000 275.00| 5.00000 550.00| SILT FENCE | | | 0070 307005-001 AA1 80.000 TN | 24.30000 1944.00| 60.00000 4800.00| AGGREGATE BASE COURSE, STONE OR GRAVEL, | | | CLASS 1 | | | 0075 307005-002 AA2 68.000 TN | | | AGGREGATE BASE COURSE, SLAG, CLASS 1 | | | SECTION TOTALS | $ 141,619.00| $ 182,360.00| $ ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 141,619.00| $ 182,360.00| $ ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 013 -1 VENDOR RANKING CALL ORDER : 013 CONTRACT ID : 1016141 COUNTIES : MERCER LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 10 CONTRACT DESCRIPTION : CLARK'S GAP ROAD SLIP PROJECT(S) : E328-0001/00-006.92 00 FEMA 1893 000 000 LOCATION: BEGIN: 0.43 MI N CO 6; END: 0.49 MI N CO 6 ------------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID ------------------------------------------------------------------------------------------------------------------------------- 1 62-1345425 BILCO CONSTRUCTION CO., INC. $ 133,979.00 100.0000% 2 55-0743840 THAXTON CONSTRUCTION COMPANY, INC., OF SISSONVILLE $ 137,645.00 102.7362% 3 61-1584805 MARKS DRILLING $ 149,943.04 111.9153% 4 55-0581702 CLAUDE ERPS CONSTRUCTION, INC. $ 185,947.00 138.7882% WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 013 -2 TABULATION OF BIDS CALL ORDER : 013 CONTRACT ID : 1016141 COUNTIES : MERCER LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 10 SET-ASIDE : ==================================================================================================================================== |( 1 ) 62-1345425 |( 2 ) 55-0743840 |( 3 ) 61-1584805 |BILCO CONSTRUCTION CO., INC. |THAXTON CONSTRUCTION COMPANY |MARKS DRILLING LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 SLIP REPAIR | | | 0005 204001-000 LUMP | 81500.00000 81500.00| 15000.00000 15000.00| 68500.00000 68500.00 MOBILIZATION | | | 0010 207001-001 100.000 CY | 8.00000 800.00| 50.00000 5000.00| 10.00000 1000.00 UNCLASSIFIED EXCAVATION | | | 0015 207034-000 120.000 SY | 2.00000 240.00| 1.50000 180.00| 0.50000 60.00 FABRIC FOR SEPARATION | | | 0020 212005-000 125.000 CY | 45.00000 5625.00| 50.00000 6250.00| 50.00000 6250.00 SELECT MATERIAL FOR BACKFILLING | | | 0025 229001-000 0.040 MI | 8000.00000 320.00| 1000.00000 40.00| 1.00000 0.04 SHOULDER AND DITCH | | | 0030 607001-001 125.000 LF | 28.00000 3500.00| 50.00000 6250.00| 45.00000 5625.00 TYPE 1 GUARDRAIL, CLASS III | | | 0035 607037-001 2.000 EA | 36.00000 72.00| 500.00000 1000.00| 100.00000 200.00 BUFFER END SECTION | | | 0040 614001-003 780.000 LF | 20.00000 15600.00| 90.00000 70200.00| 70.00000 54600.00 HP10X42 STEEL PILE | | | 0045 614003-001 1000.000 SF | 12.00000 12000.00| 10.00000 10000.00| 10.00000 10000.00 CONCRETE LAGGING, THICKNESS 6" | | | 0050 636011-001 3090.000 UN | 0.80000 2472.00| 2.00000 6180.00| 0.50000 1545.00 TRAFFIC CONTROL DEVICE | | | 0055 636014-001 300.000 HR | 35.00000 10500.00| 45.00000 13500.00| 0.01000 3.00 FLAGGER | | | 0060 636025-001 30.000 DA | 5.00000 150.00| 1.50000 45.00| 2.00000 60.00 WARNING LIGHTS, TYPE B | | | 0065 642012-001 200.000 LF | 2.00000 400.00| 10.00000 2000.00| 0.50000 100.00 SILT FENCE | | | 0070 307005-001 AA1 40.000 TN | 20.00000 800.00| 50.00000 2000.00| 50.00000 2000.00 AGGREGATE BASE COURSE, STONE OR GRAVEL, | | | CLASS 1 | | | 0075 307005-002 AA2 36.000 TN | | | AGGREGATE BASE COURSE, SLAG, CLASS 1 | | | SECTION TOTALS | $ 133,979.00| $ 137,645.00| $ 149,943.04 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 133,979.00| $ 137,645.00| $ 149,943.04 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 013 -3 TABULATION OF BIDS CALL ORDER : 013 CONTRACT ID : 1016141 COUNTIES : MERCER LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 10 SET-ASIDE : ==================================================================================================================================== |( 4 ) 55-0581702 |( ) |( ) |CLAUDE ERPS CONSTRUCTION, IN | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 SLIP REPAIR | | | 0005 204001-000 LUMP | 21500.00000 21500.00| | MOBILIZATION | | | 0010 207001-001 100.000 CY | 95.00000 9500.00| | UNCLASSIFIED EXCAVATION | | | 0015 207034-000 120.000 SY | 1.00000 120.00| | FABRIC FOR SEPARATION | | | 0020 212005-000 125.000 CY | 70.00000 8750.00| | SELECT MATERIAL FOR BACKFILLING | | | 0025 229001-000 0.040 MI | 40000.00000 1600.00| | SHOULDER AND DITCH | | | 0030 607001-001 125.000 LF | 50.00000 6250.00| | TYPE 1 GUARDRAIL, CLASS III | | | 0035 607037-001 2.000 EA | 175.00000 350.00| | BUFFER END SECTION | | | 0040 614001-003 780.000 LF | 124.00000 96720.00| | HP10X42 STEEL PILE | | | 0045 614003-001 1000.000 SF | 18.00000 18000.00| | CONCRETE LAGGING, THICKNESS 6" | | | 0050 636011-001 3090.000 UN | 1.50000 4635.00| | TRAFFIC CONTROL DEVICE | | | 0055 636014-001 300.000 HR | 50.00000 15000.00| | FLAGGER | | | 0060 636025-001 30.000 DA | 75.00000 2250.00| | WARNING LIGHTS, TYPE B | | | 0065 642012-001 200.000 LF | 1.50000 300.00| | SILT FENCE | | | 0070 307005-001 AA1 40.000 TN | 24.30000 972.00| | AGGREGATE BASE COURSE, STONE OR GRAVEL, | | | CLASS 1 | | | 0075 307005-002 AA2 36.000 TN | | | AGGREGATE BASE COURSE, SLAG, CLASS 1 | | | SECTION TOTALS | $ 185,947.00| $ | $ ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 185,947.00| $ 0.00| $ ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 014 -1 VENDOR RANKING CALL ORDER : 014 CONTRACT ID : 1019665 COUNTIES : OHIO LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 CONTRACT DESCRIPTION : SHORT CREEK ROAD +42 PROJECT(S) : E335-0TRE/E0-002.10 00 FEMA 1903 000 000 LOCATION: BEG:MP.08 .08MIN JCT CR 7 END:MP4.63 .11MIS JCT CR 1/2 ------------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID ------------------------------------------------------------------------------------------------------------------------------- 1 55-0434699 SAVAGE CONSTRUCTION COMPANY, INC. $ 197,906.25 100.0000% 2 61-1584805 MARKS DRILLING $ 198,683.30 100.3926% 3 34-1421920 OHIO-WEST VIRGINIA EXCAVATING CO. $ 364,762.49 184.3107% 4 25-1428005 CAST & BAKER CORPORATION $ 466,812.50 235.8756% WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 014 -2 TABULATION OF BIDS CALL ORDER : 014 CONTRACT ID : 1019665 COUNTIES : OHIO LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 1 ) 55-0434699 |( 2 ) 61-1584805 |( 3 ) 34-1421920 |SAVAGE CONSTRUCTION COMPANY, |MARKS DRILLING |OHIO-WEST VIRGINIA EXCAVATING LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 DEBRIS REMOVAL | | | 0005 201008-001 LUMP | 9000.00000 9000.00| 12000.00000 12000.00| 12878.20000 12878.20 DEBRIS REMOVAL CR 1 | | | 0010 201008-001 LUMP | 1000.00000 1000.00| 2000.00000 2000.00| 3370.41000 3370.41 DEBRIS REMOVAL CR 1/1 | | | 0015 201008-001 LUMP | 3000.00000 3000.00| 2000.00000 2000.00| 3370.41000 3370.41 DEBRIS REMOVAL CR 12 | | | 0020 201008-001 LUMP | 6000.00000 6000.00| 7500.00000 7500.00| 6740.83000 6740.83 DEBRIS REMOVAL CR 15 | | | 0025 201008-001 LUMP | 100.00000 100.00| 2000.00000 2000.00| 842.62000 842.62 DEBRIS REMOVAL CR 15/1 | | | 0030 201008-001 LUMP | 2000.00000 2000.00| 2000.00000 2000.00| 3370.41000 3370.41 DEBRIS REMOVAL CR 17 | | | 0035 201008-001 LUMP | 2000.00000 2000.00| 2000.00000 2000.00| 3370.41000 3370.41 DEBRIS REMOVAL CR 18/3 | | | 0040 201008-001 LUMP | 4000.00000 4000.00| 2000.00000 2000.00| 6740.83000 6740.83 DEBRIS REMOVAL CR 19 | | | 0045 201008-001 LUMP | 10000.00000 10000.00| 10000.00000 10000.00| 16852.05000 16852.05 DEBRIS REMOVAL CR 23 | | | 0050 201008-001 LUMP | 4000.00000 4000.00| 3000.00000 3000.00| 20222.46000 20222.46 DEBRIS REMOVAL CR 23/4 | | | 0055 201008-001 LUMP | 4000.00000 4000.00| 5000.00000 5000.00| 6740.83000 6740.83 DEBRIS REMOVAL CR 25 | | | 0060 201008-001 LUMP | 4000.00000 4000.00| 4000.00000 4000.00| 6740.83000 6740.83 DEBRIS REMOVAL CR 29 | | | 0065 201008-001 LUMP | 7000.00000 7000.00| 10000.00000 10000.00| 10111.23000 10111.23 DEBRIS REMOVAL CR 3 | | | 0070 201008-001 LUMP | 2000.00000 2000.00| 1500.00000 1500.00| 5055.61000 5055.61 DEBRIS REMOVAL CR 31 | | | 0075 201008-001 LUMP | 100.00000 100.00| 5000.00000 5000.00| 842.62000 842.62 DEBRIS REMOVAL CR 33 | | | 0080 201008-001 LUMP | 3000.00000 3000.00| 2000.00000 2000.00| 3370.41000 3370.41 DEBRIS REMOVAL CR 35 | | | 0085 201008-001 LUMP | 8000.00000 8000.00| 10000.00000 10000.00| 10111.23000 10111.23 DEBRIS REMOVAL CR 37 | | | 0090 201008-001 LUMP | 2000.00000 2000.00| 2000.00000 2000.00| 10111.23000 10111.23 DEBRIS REMOVAL CR 39/1 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 014 -3 TABULATION OF BIDS CALL ORDER : 014 CONTRACT ID : 1019665 COUNTIES : OHIO LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 1 ) 55-0434699 |( 2 ) 61-1584805 |( 3 ) 34-1421920 |SAVAGE CONSTRUCTION COMPANY, |MARKS DRILLING |OHIO-WEST VIRGINIA EXCAVATING LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0095 201008-001 LUMP | 2000.00000 2000.00| 3000.00000 3000.00| 3370.41000 3370.41 DEBRIS REMOVAL CR 39/2 | | | 0100 201008-001 LUMP | 6000.00000 6000.00| 6000.00000 6000.00| 10111.23000 10111.23 DEBRIS REMOVAL CR 39/6 | | | 0105 201008-001 LUMP | 2000.00000 2000.00| 3000.00000 3000.00| 5055.61000 5055.61 DEBRIS REMOVAL CR 4 | | | 0110 201008-001 LUMP | 2000.00000 2000.00| 3000.00000 3000.00| 6740.83000 6740.83 DEBRIS REMOVAL CR 40/3 | | | 0115 201008-001 LUMP | 2000.00000 2000.00| 3000.00000 3000.00| 5055.61000 5055.61 DEBRIS REMOVAL CR 40/4 | | | 0120 201008-001 LUMP | 7000.00000 7000.00| 12000.00000 12000.00| 13481.63000 13481.63 DEBRIS REMOVAL CR 41 | | | 0125 201008-001 LUMP | 3000.00000 3000.00| 2000.00000 2000.00| 3370.41000 3370.41 DEBRIS REMOVAL CR 41/3 | | | 0130 201008-001 LUMP | 4000.00000 4000.00| 3000.00000 3000.00| 6740.83000 6740.83 DEBRIS REMOVAL CR 41/4 | | | 0135 201008-001 LUMP | 100.00000 100.00| 2000.00000 2000.00| 567.77000 567.77 DEBRIS REMOVAL CR 41/5 | | | 0140 201008-001 LUMP | 5000.00000 5000.00| 8000.00000 8000.00| 13481.63000 13481.63 DEBRIS REMOVAL CR 43 | | | 0145 201008-001 LUMP | 5000.00000 5000.00| 8000.00000 8000.00| 5055.61000 5055.61 DEBRIS REMOVAL CR 45 | | | 0150 201008-001 LUMP | 600.00000 600.00| 2000.00000 2000.00| 5055.61000 5055.61 DEBRIS REMOVAL CR 49 | | | 0155 201008-001 LUMP | 4000.00000 4000.00| 2000.00000 2000.00| 6740.83000 6740.83 DEBRIS REMOVAL CR 51 | | | 0160 201008-001 LUMP | 700.00000 700.00| 1000.00000 1000.00| 2820.70000 2820.70 DEBRIS REMOVAL CR 51/1 | | | 0165 201008-001 LUMP | 900.00000 900.00| 1000.00000 1000.00| 842.62000 842.62 DEBRIS REMOVAL CR 51/3 | | | 0170 201008-001 LUMP | 6000.00000 6000.00| 7500.00000 7500.00| 10111.23000 10111.23 DEBRIS REMOVAL CR 53 | | | 0175 201008-001 LUMP | 3000.00000 3000.00| 3000.00000 3000.00| 8426.03000 8426.03 DEBRIS REMOVAL CR 53/1 | | | 0180 201008-001 LUMP | 100.00000 100.00| 2000.00000 2000.00| 3370.41000 3370.41 DEBRIS REMOVAL CR 53/3 | | | 0185 201008-001 LUMP | 200.00000 200.00| 2000.00000 2000.00| 1685.19000 1685.19 DEBRIS REMOVAL CR 53/4 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 014 -4 TABULATION OF BIDS CALL ORDER : 014 CONTRACT ID : 1019665 COUNTIES : OHIO LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 1 ) 55-0434699 |( 2 ) 61-1584805 |( 3 ) 34-1421920 |SAVAGE CONSTRUCTION COMPANY, |MARKS DRILLING |OHIO-WEST VIRGINIA EXCAVATING LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0190 201008-001 LUMP | 8000.00000 8000.00| 10000.00000 10000.00| 16852.05000 16852.05 DEBRIS REMOVAL CR 7 | | | 0195 201008-001 LUMP | 100.00000 100.00| 2000.00000 2000.00| 847.99000 847.99 DEBRIS REMOVAL CR 8 | | | 0200 201008-001 LUMP | 1000.00000 1000.00| 1000.00000 1000.00| 3370.41000 3370.41 DEBRIS REMOVAL CR 8/1 | | | 0205 201008-001 LUMP | 5000.00000 5000.00| 6000.00000 6000.00| 6740.83000 6740.83 DEBRIS REMOVAL CR 9 | | | 0210 201008-001 LUMP | 3000.00000 3000.00| 6000.00000 6000.00| 6341.54000 6341.54 DEBRIS REMOVAL US 40 | | | 0215 201008-001 LUMP | 5000.00000 5000.00| 15000.00000 15000.00| 23592.86000 23592.86 DEBRIS REMOVAL WV 88 | | | 0220 636011-001 2345.000 UN | 4.25000 9966.25| 0.50000 1172.50| 2.00000 4690.00 TRAFFIC CONTROL DEVICE | | | 0225 636014-001 1080.000 HR | 38.00000 41040.00| 0.01000 10.80| 55.00000 59400.00 FLAGGER | | | SECTION TOTALS | $ 197,906.25| $ 198,683.30| $ 364,762.49 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 197,906.25| $ 198,683.30| $ 364,762.49 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 014 -5 TABULATION OF BIDS CALL ORDER : 014 CONTRACT ID : 1019665 COUNTIES : OHIO LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 4 ) 25-1428005 |( ) |( ) |CAST & BAKER CORPORATION | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 DEBRIS REMOVAL | | | 0005 201008-001 LUMP | 22800.00000 22800.00| | DEBRIS REMOVAL CR 1 | | | 0010 201008-001 LUMP | 2500.00000 2500.00| | DEBRIS REMOVAL CR 1/1 | | | 0015 201008-001 LUMP | 5750.00000 5750.00| | DEBRIS REMOVAL CR 12 | | | 0020 201008-001 LUMP | 14000.00000 14000.00| | DEBRIS REMOVAL CR 15 | | | 0025 201008-001 LUMP | 1000.00000 1000.00| | DEBRIS REMOVAL CR 15/1 | | | 0030 201008-001 LUMP | 3700.00000 3700.00| | DEBRIS REMOVAL CR 17 | | | 0035 201008-001 LUMP | 4650.00000 4650.00| | DEBRIS REMOVAL CR 18/3 | | | 0040 201008-001 LUMP | 7500.00000 7500.00| | DEBRIS REMOVAL CR 19 | | | 0045 201008-001 LUMP | 27500.00000 27500.00| | DEBRIS REMOVAL CR 23 | | | 0050 201008-001 LUMP | 10000.00000 10000.00| | DEBRIS REMOVAL CR 23/4 | | | 0055 201008-001 LUMP | 11000.00000 11000.00| | DEBRIS REMOVAL CR 25 | | | 0060 201008-001 LUMP | 10000.00000 10000.00| | DEBRIS REMOVAL CR 29 | | | 0065 201008-001 LUMP | 17000.00000 17000.00| | DEBRIS REMOVAL CR 3 | | | 0070 201008-001 LUMP | 3000.00000 3000.00| | DEBRIS REMOVAL CR 31 | | | 0075 201008-001 LUMP | 1500.00000 1500.00| | DEBRIS REMOVAL CR 33 | | | 0080 201008-001 LUMP | 8000.00000 8000.00| | DEBRIS REMOVAL CR 35 | | | 0085 201008-001 LUMP | 20750.00000 20750.00| | DEBRIS REMOVAL CR 37 | | | 0090 201008-001 LUMP | 5000.00000 5000.00| | DEBRIS REMOVAL CR 39/1 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 014 -6 TABULATION OF BIDS CALL ORDER : 014 CONTRACT ID : 1019665 COUNTIES : OHIO LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 4 ) 25-1428005 |( ) |( ) |CAST & BAKER CORPORATION | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0095 201008-001 LUMP | 4000.00000 4000.00| | DEBRIS REMOVAL CR 39/2 | | | 0100 201008-001 LUMP | 15000.00000 15000.00| | DEBRIS REMOVAL CR 39/6 | | | 0105 201008-001 LUMP | 5000.00000 5000.00| | DEBRIS REMOVAL CR 4 | | | 0110 201008-001 LUMP | 4000.00000 4000.00| | DEBRIS REMOVAL CR 40/3 | | | 0115 201008-001 LUMP | 9500.00000 9500.00| | DEBRIS REMOVAL CR 40/4 | | | 0120 201008-001 LUMP | 18500.00000 18500.00| | DEBRIS REMOVAL CR 41 | | | 0125 201008-001 LUMP | 6000.00000 6000.00| | DEBRIS REMOVAL CR 41/3 | | | 0130 201008-001 LUMP | 9450.00000 9450.00| | DEBRIS REMOVAL CR 41/4 | | | 0135 201008-001 LUMP | 1500.00000 1500.00| | DEBRIS REMOVAL CR 41/5 | | | 0140 201008-001 LUMP | 12500.00000 12500.00| | DEBRIS REMOVAL CR 43 | | | 0145 201008-001 LUMP | 11750.00000 11750.00| | DEBRIS REMOVAL CR 45 | | | 0150 201008-001 LUMP | 1500.00000 1500.00| | DEBRIS REMOVAL CR 49 | | | 0155 201008-001 LUMP | 10000.00000 10000.00| | DEBRIS REMOVAL CR 51 | | | 0160 201008-001 LUMP | 2600.00000 2600.00| | DEBRIS REMOVAL CR 51/1 | | | 0165 201008-001 LUMP | 2200.00000 2200.00| | DEBRIS REMOVAL CR 51/3 | | | 0170 201008-001 LUMP | 14500.00000 14500.00| | DEBRIS REMOVAL CR 53 | | | 0175 201008-001 LUMP | 6000.00000 6000.00| | DEBRIS REMOVAL CR 53/1 | | | 0180 201008-001 LUMP | 1500.00000 1500.00| | DEBRIS REMOVAL CR 53/3 | | | 0185 201008-001 LUMP | 1500.00000 1500.00| | DEBRIS REMOVAL CR 53/4 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 014 -7 TABULATION OF BIDS CALL ORDER : 014 CONTRACT ID : 1019665 COUNTIES : OHIO LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 4 ) 25-1428005 |( ) |( ) |CAST & BAKER CORPORATION | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0190 201008-001 LUMP | 20400.00000 20400.00| | DEBRIS REMOVAL CR 7 | | | 0195 201008-001 LUMP | 1500.00000 1500.00| | DEBRIS REMOVAL CR 8 | | | 0200 201008-001 LUMP | 5000.00000 5000.00| | DEBRIS REMOVAL CR 8/1 | | | 0205 201008-001 LUMP | 14000.00000 14000.00| | DEBRIS REMOVAL CR 9 | | | 0210 201008-001 LUMP | 15000.00000 15000.00| | DEBRIS REMOVAL US 40 | | | 0215 201008-001 LUMP | 33000.00000 33000.00| | DEBRIS REMOVAL WV 88 | | | 0220 636011-001 2345.000 UN | 2.50000 5862.50| | TRAFFIC CONTROL DEVICE | | | 0225 636014-001 1080.000 HR | 55.00000 59400.00| | FLAGGER | | | SECTION TOTALS | $ 466,812.50| $ | $ ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 466,812.50| $ 0.00| $ ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 015 -1 VENDOR RANKING CALL ORDER : 015 CONTRACT ID : 1016827 COUNTIES : RALEIGH LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 10 CONTRACT DESCRIPTION : BATOFF MOUNTAIN ROAD PROJECT(S) : E341-0041/00-D03.10 00 00ER 0310 028 D00 LOCATION: BEGIN: 0.13 MI E. WV 61 END:2.63 MI E. WV 61 ------------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID ------------------------------------------------------------------------------------------------------------------------------- 1 55-0674033 SMH CONSTRUCTION COMPANY, INC. $ 271,822.06 100.0000% 2 55-0481221 MOUNTAINEER CONTRACTORS, INC. $ 287,410.80 105.7349% 3 55-0756636 JIM CONSTRUCTION, INC. $ 318,062.30 117.0112% WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 015 -2 TABULATION OF BIDS CALL ORDER : 015 CONTRACT ID : 1016827 COUNTIES : RALEIGH LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 10 SET-ASIDE : ==================================================================================================================================== |( 1 ) 55-0674033 |( 2 ) 55-0481221 |( 3 ) 55-0756636 |SMH CONSTRUCTION COMPANY, IN |MOUNTAINEER CONTRACTORS, INC |JIM CONSTRUCTION, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 REPAIR SHOULDERS, DITCHLINE, DRAINAGE & GUARDRAIL | | | 0005 204001-000 LUMP | 29642.00000 29642.00| 24632.20000 24632.20| 13500.00000 13500.00 MOBILIZATION | | | 0010 207001-001 50.000 CY | 15.91000 795.50| 64.00000 3200.00| 30.00000 1500.00 UNCLASSIFIED EXCAVATION | | | 0015 212005-000 150.000 CY | 68.17000 10225.50| 95.00000 14250.00| 69.50000 10425.00 SELECT MATERIAL FOR BACKFILLING | | | 0020 218001-000 980.000 CY | 43.83000 42953.40| 48.00000 47040.00| 60.50000 59290.00 RIPRAP | | | 0025 218008-000 500.000 TN | 38.45000 19225.00| 53.00000 26500.00| 43.50000 21750.00 SHOT ROCK 1 | | | 0030 229001-000 2.500 MI | 6410.85000 16027.13| 9777.50000 24443.75| 8000.00000 20000.00 SHOULDER AND DITCH | | | 0035 240001-000 440.000 LF | 53.99000 23755.60| 45.00000 19800.00| 58.00000 25520.00 CLEAN CULVERT | | | 0040 240002-000 1.000 EA | 173.00000 173.00| 462.50000 462.50| 1000.00000 1000.00 CLEAN INLET | | | 0045 601002-001 20.000 CY | 233.00000 4660.00| 301.00000 6020.00| 388.00000 7760.00 CLASS B CONCRETE | | | 0050 603028-001 158.000 SF | 36.53000 5771.74| 66.00000 10428.00| 35.00000 5530.00 PRECAST REINFORCED CONCRETE WINGWALL | | | 0055 604050-020 40.000 LF | 78.18000 3127.20| 100.25000 4010.00| 123.00000 4920.00 24 INCH CORRUGATED POLYETHYLENE PIPE | | | SMOOTH INNER WALL | | | 0060 604050-028 120.000 LF | 104.40000 12528.00| 133.50000 16020.00| 140.00000 16800.00 48 INCH CORRUGATED POLYETHYLENE PIPE | | | SMOOTH INNER WALL | | | 0065 607001-001 200.000 LF | 17.90000 3580.00| 20.20000 4040.00| 18.50000 3700.00 TYPE 1 GUARDRAIL, CLASS I | | | 0070 607009-001 1682.500 LF | 4.18000 7032.85| 5.98000 10061.35| 7.00000 11777.50 TYPE 1 GUARDRAIL REMOVED AND RESET | | | 0075 607010-020 100.000 LF | 1.27000 127.00| 1.00000 100.00| 2.50000 250.00 GUARDRAIL REMOVAL | | | 0080 607035-001 10.000 EA | 77.60000 776.00| 85.00000 850.00| 75.00000 750.00 GUARDRAIL ELEMENT | | | 0085 607042-001 30.000 EA | 41.80000 1254.00| 60.00000 1800.00| 52.00000 1560.00 6 FT STEEL POST 1 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 015 -3 TABULATION OF BIDS CALL ORDER : 015 CONTRACT ID : 1016827 COUNTIES : RALEIGH LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 10 SET-ASIDE : ==================================================================================================================================== |( 1 ) 55-0674033 |( 2 ) 55-0481221 |( 3 ) 55-0756636 |SMH CONSTRUCTION COMPANY, IN |MOUNTAINEER CONTRACTORS, INC |JIM CONSTRUCTION, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0090 636006-001 20.000 DA | 992.55000 19851.00| 218.00000 4360.00| 750.00000 15000.00 PILOT TRUCK AND DRIVER | | | 0095 636011-001 5620.000 UN | 1.16000 6519.20| 0.92000 5170.40| 0.90000 5058.00 TRAFFIC CONTROL DEVICE | | | 0100 636014-001 400.000 HR | 59.77000 23908.00| 60.00000 24000.00| 61.25000 24500.00 FLAGGER | | | 0105 636025-001 28.000 DA | 1.52000 42.56| 1.70000 47.60| 1.85000 51.80 WARNING LIGHTS, TYPE TY B | | | 0110 642004-003 40.000 LB | 5.70000 228.00| 35.00000 1400.00| 58.00000 2320.00 SEED MIXTURE, D | | | 0115 642005-002 0.500 TN | 1127.00000 563.50| 750.00000 375.00| 3500.00000 1750.00 MULCH, WOOD CELLULOSE FIBER | | | 0120 642006-001 0.500 TN | 1405.75000 702.88| 800.00000 400.00| 700.00000 350.00 FERTILIZER | | | 0125 642031-001 20.000 EA | 12.65000 253.00| 100.00000 2000.00| 150.00000 3000.00 DITCH CHECK | | | 0130 307005-001 AA1 1500.000 TN | 25.40000 38100.00| 24.00000 36000.00| 40.00000 60000.00 AGGREGATE BASE COURSE, STONE OR GRAVEL, | | | CLASS CLASS 1 | | | 0135 307005-002 AA2 1365.000 TN | | | AGGREGATE BASE COURSE, SLAG, CLASS | | | CLASS 1 | | | SECTION TOTALS | $ 271,822.06| $ 287,410.80| $ 318,062.30 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 271,822.06| $ 287,410.80| $ 318,062.30 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 016 -1 VENDOR RANKING CALL ORDER : 016 CONTRACT ID : 0634741 COUNTIES : TAYLOR LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 04 CONTRACT DESCRIPTION : GRAFTON TRAFFIC SIGNAL RENOVATION PROJECT(S) : S346-0119/00-008.11 00 STPG 0119 205 D00 LOCATION: I/S - ST. MARYS ST & EAST MAIN ST. (US 119) ------------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID ------------------------------------------------------------------------------------------------------------------------------- 1 54-0458233 DAVIS H. ELLIOT CONSTRUCTION COMPANY, INC. $ 67,935.00 100.0000% 2 55-0646159 WEST VIRGINIA SIGNAL AND LIGHT, INC. $ 69,698.20 102.5954% 3 27-0124040 EIGHT TREASURES OF KENTUCKY, LLC $ 77,070.00 113.4467% WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 016 -2 TABULATION OF BIDS CALL ORDER : 016 CONTRACT ID : 0634741 COUNTIES : TAYLOR LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 04 SET-ASIDE : ==================================================================================================================================== |( 1 ) 54-0458233 |( 2 ) 55-0646159 |( 3 ) 27-0124040 |DAVIS H. ELLIOT CONSTRUCTION |WEST VIRGINIA SIGNAL & LIGHT |EIGHT TREASURES OF KENTUCKY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 TRAFFIC SIGNAL | | | 0005 204001-000 LUMP | 5000.00000 5000.00| 5000.00000 5000.00| 4500.00000 4500.00 MOBILIZATION | | | 0010 636007-001 64.000 LF | 2.20000 140.80| 1.15000 73.60| 6.00000 384.00 ERADICATION OF PAVEMENT MARKING | | | 0015 636011-001 1960.000 UN | 0.01000 19.60| 0.01000 19.60| 0.10000 196.00 TRAFFIC CONTROL DEVICE | | | 0020 636014-001 100.000 HR | 0.10000 10.00| 0.01000 1.00| 1.00000 100.00 FLAGGER | | | 0025 660001-001 LUMP | 9500.00000 9500.00| 9500.00000 9500.00| 9500.00000 9500.00 SIGNAL CONTROLLER , 01 | | | 0030 660002-020 LUMP | 20000.00000 20000.00| 19500.00000 19500.00| 18000.00000 18000.00 TRAFFIC DETECTOR, VTDS 01 | | | 0035 660003-006 18.000 EA | 225.00000 4050.00| 275.00000 4950.00| 300.00000 5400.00 SIGNAL SECTION, V-12 | | | 0040 660004-025 2.000 EA | 8500.00000 17000.00| 3750.00000 7500.00| 5000.00000 10000.00 SIGNAL SUPPORT, A1 | | | 0045 660007-001 LUMP | 5887.40000 5887.40| 17500.00000 17500.00| 21000.00000 21000.00 MISCELLANEOUS SIGNAL , 01 | | | 0050 660010-001 1.000 EA | 2061.20000 2061.20| 2500.00000 2500.00| 3000.00000 3000.00 PRIORITY CONTROL SYSTEM DETECTOR , D1 | | | 0055 660010-010 1.000 EA | 1000.00000 1000.00| 1000.00000 1000.00| 1500.00000 1500.00 PRIORITY CONTROL SYSTEM EMITTER | | | 0060 661001-001 4.000 SF | 30.00000 120.00| 20.00000 80.00| 100.00000 400.00 0.080 IN FLAT SHEET SIGN | | | 0065 663005-011 100.000 LF | 22.00000 2200.00| 13.00000 1300.00| 18.00000 1800.00 STOP LINE, TYPE V - 24 IN | | | 0070 663006-010 86.000 LF | 11.00000 946.00| 9.00000 774.00| 15.00000 1290.00 CROSSWALK LINE, TYPE V - 12 IN X 6 FT | | | SECTION TOTALS | $ 67,935.00| $ 69,698.20| $ 77,070.00 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 67,935.00| $ 69,698.20| $ 77,070.00 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 017 -1 VENDOR RANKING CALL ORDER : 017 CONTRACT ID : 1019666 COUNTIES : TYLER LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 CONTRACT DESCRIPTION : COWHOUSE ROAD +48 PROJECT(S) : E348-0TRE/E0-002.10 00 FEMA 1903 000 000 LOCATION: BEG:MP2.17 .20MIN JCT CR4 END:MP2.97 1.00MIN JCT CR4 ------------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID ------------------------------------------------------------------------------------------------------------------------------- 1 61-1584805 MARKS DRILLING $ 79,776.10 100.0000% 2 27-0738567 R.K. CONSTRUCTION, INC. $ 118,395.50 148.4097% 3 55-0434699 SAVAGE CONSTRUCTION COMPANY, INC. $ 192,558.75 241.3740% 4 34-1421920 OHIO-WEST VIRGINIA EXCAVATING CO. $ 294,783.27 369.5133% 5 55-0674033 SMH CONSTRUCTION COMPANY, INC. $ 454,602.60 569.8481% WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 017 -2 TABULATION OF BIDS CALL ORDER : 017 CONTRACT ID : 1019666 COUNTIES : TYLER LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 1 ) 61-1584805 |( 2 ) 27-0738567 |( 3 ) 55-0434699 |MARKS DRILLING |R.K. CONSTRUCTION, INC. |SAVAGE CONSTRUCTION COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 DEBRIS REMOVAL | | | 0005 201008-001 LUMP | 1000.00000 1000.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 1/4 | | | 0010 201008-001 LUMP | 1000.00000 1000.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 10 | | | 0015 201008-001 LUMP | 1000.00000 1000.00| 500.00000 500.00| 300.00000 300.00 DEBRIS REMOVAL CR 10/2 | | | 0020 201008-001 LUMP | 6000.00000 6000.00| 7461.00000 7461.00| 20000.00000 20000.00 DEBRIS REMOVAL CR 11 | | | 0025 201008-001 LUMP | 1000.00000 1000.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 11/4 | | | 0030 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 11/5 | | | 0035 201008-001 LUMP | 2000.00000 2000.00| 2540.00000 2540.00| 7000.00000 7000.00 DEBRIS REMOVAL CR 13 | | | 0040 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 13/1 | | | 0045 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 200.00000 200.00 DEBRIS REMOVAL CR 13/4 | | | 0050 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 14 | | | 0055 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 18/11 | | | 0060 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 18/4 | | | 0065 201008-001 LUMP | 1500.00000 1500.00| 1890.00000 1890.00| 5000.00000 5000.00 DEBRIS REMOVAL CR 18/6 | | | 0070 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 18/8 | | | 0075 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 2/3 | | | 0080 201008-001 LUMP | 1500.00000 1500.00| 1800.00000 1800.00| 5000.00000 5000.00 DEBRIS REMOVAL CR 2/4 | | | 0085 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 1000.00000 1000.00 DEBRIS REMOVAL CR 20/1 | | | 0090 201008-001 LUMP | 1500.00000 1500.00| 1443.00000 1443.00| 4000.00000 4000.00 DEBRIS REMOVAL CR 22 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 017 -3 TABULATION OF BIDS CALL ORDER : 017 CONTRACT ID : 1019666 COUNTIES : TYLER LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 1 ) 61-1584805 |( 2 ) 27-0738567 |( 3 ) 55-0434699 |MARKS DRILLING |R.K. CONSTRUCTION, INC. |SAVAGE CONSTRUCTION COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0095 201008-001 LUMP | 2000.00000 2000.00| 3150.00000 3150.00| 9000.00000 9000.00 DEBRIS REMOVAL CR 23 | | | 0100 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 24 | | | 0105 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 24/1 | | | 0110 201008-001 LUMP | 5000.00000 5000.00| 6124.00000 6124.00| 16000.00000 16000.00 DEBRIS REMOVAL CR 28/1 | | | 0115 201008-001 LUMP | 1000.00000 1000.00| 720.00000 720.00| 2000.00000 2000.00 DEBRIS REMOVAL CR 3 | | | 0120 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 30 | | | 0125 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 800.00000 800.00 DEBRIS REMOVAL CR 30/1 | | | 0130 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 30/2 | | | 0135 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 30/3 | | | 0140 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 32/2 | | | 0145 201008-001 LUMP | 1500.00000 1500.00| 2286.00000 2286.00| 6000.00000 6000.00 DEBRIS REMOVAL CR 34 | | | 0150 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 40 | | | 0155 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 44 | | | 0160 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 46 | | | 0165 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 500.00000 500.00 DEBRIS REMOVAL CR 5 | | | 0170 201008-001 LUMP | 2000.00000 2000.00| 8120.00000 8120.00| 5000.00000 5000.00 DEBRIS REMOVAL CR 56 | | | 0175 201008-001 LUMP | 2000.00000 2000.00| 2880.00000 2880.00| 8000.00000 8000.00 DEBRIS REMOVAL CR 58 | | | 0180 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 1000.00000 1000.00 DEBRIS REMOVAL CR 58/2 | | | 0185 201008-001 LUMP | 600.00000 600.00| 500.00000 500.00| 200.00000 200.00 DEBRIS REMOVAL CR 6 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 017 -4 TABULATION OF BIDS CALL ORDER : 017 CONTRACT ID : 1019666 COUNTIES : TYLER LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 1 ) 61-1584805 |( 2 ) 27-0738567 |( 3 ) 55-0434699 |MARKS DRILLING |R.K. CONSTRUCTION, INC. |SAVAGE CONSTRUCTION COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0190 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 6/1 | | | 0195 201008-001 LUMP | 1000.00000 1000.00| 500.00000 500.00| 200.00000 200.00 DEBRIS REMOVAL CR 6/4 | | | 0200 201008-001 LUMP | 1500.00000 1500.00| 900.00000 900.00| 3000.00000 3000.00 DEBRIS REMOVAL CR 60/1 | | | 0205 201008-001 LUMP | 500.00000 500.00| 500.00000 500.00| 300.00000 300.00 DEBRIS REMOVAL CR 60/3 | | | 0210 201008-001 LUMP | 2000.00000 2000.00| 3096.00000 3096.00| 8000.00000 8000.00 DEBRIS REMOVAL CR 62 | | | 0215 201008-001 LUMP | 6000.00000 6000.00| 8910.00000 8910.00| 23000.00000 23000.00 DEBRIS REMOVAL CR 7 | | | 0220 201008-001 LUMP | 1000.00000 1000.00| 1810.00000 1810.00| 3000.00000 3000.00 DEBRIS REMOVAL CR 7/3 | | | 0225 201008-001 LUMP | 1000.00000 1000.00| 500.00000 500.00| 500.00000 500.00 DEBRIS REMOVAL CR 74 | | | 0230 201008-001 LUMP | 1000.00000 1000.00| 500.00000 500.00| 100.00000 100.00 DEBRIS REMOVAL CR 8 | | | 0235 201008-001 LUMP | 1000.00000 1000.00| 6000.00000 6000.00| 100.00000 100.00 DEBRIS REMOVAL CR1/6 | | | 0240 201008-001 LUMP | 2000.00000 2000.00| 1710.00000 1710.00| 5000.00000 5000.00 DEBRIS REMOVAL CR6/3 | | | 0245 201008-001 LUMP | 20000.00000 20000.00| 20538.00000 20538.00| 26500.00000 26500.00 DEBRIS REMOVAL WV 18 | | | 0250 636011-001 2345.000 UN | 0.50000 1172.50| 1.50000 3517.50| 4.75000 11138.75 TRAFFIC CONTROL DEVICE | | | 0255 636014-001 360.000 HR | 0.01000 3.60| 50.00000 18000.00| 52.00000 18720.00 FLAGGER | | | SECTION TOTALS | $ 79,776.10| $ 118,395.50| $ 192,558.75 ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 79,776.10| $ 118,395.50| $ 192,558.75 ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 017 -5 TABULATION OF BIDS CALL ORDER : 017 CONTRACT ID : 1019666 COUNTIES : TYLER LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 4 ) 34-1421920 |( 5 ) 55-0674033 |( ) |OHIO-WEST VIRGINIA EXCAVATIN |SMH CONSTRUCTION COMPANY, IN | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 DEBRIS REMOVAL | | | 0005 201008-001 LUMP | 1677.15000 1677.15| 1917.50000 1917.50| DEBRIS REMOVAL CR 1/4 | | | 0010 201008-001 LUMP | 1677.15000 1677.15| 1840.00000 1840.00| DEBRIS REMOVAL CR 10 | | | 0015 201008-001 LUMP | 1677.15000 1677.15| 2300.00000 2300.00| DEBRIS REMOVAL CR 10/2 | | | 0020 201008-001 LUMP | 26834.62000 26834.62| 41128.00000 41128.00| DEBRIS REMOVAL CR 11 | | | 0025 201008-001 LUMP | 1677.15000 1677.15| 1840.00000 1840.00| DEBRIS REMOVAL CR 11/4 | | | 0030 201008-001 LUMP | 1677.15000 1677.15| 1840.00000 1840.00| DEBRIS REMOVAL CR 11/5 | | | 0035 201008-001 LUMP | 6708.67000 6708.67| 12580.00000 12580.00| DEBRIS REMOVAL CR 13 | | | 0040 201008-001 LUMP | 1677.15000 1677.15| 1380.00000 1380.00| DEBRIS REMOVAL CR 13/1 | | | 0045 201008-001 LUMP | 1677.15000 1677.15| 1840.00000 1840.00| DEBRIS REMOVAL CR 13/4 | | | 0050 201008-001 LUMP | 1677.15000 1677.15| 1120.00000 1120.00| DEBRIS REMOVAL CR 14 | | | 0055 201008-001 LUMP | 1677.15000 1677.15| 920.00000 920.00| DEBRIS REMOVAL CR 18/11 | | | 0060 201008-001 LUMP | 1677.15000 1677.15| 1380.00000 1380.00| DEBRIS REMOVAL CR 18/4 | | | 0065 201008-001 LUMP | 8385.82000 8385.82| 12097.00000 12097.00| DEBRIS REMOVAL CR 18/6 | | | 0070 201008-001 LUMP | 1677.15000 1677.15| 920.00000 920.00| DEBRIS REMOVAL CR 18/8 | | | 0075 201008-001 LUMP | 1677.15000 1677.15| 1150.00000 1150.00| DEBRIS REMOVAL CR 2/3 | | | 0080 201008-001 LUMP | 3354.32000 3354.32| 13000.00000 13000.00| DEBRIS REMOVAL CR 2/4 | | | 0085 201008-001 LUMP | 5031.50000 5031.50| 1516.00000 1516.00| DEBRIS REMOVAL CR 20/1 | | | 0090 201008-001 LUMP | 8385.82000 8385.82| 7742.00000 7742.00| DEBRIS REMOVAL CR 22 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 017 -6 TABULATION OF BIDS CALL ORDER : 017 CONTRACT ID : 1019666 COUNTIES : TYLER LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 4 ) 34-1421920 |( 5 ) 55-0674033 |( ) |OHIO-WEST VIRGINIA EXCAVATIN |SMH CONSTRUCTION COMPANY, IN | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0095 201008-001 LUMP | 6708.67000 6708.67| 16935.00000 16935.00| DEBRIS REMOVAL CR 23 | | | 0100 201008-001 LUMP | 1677.15000 1677.15| 920.00000 920.00| DEBRIS REMOVAL CR 24 | | | 0105 201008-001 LUMP | 1677.15000 1677.15| 1380.00000 1380.00| DEBRIS REMOVAL CR 24/1 | | | 0110 201008-001 LUMP | 18448.80000 18448.80| 33870.00000 33870.00| DEBRIS REMOVAL CR 28/1 | | | 0115 201008-001 LUMP | 3354.32000 3354.32| 4600.00000 4600.00| DEBRIS REMOVAL CR 3 | | | 0120 201008-001 LUMP | 2683.44000 2683.44| 920.00000 920.00| DEBRIS REMOVAL CR 30 | | | 0125 201008-001 LUMP | 1677.15000 1677.15| 1380.00000 1380.00| DEBRIS REMOVAL CR 30/1 | | | 0130 201008-001 LUMP | 1677.15000 1677.15| 920.00000 920.00| DEBRIS REMOVAL CR 30/2 | | | 0135 201008-001 LUMP | 1677.15000 1677.15| 920.00000 920.00| DEBRIS REMOVAL CR 30/3 | | | 0140 201008-001 LUMP | 1677.15000 1677.15| 920.00000 920.00| DEBRIS REMOVAL CR 32/2 | | | 0145 201008-001 LUMP | 11740.14000 11740.14| 14516.00000 14516.00| DEBRIS REMOVAL CR 34 | | | 0150 201008-001 LUMP | 1677.15000 1677.15| 1840.00000 1840.00| DEBRIS REMOVAL CR 40 | | | 0155 201008-001 LUMP | 1677.15000 1677.15| 920.00000 920.00| DEBRIS REMOVAL CR 44 | | | 0160 201008-001 LUMP | 1677.15000 1677.15| 920.00000 920.00| DEBRIS REMOVAL CR 46 | | | 0165 201008-001 LUMP | 1677.15000 1677.15| 2300.00000 2300.00| DEBRIS REMOVAL CR 5 | | | 0170 201008-001 LUMP | 8385.82000 8385.82| 9630.00000 9630.00| DEBRIS REMOVAL CR 56 | | | 0175 201008-001 LUMP | 12501.27000 12501.27| 16935.00000 16935.00| DEBRIS REMOVAL CR 58 | | | 0180 201008-001 LUMP | 3354.32000 3354.32| 2760.00000 2760.00| DEBRIS REMOVAL CR 58/2 | | | 0185 201008-001 LUMP | 1677.15000 1677.15| 1840.00000 1840.00| DEBRIS REMOVAL CR 6 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 017 -7 TABULATION OF BIDS CALL ORDER : 017 CONTRACT ID : 1019666 COUNTIES : TYLER LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 4 ) 34-1421920 |( 5 ) 55-0674033 |( ) |OHIO-WEST VIRGINIA EXCAVATIN |SMH CONSTRUCTION COMPANY, IN | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0190 201008-001 LUMP | 1677.15000 1677.15| 920.00000 920.00| DEBRIS REMOVAL CR 6/1 | | | 0195 201008-001 LUMP | 1677.15000 1677.15| 2300.00000 2300.00| DEBRIS REMOVAL CR 6/4 | | | 0200 201008-001 LUMP | 6708.67000 6708.67| 4839.00000 4839.00| DEBRIS REMOVAL CR 60/1 | | | 0205 201008-001 LUMP | 1677.15000 1677.15| 1840.00000 1840.00| DEBRIS REMOVAL CR 60/3 | | | 0210 201008-001 LUMP | 6708.67000 6708.67| 16935.00000 16935.00| DEBRIS REMOVAL CR 62 | | | 0215 201008-001 LUMP | 20125.97000 20125.97| 48386.00000 48386.00| DEBRIS REMOVAL CR 7 | | | 0220 201008-001 LUMP | 5031.50000 5031.50| 4839.00000 4839.00| DEBRIS REMOVAL CR 7/3 | | | 0225 201008-001 LUMP | 1677.15000 1677.15| 920.00000 920.00| DEBRIS REMOVAL CR 74 | | | 0230 201008-001 LUMP | 1677.15000 1677.15| 1400.00000 1400.00| DEBRIS REMOVAL CR 8 | | | 0235 201008-001 LUMP | 1677.15000 1677.15| 900.00000 900.00| DEBRIS REMOVAL CR1/6 | | | 0240 201008-001 LUMP | 6708.67000 6708.67| 10000.00000 10000.00| DEBRIS REMOVAL CR6/3 | | | 0245 201008-001 LUMP | 50314.91000 50314.91| 106127.00000 106127.00| DEBRIS REMOVAL WV 18 | | | 0250 636011-001 2345.000 UN | 2.00000 4690.00| 3.38000 7926.10| TRAFFIC CONTROL DEVICE | | | 0255 636014-001 360.000 HR | 55.50000 19980.00| 73.15000 26334.00| FLAGGER | | | SECTION TOTALS | $ 294,783.27| $ 454,602.60| $ ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 294,783.27| $ 454,602.60| $ ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 018 -1 VENDOR RANKING CALL ORDER : 018 CONTRACT ID : 1019661 COUNTIES : WETZEL LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 CONTRACT DESCRIPTION : NEW MARTINSVILLE - NEW DALE +85 PROJECT(S) : E352-0TRE/E0-002.10 00 FEMA 1903 000 000 LOCATION: BEG:MP.82 .07MIE JCT CR 3/1 END:MP7.31 .13MIE JCT CR 3/3 ------------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID ------------------------------------------------------------------------------------------------------------------------------- 1 55-0434699 SAVAGE CONSTRUCTION COMPANY, INC. $ 425,264.10 100.0000% 2 34-1421920 OHIO-WEST VIRGINIA EXCAVATING CO. $ 655,126.31 154.0516% WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 018 -2 TABULATION OF BIDS CALL ORDER : 018 CONTRACT ID : 1019661 COUNTIES : WETZEL LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 1 ) 55-0434699 |( 2 ) 34-1421920 |( ) |SAVAGE CONSTRUCTION COMPANY, |OHIO-WEST VIRGINIA EXCAVATIN | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 DEBRIS REMOVAL | | | 0005 201008-001 LUMP | 4000.00000 4000.00| 6690.27000 6690.27| DEBRIS REMOVAL CR 1/13 | | | 0010 201008-001 LUMP | 7000.00000 7000.00| 10035.39000 10035.39| DEBRIS REMOVAL CR 1/15 | | | 0015 201008-001 LUMP | 2000.00000 2000.00| 1672.56000 1672.56| DEBRIS REMOVAL CR 1/19 | | | 0020 201008-001 LUMP | 6000.00000 6000.00| 8362.84000 8362.84| DEBRIS REMOVAL CR 1/2 | | | 0025 201008-001 LUMP | 3000.00000 3000.00| 3345.12000 3345.12| DEBRIS REMOVAL CR 1/21 | | | 0030 201008-001 LUMP | 100.00000 100.00| 1338.06000 1338.06| DEBRIS REMOVAL CR 1/23 | | | 0035 201008-001 LUMP | 4000.00000 4000.00| 3345.12000 3345.12| DEBRIS REMOVAL CR 1/4 | | | 0040 201008-001 LUMP | 3000.00000 3000.00| 3345.12000 3345.12| DEBRIS REMOVAL CR 1/5 | | | 0045 201008-001 LUMP | 2000.00000 2000.00| 1672.56000 1672.56| DEBRIS REMOVAL CR 1/6 | | | 0050 201008-001 LUMP | 2000.00000 2000.00| 1672.56000 1672.56| DEBRIS REMOVAL CR 1/8 | | | 0055 201008-001 LUMP | 2000.00000 2000.00| 1672.56000 1672.56| DEBRIS REMOVAL CR 1/9 | | | 0060 201008-001 LUMP | 5000.00000 5000.00| 6690.27000 6690.27| DEBRIS REMOVAL CR 11 | | | 0065 201008-001 LUMP | 100.00000 100.00| 1338.06000 1338.06| DEBRIS REMOVAL CR 12 | | | 0070 201008-001 LUMP | 8000.00000 8000.00| 6690.27000 6690.27| DEBRIS REMOVAL CR 13 | | | 0075 201008-001 LUMP | 4000.00000 4000.00| 6690.27000 6690.27| DEBRIS REMOVAL CR 14 | | | 0080 201008-001 LUMP | 24000.00000 24000.00| 36588.51000 36588.51| DEBRIS REMOVAL CR 15 | | | 0085 201008-001 LUMP | 5000.00000 5000.00| 5017.71000 5017.71| DEBRIS REMOVAL CR 15/2 | | | 0090 201008-001 LUMP | 500.00000 500.00| 1338.06000 1338.06| DEBRIS REMOVAL CR 15/3 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 018 -3 TABULATION OF BIDS CALL ORDER : 018 CONTRACT ID : 1019661 COUNTIES : WETZEL LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 1 ) 55-0434699 |( 2 ) 34-1421920 |( ) |SAVAGE CONSTRUCTION COMPANY, |OHIO-WEST VIRGINIA EXCAVATIN | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0095 201008-001 LUMP | 2000.00000 2000.00| 1338.06000 1338.06| DEBRIS REMOVAL CR 15/4 | | | 0100 201008-001 LUMP | 4000.00000 4000.00| 8362.84000 8362.84| DEBRIS REMOVAL CR 16 | | | 0105 201008-001 LUMP | 2000.00000 2000.00| 3345.12000 3345.12| DEBRIS REMOVAL CR 16/1 | | | 0110 201008-001 LUMP | 6000.00000 6000.00| 10035.39000 10035.39| DEBRIS REMOVAL CR 17 | | | 0115 201008-001 LUMP | 3000.00000 3000.00| 4181.44000 4181.44| DEBRIS REMOVAL CR 17/1 | | | 0120 201008-001 LUMP | 500.00000 500.00| 1672.56000 1672.56| DEBRIS REMOVAL CR 18/3 | | | 0125 201008-001 LUMP | 11000.00000 11000.00| 16725.68000 16725.68| DEBRIS REMOVAL CR 19 | | | 0130 201008-001 LUMP | 4000.00000 4000.00| 6690.27000 6690.27| DEBRIS REMOVAL CR 19/1 | | | 0135 201008-001 LUMP | 100.00000 100.00| 1672.56000 1672.56| DEBRIS REMOVAL CR 19/3 | | | 0140 201008-001 LUMP | 100.00000 100.00| 1338.06000 1338.06| DEBRIS REMOVAL CR 19/6 | | | 0145 201008-001 LUMP | 100.00000 100.00| 2676.09000 2676.09| DEBRIS REMOVAL CR 2/1 | | | 0150 201008-001 LUMP | 2000.00000 2000.00| 1672.56000 1672.56| DEBRIS REMOVAL CR 20/11 | | | 0155 201008-001 LUMP | 500.00000 500.00| 1338.06000 1338.06| DEBRIS REMOVAL CR 20/15 | | | 0160 201008-001 LUMP | 4000.00000 4000.00| 8362.84000 8362.84| DEBRIS REMOVAL CR 20/5 | | | 0165 201008-001 LUMP | 2000.00000 2000.00| 1338.06000 1338.06| DEBRIS REMOVAL CR 20/6 | | | 0170 201008-001 LUMP | 700.00000 700.00| 1338.06000 1338.06| DEBRIS REMOVAL CR 20/8 | | | 0175 201008-001 LUMP | 100.00000 100.00| 669.01000 669.01| DEBRIS REMOVAL CR 20/9 | | | 0180 201008-001 LUMP | 9000.00000 9000.00| 10035.39000 10035.39| DEBRIS REMOVAL CR 21 | | | 0185 201008-001 LUMP | 500.00000 500.00| 3345.12000 3345.12| DEBRIS REMOVAL CR 21/1 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 018 -4 TABULATION OF BIDS CALL ORDER : 018 CONTRACT ID : 1019661 COUNTIES : WETZEL LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 1 ) 55-0434699 |( 2 ) 34-1421920 |( ) |SAVAGE CONSTRUCTION COMPANY, |OHIO-WEST VIRGINIA EXCAVATIN | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0190 201008-001 LUMP | 2000.00000 2000.00| 5017.71000 5017.71| DEBRIS REMOVAL CR 21/2 | | | 0195 201008-001 LUMP | 4000.00000 4000.00| 13380.54000 13380.54| DEBRIS REMOVAL CR 21/3 | | | 0200 201008-001 LUMP | 4000.00000 4000.00| 5017.71000 5017.71| DEBRIS REMOVAL CR 21/4 | | | 0205 201008-001 LUMP | 100.00000 100.00| 1672.56000 1672.56| DEBRIS REMOVAL CR 22 | | | 0210 201008-001 LUMP | 200.00000 200.00| 836.31000 836.31| DEBRIS REMOVAL CR 24 | | | 0215 201008-001 LUMP | 500.00000 500.00| 836.31000 836.31| DEBRIS REMOVAL CR 24/2 | | | 0220 201008-001 LUMP | 200.00000 200.00| 1672.56000 1672.56| DEBRIS REMOVAL CR 250/2 | | | 0225 201008-001 LUMP | 300.00000 300.00| 1338.06000 1338.06| DEBRIS REMOVAL CR 250/3 | | | 0230 201008-001 LUMP | 100.00000 100.00| 1338.06000 1338.06| DEBRIS REMOVAL CR 26/1 | | | 0235 201008-001 LUMP | 12000.00000 12000.00| 6690.27000 6690.27| DEBRIS REMOVAL CR 3 | | | 0240 201008-001 LUMP | 6000.00000 6000.00| 3345.12000 3345.12| DEBRIS REMOVAL CR 3/1 | | | 0245 201008-001 LUMP | 100.00000 100.00| 1338.06000 1338.06| DEBRIS REMOVAL CR 36 | | | 0250 201008-001 LUMP | 2000.00000 2000.00| 1338.06000 1338.06| DEBRIS REMOVAL CR 38 | | | 0255 201008-001 LUMP | 5000.00000 5000.00| 6690.27000 6690.27| DEBRIS REMOVAL CR 4 | | | 0260 201008-001 LUMP | 2000.00000 2000.00| 1672.56000 1672.56| DEBRIS REMOVAL CR 4/7 | | | 0265 201008-001 LUMP | 200.00000 200.00| 836.31000 836.31| DEBRIS REMOVAL CR 40 | | | 0270 201008-001 LUMP | 100.00000 100.00| 836.31000 836.31| DEBRIS REMOVAL CR 46 | | | 0275 201008-001 LUMP | 100.00000 100.00| 836.31000 836.31| DEBRIS REMOVAL CR 5 | | | 0280 201008-001 LUMP | 6000.00000 6000.00| 6690.27000 6690.27| DEBRIS REMOVAL CR 52 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 018 -5 TABULATION OF BIDS CALL ORDER : 018 CONTRACT ID : 1019661 COUNTIES : WETZEL LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 1 ) 55-0434699 |( 2 ) 34-1421920 |( ) |SAVAGE CONSTRUCTION COMPANY, |OHIO-WEST VIRGINIA EXCAVATIN | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0285 201008-001 LUMP | 1000.00000 1000.00| 1338.06000 1338.06| DEBRIS REMOVAL CR 54/1 | | | 0290 201008-001 LUMP | 8000.00000 8000.00| 6690.27000 6690.27| DEBRIS REMOVAL CR 56 | | | 0295 201008-001 LUMP | 100.00000 100.00| 1672.56000 1672.56| DEBRIS REMOVAL CR 56/1 | | | 0300 201008-001 LUMP | 5000.00000 5000.00| 3345.12000 3345.12| DEBRIS REMOVAL CR 6 | | | 0305 201008-001 LUMP | 6000.00000 6000.00| 6690.27000 6690.27| DEBRIS REMOVAL CR 64 | | | 0310 201008-001 LUMP | 300.00000 300.00| 1672.56000 1672.56| DEBRIS REMOVAL CR 64/1 | | | 0315 201008-001 LUMP | 3000.00000 3000.00| 10035.39000 10035.39| DEBRIS REMOVAL CR 64/3 | | | 0320 201008-001 LUMP | 2000.00000 2000.00| 8362.84000 8362.84| DEBRIS REMOVAL CR 64/6 | | | 0325 201008-001 LUMP | 7000.00000 7000.00| 10035.39000 10035.39| DEBRIS REMOVAL CR 66 | | | 0330 201008-001 LUMP | 100.00000 100.00| 1672.56000 1672.56| DEBRIS REMOVAL CR 68 | | | 0335 201008-001 LUMP | 2000.00000 2000.00| 1672.56000 1672.56| DEBRIS REMOVAL CR 69/1 | | | 0340 201008-001 LUMP | 7000.00000 7000.00| 8362.84000 8362.84| DEBRIS REMOVAL CR 7/1 | | | 0345 201008-001 LUMP | 300.00000 300.00| 1338.06000 1338.06| DEBRIS REMOVAL CR 7/17 | | | 0350 201008-001 LUMP | 600.00000 600.00| 836.31000 836.31| DEBRIS REMOVAL CR 7/22 | | | 0355 201008-001 LUMP | 5000.00000 5000.00| 5017.71000 5017.71| DEBRIS REMOVAL CR 7/6 | | | 0360 201008-001 LUMP | 200.00000 200.00| 1672.56000 1672.56| DEBRIS REMOVAL CR 7/7 | | | 0365 201008-001 LUMP | 8000.00000 8000.00| 11707.96000 11707.96| DEBRIS REMOVAL CR 76 | | | 0370 201008-001 LUMP | 5000.00000 5000.00| 5017.71000 5017.71| DEBRIS REMOVAL CR 78 | | | 0375 201008-001 LUMP | 17000.00000 17000.00| 26761.07000 26761.07| DEBRIS REMOVAL CR 8 | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 018 -6 TABULATION OF BIDS CALL ORDER : 018 CONTRACT ID : 1019661 COUNTIES : WETZEL LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 06 SET-ASIDE : ==================================================================================================================================== |( 1 ) 55-0434699 |( 2 ) 34-1421920 |( ) |SAVAGE CONSTRUCTION COMPANY, |OHIO-WEST VIRGINIA EXCAVATIN | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0380 201008-001 LUMP | 100.00000 100.00| 1672.56000 1672.56| DEBRIS REMOVAL CR 8/2 | | | 0385 201008-001 LUMP | 4000.00000 4000.00| 6690.27000 6690.27| DEBRIS REMOVAL CR 80 | | | 0390 201008-001 LUMP | 6000.00000 6000.00| 5017.71000 5017.71| DEBRIS REMOVAL CR 82 | | | 0395 201008-001 LUMP | 3000.00000 3000.00| 3345.12000 3345.12| DEBRIS REMOVAL CR 82/1 | | | 0400 201008-001 LUMP | 6000.00000 6000.00| 10035.39000 10035.39| DEBRIS REMOVAL CR 84 | | | 0405 201008-001 LUMP | 33500.00000 33500.00| 26761.07000 26761.07| DEBRIS REMOVAL CR 89 | | | 0410 201008-001 LUMP | 6000.00000 6000.00| 8362.84000 8362.84| DEBRIS REMOVAL CR 9 | | | 0415 201008-001 LUMP | 100.00000 100.00| 1338.06000 1338.06| DEBRIS REMOVAL CR 9/1 | | | 0420 201008-001 LUMP | 700.00000 700.00| 1672.56000 1672.56| DEBRIS REMOVAL WV 180 | | | 0425 201008-001 LUMP | 14000.00000 14000.00| 36796.48000 36796.48| DEBRIS REMOVAL WV 20 | | | 0430 201008-001 LUMP | 15000.00000 15000.00| 40141.61000 40141.61| DEBRIS REMOVAL WV 7 | | | 0435 636011-001 2345.000 UN | 3.78000 8864.10| 17.00000 39865.00| TRAFFIC CONTROL DEVICE | | | 0440 636014-001 1900.000 HR | 38.00000 72200.00| 55.00000 104500.00| FLAGGER | | | SECTION TOTALS | $ 425,264.10| $ 655,126.31| $ ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 425,264.10| $ 655,126.31| $ ==================================================================================================================================== WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 019 -1 VENDOR RANKING CALL ORDER : 019 CONTRACT ID : 1021610 COUNTIES : HARRISON PRESTON LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 04 TAYLOR OTHERS CONTRACT DESCRIPTION : DISTRICT 4 GUARDRAIL REPAIR PROJECT(S) : R084-0REM/GR-011.00 00 LOCATION: DISTRICT WIDE ------------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID ------------------------------------------------------------------------------------------------------------------------------- 1 25-1271209 GREEN ACRES CONTRACTING COMPANY, INC. $ 538,796.00 100.0000% 2 25-1000923 PENN LINE SERVICE, INC. $ 561,093.77 104.1384% WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 019 -2 TABULATION OF BIDS CALL ORDER : 019 CONTRACT ID : 1021610 COUNTIES : HARRISON PRESTON LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 04 TAYLOR OTHERS SET-ASIDE : ==================================================================================================================================== |( 1 ) 25-1271209 |( 2 ) 25-1000923 |( ) |GREEN ACRES CONTRACTING COMP |PENN LINE SERVICE, INC. | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- SECTION 0001 DISTRICT WIDE GUARDRAIL REPAIR | | | 0005 204002-000 1000.000 MI | 0.01000 10.00| 1.00000 1000.00| MOBILIZATION, PER COUNTY | | | 0010 204003-000 8.000 EA | 1000.00000 8000.00| 2500.00000 20000.00| MOBILIZATION, PER EMERGENCY | | | 0015 204003-000 8.000 EA | 1.00000 8.00| 500.00000 4000.00| MOBILIZATION, PER JOB ORDER | | | 0020 607001-001 6000.000 LF | 12.00000 72000.00| 21.50000 129000.00| TYPE 1 GUARDRAIL, CLASS I | | | 0025 607001-001 5500.000 LF | 10.00000 55000.00| 9.75000 53625.00| TYPE 1 GUARDRAIL, CLASS II | | | 0030 607001-001 3500.000 LF | 9.75000 34125.00| 9.50000 33250.00| TYPE 1 GUARDRAIL, CLASS III | | | 0035 607005-001 25.000 LF | 15.00000 375.00| 13.00000 325.00| TYPE 5 GUARDRAIL, CLASS I | | | 0040 607006-001 2.000 EA | 125.00000 250.00| 1200.00000 2400.00| THRIE BEAM GUARDRAIL BRIDGE TRANSITION | | | 0045 607009-001 500.000 LF | 3.00000 1500.00| 4.15000 2075.00| TYPE 1 GUARDRAIL REMOVED AND RESET CL 1 | | | 0050 607010-001 16000.000 LF | 0.15000 2400.00| 0.50000 8000.00| TYPE 1 GUARDRAIL REMOVED AND STORED | | | 0055 607011-001 250.000 LF | 2.50000 625.00| 3.75000 937.50| RESET TYPE 1 GUARDRAIL, CLASS I | | | 0060 607011-001 6000.000 LF | 2.25000 13500.00| 1.70000 10200.00| RESET TYPE 1 GUARDRAIL, CLASS II | | | 0065 607011-001 7000.000 LF | 2.00000 14000.00| 1.50000 10500.00| RESET TYPE 1 GUARDRAIL, CLASS III | | | 0070 607025-001 1.000 EA | 150.00000 150.00| 75.00000 75.00| CUT SLOPE TERMINAL, TYPE A | | | 0075 607025-001 1.000 EA | 150.00000 150.00| 125.00000 125.00| CUT SLOPE TERMINAL, TYPE B | | | 0080 607028-001 5.000 EA | 10.00000 50.00| 35.00000 175.00| MODIFIED ECCENTRIC LOADER TERMINAL | | | BUFFERED END SECTION | | | 0085 607028-002 2.000 EA | 5.00000 10.00| 1.00000 2.00| MODIFIED ECCENTRIC LOADER TERMINAL | | | DIAPHRAGM PLATE | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 019 -3 TABULATION OF BIDS CALL ORDER : 019 CONTRACT ID : 1021610 COUNTIES : HARRISON PRESTON LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 04 TAYLOR OTHERS SET-ASIDE : ==================================================================================================================================== |( 1 ) 25-1271209 |( 2 ) 25-1000923 |( ) |GREEN ACRES CONTRACTING COMP |PENN LINE SERVICE, INC. | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0090 607028-003 1.000 EA | 1.00000 1.00| 1.00000 1.00| MODIFIED ECCENTRIC LOADER TERMINAL | | | STRUT AND YOKE ASSEMBLY | | | 0095 607028-004 10.000 EA | 59.50000 595.00| 100.00000 1000.00| MODIFIED ECCENTRIC LOADER TERMINAL | | | SHORT BREAKAWAY POST | | | 0100 607028-005 5.000 EA | 20.00000 100.00| 65.00000 325.00| MODIFIED ECCENTRIC LOADER TERMINAL | | | WOODEN BREAKAWAY LINE POST | | | 0105 607029-001 2.000 EA | 5.00000 10.00| 1.00000 2.00| BCT-11 IN RADIUS RETURN SECTION | | | 0110 607030-001 1.000 EA | 330.00000 330.00| 1000.00000 1000.00| SPECIAL TRAILING END TERMINAL | | | 0115 607031-001 5.000 EA | 320.00000 1600.00| 495.00000 2475.00| 25 FT RAIL ELEMENT | | | 0120 607031-002 2.000 EA | 100.00000 200.00| 0.01000 0.02| 25 FT APPROACH RAIL ELEMENT | | | 0125 607031-003 1.000 EA | 5.00000 5.00| 0.01000 0.01| NOSE COVER | | | 0130 607031-004 1.000 EA | 1.00000 1.00| 0.01000 0.01| STRUT (2000) | | | 0135 607035-001 550.000 EA | 160.00000 88000.00| 247.50000 136125.00| GUARDRAIL ELEMENT | | | 0140 607036-001 5.000 EA | 30.00000 150.00| 20.00000 100.00| GUARDRAIL END SHOE | | | 0145 607037-001 150.000 EA | 30.00000 4500.00| 20.00000 3000.00| BUFFER END SECTION | | | 0150 607039-001 150.000 EA | 3.00000 450.00| 10.00000 1500.00| 6X6X14 IN TREATED WOOD BLOCK | | | 0155 607040-001 115.000 EA | 5.00000 575.00| 10.00000 1150.00| 8X6X14 IN TREATED WOOD BLOCK | | | 0160 607040-002 20.000 EA | 4.00000 80.00| 0.01000 0.20| 8 IN BLOCKOUT STEEL | | | 0165 607041-001 100.000 EA | 175.00000 17500.00| 247.50000 24750.00| 13 FT - 6.5 IN CURVED RAIL ELEMENT | | | 0170 607042-001 115.000 EA | 45.00000 5175.00| 90.00000 10350.00| 6 FT STEEL POST | | | 0175 607043-001 110.000 EA | 50.00000 5500.00| 91.50000 10065.00| 8 FT STEEL POST | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 019 -4 TABULATION OF BIDS CALL ORDER : 019 CONTRACT ID : 1021610 COUNTIES : HARRISON PRESTON LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 04 TAYLOR OTHERS SET-ASIDE : ==================================================================================================================================== |( 1 ) 25-1271209 |( 2 ) 25-1000923 |( ) |GREEN ACRES CONTRACTING COMP |PENN LINE SERVICE, INC. | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0180 607044-001 10.000 EA | 15.00000 150.00| 13.00000 130.00| 6X8X72 IN TREATED WOOD POST | | | 0185 607044-002 5.000 EA | 20.00000 100.00| 20.00000 100.00| 6X8X96 IN TREATED WOOD POST | | | 0190 607045-001 20.000 EA | 30.00000 600.00| 100.00000 2000.00| 5.5X7.5X44 IN TREATED WOOD POST | | | 0195 607046-001 30.000 EA | 30.00000 900.00| 70.00000 2100.00| 7 INCH ROUND X 6 FT TREATED WOOD POST | | | 0200 607046-002 25.000 EA | 35.00000 875.00| 71.00000 1775.00| 7 IN ROUND X 8 FT TREATED WOOD POST | | | 0205 607047-001 1.000 EA | 1.00000 1.00| 0.01000 0.01| 10X10X72 IN TREATED WOOD POST | | | 0210 607048-001 60.000 EA | 65.00000 3900.00| 135.00000 8100.00| STRUCTURE MOUNTED POST, ANCHORED | | | 0215 607049-001 2.000 EA | 55.00000 110.00| 83.00000 166.00| 10 FT STEEL POST | | | 0220 607065-001 3.000 EA | 1500.00000 4500.00| 3000.00000 9000.00| FLARED END TERMINAL | | | 0225 607066-001 2.000 EA | 1700.00000 3400.00| 4000.00000 8000.00| TANGENT END TERMINAL | | | 0230 607070-101 6.000 EA | 25.00000 150.00| 25.00000 150.00| SPRING CABLE END ASSEMBLY CABLE | | | 0235 607070-102 10.000 EA | 25.00000 250.00| 25.00000 250.00| TURNBUCKLE CABLE END ASSEMBLY CABLE | | | 0240 607070-103 1000.000 LF | 0.90000 900.00| 0.01000 10.00| 3/4 INCH CABLE CABLE | | | 0245 607070-104 100.000 EA | 15.00000 1500.00| 35.00000 3500.00| CABLE SPLICE CABLE | | | 0250 607070-105 10.000 EA | 1.00000 10.00| 10.00000 100.00| DRIVEWAY END POST CAP CABLE | | | 0255 607070-106 500.000 EA | 1.00000 500.00| 0.01000 5.00| END POST CAP CABLE | | | 0260 607070-108 1000.000 EA | 1.50000 1500.00| 1.50000 1500.00| HOOK BOLTS FOR POSTS CABLE | | | 0265 607070-109 100.000 EA | 25.00000 2500.00| 25.00000 2500.00| CABLE TENSIONING CABLE | | | 0270 607070-110 10.000 EA | 10.00000 100.00| 10.00000 100.00| END POST BEARING PLATE | | | WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways DATE : 11/01/10 PAGE : 019 -5 TABULATION OF BIDS CALL ORDER : 019 CONTRACT ID : 1021610 COUNTIES : HARRISON PRESTON LETTING DATE : 10/05/10 10:00 A.M. DISTRICT : 04 TAYLOR OTHERS SET-ASIDE : ==================================================================================================================================== |( 1 ) 25-1271209 |( 2 ) 25-1000923 |( ) |GREEN ACRES CONTRACTING COMP |PENN LINE SERVICE, INC. | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+-----------------------------+-----------------------------+----------------------------- 0275 607070-111 150.000 EA | 2.00000 300.00| 5.00000 750.00| DOUBLE SIDED REFLECTOR UNIT, COMPLETE | | | CABLE | | | 0280 607070-112 25.000 EA | 100.00000 2500.00| 100.00000 2500.00| ANCHOR POST, CABLE | | | 0285 607070-113 25.000 EA | 25.00000 625.00| 75.00000 1875.00| ANCHOR POST ADAPTER, CABLE | | | 0290 607070-201 500.000 EA | 30.00000 15000.00| 40.00000 20000.00| CABLE GUARDRAIL POST COMPLETE WITHOUT | | | BASE, HIGH TENSION CABLE | | | 0295 607070-202 100.000 EA | 50.00000 5000.00| 50.00000 5000.00| CABLE GUARDRAIL POST BASE COMPLETE, | | | HIGH TENSION CABLE | | | 0300 607070-203 50.000 EA | 200.00000 10000.00| 100.00000 5000.00| CABLE GUARDRAIL END TERMINAL REPAIR, | | | HIGH TENSION CABLE | | | 0305 607072-001 15.000 EA | 100.00000 1500.00| 500.00000 7500.00| CABLE GUARDRAIL ANCHOR UNIT | | | 0310 607081-001 1.000 EA | 2500.00000 2500.00| 0.01000 0.01| TANGENT END TERMINAL REPAIR, SKT 350 | | | 0315 607081-002 1.000 EA | 3000.00000 3000.00| 6000.00000 6000.00| TANGENT END TERMINAL REPAIR, ET-2000 | | | 0320 607082-001 1.000 EA | 2500.00000 2500.00| 0.01000 0.01| FLARED END TERMINAL REPAIR, FLEAT 350 | | | 0325 607082-002 1.000 EA | 3000.00000 3000.00| 5000.00000 5000.00| FLARED END TERMINAL REPAIR, SRT-350 | | | 0330 636027-001 450.000 SI | 320.00000 144000.00| 1.00000 450.00| TRAFFIC CONTROL, | | | SECTION TOTALS | $ 538,796.00| $ 561,093.77| $ ------------------------------------------+-----------------------------+-----------------------------+----------------------------- CONTRACT TOTALS | $ 538,796.00| $ 561,093.77| $ ====================================================================================================================================