WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- May 22, 2012 LETTING Bids will be received electronically by the West Virginia Department of Transportation, Division of Highways through the Bid Express Bidding Service (www.bidx.com) and by sealed proposals (only when prequalification is waived) being received at its office in Building 5, Room A-748, 1900 Kanawha Boulevard East, Charleston, West Virginia until May 22, 2012 at 10:00 AM (Eastern Standard Time). The bids will be downloaded and/or opened and read publically thereafter for the construction of the following project(s): ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 001 0430842 S302-0006/00-000.96 00 00BR 0006 030 D00 STRUCTURE REPLACEMENT PARK GAP BRIDGE / BACK CREEK, 0.04 MI W 9/9 SLS COUNTY: BERKELEY DBE GOAL: 5 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 002 1015315 S320-0083/00-000.92 00 00BR 0083 053 D00 STRUCTURE REPLACEMENT BURNWELL BRIDGE / PAINT CR, 0.92 MI N FAYETTE CO LINE COUNTY: KANAWHA BRIDGE : 11065 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 3 ; STRUCTURE STEEL: 131,006.00 DBE GOAL: 3 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 003 1022302 S336-0023/00-017.34 00 CLEAN AND PAINT STRUCTURE C&P HANOVER BRIDGE 0.19 MILE SOUTH OF US 220 COUNTY: PENDLETON BRIDGE : 36A072 CONCRETE ON ROLLED I BEAM SPAN(S): 2 ; ------------------------------------------------------------------------------------------------------------------------------------ 004 0412442 S336-0033/00-005.93 00 00BR 0033 266 D00 CONST NEW/RELOC 2 LANE ROAD W/BRIDGE(S) SENECA CREEK BRIDGE / SENECA CK, 0.06 MI E CO 5/2 COUNTY: PENDLETON BRIDGE : 11001 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 2 ; STRUCTURE STEEL: 646,459.00 DBE GOAL: 3 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 005 1022301 S343-0807/00-000.00 00 0 CLEAN AND PAINT STRUCTURE C&P NORTH BEND PARK BRIDGE (43A156) 0.01 MILES NORTH OF PARK RTE 801 COUNTY: RITCHIE BRIDGE : 43A156 TIMBER DECK ON STEEL STRINGER SPAN(S): 3 ; ------------------------------------------------------------------------------------------------------------------------------------ WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- May 22, 2012 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 006 1127348 S306-0043/00-010.06 00 0STP 0043 133 D00 RESURFACING HUGHES BRANCH ROAD JCT WAYNE CR 17/8-JCT CR 35 COUNTY: CABELL DBE GOAL: 3 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 007 *1127427 S323-0010/00-002.98 00 0STP 0010 231 D00 RESURFACING WYOMING LINE-GILLIAM BOTTOM JCT CR 10/43-JCT CR 10/71 COUNTY: LOGAN ------------------------------------------------------------------------------------------------------------------------------------ 008 1127329 S328-0104/00-000.00 00 0STP 0104 010 D00 RESURFACING NEW HOPE RD - COURTHOUSE RD RESURFACE JCT WV ROUTE 20 TO JCT US ROUTE 19 COUNTY: MERCER DBE GOAL: 8 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 009 1207401 S339-0024/00-000.00 00 RESURFACING BROOKSIDE-SILVERLAKE RD BEG: JCT US 219 END: JCT CO 116 COUNTY: PRESTON ------------------------------------------------------------------------------------------------------------------------------------ 010 1127230 S349-0020/00-024.89 00 0STP 0020 285 D RESURFACING TENNERTON ROAD CO 4/20 - 0.14 MILE S CO 33/1 COUNTY: UPSHUR DBE GOAL: 8 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 011 *1127350 S350-0020/00-002.98 00 0STP 0020 288 D00 RESURFACING CENTERVILLE ROAD JCT CR 18 S-JCT CR 19 COUNTY: WAYNE ------------------------------------------------------------------------------------------------------------------------------------ 012 1127341 S350-0052/00-011.93 00 00NH 0052 297 D00 RESURFACING WHITES CREEK-GLEN HAYES JCT CR 19-JCT CR 44 COUNTY: WAYNE ----------------------------------------------------------------------------------------------------------------------------------- WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- May 22, 2012 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 013 *1114323 S320-0006/01-000.84 00 SLIDE REPAIR W/PILING DRY RIDGE RD SLIDE CR 6/1 AT MP 0.84 COUNTY: KANAWHA ------------------------------------------------------------------------------------------------------------------------------------ 014 1112931 S325-0310/00-009.89 00 00BR 0310 034 D CLEAN AND PAINT STRUCTURE DAVID MORGAN MEMORIAL BRIDGE 0.22 MILE NORTH OF COUNTY ROUTE 19/73 COUNTY: MARION BRIDGE : 25A189 CONCRETE SLAB ON FABRICATED STEEL GIRDER SPAN(S): 6 ; DBE GOAL: 2 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 015 *1203101 S340-0034/00-021.36 00 REPAIR DAMAGE ROSS BOOTH MEMORIAL BRIDGE REPAIR 0.31 MI N WV 817 COUNTY: PUTNAM BRIDGE : 1364.7 CONCRETE SLAB ON STEEL THRU TRUSS SPAN(S): 10 ; ------------------------------------------------------------------------------------------------------------------------------------ 016 *1114405 S340-0001/00-001.77 0 SLIDE REPAIR W/PILING MANILLA RIDGE ROAD SLIDE CORRECTION CR-1 MP 1.77 COUNTY: PUTNAM REMARKS : CR 1MANILLA RIDGE RD SLID ------------------------------------------------------------------------------------------------------------------------------------ 017 0607641 U354-0050/00-004.83 00 0NHG 0050 272 D00 SIGNING US 50 SIGNING RENOVATION I/S US 50 (PARKERSBURG) - I/S US 50 (CLARKSBURG) COUNTY: WOOD RITCHIE HARRISON DODDRIDGE DBE GOAL: 3 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 018 1131116 S305-0001/08-000.00 00 RESURFACING CR 1/8, HOSPITAL HILL ROAD RESURFACING BEG: MP 0.00, JCT CR 1, END: MP 1.52, 0.89 MI S JCT CR 105 COUNTY: BROOKE ------------------------------------------------------------------------------------------------------------------------------------ 019 1131120 S305-0002/00-006.83 00 RESURFACING WV 2, WELLSBURG ROAD RESURFACING BEG: MP 6.83, JCT WV 67 END: MP 7.59, 0.12 MI N JCT WV 27 COUNTY: BROOKE ------------------------------------------------------------------------------------------------------------------------------------ 020 1130520 S312-0028/00-009.28 00 RESURFACING WV 28 1.37 MILES EAST CR 28/9 - 0.22 MILES WEST CR 28/10 COUNTY: GRANT ------------------------------------------------------------------------------------------------------------------------------------ WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- May 22, 2012 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 021 1130723 S311-0047/00-000.00 00 RESURFACING RITCHIE COUNTY LINE-COXS MILL ROAD RITCHIE COUNTY LINE - CO 3 COUNTY: GILMER ------------------------------------------------------------------------------------------------------------------------------------ 022 1131124 S315-0024/00-000.00 00 RESURFACING CR 24, FRANKFORT ROAD RESURFACING BEG: 0.00 JCT WV 8 END: 1.35 0.02 MI E JCT CR 2/3 COUNTY: HANCOCK ------------------------------------------------------------------------------------------------------------------------------------ 023 1130515 S316-0055/20-027.50 00 RESURFACING OLD ROUTE 55 0.02 MILES EAST WV 259 - 0.66 MILES EAST WV 29 COUNTY: HARDY ------------------------------------------------------------------------------------------------------------------------------------ 024 1130724 S321-0017/00-003.21 00 RESURFACING COPLEY ROAD CO 17/2 - 0.28 MILE W CO 20 COUNTY: LEWIS ------------------------------------------------------------------------------------------------------------------------------------ 025 1131122 S326-0014/00-001.49 00 RESURFACING CR 14, PINE HILL ROAD RESURFACING CR 14, PINE HILL ROAD RESURFACING COUNTY: MARSHALL ------------------------------------------------------------------------------------------------------------------------------------ 026 1131119 S326-0017/00-008.60 00 RESURFACING CR 17, FORK RIDGE ROAD RESURFACING CR 17, FORK RIDGE ROAD RESURFACING COUNTY: MARSHALL ------------------------------------------------------------------------------------------------------------------------------------ 027 *1133327 S326-0007/00-000.00 00 HSIP 0007 239 D00 GUARDRAIL MARSHALL COUNTY GUARDRAIL INSTALLATION VARIOUS COUNTY: MARSHALL ------------------------------------------------------------------------------------------------------------------------------------ 028 1125927 S326-0250/00-025.41 00 00NH 0250 208 D00 RESURFACING US 250, SHERRARD TO GRANDVIEW ROAD RESURFACING BEG: MP 25.41, JCT WV 88 END: MP 28.04, 0.45 MI S JCT CR 12 COUNTY: MARSHALL DBE GOAL: 7 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 029 1131123 S348-0007/00-008.40 00 RESURFACING CR 7, WICK ROAD RESURFACING BEG:MP8.40 0.49MI N JCT CR6 END:MP10.42 0.27MI N JCT CR7/3 COUNTY: TYLER ------------------------------------------------------------------------------------------------------------------------------------ WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- May 22, 2012 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 030 1130725 S349-0011/00-013.59 00 RESURFACING ALEXANDER ROAD 0.13 MILE E CO 11/11 - CO 11/13 COUNTY: UPSHUR ------------------------------------------------------------------------------------------------------------------------------------ 031 *1130726 S351-0015/03-000.02 00 RESURFACING CURTIN ROAD 0.02 MILE E WV 15 - 0.02 MILE E CO 15/6 COUNTY: WEBSTER ------------------------------------------------------------------------------------------------------------------------------------ 032 *1131115 S352-0007/00-002.70 00 RESURFACING WV 7, NEW MARTINSVILLE TO FAIRGROUNDS ROAD RESURFACING BEG: MP2.70,0.58MI E JCT CR7/9,END: MP4.00,0.11MI E JCT CR32 COUNTY: WETZEL ------------------------------------------------------------------------------------------------------------------------------------ 033 1116544 S352-0002/00-007.17 00 00NH 0002 510 D00 RESURFACING WV 2, NEW MARTINSVILLE ROAD RESURFACING BEG 0.22 MI N JCT WV 7 END 0.31 MI S JCT CR 2/8 COUNTY: WETZEL DBE GOAL: 8 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 034 1130507 S310-0011/00-000.00 00 RESURFACING CLIFFTOP ROAD + 1 BEG: WV 41 & CR 11 - END: 0.02 MI NORTH OF CR 11/3 & WV 41 COUNTY: FAYETTE REMARKS : ------------------------------------------------------------------------------------------------------------------------------------ 035 0512340R3 S313-0064/00-150.06 00 00IM 0644 145 D00 REHABILITATION-RESTORATION-RESURFACING DAWSON - SAM BLACK CHURCH MP. 149.84 - MP. 155.99 COUNTY: GREENBRIER DBE GOAL: 3 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ 036 1130514 S319-0480/00-000.00 00 RESURFACING SHEPHERDSTOWN ROAD JCT OF OLD WV 9 - 0.17 MILES SOUTH OF CR 16 COUNTY: JEFFERSON ------------------------------------------------------------------------------------------------------------------------------------ 037 1125928 S326-0002/00-010.88 00 00NH 0002 519 D00 RESURFACING WV 2, CRESAP ROAD RESURFACING BEG:MP10.88 2.43MI N JCT CR74 END:MP11.42 0.50MI S JCT CR2/1 COUNTY: MARSHALL DBE GOAL: 8 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. ------------------------------------------------------------------------------------------------------------------------------------ WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS -- May 22, 2012 LETTING ------------------------------------------------------------------------------------------------------------------------------------ Call Contract State Project Federal Project Description ==================================================================================================================================== 038 1131125 S326-0021/00-008.80 00 RESURFACING CR 21, SALLY'S BACKBONE ROAD RESURFACING BEG: 8.80 0.08 MI S JCT CR 21/14 END: 10.30 JCT CR 62 COUNTY: MARSHALL ------------------------------------------------------------------------------------------------------------------------------------ 039 1130506 S334-0034/00-000.00 00 RESURFACING WARD ROAD BEG: WV 39 - END: 0.35 MI EAST OF CR 34/5 COUNTY: NICHOLAS REMARKS : ------------------------------------------------------------------------------------------------------------------------------------ 040 1131161 S335-0015/01-002.00 00 RESURFACING CR 15/1, PARK VIEW ROAD RESURFACING BEG: 2.00 JCT CR 15/3 END: 2.77 KCT CR 40/1 COUNTY: OHIO ------------------------------------------------------------------------------------------------------------------------------------ 041 1207510 S349-0151/00-000.30 00 RESURFACING OLD US 33 0.30 MILE E CO 12 - CO 5/9 COUNTY: UPSHUR ------------------------------------------------------------------------------------------------------------------------------------ 042 1203826 S389-0GRD/RL-012.00 00 HSIP 2012 541 D00 GUARDRAIL UPGRADE GUARDRAIL (DELINQUENT GUARDRAIL) BEG: VARIES - END: VARIES COUNTY: GREENBRIER FAYETTE SUMMERS OTHER DBE GOAL: 5 % OF CONTRACT BID AMOUNT. BIDDER MUST PROVIDE WRITTEN ASSURANCE OF MEETING GOAL ON FORM IN PROPOSAL. REMARKS : ------------------------------------------------------------------------------------------------------------------------------------ 043 1209751 S320-0119/00-025.53 00 STRUCTURE REPLACEMENT COOPERS CREEK BRIDGE-DESIGN BUILD 0.07 MI N WV 114 COUNTY: KANAWHA ------------------------------------------------------------------------------------------------------------------------------------ Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX - BUILDING FIVE 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25304-0430 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Division of Highways NOTICE TO CONTRACTORS Electronic Bids, (via the Bid Express Bidding Service www.bidx.com), will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors’ license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12, of the West Virginia Code. All contractors submitting bids on project(s) should use the Electronic Bid Bond Service compatible with BIDX. If electronic bid bond service is not used, contractors must submit a proposal guarantee bond, cashers check, or certified check for $500.00 or 5% of total bid, whichever is greater prior to bid reading. Failure to include one of the above forms could result in a bid being declared irregular. Proposals and bid bonds must be submitted on standard forms which may be obtained thru BIDX or at the Charleston office. The right is reserved to reject any or all proposals * These are projects on which any contractor with a Category “W” Prequalification rating may be eligible to bid. Final award of all Interstate and Federal-Aid Projects, with the exception of exempt projects, is subject to the approval of the Federal Highway Administration. Minimum wage rates for these projects have been predetermined as required by law and are set forth in the bid proposal. Federal-Aid projects are subject to the WHA of 1961 PL-581 approved August 13, 1962. Plans and proposals shall be purchased through the Bid Express Bidding Service at www.bidx.com. The above noted project information will be available in the Contract Unit, Contract Administration Division, Division of Highways, Room A-737, Building 5, 1900 Kanawha Boulevard East, Charleston, WV 25305. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly reading bids for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid subscription with BIDX will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly read. The West Virginia Department of Transportation, Division of Highways hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex or national origin in consideration for an award. It is necessary to submit your approximate uncompleted workload prior to submitting a bid when you are over your prequalification limit. The reading of bids received will be in the order as designated in the “Notice to Contractors”. Sealed proposals (when prequalification has been waived) may also be deposited in the bid depository box which will be located near the corner of Piedmont Road and California Avenue between the hours of 9:00 A.M. and 10:00 A.M., on the day of the letting. Letting location: DOH CONFERENCE ROOM A-122 STATE CAPITOL COMPLEX – BUILDING 5 1900 KANAWHA BOULEVARD EAST CHARLESTON, WEST VIRGINIA 25305-0430 WEST VIRGNIA DEPARTMENT OF TRANSPORATION Division of Highways Robert L. Pennington, P.E. Director of Program Planning and Administration 1 FEDERAL PROJECT PAGE 1 Call Order : 001 CONTRACT ID : 0430842 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S302-0006/00-000.96 00 00BR 0006 030 D00 COUNTIES : BERKELEY DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/13 RES. ENG.: GARY LONG DESCRIPTION: PARK GAP BRIDGE ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 444.000 CY 0020 207002-000 SUBGRADE 335.000 CY 0025 207034-000 FABRIC FOR SEPARATION 1,922.000 SY 0030 211001-000 UNCLASSIFIED BORROW EXCAVATION 1,567.000 CY 0035 211008-000 ROCK BORROW EXCAVATION ,CAUSEWAY 321.000 TN 0040 307001-000 AGGREGATE BASE COURSE, CLASS 1 335.000 CY 0045 307001-000 AGGREGATE BASE COURSE, CLASS 10 45.000 CY 0050 502001-012 12 INCH PORTLAND CEMENT CONCRETE APPROACH SLAB 119.000 SY 0055 603028-001 PRECAST REINFORCED CONCRETE WINGWALL 278.000 SF 0060 604076-030 54 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A3 60.000 LF 0065 607001-001 TYPE 1 GUARDRAIL, CLASS II 325.000 LF 0070 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 2.000 EA 0075 607066-001 TANGENT END TERMINAL 2.000 EA 0080 636007-001 ERADICATION OF PAVEMENT MARKING 800.000 LF 0085 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 1,600.000 LF 0090 636011-001 TRAFFIC CONTROL DEVICE 8,180.000 UN 0095 636014-001 FLAGGER 600.000 HR 0100 636017-001 TEMPORARY CONCRETE BARRIER 200.000 LF 1 FEDERAL PROJECT PAGE 2 Call Order : 001 CONTRACT ID : 0430842 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S302-0006/00-000.96 00 00BR 0006 030 D00 COUNTIES : BERKELEY DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/13 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0105 636025-001 WARNING LIGHTS, TYPE B 720.000 DA 0110 638002-001 RIGHT OF WAY MARKER 25.000 EA 0115 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0120 640003-001 BUILDING EQUIPMENT LUMP LUMP 0125 640006-001 SMALL FIELD OFFICE 7.000 MO 0130 642004-001 SEED MIXTURE, TEMPORARY 9.000 LB 0135 642004-003 SEED MIXTURE, D 12.000 LB 0140 642005-001 MULCH, STRAW OR HAY 0.300 TN 0145 642005-002 MULCH, WOOD CELLULOSE FIBER 0.100 TN 0150 642006-001 FERTILIZER 0.100 TN 0155 642008-001 TEMPORARY PIPE ,CAUSEWAY 216.000 LF 0160 642010-001 AGRICULTURAL LIMESTONE 0.100 TN 0165 642012-001 SILT FENCE 1,900.000 LF 0170 642031-001 DITCH CHECK 20.000 EA 0175 652001-001 AGRICULTURAL LIMESTONE 0.090 TN 0180 652002-001 FERTILIZER, 10-20-10 0.080 TN 0185 652002-002 FERTILIZER, UREA FORMALDEHYDE 0.010 TN 0190 652003-002 SEED MIXTURE, D 10.000 LB 0195 652004-001 STRAW OR HAY MULCH 0.170 TN 0200 652004-002 WOOD CELLULOSE FIBER MULCH 0.110 TN 0205 663001-004 EDGE LINE, TYPE II - 4 IN WHITE 2,200.000 LF 1 FEDERAL PROJECT PAGE 3 Call Order : 001 CONTRACT ID : 0430842 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S302-0006/00-000.96 00 00BR 0006 030 D00 COUNTIES : BERKELEY DBE GOALS : 5.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 05/31/13 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0210 663002-038 CENTERLINE, TYPE II - 4 IN 2,200.000 LF 0215 663005-010 STOP LINE, TYPE V - 12 IN 20.000 LF 0220 401001-020 MARSHALL HMA BASE CRSE, SG, TY I 448.000 TN AA1 0225 401001-021 MARSHALL HMA BASE CRSE, S, TY I 428.000 TN AA2 0230 401002-020 MARSHALL HMA WEAR CRSE, SG, TY I 161.000 TN BB1 0235 401002-021 MARSHALL HMA WEAR CRSE, S, TY I 154.000 TN BB2 SECTION NO. 0002 BRIDGE #11013 0240 212001-000 STRUCTURE EXCAVATION 341.000 CY 0245 212005-000 SELECT MATERIAL FOR BACKFILLING 62.000 CY 0250 218006-000 FOUNDATION PROTECTION 356.000 CY 0255 601002-001 CLASS B CONCRETE 152.000 CY 0260 601003-001 CLASS K CONCRETE 25.000 CY 0265 601009-001 CLASS H CONCRETE 126.000 CY 0270 602002-001 EPOXY COATED REINFORCING STEEL BAR 43,522.000 LB 0275 615001-001 STEEL SUPERSTRUCTURE ( 183,977.00 ) LUMP 0280 616005-017 HP14X89 STEEL BEARING PILE, PRE-DRILLED AND DRIVEN 82.000 LF 0285 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP SECTION NO. 0003 COMPUTER SYSTEM 0290 640004-001 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP 1 FEDERAL PROJECT PAGE 4 Call Order : 002 CONTRACT ID : 1015315 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S320-0083/00-000.92 00 00BR 0083 053 D00 COUNTIES : KANAWHA DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/13 RES. ENG.: GARY MULLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 1,264.000 CY 0020 207002-000 SUBGRADE 705.000 CY 0025 207034-000 FABRIC FOR SEPARATION 1,155.000 SY 0030 307001-000 AGGREGATE BASE COURSE, CLASS 1 647.000 CY 0035 307001-000 AGGREGATE BASE COURSE, CLASS 10 23.000 CY 0040 415005-001 REMOVE EXISTING PAVEMENT SURFACE 487.000 SY 0045 502001-012 12 INCH PORTLAND CEMENT CONCRETE APPROACH SLAB 108.000 SY 0050 607001-001 TYPE 1 GUARDRAIL, CLASS I 100.000 LF 0055 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 4.000 EA 0060 636011-001 TRAFFIC CONTROL DEVICE 5,480.000 UN 0065 636012-010 PROJECT TRAFFIC CONTROL DEVICE CLEANING 2.000 EA 0070 636013-001 INDIVIDUAL TRAFFIC CONTROL DEVICE CLEANING 50.000 EA 0075 636014-001 FLAGGER 300.000 HR 0080 636025-001 WARNING LIGHTS, TYPE B 720.000 DA 0085 638002-001 RIGHT OF WAY MARKER 4.000 EA 0090 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0095 640003-001 BUILDING EQUIPMENT LUMP LUMP 0100 640006-001 SMALL FIELD OFFICE 8.000 MO 0105 642004-001 SEED MIXTURE, TEMPORARY 4.000 LB 1 FEDERAL PROJECT PAGE 5 Call Order : 002 CONTRACT ID : 1015315 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S320-0083/00-000.92 00 00BR 0083 053 D00 COUNTIES : KANAWHA DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/13 RES. ENG.: GARY MULLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0110 642004-002 SEED MIXTURE, B 9.000 LB 0115 642004-003 SEED MIXTURE, D 6.000 LB 0120 642005-001 MULCH, STRAW OR HAY 0.200 TN 0125 642005-002 MULCH, WOOD CELLULOSE FIBER 0.100 TN 0130 642010-001 AGRICULTURAL LIMESTONE 0.100 TN 0135 642012-001 SILT FENCE 1,100.000 LF 0140 642031-001 DITCH CHECK 5.000 EA 0145 652001-001 AGRICULTURAL LIMESTONE 0.100 TN 0150 652002-001 FERTILIZER, 10-20-10 0.100 TN 0155 652002-002 FERTILIZER, UREA FORMALDEHYDE 0.100 TN 0160 652003-001 SEED MIXTURES, B, C-1, OR C-2 7.000 LB 0165 652003-002 SEED MIXTURE, D 5.000 LB 0170 652004-001 STRAW OR HAY MULCH 0.100 TN 0175 652004-002 WOOD CELLULOSE FIBER MULCH 0.100 TN 0180 663001-004 EDGE LINE, TYPE II - 4 IN WHITE 550.000 LF 0185 663002-038 CENTERLINE, TYPE II - 4 IN 550.000 LF 0190 401001-020 MARSHALL HMA BASE CRSE, SG, TY I 346.000 TN AA1 0195 401001-021 MARSHALL HMA BASE CRSE, S, TY I 314.000 TN AA2 0200 401002-020 MARSHALL HMA WEAR CRSE, SG, TY I 58.000 TN BB1 0205 401002-021 MARSHALL HMA WEAR CRSE, S, TY I 53.000 TN BB2 SECTION NO. 0002 BRIDGE #11065 1 FEDERAL PROJECT PAGE 6 Call Order : 002 CONTRACT ID : 1015315 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S320-0083/00-000.92 00 00BR 0083 053 D00 COUNTIES : KANAWHA DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/13 RES. ENG.: GARY MULLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 BRIDGE #11065 0210 203001-000 DISMANTLING STRUCTURE LUMP LUMP 0215 212001-000 STRUCTURE EXCAVATION 504.000 CY 0220 212002-000 WET EXCAVATION 212.000 CY 0225 212004-000 COFFERDAM 2.000 EA 0230 212005-000 SELECT MATERIAL FOR BACKFILLING 532.000 CY 0235 218006-000 FOUNDATION PROTECTION 246.000 CY 0240 601002-001 CLASS B CONCRETE 239.000 CY 0245 601003-001 CLASS K CONCRETE 28.000 CY 0250 601009-001 CLASS H CONCRETE 172.000 CY 0255 602001-001 REINFORCING STEEL BAR 14,464.000 LB 0260 602002-001 EPOXY COATED REINFORCING STEEL BAR 64,196.000 LB 0265 615001-001 STEEL SUPERSTRUCTURE ( 131,006.00 ) LUMP 0270 615028-001 GUIDED BEARING, ELASTOMERIC 8.000 EA 0275 615029-001 NON-GUIDED BEARING, ELASTOMERIC 8.000 EA 0280 616005-018 HP14X73 STEEL BEARING PILE, PRE-DRILLED AND DRIVEN 209.000 LF 0285 625001-012 36 INCH DIAMETER DRILLED CAISSONS 130.000 LF 0290 625003-010 30 INCH ROCK SOCKET FOUNDATION 42.000 LF 0295 625005-001 PREINSTALLATION CORE HOLE 172.000 LF 0300 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0305 642050-001 DEWATERING DEVICE 4.000 EA SECTION NO. 0003 COMPUTER SYSTEM 1 FEDERAL PROJECT PAGE 7 Call Order : 002 CONTRACT ID : 1015315 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S320-0083/00-000.92 00 00BR 0083 053 D00 COUNTIES : KANAWHA DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/31/13 RES. ENG.: GARY MULLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0003 COMPUTER SYSTEM 0310 640004-001 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP 1 STATE PROJECT PAGE 8 Call Order : 003 CONTRACT ID : 1022302 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S336-0023/00-017.34 00 COUNTIES : PENDLETON GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/15/12 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CLEAN & PAINT 0005 204001-000 MOBILIZATION LUMP LUMP 0010 636011-001 TRAFFIC CONTROL DEVICE 6,060.000 UN 0015 636014-001 FLAGGER 300.000 HR 0020 636025-001 WARNING LIGHTS, TYPE B 540.000 DA 0025 688002-001 CLEAN AND PAINT EXISTING STEEL BRIDGE COATED WITH LEAD BASE LUMP LUMP PAINT 0030 688003-001 CONTAINMENT AND DISPOSAL OF SPENT MATERIAL LUMP LUMP 1 FEDERAL PROJECT PAGE 9 Call Order : 004 CONTRACT ID : 0412442 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S336-0033/00-005.93 00 00BR 0033 266 D00 COUNTIES : PENDLETON DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/13 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 4,209.000 CY 0020 207002-000 SUBGRADE 1,015.000 CY 0025 207034-000 FABRIC FOR SEPARATION 6,231.000 SY 0030 211001-000 UNCLASSIFIED BORROW EXCAVATION 11,382.000 CY 0035 211002-000 ROCK BORROW EXCAVATION 200.000 CY 0040 240001-000 CLEAN CULVERT 40.000 LF 0045 307001-000 AGGREGATE BASE COURSE, CLASS 1 460.000 CY 0050 307001-000 AGGREGATE BASE COURSE, CLASS 10 213.000 CY 0055 307001-000 AGGREGATE BASE COURSE, CLASS 3 46.000 CY 0060 311006-001 OPEN GRADED FREE DRAINING BASE COURSE 232.000 CY 0065 408002-001 BITUMINOUS MATERIAL 564.000 GA 0070 502001-012 12 INCH PORTLAND CEMENT CONCRETE APPROACH SLAB 164.000 SY 0075 604009-016 18 INCH CORRUGATED STEEL PIPE END SECTION 2.000 EA 0080 604072-120 24 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 1.000 EA 0085 604076-016 18 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 17.000 LF 0090 604076-020 24 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 20.000 LF 0095 606029-001 FREE DRAINING BASE TRENCH 483.000 LF 0100 606030-001 OUTLET PIPE, 6 INCH 37.000 LF 0105 607001-001 TYPE 1 GUARDRAIL, CLASS I 862.500 LF 1 FEDERAL PROJECT PAGE 10 Call Order : 004 CONTRACT ID : 0412442 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S336-0033/00-005.93 00 00BR 0033 266 D00 COUNTIES : PENDLETON DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/13 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0110 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION 4.000 EA 0115 607010-020 GUARDRAIL REMOVAL 788.000 LF 0120 607065-001 FLARED END TERMINAL 3.000 EA 0125 608003-005 5 FT TEMPORARY FENCE 890.000 LF 0130 610001-003 PLAIN CONCRETE CURBING, TYPE III 40.000 LF 0135 633003-001 DUMPED ROCK GUTTER 23.000 CY 0140 636007-001 ERADICATION OF PAVEMENT MARKING 2,800.000 LF 0145 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN SOLID LINE 5,800.000 LF 0150 636011-001 TRAFFIC CONTROL DEVICE 4,390.000 UN 0155 636012-010 PROJECT TRAFFIC CONTROL DEVICE CLEANING 2.000 EA 0160 636013-001 INDIVIDUAL TRAFFIC CONTROL DEVICE CLEANING 75.000 EA 0165 636014-001 FLAGGER 400.000 HR 0170 636017-001 TEMPORARY CONCRETE BARRIER 156.000 LF 0175 636025-001 WARNING LIGHTS, TYPE B 550.000 DA 0180 638002-001 RIGHT OF WAY MARKER 9.000 EA 0185 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0190 640003-001 BUILDING EQUIPMENT LUMP LUMP 0195 640006-001 SMALL FIELD OFFICE 12.000 MO 0200 642001-001 TEMPORARY BERM 3,233.000 LF 0205 642002-001 SLOPE DRAIN 80.000 LF 0210 642004-001 SEED MIXTURE, TEMPORARY 458.000 LB 1 FEDERAL PROJECT PAGE 11 Call Order : 004 CONTRACT ID : 0412442 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S336-0033/00-005.93 00 00BR 0033 266 D00 COUNTIES : PENDLETON DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/13 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0215 642005-001 MULCH, STRAW OR HAY 5.000 TN 0220 642005-002 MULCH, WOOD CELLULOSE FIBER 1.000 TN 0225 642006-001 FERTILIZER 0.800 TN 0230 642008-001 TEMPORARY PIPE 80.000 LF 0235 642009-001 CONTOUR DITCH 4,900.000 LF 0240 642010-001 AGRICULTURAL LIMESTONE 3.000 TN 0245 642012-001 SILT FENCE 3,270.000 LF 0250 642031-001 DITCH CHECK 7.000 EA 0255 642033-001 SEDIMENT TRAP 164.000 CY 0260 642036-001 SEDIMENT REMOVAL 164.000 CY 0265 642040-001 INLET PROTECTION 2.000 EA 0270 642042-001 FLOCCULANT BLOCK 4.000 EA 0275 652002-001 FERTILIZER, 10-20-10 1.100 TN 0280 652002-002 FERTILIZER, UREA FORMALDEHYDE 0.400 TN 0285 652003-001 SEED MIXTURES, B, C-1, OR C-2 141.000 LB 0290 652003-002 SEED MIXTURE, D 231.000 LB 0295 652004-001 STRAW OR HAY MULCH 4.000 TN 0300 652004-002 WOOD CELLULOSE FIBER MULCH 0.100 TN 0305 655001-001 MATTING 22.000 SY 0310 657008-001 2.00 LB CHANNEL POST 61.500 LF 0315 657010-001 3.00 LB CHANNEL POST 42.000 LF 1 FEDERAL PROJECT PAGE 12 Call Order : 004 CONTRACT ID : 0412442 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S336-0033/00-005.93 00 00BR 0033 266 D00 COUNTIES : PENDLETON DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/13 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GRADE, DRAIN & PAVE 0320 661001-001 0.080 IN FLAT SHEET SIGN 37.000 SF 0325 663001-004 EDGE LINE, TYPE II - 4 IN WHITE 3,270.000 LF 0330 663002-038 CENTERLINE, TYPE II - 4 IN 3,270.000 LF 0335 665004-001 WATER WELL SURVEY 1.000 EA 0340 401001-020 MARSHALL HMA BASE CRSE, SG, TY I 943.000 TN AA1 0345 401001-021 MARSHALL HMA BASE CRSE, S, TY I 850.000 TN AA2 0350 401001-023 MARSHALL HMA BASE CRSE, SG, TY II 431.000 TN AB1 0355 401001-024 MARSHALL HMA BASE CRSE, S, TY II 389.000 TN AB2 0360 401002-020 MARSHALL HMA WEAR CRSE, SG, TY I 337.000 TN AC1 0365 401002-021 MARSHALL HMA WEAR CRSE, S, TY I 303.000 TN AC2 0370 604076-020 24 INCH ALUMINUM COATED CORRUGATED STEEL PIPE, A2 66.000 LF AD1 0375 604072-120 24 INCH CORRUGATED STEEL PIPE SAFETY SLOPE END SECTION 2.000 EA AD1 0380 604037-020 24 INCH REINFORCED CONCRETE PIPE, CLASS II 66.000 LF AD2 0385 604071-020 24 INCH REINFORCED CONCRETE PIPE SAFETY SLOPE END SECTION 2.000 EA AD2 SECTION NO. 0002 BRIDGE #11001 0390 203001-000 DISMANTLING STRUCTURE LUMP LUMP 0395 212001-000 STRUCTURE EXCAVATION 119.000 CY 0400 212003-000 ROCK EXCAVATION 56.000 CY 0405 212004-000 COFFERDAM 1.000 EA 0410 212005-000 SELECT MATERIAL FOR BACKFILLING 68.000 CY 0415 218006-000 FOUNDATION PROTECTION 1,823.000 CY 1 FEDERAL PROJECT PAGE 13 Call Order : 004 CONTRACT ID : 0412442 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S336-0033/00-005.93 00 00BR 0033 266 D00 COUNTIES : PENDLETON DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 07/31/13 RES. ENG.: KYLE HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0002 BRIDGE #11001 0420 601002-001 CLASS B CONCRETE 216.000 CY 0425 601003-001 CLASS K CONCRETE 58.000 CY 0430 601009-001 CLASS H CONCRETE 384.000 CY 0435 602001-001 REINFORCING STEEL BAR 14,401.000 LB 0440 602002-001 EPOXY COATED REINFORCING STEEL BAR 110,538.000 LB 0445 615001-001 STEEL SUPERSTRUCTURE ( 646,459.00 ) LUMP 0450 625001-012 36 INCH DIAMETER DRILLED CAISSONS 98.000 LF 0455 625003-010 30 INCH ROCK SOCKET FOUNDATION 20.000 LF 0460 625005-001 PREINSTALLATION CORE HOLE 130.000 LF 0465 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0470 642050-001 DEWATERING DEVICE 6.000 EA SECTION NO. 0003 COMPUTER SYSTEM 0475 640004-001 COMPUTER SYSTEM FOR FIELD OFFICE LUMP LUMP 1 STATE PROJECT PAGE 14 Call Order : 005 CONTRACT ID : 1022301 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S343-0807/00-000.00 00 0 COUNTIES : RITCHIE GUARANTY : 5% OF BID TOTAL PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/19/12 RES. ENG.: MIKE FOLEY ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CLEAN & PAINT 0005 204001-000 MOBILIZATION LUMP LUMP 0010 636011-001 TRAFFIC CONTROL DEVICE 5,700.000 UN 0015 636014-001 FLAGGER 300.000 HR 0020 636025-001 WARNING LIGHTS, TYPE B 200.000 DA 0025 688002-001 CLEAN AND PAINT EXISTING STEEL BRIDGE COATED WITH LEAD BASE LUMP LUMP PAINT 0030 688003-001 CONTAINMENT AND DISPOSAL OF SPENT MATERIAL LUMP LUMP 1 FEDERAL PROJECT PAGE 15 Call Order : 006 CONTRACT ID : 1127348 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S306-0043/00-010.06 00 0STP 0043 133 D00 COUNTIES : CABELL DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/15/12 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408002-001 BITUMINOUS MATERIAL 717.000 GA 0010 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN WHITE 20,608.000 LF 0015 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN YELLOW 20,608.000 LF 0020 636011-001 TRAFFIC CONTROL DEVICE 1,780.000 UN 0025 636014-001 FLAGGER 50.000 HR 0030 663001-004 EDGE LINE, TYPE II - 4 IN WHITE 20,608.000 LF 0035 663002-038 CENTERLINE, TYPE II - 4 IN 20,608.000 LF 0040 401002-020 MARSHALL HMA WEAR CRSE, SG, TY I 2,066.000 TN AA1 0045 401002-021 MARSHALL HMA WEAR CRSE, S, TY I 1,963.000 TN AA2 0050 401003-001 MARSHALL HMA P/L CRSE, SG 400.000 TN BB1 GRAVEL 0055 401003-002 MARSHALL HMA P/L CRSE, S 380.000 TN BB2 1 FEDERAL PROJECT PAGE 16 Call Order : 007 CONTRACT ID : 1127427 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S323-0010/00-002.98 00 0STP 0010 231 D00 COMPLETION DATE : 10/15/12 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408002-001 BITUMINOUS MATERIAL 397.000 GA 0010 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN WHITE 11,150.000 LF 0015 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN YELLOW 11,150.000 LF 0020 636011-001 TRAFFIC CONTROL DEVICE 1,420.000 UN 0025 636014-001 FLAGGER 30.000 HR 0030 663001-004 EDGE LINE, TYPE II - 4 IN WHITE 11,150.000 LF 0035 663002-038 CENTERLINE, TYPE II - 4 IN 11,150.000 LF 0040 401002-020 MARSHALL HMA WEAR CRSE, SG, TY I 1,141.000 TN AA1 0045 401002-021 MARSHALL HMA WEAR CRSE, S, TY I 1,084.000 TN AA2 0050 401007-020 MARSHALL SCRATCH CRSE, SG, TY I 100.000 TN BB1 0055 401007-021 MARSHALL SCRATCH CRSE, S, TY I 95.000 TN BB2 1 FEDERAL PROJECT PAGE 17 Call Order : 008 CONTRACT ID : 1127329 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S328-0104/00-000.00 00 0STP 0104 010 D00 COUNTIES : MERCER DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/15/12 RES. ENG.: JENNIFER BELCHER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207001-001 UNCLASSIFIED EXCAVATION 550.000 CY 0015 207034-000 FABRIC FOR SEPARATION 422.000 SY 0020 229001-000 SHOULDER AND DITCH 1.200 MI 0025 408002-001 BITUMINOUS MATERIAL 360.000 GA 0030 415005-001 REMOVE EXISTING PAVEMENT SURFACE 82.000 SY 0035 607001-001 TYPE 1 GUARDRAIL, CLASS I 50.000 LF 0040 607010-020 GUARDRAIL REMOVAL 40.000 LF 0045 607037-001 BUFFER END SECTION 1.000 EA 0050 636006-001 PILOT TRUCK AND DRIVER 9.000 DA 0055 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN 15,071.000 LF 0060 636011-001 TRAFFIC CONTROL DEVICE 5,690.000 UN 0065 636014-001 FLAGGER 380.000 HR 0070 636025-001 WARNING LIGHTS, TYPE B 140.000 DA 0075 636026-001 TEMPORARY LIGHTING LUMP LUMP 0080 642004-002 SEED MIXTURE, B 52.000 LB 0085 642005-002 MULCH, WOOD CELLULOSE FIBER 1.100 TN 0090 642006-001 FERTILIZER 0.300 TN 0095 660002-001 TRAFFIC DETECTOR, LPS 1.000 EA 0100 663001-004 EDGE LINE, TYPE II - 4 IN WHITE 7,210.000 LF 0105 663002-005 LANE LINE, TYPE II - 4 IN 111.000 LF 1 FEDERAL PROJECT PAGE 18 Call Order : 008 CONTRACT ID : 1127329 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S328-0104/00-000.00 00 0STP 0104 010 D00 COUNTIES : MERCER DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/15/12 RES. ENG.: JENNIFER BELCHER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 663002-038 CENTERLINE, TYPE II - 4 IN 7,210.000 LF 0115 663004-011 CHANNELIZING LINE, TYPE V - 8 IN 540.000 LF 0120 663005-010 STOP LINE, TYPE V - 12 IN 36.000 LF 0125 663006-010 CROSSWALK LINE, TYPE V - 12 IN X 6 FT 168.000 LF 0130 663010-010 ONE DIRECTION LANE ASSIGNMENT ARROW, TY V 9.000 EA 0135 663010-011 MULTI DIRECTIONAL LANE ASSIGNMENT ARROW, TY V 3.000 EA 0140 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 1 210.000 TN AA1 0145 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 1 189.000 TN AA2 0150 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 30.000 TN BB1 0155 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 27.000 TN BB2 0160 401001-020 MARSHALL HMA BASE CRSE, SG, TY I 810.000 TN CC1 0165 401001-021 MARSHALL HMA BASE CRSE, S, TY I 729.000 TN CC2 0170 401007-020 MARSHALL SCRATCH CRSE, SG, TY I 490.000 TN DD1 0175 401007-021 MARSHALL SCRATCH CRSE, S, TY I 441.000 TN DD2 0180 402001-020 MARSHALL HMA SKID PVT, SG, TY I 1,260.000 TN EE1 0185 402001-021 MARSHALL HMA SKID PVT, S, TY I 1,134.000 TN EE2 1 STATE PROJECT PAGE 19 Call Order : 009 CONTRACT ID : 1207401 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S339-0024/00-000.00 00 COMPLETION DATE : 10/31/12 RES. ENG.: JASON NELSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 207001-001 UNCLASSIFIED EXCAVATION 868.000 CY 0010 218003-000 GABION 14.000 CY 0015 229001-000 SHOULDER AND DITCH 7.520 MI 0020 408002-001 BITUMINOUS MATERIAL 1,800.000 GA 0025 607001-001 TYPE 1 GUARDRAIL, CLASS 1 850.000 LF 0030 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 1,012.500 LF 0035 607010-020 GUARDRAIL REMOVAL 387.500 LF 0040 607027-001 BULLNOSE ATTENUATOR 1.000 EA 0045 607037-001 BUFFER END SECTION 5.000 EA 0050 607065-002 FLARED END TERMINAL, REMOVE AND RESET 6.000 EA 0055 607066-001 TANGENT END TERMINAL 2.000 EA 0060 636006-001 PILOT TRUCK AND DRIVER 15.000 DA 0065 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN 76,773.000 LF 0070 636011-001 TRAFFIC CONTROL DEVICE 4,210.000 UN 0075 636014-001 FLAGGER 460.000 HR 0080 642004-002 SEED MIXTURE, B 190.000 LB 0085 642005-002 MULCH, WOOD CELLULOSE FIBER 1.500 TN 0090 642006-001 FERTILIZER 0.800 TN 0095 642031-001 DITCH CHECK 82.000 EA 0100 663001-004 EDGE LINE, TYPE II - 4 IN WHITE 40,868.000 LF 0105 663002-038 CENTERLINE, TYPE II - 4 IN 35,905.000 LF 0110 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 550.000 TN AA1 0115 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 523.000 TN AA2 1 STATE PROJECT PAGE 20 Call Order : 009 CONTRACT ID : 1207401 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S339-0024/00-000.00 00 COMPLETION DATE : 10/31/12 RES. ENG.: JASON NELSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0120 401001-023 MARSHALL HMA BASE CRSE, SG, TY II 1,725.000 TN BB1 0125 401001-024 MARSHALL HMA BASE CRSE, S, TY II 1,600.000 TN BB2 0130 401002-020 MARSHALL HMA WEAR CRSE, SG, TY I 5,000.000 TN CC1 0135 401002-021 MARSHALL HMA WEAR CRSE, S, TY I 4,750.000 TN CC2 0140 401003-001 MARSHALL HMA P/L CRSE, SG 600.000 TN DD1 GRAVEL 0145 401003-002 MARSHALL HMA P/L CRSE, S 570.000 TN DD2 1 FEDERAL PROJECT PAGE 21 Call Order : 010 CONTRACT ID : 1127230 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S349-0020/00-024.89 00 0STP 0020 285 D COUNTIES : UPSHUR DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/15/12 RES. ENG.: KIP HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 TENNERTON ROAD 0005 408002-001 BITUMINOUS MATERIAL 1,740.000 GA 0010 415005-001 REMOVE EXISTING PAVEMENT SURFACE 28,997.000 SY 0015 605020-001 INSTALL INLET GRATE, TYPE 1 4.000 EA 0020 636006-001 PILOT TRUCK AND DRIVER 15.000 DA 0025 636011-001 TRAFFIC CONTROL DEVICE 4,390.000 UN 0030 636014-001 FLAGGER 600.000 HR 0035 660002-005 TRAFFIC DETECTOR, LPS-C 1.000 EA 0040 660002-010 TRAFFIC DETECTOR, LPS-SD 4.000 EA 0045 662015-001 ELECTRICAL TEST, TRAFFIC DETECTORS, PER INTERSECTION ( 1.00 ) LUMP 0050 663001-004 EDGE LINE, TYPE II - 4 IN WHITE 5,872.000 LF 0055 663002-005 LANE LINE, TYPE II - 4 IN WHITE 606.000 LF 0060 663002-038 CENTERLINE, TYPE II - 4 IN YELLOW 25,672.000 LF 0065 663004-011 CHANNELIZING LINE, TYPE V - 8 IN 1,956.000 LF 0070 663005-011 STOP LINE, TYPE V - 24 IN 245.000 LF 0075 663006-010 CROSSWALK LINE, TYPE V - 12 IN X 6 FT 796.000 LF 0080 663007-010 STRIPE, TYPE V - 12 IN WHITE 593.000 LF 0085 663007-010 STRIPE, TYPE V - 12 IN YELLOW 213.000 LF 0090 663010-010 ONE DIRECTION LANE ASSIGNMENT ARROW, TY V 31.000 EA 0095 663010-011 MULTI DIRECTIONAL LANE ASSIGNMENT ARROW, TY V 6.000 EA 0100 663010-013 LANE DROP ARROW, TY V 1.000 EA 0105 663011-010 LANE LETTER, TYPE V 36.000 EA 1 FEDERAL PROJECT PAGE 22 Call Order : 010 CONTRACT ID : 1127230 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S349-0020/00-024.89 00 0STP 0020 285 D COUNTIES : UPSHUR DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/15/12 RES. ENG.: KIP HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 TENNERTON ROAD 0110 663015-005 RAILROAD CROSSING MARKING, TYPE V 4.000 EA 0115 401003-011 SUPERPAVE HMA PCH/LEV CRSE, SG 9.000 TN AA1 0120 401003-012 SUPERPAVE HMA PCH/LEV CRSE, S 8.000 TN AA2 0125 401007-040 SUPERPAVE HMA SCRATCH CRSE, SG, TY 9.5 798.000 TN BB1 0130 401007-041 SUPERPAVE HMA SCRATCH CRSE, S, TY 9.5 718.000 TN BB2 0135 402001-040 SUPERPAVE HMA SKID PVT, SG, TY 9.5 2,393.000 TN CC1 0140 402001-041 SUPERPAVE HMA SKID PVT, S, TY 9.5 2,154.000 TN CC2 1 FEDERAL PROJECT PAGE 23 Call Order : 011 CONTRACT ID : 1127350 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S350-0020/00-002.98 00 0STP 0020 288 D00 COMPLETION DATE : 10/15/12 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408002-001 BITUMINOUS MATERIAL 474.000 GA 0010 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN YELLOW 16,070.000 LF 0015 636011-001 TRAFFIC CONTROL DEVICE 1,600.000 UN 0020 636014-001 FLAGGER 40.000 HR 0025 663002-038 CENTERLINE, TYPE II - 4 IN 16,070.000 LF 0030 401002-020 MARSHALL HMA WEAR CRSE, SG, TY I 1,378.000 TN AA1 0035 401002-021 MARSHALL HMA WEAR CRSE, S, TY I 1,309.000 TN AA2 0040 401002-026 MARSHALL WMA WEAR CRSE, SG, TY I 1,378.000 TN AA3 0045 401002-027 MARSHALL WMA WEAR CRSE, S, TY I 1,309.000 TN AA4 0050 401003-001 MARSHALL HMA P/L CRSE, SG 300.000 TN BB1 GRAVEL 0055 401003-002 MARSHALL HMA P/L CRSE, S 285.000 TN BB2 0060 401003-006 MARSHALL WMA P/L CRSE, SG 300.000 TN BB3 0065 401003-007 MARSHALL WMA P/L CRSE, S 285.000 TN BB4 1 FEDERAL PROJECT PAGE 24 Call Order : 012 CONTRACT ID : 1127341 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S350-0052/00-011.93 00 00NH 0052 297 D00 COUNTIES : WAYNE DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 0.00 PLANS COMPLETE : 0.00 PLANS WO X-SECTIONS : 0.00 COMPLETION DATE : 06/30/12 RES. ENG.: CHRIS COLLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 408002-001 BITUMINOUS MATERIAL 318.000 GA 0010 415005-001 REMOVE EXISTING PAVEMENT SURFACE 10,624.000 SY 0015 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN WHITE 6,622.000 LF 0020 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN YELLOW 11,068.000 LF 0025 636011-001 TRAFFIC CONTROL DEVICE 1,420.000 UN 0030 636014-001 FLAGGER 40.000 HR 0035 663001-004 EDGE LINE, TYPE II - 4 IN WHITE 6,622.000 LF 0040 663002-038 CENTERLINE, TYPE II - 4 IN 11,068.000 LF 0045 402001-050 SUPERPAVE HMA SKID PVT, SG, TY 19 1,511.000 TN AA1 0050 402001-051 SUPERPAVE HMA SKID PVT, S, TY 19 1,435.000 TN AA2 0055 401007-050 SUPERPAVE HMA SCRATCH CRSE, SG, TY 4.75 340.000 TN BB1 0060 401007-051 SUPERPAVE HMA SCRATCH CRSE, S, TY 4.75 323.000 TN BB2 1 STATE PROJECT PAGE 25 Call Order : 013 CONTRACT ID : 1114323 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S320-0006/01-000.84 00 COMPLETION DATE : 10/15/12 RES. ENG.: GARY MULLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SLIDE CORRECTION 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 22.000 CY 0020 207034-000 FABRIC FOR SEPARATION 178.000 SY 0025 408002-001 BITUMINOUS MATERIAL 11.000 GA 0030 415005-001 REMOVE EXISTING PAVEMENT SURFACE 269.000 SY 0035 604050-016 18 INCH CORRUGATED POLYETHYLENE PIPE 10.000 LF 0040 607001-001 TYPE 1 GUARDRAIL, CLASS CLASS II 175.000 LF 0045 614001-003 HP10X42 STEEL PILE 1,241.000 LF 0050 636009-002 TEMPORARY PAVEMENT MARKING-TAPE 6 IN, TY WHITE 18.000 LF 0055 636011-001 TRAFFIC CONTROL DEVICE 3,420.000 UN 0060 636014-001 FLAGGER 384.000 HR 0065 636022-001 CHANGEABLE MESSAGE SIGN 48.000 DA 0070 638002-001 RIGHT OF WAY MARKER 8.000 EA 0075 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0080 642004-002 SEED MIXTURE, B 20.000 LB 0085 642005-002 MULCH, WOOD CELLULOSE FIBER 0.200 TN 0090 642006-001 FERTILIZER 0.200 TN 0095 642011-001 HAY OR STRAW BALE 10.000 EA 0100 642012-001 SILT FENCE 180.000 LF 0105 652001-001 AGRICULTURAL LIMESTONE 0.200 TN 0110 652002-001 FERTILIZER, 10-20-10 0.100 TN 0115 652003-001 SEED MIXTURES, B, C-1, OR C-2 20.000 LB 1 STATE PROJECT PAGE 26 Call Order : 013 CONTRACT ID : 1114323 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S320-0006/01-000.84 00 COMPLETION DATE : 10/15/12 RES. ENG.: GARY MULLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SLIDE CORRECTION 0120 652004-001 STRAW OR HAY MULCH HAY 0.200 TN 0125 401001-023 MARSHALL HMA BASE CRSE, SG, TY II 4" 18.000 TN AA1 0130 401001-024 MARSHALL HMA BASE CRSE, S, TY II 4" 17.000 TN AA2 0135 401002-020 MARSHALL HMA WEAR CRSE, SG, TY I 1.5" 29.000 TN BB1 0140 401002-021 MARSHALL HMA WEAR CRSE, S, TY I 1.5" 28.000 TN BB2 0145 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 88.000 TN CC1 0150 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 81.000 TN CC2 0155 614003-001 CONCRETE LAGGING, THICKNESS 6 INCH 675.000 SF DD1 0160 614004-001 TIMBER LAGGING 675.000 SF DD2 1 FEDERAL PROJECT PAGE 27 Call Order : 014 CONTRACT ID : 1112931 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S325-0310/00-009.89 00 00BR 0310 034 D COUNTIES : MARION DBE GOALS : 2.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/15/12 RES. ENG.: JASON NELSON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CLEAN & PAINT 0005 204001-000 MOBILIZATION LUMP LUMP 0010 636011-001 TRAFFIC CONTROL DEVICE 5,820.000 UN 0015 636014-001 FLAGGER 600.000 HR 0020 636014-002 TRAFFIC DIRECTOR 200.000 HR 0025 636022-001 CHANGEABLE MESSAGE SIGN 480.000 DA 0030 636025-001 WARNING LIGHTS, TYPE B 1,200.000 DA 0035 636028-001 SHADOW VEHICLE 240.000 DA 0040 636030-001 SPEED MONITORING TRAILER 240.000 DA 0045 688002-001 CLEAN AND PAINT EXISTING STEEL BRIDGE COATED WITH LEAD BASE LUMP LUMP PAINT 0050 688003-001 CONTAINMENT AND DISPOSAL OF SPENT MATERIAL LUMP LUMP 1 STATE PROJECT PAGE 28 Call Order : 015 CONTRACT ID : 1203101 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S340-0034/00-021.36 00 COMPLETION DATE : 07/31/12 RES. ENG.: GARY MULLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 BRIDGE #1364.7 0005 204001-000 MOBILIZATION LUMP LUMP 0010 615050-001 HEAT STRAIGHTENING AND REPAIR OF STRUCTURAL MEMBERS LUMP LUMP 0015 615075-001 MISCELLANEOUS BRIDGE WORK, BOTTOM LATERAL REPLACEMENT LUMP LUMP 0020 615075-001 MISCELLANEOUS BRIDGE WORK, GUSSET PLATE REPAIR LUMP LUMP 0025 636011-001 TRAFFIC CONTROL DEVICE 4,260.000 UN 0030 636014-001 FLAGGER 200.000 HR 0035 636014-002 TRAFFIC DIRECTOR 200.000 HR 0040 636022-001 CHANGEABLE MESSAGE SIGN 560.000 DA 0045 636025-001 WARNING LIGHTS, TYPE B 500.000 DA 0050 661001-001 0.080 IN FLAT SHEET SIGN 13.000 SF 0055 688001-001 CLEAN AND PAINT EXISTING STEEL BRIDGE LUMP LUMP 1 STATE PROJECT PAGE 29 Call Order : 016 CONTRACT ID : 1114405 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S340-0001/00-001.77 0 COMPLETION DATE : 10/15/12 RES. ENG.: GARY MULLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CR-1 SLIDE CORRECTION 0005 201001-000 CLEARING AND GRUBBING ( 1.00 ) LUMP 0010 204001-000 MOBILIZATION LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION 70.000 CY 0020 207034-000 FABRIC FOR SEPARATION 145.000 SY 0025 408002-001 BITUMINOUS MATERIAL 14.000 GA 0030 415005-001 REMOVE EXISTING PAVEMENT SURFACE 453.000 SY 0035 607001-001 TYPE 1 GUARDRAIL, CLASS CLASS II 250.000 LF 0040 614001-003 HP10X42 STEEL PILE 971.000 LF 0045 636009-002 TEMPORARY PAVEMENT MARKING-TAPE 6 IN, TY WHITE 18.000 LF 0050 636011-001 TRAFFIC CONTROL DEVICE 3,420.000 UN 0055 636014-001 FLAGGER 384.000 HR 0060 636025-001 WARNING LIGHTS, TYPE B 100.000 DA 0065 638002-001 RIGHT OF WAY MARKER 4.000 EA 0070 639001-001 CONSTRUCTION LAYOUT STAKE LUMP LUMP 0075 642004-002 SEED MIXTURE, B 40.000 LB 0080 642005-002 MULCH, WOOD CELLULOSE FIBER 0.300 TN 0085 642006-001 FERTILIZER 0.300 TN 0090 642011-001 HAY OR STRAW BALE 10.000 EA 0095 642012-001 SILT FENCE 300.000 LF 0100 652001-001 AGRICULTURAL LIMESTONE 0.250 TN 0105 652002-001 FERTILIZER, 10-20-10 0.300 TN 0110 652003-001 SEED MIXTURES, B, C-1, OR C-2 30.000 LB 0115 652004-001 STRAW OR HAY MULCH HAY 0.300 TN 1 STATE PROJECT PAGE 30 Call Order : 016 CONTRACT ID : 1114405 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S340-0001/00-001.77 0 COMPLETION DATE : 10/15/12 RES. ENG.: GARY MULLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CR-1 SLIDE CORRECTION 0120 401001-023 MARSHALL HMA BASE CRSE, SG, TY II 4" 7.000 TN AA1 0125 401001-024 MARSHALL HMA BASE CRSE, S, TY II 4" 7.000 TN AA2 0130 401002-020 MARSHALL HMA WEAR CRSE, SG, TY I 1.5" 38.000 TN BB1 0135 401002-021 MARSHALL HMA WEAR CRSE, S, TY I 1.5" 38.000 TN BB2 0140 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 173.000 TN CC1 0145 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 159.000 TN CC2 0150 614003-001 CONCRETE LAGGING, THICKNESS 6 INCH 660.000 SF DD1 0155 614004-001 TIMBER LAGGING 660.000 SF DD2 1 FEDERAL PROJECT PAGE 31 Call Order : 017 CONTRACT ID : 0607641 Letting Date : 05/22/12 10:00 A.M. PROJECTS : U354-0050/00-004.83 00 0NHG 0050 272 D00 COUNTIES : WOOD RITCHIE DBE GOALS : 3.00 GUARANTY : 5.0% OF BID HARRISON OTHERS PROPOSAL ONLY : 10.00 COMPLETIONLDATE : 01/17/14 RES. ENG.: MIKE FOLEY WO X-SECTIONS : 15.00 ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SIGN RENOVATION 0005 204001-000 MOBILIZATION LUMP LUMP 0010 615003-001 FABRICATED STRUCTURAL STEEL ( 1.00 ) LUMP 0015 636011-001 TRAFFIC CONTROL DEVICE 94,030.000 UN 0020 636014-001 FLAGGER 300.000 HR 0025 636014-002 TRAFFIC DIRECTOR 40.000 HR 0030 636021-001 ELECTRIC ARROW 100.000 DA 0035 636022-001 CHANGEABLE MESSAGE SIGN 100.000 DA 0040 636025-001 WARNING LIGHTS, TYPE B 600.000 DA 0045 636028-001 SHADOW VEHICLE 5.000 DA 0050 640003-001 BUILDING EQUIPMENT LUMP LUMP 0055 640006-001 SMALL FIELD OFFICE 18.000 MO 0060 657006-001 S4X7.7, A-572 SUPPORT, GALVANIZED 5,395.000 LF 0065 657006-005 W6X12, A-572 SUPPORT, GALVANIZED 3,669.000 LF 0070 657006-010 W8X18, A-572 SUPPORT, GALVANIZED 1,492.000 LF 0075 657006-015 W10X22, A-572 SUPPORT, GALVANIZED 66.000 LF 0080 657008-001 2.00 LB CHANNEL POST 5,548.000 LF 0085 657010-001 3.00 LB CHANNEL POST 15,320.000 LF 0090 657012-001 4.00 LB BACK TO BACK CHANNEL POST 3,113.000 LF 0095 657014-001 6.00 LB BACK TO BACK CHANNEL POST 424.000 LF 0100 657017-001 CLASS B CONCRETE FOOTING, REINFORCED, ROADSIDE 327.000 CY 0105 657018-001 POST REMOVAL 1,874.000 EA 0110 659001-001 SIGN LIGHTING, TYPE 3 250W - ASSY NO. 1414 LUMP LUMP 1 FEDERAL PROJECT PAGE 32 Call Order : 017 CONTRACT ID : 0607641 Letting Date : 05/22/12 10:00 A.M. PROJECTS : U354-0050/00-004.83 00 0NHG 0050 272 D00 COUNTIES : WOOD RITCHIE DBE GOALS : 3.00 GUARANTY : 5.0% OF BID HARRISON OTHERS PROPOSAL ONLY : 10.00 COMPLETIONLDATE : 01/17/14 RES. ENG.: MIKE FOLEY WO X-SECTIONS : 15.00 ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SIGN RENOVATION 0115 659001-001 SIGN LIGHTING, TYPE 3 250W - ASSY NO. 1415 LUMP LUMP 0120 659001-001 SIGN LIGHTING, TYPE 3 250W - ASSY NO. 2000 LUMP LUMP 0125 659001-001 SIGN LIGHTING, TYPE 3 250W - ASSY NO. 2001 LUMP LUMP 0130 660003-006 SIGNAL SECTION, V-12 14.000 EA 0135 660005-010 JUNCTION BOX, TYPE H 6.000 EA 0140 660007-001 MISCELLANEOUS SIGNAL (1398) LUMP LUMP 0145 660007-001 MISCELLANEOUS SIGNAL (1400) LUMP LUMP 0150 660007-001 MISCELLANEOUS SIGNAL (498) LUMP LUMP 0155 660007-001 MISCELLANEOUS SIGNAL (509) LUMP LUMP 0160 660007-001 MISCELLANEOUS SIGNAL (788) LUMP LUMP 0165 660007-001 MISCELLANEOUS SIGNAL (797) LUMP LUMP 0170 660007-001 MISCELLANEOUS SIGNAL (828) LUMP LUMP 0175 660007-001 MISCELLANEOUS SIGNAL (837) LUMP LUMP 0180 661001-001 0.080 IN FLAT SHEET SIGN 16,874.000 SF 0185 661002-001 EXTRUDED PANEL SIGN 19,840.000 SF 0190 661004-002 DELINEATOR, ENCAPSULATED LENS, SINGLE, 3"X9" WHITE 3.000 EA 0195 661004-002 DELINEATOR, ENCAPSULATED LENS, SINGLE, 3"X9" YELLOW 3.000 EA 0200 661008-001 DELINEATOR BRACKET, TYPE A 6.000 EA 0205 661008-001 DELINEATOR BRACKET, TYPE B 20.000 EA 0210 661013-001 PLASTIC DELINEATOR POST, WHITE (GUARDRAIL MOUNTED) 1,738.000 EA 0215 661013-001 PLASTIC DELINEATOR POST, WHITE (SOIL ANCHORED) 1,630.000 EA 0220 661013-001 PLASTIC DELINEATOR POST, YELLOW (GUARDRAIL MOUNTED) 29.000 EA 1 FEDERAL PROJECT PAGE 33 Call Order : 017 CONTRACT ID : 0607641 Letting Date : 05/22/12 10:00 A.M. PROJECTS : U354-0050/00-004.83 00 0NHG 0050 272 D00 COUNTIES : WOOD RITCHIE DBE GOALS : 3.00 GUARANTY : 5.0% OF BID HARRISON OTHERS PROPOSAL ONLY : 10.00 COMPLETIONLDATE : 01/17/14 RES. ENG.: MIKE FOLEY WO X-SECTIONS : 15.00 ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 SIGN RENOVATION 0225 661013-001 PLASTIC DELINEATOR POST, YELLOW (SOIL ANCHORED) 783.000 EA 0230 661020-001 DELINEATOR, TYPE B-1 8"X12" WHITE 17.000 EA 0235 661020-001 DELINEATOR, TYPE B-1 8"X12" YELLOW 17.000 EA 1 STATE PROJECT PAGE 34 Call Order : 018 CONTRACT ID : 1131116 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S305-0001/08-000.00 00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 408002-001 BITUMINOUS MATERIAL 1,370.000 GA 0015 636011-001 TRAFFIC CONTROL DEVICE 4,270.000 UN 0020 636014-001 FLAGGER 240.000 HR 0025 663001-004 EDGE LINE, TYPE II - 4 IN PERM, WHITE 15,740.000 LF 0030 663001-004 EDGE LINE, TYPE II - 4 IN TEMP, WHITE 15,740.000 LF 0035 663002-038 CENTERLINE, TYPE II - 4 IN PERM, YELLOW 15,740.000 LF 0040 663002-038 CENTERLINE, TYPE II - 4 IN TEMP, YELLOW 15,740.000 LF 0045 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 167.000 TN AA1 0050 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 164.000 TN AA2 0055 307005-003 AGGREGATE BASE COURSE, STEEL SLAG, CLASS 10 177.000 TN AA3 0060 401001-023 MARSHALL HMA BASE CRSE, SG, TY II 1,613.000 TN BB1 0065 401001-024 MARSHALL HMA BASE CRSE, S, TY II 1,581.000 TN BB2 0070 401001-025 MARSHALL HMA BASE CRSE, SS, TY II 1,702.000 TN BB3 0075 401001-033 MARSHALL WMA BASE CRSE, SG, TY II 1,613.000 TN BB4 0080 401001-034 MARSHALL WMA BASE CRSE, S, TY II 1,581.000 TN BB5 0085 401001-035 MARSHALL WMA BASE CRSE, SS, TY II 1,702.000 TN BB6 0090 401002-023 MARSHALL HMA WEAR CRSE, SG, TY III 799.000 TN CC1 0095 401002-024 MARSHALL HMA WEAR CRSE, S, TY III 783.000 TN CC2 0100 401002-025 MARSHALL HMA WEAR CRSE, SS, TY III 843.000 TN CC3 0105 401002-029 MARSHALL WMA WEAR CRSE, SG, TY III 799.000 TN CC4 0110 401002-030 MARSHALL WMA WEAR CRSE, S, TY III 783.000 TN CC5 0115 401002-031 MARSHALL WMA WEAR CRSE, SS, TY III 843.000 TN CC6 1 STATE PROJECT PAGE 35 Call Order : 018 CONTRACT ID : 1131116 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S305-0001/08-000.00 00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0120 401003-001 MARSHALL HMA P/L CRSE, SG 76.000 TN DD1 GRAVEL 0125 401003-002 MARSHALL HMA P/L CRSE, S 75.000 TN DD2 0130 401003-003 MARSHALL HMA P/L CRSE, SS 81.000 TN DD3 0135 401003-006 MARSHALL WMA P/L CRSE, SG 76.000 TN DD4 0140 401003-007 MARSHALL WMA P/L CRSE, S 75.000 TN DD5 0145 401003-008 MARSHALL WMA P/L CRSE, SS 81.000 TN DD6 1 STATE PROJECT PAGE 36 Call Order : 019 CONTRACT ID : 1131120 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S305-0002/00-006.83 00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 408002-001 BITUMINOUS MATERIAL 1,034.000 GA 0015 415005-001 REMOVE EXISTING PAVEMENT SURFACE 15,670.000 SY 0020 605012-001 ADJUST INLET TYPE, B 2.000 EA 0025 605012-001 ADJUST INLET TYPE, MISC. 1.000 EA 0030 605015-001 ADJUST MANHOLE TYPE A 1.000 EA 0035 636011-001 TRAFFIC CONTROL DEVICE 8,320.000 UN 0040 636014-001 FLAGGER 400.000 HR 0045 636014-002 TRAFFIC DIRECTOR 400.000 HR 0050 660007-001 MISCELLANEOUS SIGNAL 1 LUMP LUMP 0055 660007-001 MISCELLANEOUS SIGNAL 2 LUMP LUMP 0060 660007-001 MISCELLANEOUS SIGNAL 3 LUMP LUMP 0065 660007-001 MISCELLANEOUS SIGNAL 4 LUMP LUMP 0070 662015-001 ELECTRICAL TEST, LOOP DETECTORS ( 1.00 ) LUMP 0075 663001-004 EDGE LINE, TYPE II - 4 IN PERM. WHITE 1,933.000 LF 0080 663001-004 EDGE LINE, TYPE II - 4 IN TEMP. WHITE 3,866.000 LF 0085 663001-004 EDGE LINE, TYPE II - 4 IN TEMP. WHITE, ROTOMILL 1,933.000 LF 0090 663001-034 EDGE LINE, TYPE II - 8 IN PERM. WHITE 428.000 LF 0095 663001-034 EDGE LINE, TYPE II - 8 IN TEMP. WHITE 856.000 LF 0100 663001-034 EDGE LINE, TYPE II - 8 IN TEMP. WHITE, ROTOMILL 428.000 LF 0105 663002-038 CENTERLINE, TYPE II - 4 IN PERM. YELLOW 7,414.000 LF 0110 663002-038 CENTERLINE, TYPE II - 4 IN TEMP. YELLOW 14,828.000 LF 0115 663002-038 CENTERLINE, TYPE II - 4 IN TEMP. YELLOW, ROTOMILL 7,414.000 LF 1 STATE PROJECT PAGE 37 Call Order : 019 CONTRACT ID : 1131120 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S305-0002/00-006.83 00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0120 663005-011 STOP LINE, TYPE V - 24 IN WHITE 96.000 LF 0125 663010-010 ONE DIRECTION LANE ASSIGNMENT ARROW, TY V 10.000 EA 0130 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 12.000 TN AA1 0135 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 12.000 TN AA2 0140 307005-003 AGGREGATE BASE COURSE, STEEL SLAG, CLASS 10 13.000 TN AA3 0145 401007-020 MARSHALL SCRATCH CRSE, SG, TY I 539.000 TN BB1 0150 401007-021 MARSHALL SCRATCH CRSE, S, TY I 529.000 TN BB2 0155 401007-022 MARSHALL SCRATCH CRSE, SS, TY I 569.000 TN BB3 0160 401007-023 MARSHALL WMA SCRATCH CRSE, SG, TY I 539.000 TN BB4 0165 401007-024 MARSHALL WMA SCRATCH CRSE, S, TY I 529.000 TN BB5 0170 401007-025 MARSHALL WMA SCRATCH CRSE, SS, TY I 569.000 TN BB6 0175 402001-020 MARSHALL HMA SKID PVT, SG, TY I 862.000 TN CC1 0180 402001-021 MARSHALL HMA SKID PVT, S, TY I 845.000 TN CC2 0185 402001-022 MARSHALL HMA SKID PVT, SS, TY I 910.000 TN CC3 0190 402001-029 MARSHALL WMA SKID PVT, SG, TY I 862.000 TN CC4 0195 402001-030 MARSHALL WMA SKID PVT, S, TY I 845.000 TN CC5 1 STATE PROJECT PAGE 38 Call Order : 020 CONTRACT ID : 1130520 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S312-0028/00-009.28 00 COMPLETION DATE : 10/15/12 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207001-001 UNCLASSIFIED EXCAVATION 570.000 CY 0015 408002-001 BITUMINOUS MATERIAL 871.000 GA 0020 636006-001 PILOT TRUCK AND DRIVER 8.000 DA 0025 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN 40,128.000 LF 0030 636011-001 TRAFFIC CONTROL DEVICE 5,520.000 UN 0035 636014-001 FLAGGER 360.000 HR 0040 663001-005 EDGE LINE, TYPE II - 4 IN WHITE 4.360 MI 0045 663002-039 CENTERLINE, TYPE II - 4 IN 3.240 MI 0050 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 200.000 TN AA1 0055 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 180.000 TN AA2 0060 401001-020 MARSHALL HMA BASE CRSE, SG, TY I 1,128.000 TN BB1 0065 401001-021 MARSHALL HMA BASE CRSE, S, TY I 1,015.000 TN BB2 0070 401001-030 MARSHALL WMA BASE CRSE, SG, TY I 1,128.000 TN BB3 0075 401001-031 MARSHALL WMA BASE CRSE, S, TY I 1,015.000 TN BB4 0080 401007-020 MARSHALL SCRATCH CRSE, SG, TY I 1,175.000 TN CC1 0085 401007-021 MARSHALL SCRATCH CRSE, S, TY I 1,058.000 TN CC2 0090 401007-023 MARSHALL WMA SCRATCH CRSE, SG, TY I 1,175.000 TN CC3 0095 401007-024 MARSHALL WMA SCRATCH CRSE, S, TY I 1,058.000 TN CC4 0100 402001-020 MARSHALL HMA SKID PVT, SG, TY I 3,110.000 TN DD1 0105 402001-021 MARSHALL HMA SKID PVT, S, TY I 2,799.000 TN DD2 0110 402001-029 MARSHALL WMA SKID PVT, SG, TY I 3,110.000 TN DD3 0115 402001-030 MARSHALL WMA SKID PVT, S, TY I 2,799.000 TN DD4 1 STATE PROJECT PAGE 39 Call Order : 021 CONTRACT ID : 1130723 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S311-0047/00-000.00 00 COMPLETION DATE : 10/15/12 RES. ENG.: KIP HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RITCHIE COUNTY LINE-COXS MILL ROAD 0005 207001-001 UNCLASSIFIED EXCAVATION 481.000 CY 0010 408002-001 BITUMINOUS MATERIAL 2,105.000 GA 0015 636006-001 PILOT TRUCK AND DRIVER 13.000 DA 0020 636011-001 TRAFFIC CONTROL DEVICE 4,660.000 UN 0025 636014-001 FLAGGER 260.000 HR 0030 663001-004 EDGE LINE, TYPE II - 4 IN WHITE 57,732.000 LF 0035 663002-038 CENTERLINE, TYPE II - 4 IN YELLOW 55,246.000 LF 0040 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 300.000 TN AA1 0045 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 270.000 TN AA2 0050 401001-023 MARSHALL HMA BASE CRSE, SG, TY II 951.000 TN BB1 0055 401001-024 MARSHALL HMA BASE CRSE, S, TY II 856.000 TN BB2 0060 401001-033 MARSHALL WMA BASE CRSE, SG, TY II 951.000 TN BB3 0065 401001-034 MARSHALL WMA BASE CRSE, S, TY II 856.000 TN BB4 0070 401002-020 MARSHALL HMA WEAR CRSE, SG, TY I 3,369.000 TN CC1 0075 401002-021 MARSHALL HMA WEAR CRSE, S, TY I 3,032.000 TN CC2 0080 401002-026 MARSHALL WMA WEAR CRSE, SG, TY I 3,369.000 TN CC3 0085 401002-027 MARSHALL WMA WEAR CRSE, S, TY I 3,032.000 TN CC4 0090 401003-001 MARSHALL HMA P/L CRSE, SG 62.000 TN DD1 GRAVEL 0095 401003-002 MARSHALL HMA P/L CRSE, S 55.000 TN DD2 0100 401003-006 MARSHALL WMA P/L CRSE, SG 62.000 TN DD3 0105 401003-007 MARSHALL WMA P/L CRSE, S 55.000 TN DD4 1 STATE PROJECT PAGE 40 Call Order : 022 CONTRACT ID : 1131124 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S315-0024/00-000.00 00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 408002-001 BITUMINOUS MATERIAL 1,202.000 GA 0015 636011-001 TRAFFIC CONTROL DEVICE 5,360.000 UN 0020 636014-001 FLAGGER 200.000 HR 0025 663001-004 EDGE LINE, TYPE II - 4 IN PERM. WHITE 14,056.000 LF 0030 663001-004 EDGE LINE, TYPE II - 4 IN TEMP. WHITE 14,056.000 LF 0035 663002-038 CENTERLINE, TYPE II - 4 IN PERM. YELLOW 11,922.000 LF 0040 663002-038 CENTERLINE, TYPE II - 4 IN TEMP. YELLOW 11,922.000 LF 0045 670023-001 ADJUSTING VALVE BOX 4.000 EA 0050 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 153.000 TN AA1 0055 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 150.000 TN AA2 0060 307005-003 AGGREGATE BASE COURSE, STEEL SLAG, CLASS 10 162.000 TN AA3 0065 401001-023 MARSHALL HMA BASE CRSE, SG, TY II 1,483.000 TN BB1 0070 401001-024 MARSHALL HMA BASE CRSE, S, TY II 1,454.000 TN BB2 0075 401001-025 MARSHALL HMA BASE CRSE, SS, TY II 1,565.000 TN BB3 0080 401001-033 MARSHALL WMA BASE CRSE, SG, TY II 1,483.000 TN BB4 0085 401001-034 MARSHALL WMA BASE CRSE, S, TY II 1,454.000 TN BB5 0090 401001-035 MARSHALL WMA BASE CRSE, SS, TY II 1,565.000 TN BB6 0095 401002-023 MARSHALL HMA WEAR CRSE, SG, TY III 813.000 TN CC1 0100 401002-024 MARSHALL HMA WEAR CRSE, S, TY III 797.000 TN CC2 0105 401002-025 MARSHALL HMA WEAR CRSE, SS, TY III 858.000 TN CC3 0110 401002-029 MARSHALL WMA WEAR CRSE, SG, TY III 813.000 TN CC4 0115 401002-030 MARSHALL WMA WEAR CRSE, S, TY III 797.000 TN CC5 1 STATE PROJECT PAGE 41 Call Order : 022 CONTRACT ID : 1131124 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S315-0024/00-000.00 00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0120 401002-031 MARSHALL WMA WEAR CRSE, SS, TY III 858.000 TN CC6 1 STATE PROJECT PAGE 42 Call Order : 023 CONTRACT ID : 1130515 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S316-0055/20-027.50 00 COMPLETION DATE : 10/28/12 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207001-001 UNCLASSIFIED EXCAVATION 370.000 CY 0015 408002-001 BITUMINOUS MATERIAL 1,102.000 GA 0020 415005-001 REMOVE EXISTING PAVEMENT SURFACE 1,936.000 SY 0025 636006-001 PILOT TRUCK AND DRIVER 7.000 DA 0030 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN 51,438.000 LF 0035 636011-001 TRAFFIC CONTROL DEVICE 5,520.000 UN 0040 636014-001 FLAGGER 260.000 HR 0045 663001-005 EDGE LINE, TYPE II - 4 IN WHITE 4.900 MI 0050 663002-039 CENTERLINE, TYPE II - 4 IN 4.850 MI 0055 663004-011 CHANNELIZING LINE, TYPE V - 8 IN 330.000 LF 0060 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 200.000 TN AA1 0065 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 180.000 TN AA2 0070 401001-020 MARSHALL HMA BASE CRSE, SG, TY I 733.000 TN BB1 0075 401001-021 MARSHALL HMA BASE CRSE, S, TY I 660.000 TN BB2 0080 401001-030 MARSHALL WMA BASE CRSE, SG, TY I 733.000 TN BB3 0085 401001-031 MARSHALL WMA BASE CRSE, S, TY I 660.000 TN BB4 0090 401007-020 MARSHALL SCRATCH CRSE, SG, TY I 1,350.000 TN CC1 0095 401007-021 MARSHALL SCRATCH CRSE, S, TY I 1,215.000 TN CC2 0100 401007-023 MARSHALL WMA SCRATCH CRSE, SG, TY I 1,350.000 TN CC3 0105 401007-024 MARSHALL WMA SCRATCH CRSE, S, TY I 1,215.000 TN CC4 0110 402001-020 MARSHALL HMA SKID PVT, SG, TY I 3,420.000 TN DD1 0115 402001-021 MARSHALL HMA SKID PVT, S, TY I 3,078.000 TN DD2 1 STATE PROJECT PAGE 43 Call Order : 023 CONTRACT ID : 1130515 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S316-0055/20-027.50 00 COMPLETION DATE : 10/28/12 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0120 402001-029 MARSHALL WMA SKID PVT, SG, TY I 3,420.000 TN DD3 0125 402001-030 MARSHALL WMA SKID PVT, S, TY I 3,078.000 TN DD4 1 STATE PROJECT PAGE 44 Call Order : 024 CONTRACT ID : 1130724 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S321-0017/00-003.21 00 COMPLETION DATE : 10/15/12 RES. ENG.: KIP HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 COPLEY ROAD 0005 207001-001 UNCLASSIFIED EXCAVATION 342.000 CY 0010 408002-001 BITUMINOUS MATERIAL 1,301.000 GA 0015 636006-001 PILOT TRUCK AND DRIVER 8.000 DA 0020 636011-001 TRAFFIC CONTROL DEVICE 3,940.000 UN 0025 636014-001 FLAGGER 160.000 HR 0030 663001-004 EDGE LINE, TYPE II - 4 IN WHITE 43,200.000 LF 0035 663002-038 CENTERLINE, TYPE II - 4 IN YELLOW 43,200.000 LF 0040 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 200.000 TN AA1 0045 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 180.000 TN AA2 0050 401001-023 MARSHALL HMA BASE CRSE, SG, TY II 676.000 TN BB1 0055 401001-024 MARSHALL HMA BASE CRSE, S, TY II 608.000 TN BB2 0060 401001-033 MARSHALL WMA BASE CRSE, SG, TY II 676.000 TN BB3 0065 401001-034 MARSHALL WMA BASE CRSE, S, TY II 608.000 TN BB4 0070 401002-020 MARSHALL HMA WEAR CRSE, SG, TY I 2,126.000 TN CC1 0075 401002-021 MARSHALL HMA WEAR CRSE, S, TY I 1,913.000 TN CC2 0080 401002-026 MARSHALL WMA WEAR CRSE, SG, TY I 2,126.000 TN CC3 0085 401002-027 MARSHALL WMA WEAR CRSE, S, TY I 1,913.000 TN CC4 1 STATE PROJECT PAGE 45 Call Order : 025 CONTRACT ID : 1131122 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S326-0014/00-001.49 00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 408002-001 BITUMINOUS MATERIAL 1,143.000 GA 0015 636011-001 TRAFFIC CONTROL DEVICE 4,280.000 UN 0020 636014-001 FLAGGER 200.000 HR 0025 663002-038 CENTERLINE, TYPE II - 4 IN PERM YELLOW 850.000 LF 0030 663002-038 CENTERLINE, TYPE II - 4 IN TEMP YELLOW 850.000 LF 0035 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 182.000 TN AA1 0040 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 178.000 TN AA2 0045 307005-003 AGGREGATE BASE COURSE, STEEL SLAG, CLASS 10 192.000 TN AA3 0050 401001-023 MARSHALL HMA BASE CRSE, SG, TY II 1,385.000 TN BB1 0055 401001-024 MARSHALL HMA BASE CRSE, S, TY II 1,358.000 TN BB2 0060 401001-025 MARSHALL HMA BASE CRSE, SS, TY II 1,461.000 TN BB3 0065 401001-033 MARSHALL WMA BASE CRSE, SG, TY II 1,385.000 TN BB4 0070 401001-034 MARSHALL WMA BASE CRSE, S, TY II 1,358.000 TN BB5 0075 401001-035 MARSHALL WMA BASE CRSE, SS, TY II 1,461.000 TN BB6 0080 401002-023 MARSHALL HMA WEAR CRSE, SG, TY III 698.000 TN CC1 0085 401002-024 MARSHALL HMA WEAR CRSE, S, TY III 684.000 TN CC2 0090 401002-025 MARSHALL HMA WEAR CRSE, SS, TY III 736.000 TN CC3 0095 401002-029 MARSHALL WMA WEAR CRSE, SG, TY III 698.000 TN CC4 0100 401002-030 MARSHALL WMA WEAR CRSE, S, TY III 684.000 TN CC5 0105 401002-031 MARSHALL WMA WEAR CRSE, SS, TY III 736.000 TN CC6 1 STATE PROJECT PAGE 46 Call Order : 026 CONTRACT ID : 1131119 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S326-0017/00-008.60 00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 408002-001 BITUMINOUS MATERIAL 1,089.000 GA 0015 636011-001 TRAFFIC CONTROL DEVICE 3,740.000 UN 0020 636014-001 FLAGGER 200.000 HR 0025 663002-038 CENTERLINE, TYPE II - 4 IN 30,220.000 LF 0030 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 155.000 TN AA1 0035 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 152.000 TN AA2 0040 307005-003 AGGREGATE BASE COURSE, STEEL SLAG, CLASS 10 164.000 TN AA3 0045 401001-023 MARSHALL HMA BASE CRSE, SG, TY II 1,378.000 TN BB1 0050 401001-024 MARSHALL HMA BASE CRSE, S, TY II 1,350.000 TN BB2 0055 401001-025 MARSHALL HMA BASE CRSE, SS, TY II 1,454.000 TN BB3 0060 401001-033 MARSHALL WMA BASE CRSE, SG, TY II 1,378.000 TN BB4 0065 401001-034 MARSHALL WMA BASE CRSE, S, TY II 1,350.000 TN BB5 0070 401001-035 MARSHALL WMA BASE CRSE, SS, TY II 1,454.000 TN BB6 0075 401002-023 MARSHALL HMA WEAR CRSE, SG, TY III 584.000 TN CC1 0080 401002-024 MARSHALL HMA WEAR CRSE, S, TY III 573.000 TN CC2 0085 401002-025 MARSHALL HMA WEAR CRSE, SS, TY III 616.000 TN CC3 0090 401002-029 MARSHALL WMA WEAR CRSE, SG, TY III 584.000 TN CC4 0095 401002-030 MARSHALL WMA WEAR CRSE, S, TY III 573.000 TN CC5 0100 401002-031 MARSHALL WMA WEAR CRSE, SS, TY III 616.000 TN CC6 1 FEDERAL PROJECT PAGE 47 Call Order : 027 CONTRACT ID : 1133327 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S326-0007/00-000.00 00 HSIP 0007 239 D00 COMPLETION DATE : 08/28/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 GUARDRAIL INSTALLATION 0005 204001-000 MOBILIZATION LUMP LUMP 0010 607001-001 TYPE 1 GUARDRAIL, CLASS 2, STEEL POST 2,200.000 LF 0015 607001-001 TYPE 1 GUARDRAIL, CLASS 3, STEEL POST 10,775.000 LF 0020 607001-001 TYPE 1 GUARDRAIL, CLASS 5, STEEL POST 25.000 LF 0025 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 500.000 LF 0030 607037-001 BUFFER END SECTION 22.000 EA 0035 607043-001 8 FT STEEL POST 5.000 EA 0040 636027-001 TRAFFIC CONTROL, 18.000 SI 1 FEDERAL PROJECT PAGE 48 Call Order : 028 CONTRACT ID : 1125927 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S326-0250/00-025.41 00 00NH 0250 208 D00 COUNTIES : MARSHALL DBE GOALS : 7.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 229001-000 SHOULDER AND DITCH 2.660 MI 0015 408002-001 BITUMINOUS MATERIAL 2,554.000 GA 0020 495001-001 MICRO SURFACE MULTIPLE COURSE 43,969.000 SY 0025 636011-001 TRAFFIC CONTROL DEVICE 5,360.000 UN 0030 636014-001 FLAGGER 400.000 HR 0035 642004-002 SEED MIXTURE, B 367.000 LB 0040 642005-002 MULCH, WOOD CELLULOSE FIBER 2.900 TN 0045 642006-001 FERTILIZER 1.500 TN 0050 663001-004 EDGE LINE, TYPE II - 4 IN PERM. WHITE 28,050.000 LF 0055 663001-004 EDGE LINE, TYPE II - 4 IN TEMP. WHITE 28,050.000 LF 0060 663002-038 CENTERLINE, TYPE II - 4 IN PERM. YELLOW 28,050.000 LF 0065 663002-038 CENTERLINE, TYPE II - 4 IN TEMP. YELLOW 28,050.000 LF 0070 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 303.000 TN AA1 0075 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 297.000 TN AA2 0080 307005-003 AGGREGATE BASE COURSE, STEEL SLAG, CLASS 10 320.000 TN AA3 0085 401001-023 MARSHALL HMA BASE CRSE, SG, TY II 3,218.000 TN BB1 0090 401001-024 MARSHALL HMA BASE CRSE, S, TY II 3,154.000 TN BB2 0095 401001-025 MARSHALL HMA BASE CRSE, SS, TY II 3,395.000 TN BB3 0100 401001-033 MARSHALL WMA BASE CRSE, SG, TY II 3,218.000 TN BB4 0105 401001-034 MARSHALL WMA BASE CRSE, S, TY II 3,154.000 TN BB5 1 FEDERAL PROJECT PAGE 49 Call Order : 028 CONTRACT ID : 1125927 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S326-0250/00-025.41 00 00NH 0250 208 D00 COUNTIES : MARSHALL DBE GOALS : 7.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 401001-035 MARSHALL WMA BASE CRSE, SS, TY II 3,395.000 TN BB6 1 STATE PROJECT PAGE 50 Call Order : 029 CONTRACT ID : 1131123 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S348-0007/00-008.40 00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 408002-001 BITUMINOUS MATERIAL 1,432.000 GA 0015 636011-001 TRAFFIC CONTROL DEVICE 4,460.000 UN 0020 636014-001 FLAGGER 200.000 HR 0025 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 225.000 TN AA1 0030 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 221.000 TN AA2 0035 307005-003 AGGREGATE BASE COURSE, STEEL SLAG, CLASS 10 237.000 TN AA3 0040 401001-023 MARSHALL HMA BASE CRSE, SG, TY II 1,644.000 TN BB1 0045 401001-024 MARSHALL HMA BASE CRSE, S, TY II 1,611.000 TN BB2 0050 401001-025 MARSHALL HMA BASE CRSE, SS, TY II 1,735.000 TN BB3 0055 401001-033 MARSHALL WMA BASE CRSE, SG, TY II 1,644.000 TN BB4 0060 401001-034 MARSHALL WMA BASE CRSE, S, TY II 1,611.000 TN BB5 0065 401001-035 MARSHALL WMA BASE CRSE, SS, TY II 1,735.000 TN BB6 0070 401002-023 MARSHALL HMA WEAR CRSE, SG, TY III 740.000 TN CC1 0075 401002-024 MARSHALL HMA WEAR CRSE, S, TY III 725.000 TN CC2 0080 401002-025 MARSHALL HMA WEAR CRSE, SS, TY III 781.000 TN CC3 0085 401002-029 MARSHALL WMA WEAR CRSE, SG, TY III 740.000 TN CC4 0090 401002-030 MARSHALL WMA WEAR CRSE, S, TY III 725.000 TN CC5 0095 401002-031 MARSHALL WMA WEAR CRSE, SS, TY III 781.000 TN CC6 1 STATE PROJECT PAGE 51 Call Order : 030 CONTRACT ID : 1130725 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S349-0011/00-013.59 00 COMPLETION DATE : 10/28/12 RES. ENG.: KIP HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 ALEXANDER ROAD 0005 207001-001 UNCLASSIFIED EXCAVATION 318.000 CY 0010 408002-001 BITUMINOUS MATERIAL 1,222.000 GA 0015 636006-001 PILOT TRUCK AND DRIVER 10.000 DA 0020 636011-001 TRAFFIC CONTROL DEVICE 3,580.000 UN 0025 636014-001 FLAGGER 200.000 HR 0030 663001-004 EDGE LINE, TYPE II - 4 IN WHITE 35,572.000 LF 0035 663002-038 CENTERLINE, TYPE II - 4 IN YELLOW 35,572.000 LF 0040 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 150.000 TN AA1 0045 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 135.000 TN AA2 0050 401001-023 MARSHALL HMA BASE CRSE, SG, TY II 630.000 TN BB1 0055 401001-024 MARSHALL HMA BASE CRSE, S, TY II 567.000 TN BB2 0060 401001-033 MARSHALL WMA BASE CRSE, SG, TY II 630.000 TN BB3 0065 401001-034 MARSHALL WMA BASE CRSE, S, TY II 567.000 TN BB4 0070 401002-035 MARSHALL HMA WEAR CRSE, SG, TY IV 2,659.000 TN CC1 0075 401002-036 MARSHALL HMA WEAR CRSE, S, TY IV 2,393.000 TN CC2 0080 401002-040 MARSHALL WMA WEAR CRSE, SG, TY IV 2,659.000 TN CC3 0085 401002-041 MARSHALL WMA WEAR CRSE, S, TY IV 2,393.000 TN CC4 1 STATE PROJECT PAGE 52 Call Order : 031 CONTRACT ID : 1130726 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S351-0015/03-000.02 00 COMPLETION DATE : 10/15/12 RES. ENG.: KIP HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 CURTIN ROAD 0005 207001-001 UNCLASSIFIED EXCAVATION 35.000 CY 0010 408002-001 BITUMINOUS MATERIAL 584.000 GA 0015 636006-001 PILOT TRUCK AND DRIVER 4.000 DA 0020 636011-001 TRAFFIC CONTROL DEVICE 2,950.000 UN 0025 636014-001 FLAGGER 80.000 HR 0030 663001-004 EDGE LINE, TYPE II - 4 IN WHITE 17,124.000 LF 0035 663002-038 CENTERLINE, TYPE II - 4 IN YELLOW 17,124.000 LF 0040 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 100.000 TN AA1 0045 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 90.000 TN AA2 0050 401001-020 MARSHALL HMA BASE CRSE, SG, TY I 70.000 TN BB1 0055 401001-021 MARSHALL HMA BASE CRSE, S, TY I 63.000 TN BB2 0060 401001-030 MARSHALL WMA BASE CRSE, SG, TY I 70.000 TN BB3 0065 401001-031 MARSHALL WMA BASE CRSE, S, TY I 63.000 TN BB4 0070 401002-035 MARSHALL HMA WEAR CRSE, SG, TY IV 1,289.000 TN CC1 0075 401002-036 MARSHALL HMA WEAR CRSE, S, TY IV 1,160.000 TN CC2 0080 401002-040 MARSHALL WMA WEAR CRSE, SG, TY IV 1,289.000 TN CC3 0085 401002-041 MARSHALL WMA WEAR CRSE, S, TY IV 1,160.000 TN CC4 1 STATE PROJECT PAGE 53 Call Order : 032 CONTRACT ID : 1131115 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S352-0007/00-002.70 00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207001-001 UNCLASSIFIED EXCAVATION 25.000 CY 0015 408002-001 BITUMINOUS MATERIAL 1,094.000 GA 0020 636011-001 TRAFFIC CONTROL DEVICE 3,740.000 UN 0025 636014-001 FLAGGER 240.000 HR 0030 663001-004 EDGE LINE, TYPE II - 4 IN PERM, WHITE 12,658.000 LF 0035 663001-004 EDGE LINE, TYPE II - 4 IN TEMP, WHITE 12,658.000 LF 0040 663002-038 CENTERLINE, TYPE II - 4 IN PERM, YELLOW 10,284.000 LF 0045 663002-038 CENTERLINE, TYPE II - 4 IN TEMP, YELLOW 10,284.000 LF 0050 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 137.000 TN AA1 0055 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 135.000 TN AA2 0060 307005-003 AGGREGATE BASE COURSE, STEEL SLAG, CLASS 10 145.000 TN AA3 0065 401001-023 MARSHALL HMA BASE CRSE, SG, TY II 49.000 TN BB1 0070 401001-024 MARSHALL HMA BASE CRSE, S, TY II 48.000 TN BB2 0075 401001-025 MARSHALL HMA BASE CRSE, SS, TY II 52.000 TN BB3 0080 401001-033 MARSHALL WMA BASE CRSE, SG, TY II 49.000 TN BB4 0085 401001-034 MARSHALL WMA BASE CRSE, S, TY II 48.000 TN BB5 0090 401001-035 MARSHALL WMA BASE CRSE, SS, TY II 52.000 TN BB6 0095 401007-020 MARSHALL SCRATCH CRSE, SG, TY I 531.000 TN CC1 0100 401007-021 MARSHALL SCRATCH CRSE, S, TY I 521.000 TN CC2 0105 401007-022 MARSHALL SCRATCH CRSE, SS, TY I 561.000 TN CC3 0110 401007-023 MARSHALL WMA SCRATCH CRSE, SG, TY I 531.000 TN CC4 0115 401007-024 MARSHALL WMA SCRATCH CRSE, S, TY I 521.000 TN CC5 1 STATE PROJECT PAGE 54 Call Order : 032 CONTRACT ID : 1131115 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S352-0007/00-002.70 00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0120 401007-025 MARSHALL WMA SCRATCH CRSE, SS, TY I 561.000 TN CC6 0125 402001-020 MARSHALL HMA SKID PVT, SG, TY I 1,031.000 TN DD1 0130 402001-021 MARSHALL HMA SKID PVT, S, TY I 1,011.000 TN DD2 0135 402001-022 MARSHALL HMA SKID PVT, SS, TY I 1,088.000 TN DD3 0140 402001-029 MARSHALL WMA SKID PVT, SG, TY I 1,031.000 TN DD4 0145 402001-030 MARSHALL WMA SKID PVT, S, TY I 1,011.000 TN DD5 1 FEDERAL PROJECT PAGE 55 Call Order : 033 CONTRACT ID : 1116544 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S352-0002/00-007.17 00 00NH 0002 510 D00 COUNTIES : WETZEL DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207001-001 UNCLASSIFIED EXCAVATION 44.000 CY 0015 229001-000 SHOULDER AND DITCH 0.910 MI 0020 240002-000 CLEAN INLET 3.000 EA 0025 408002-001 BITUMINOUS MATERIAL 1,902.000 GA 0030 415005-001 REMOVE EXISTING PAVEMENT SURFACE 7,695.000 SY 0035 605012-001 ADJUST INLET TYPE, B 8.000 EA 0040 605015-001 ADJUST MANHOLE TYPE A 10.000 EA 0045 636011-001 TRAFFIC CONTROL DEVICE 13,940.000 UN 0050 636014-001 FLAGGER 420.000 HR 0055 636014-002 TRAFFIC DIRECTOR 200.000 HR 0060 636021-001 ELECTRIC ARROW 30.000 DA 0065 642004-002 SEED MIXTURE, B 175.000 LB 0070 642005-002 MULCH, WOOD CELLULOSE FIBER 1.400 TN 0075 642006-001 FERTILIZER 0.700 TN 0080 642031-001 DITCH CHECK 10.000 EA 0085 663001-004 EDGE LINE, TYPE II - 4 IN PERM. WHITE 9,755.000 LF 0090 663001-004 EDGE LINE, TYPE II - 4 IN TEMP. WHITE 9,755.000 LF 0095 663001-004 EDGE LINE, TYPE II - 4 IN TEMP. WHITE ROTOMILL 155.000 LF 0100 663002-005 LANE LINE, TYPE II - 4 IN PERM. WHITE 72.000 LF 0105 663002-005 LANE LINE, TYPE II - 4 IN TEMP. WHITE 72.000 LF 1 FEDERAL PROJECT PAGE 56 Call Order : 033 CONTRACT ID : 1116544 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S352-0002/00-007.17 00 00NH 0002 510 D00 COUNTIES : WETZEL DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 663002-005 LANE LINE, TYPE II - 4 IN TEMP. WHITE ROTOMILL 72.000 LF 0115 663002-038 CENTERLINE, TYPE II - 4 IN PERM. YELLOW 15,366.000 LF 0120 663002-038 CENTERLINE, TYPE II - 4 IN TEMP. YELLOW 15,366.000 LF 0125 663002-038 CENTERLINE, TYPE II - 4 IN TEMP. YELLOW ROTOMILL 4,132.000 LF 0130 663004-011 CHANNELIZING LINE, TYPE V - 8 IN 334.000 LF 0135 663005-011 STOP LINE, TYPE V - 24 IN WHITE 147.000 LF 0140 663007-010 STRIPE, TYPE V - 12 IN YELLOW 51.000 LF 0145 663010-010 ONE DIRECTION LANE ASSIGNMENT ARROW, TY V 19.000 EA 0150 663011-010 LANE LETTER, TYPE V 12.000 EA 0155 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 72.000 TN AA1 0160 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 71.000 TN AA2 0165 307005-003 AGGREGATE BASE COURSE, STEEL SLAG, CLASS 10 76.000 TN AA3 0170 401001-023 MARSHALL HMA BASE CRSE, SG, TY II 721.000 TN BB1 0175 401001-024 MARSHALL HMA BASE CRSE, S, TY II 707.000 TN BB2 0180 401001-025 MARSHALL HMA BASE CRSE, SS, TY II 761.000 TN BB3 0185 401001-033 MARSHALL WMA BASE CRSE, SG, TY II 721.000 TN BB4 0190 401001-034 MARSHALL WMA BASE CRSE, S, TY II 707.000 TN BB5 0195 401001-035 MARSHALL WMA BASE CRSE, SS, TY II 761.000 TN BB6 0200 401003-001 MARSHALL HMA P/L CRSE, SG 30.000 TN CC1 GRAVEL 0205 401003-002 MARSHALL HMA P/L CRSE, S 29.000 TN CC2 0210 401003-003 MARSHALL HMA P/L CRSE, SS 32.000 TN CC3 1 FEDERAL PROJECT PAGE 57 Call Order : 033 CONTRACT ID : 1116544 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S352-0002/00-007.17 00 00NH 0002 510 D00 COUNTIES : WETZEL DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 30.00 PLANS COMPLETE : 160.00 PLANS WO X-SECTIONS : 90.00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0215 401003-006 MARSHALL WMA P/L CRSE, SG 30.000 TN CC4 0220 401003-007 MARSHALL WMA P/L CRSE, S 29.000 TN CC5 0225 401003-008 MARSHALL WMA P/L CRSE, SS 32.000 TN CC6 0230 401007-020 MARSHALL SCRATCH CRSE, SG, TY I 733.000 TN DD1 0235 401007-021 MARSHALL SCRATCH CRSE, S, TY I 719.000 TN DD2 0240 401007-022 MARSHALL SCRATCH CRSE, SS, TY I 774.000 TN DD3 0245 401007-023 MARSHALL WMA SCRATCH CRSE, SG, TY I 733.000 TN DD4 0250 401007-024 MARSHALL WMA SCRATCH CRSE, S, TY I 719.000 TN DD5 0255 401007-025 MARSHALL WMA SCRATCH CRSE, SS, TY I 774.000 TN DD6 0260 402001-020 MARSHALL HMA SKID PVT, SG, TY I 1,666.000 TN EE1 0265 402001-021 MARSHALL HMA SKID PVT, S, TY I 1,633.000 TN EE2 0270 402001-022 MARSHALL HMA SKID PVT, SS, TY I 1,758.000 TN EE3 0275 402001-029 MARSHALL WMA SKID PVT, SG, TY I 1,666.000 TN EE4 0280 402001-030 MARSHALL WMA SKID PVT, S, TY I 1,633.000 TN EE5 1 STATE PROJECT PAGE 58 Call Order : 034 CONTRACT ID : 1130507 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S310-0011/00-000.00 00 COMPLETION DATE : 10/15/12 RES. ENG.: GREG HYLTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING PROJECT 0005 207001-001 UNCLASSIFIED EXCAVATION 567.000 CY 0010 408002-001 BITUMINOUS MATERIAL 2,343.000 GA 0015 415005-001 REMOVE EXISTING PAVEMENT SURFACE 397.000 SY 0020 636006-001 PILOT TRUCK AND DRIVER 8.000 DA 0025 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN 15,700.000 LF 0030 636011-001 TRAFFIC CONTROL DEVICE 15,820.000 UN 0035 636014-001 FLAGGER 192.000 HR 0040 642012-001 SILT FENCE 304.000 LF 0045 642031-001 DITCH CHECK 160.000 EA 0050 663002-038 CENTERLINE, TYPE II - 4 IN 15,700.000 LF 0055 663005-011 STOP LINE, TYPE V - 24 IN 42.000 LF 0060 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 252.000 TN AA1 0065 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 230.000 TN AA2 0070 401001-020 MARSHALL HMA BASE CRSE, SG, TY I 1,122.000 TN BB1 0075 401001-021 MARSHALL HMA BASE CRSE, S, TY I 1,021.000 TN BB2 0080 401001-030 MARSHALL WMA BASE CRSE, SG, TY I 1,122.000 TN BB3 0085 401001-031 MARSHALL WMA BASE CRSE, S, TY I 1,021.000 TN BB4 0090 401002-020 MARSHALL HMA WEAR CRSE, SG, TY I 1,933.000 TN CC1 0095 401002-021 MARSHALL HMA WEAR CRSE, S, TY I 1,759.000 TN CC2 0100 401002-026 MARSHALL WMA WEAR CRSE, SG, TY I 1,933.000 TN CC3 0105 401002-027 MARSHALL WMA WEAR CRSE, S, TY I 1,759.000 TN CC4 0110 401003-001 MARSHALL HMA P/L CRSE, SG 225.000 TN DD1 GRAVEL 0115 401003-002 MARSHALL HMA P/L CRSE, S 205.000 TN DD2 1 STATE PROJECT PAGE 59 Call Order : 034 CONTRACT ID : 1130507 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S310-0011/00-000.00 00 COMPLETION DATE : 10/15/12 RES. ENG.: GREG HYLTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING PROJECT 0120 401003-006 MARSHALL WMA P/L CRSE, SG 225.000 TN DD3 0125 401003-007 MARSHALL WMA P/L CRSE, S 205.000 TN DD4 0130 401007-020 MARSHALL SCRATCH CRSE, SG, TY I 762.000 TN EE1 0135 401007-021 MARSHALL SCRATCH CRSE, S, TY I 693.000 TN EE2 0140 401007-023 MARSHALL WMA SCRATCH CRSE, SG, TY I 762.000 TN EE3 0145 401007-024 MARSHALL WMA SCRATCH CRSE, S, TY I 693.000 TN EE4 1 FEDERAL PROJECT PAGE 60 Call Order : 035 CONTRACT ID : 0512340R3 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S313-0064/00-150.06 00 00IM 0644 145 D00 COUNTIES : GREENBRIER DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/28/12 RES. ENG.: JENNIFER BELCHER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 REPAIR CONC. PVMT, RESURFACE SHOULDERS, & GUARDRAIL 0005 204001-000 MOBILIZATION LUMP LUMP 0010 212005-000 SELECT MATERIAL FOR BACKFILLING 500.000 CY 0015 229001-000 SHOULDER AND DITCH 6.140 MI 0020 408002-001 BITUMINOUS MATERIAL 3,320.000 GA 0025 415005-001 REMOVE EXISTING PAVEMENT SURFACE 110,550.000 SY 0030 503001-001 SEALING JOINTS AND CRACKS 103,750.000 LF 0035 506001-001 CONCRETE PAVEMENT REPAIR, TYPE VARIOUS 5,458.000 SY 0040 508003-001 FINAL TEXTURED SURFACE AREA OF DIAMOND GROUND PAVEMENT 186,710.000 SY 0045 607001-001 TYPE 1 GUARDRAIL, CLASS 1 200.000 LF 0050 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 22,662.500 LF 0055 607010-020 GUARDRAIL REMOVAL 1,050.000 LF 0060 607035-001 GUARDRAIL ELEMENT 30.000 EA 0065 607039-001 6X6X14 IN TREATED WOOD BLOCK 30.000 EA 0070 607042-001 6 FT STEEL POST 30.000 EA 0075 607065-001 FLARED END TERMINAL 3.000 EA 0080 607066-001 TANGENT END TERMINAL 15.000 EA 0085 636008-002 TEMPORARY PAVEMENT MARKING-PAINT 6 IN 157,025.000 LF 0090 636011-001 TRAFFIC CONTROL DEVICE 12,695.000 UN 0095 636014-002 TRAFFIC DIRECTOR 715.000 HR 0100 636021-001 ELECTRIC ARROW 72.000 DA 0105 636022-001 CHANGEABLE MESSAGE SIGN 72.000 DA 1 FEDERAL PROJECT PAGE 61 Call Order : 035 CONTRACT ID : 0512340R3 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S313-0064/00-150.06 00 00IM 0644 145 D00 COUNTIES : GREENBRIER DBE GOALS : 3.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 09/28/12 RES. ENG.: JENNIFER BELCHER ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 REPAIR CONC. PVMT, RESURFACE SHOULDERS, & GUARDRAIL 0110 636025-001 WARNING LIGHTS, TYPE B 286.000 DA 0115 663001-026 EDGE LINE, TYPE II - 6 IN WHITE 75,915.000 LF 0120 663001-026 EDGE LINE, TYPE II - 6 IN YELLOW 64,840.000 LF 0125 663002-026 LANE LINE, TYPE II - 6 IN 16,210.000 LF 0130 663007-010 STRIPE, TYPE V - 12 IN WHITE 800.000 LF 0135 664002-001 EDGE LINE RUMBLE STRIP, ASPHALT 129,675.000 LF 0140 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 921.000 TN AA1 0145 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 875.000 TN AA2 0150 401001-040 SUPERPAVE HMA BASE CRSE, SG, TY 19 14,500.000 TN BB1 0155 401001-041 SUPERPAVE HMA BASE CRSE, S, TY 19 13,775.000 TN BB2 0160 401001-044 SUPERPAVE WMA BASE CRSE, SG, TY 19 14,500.000 TN BB3 0165 401001-045 SUPERPAVE WMA BASE CRSE, S, TY 19 13,775.000 TN BB4 0170 402001-045 SUPERPAVE HMA SKID PVT, SG, TY 12.5 7,100.000 TN CC1 0175 402001-046 SUPERPAVE HMA SKID PVT, S, TY 12.5 6,745.000 TN CC2 0180 402001-065 SUPERPAVE WMA SKID PVT, SG, TY 12.5 7,100.000 TN CC3 0185 402001-066 SUPERPAVE WMA SKID PVT, S, TY 12.5 6,745.000 TN CC4 1 STATE PROJECT PAGE 62 Call Order : 036 CONTRACT ID : 1130514 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S319-0480/00-000.00 00 COMPLETION DATE : 10/15/12 RES. ENG.: GARY LONG ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACE 0005 204001-000 MOBILIZATION LUMP LUMP 0010 207001-001 UNCLASSIFIED EXCAVATION 97.000 CY 0015 408002-001 BITUMINOUS MATERIAL 27.000 GA 0020 495001-001 MICRO SURFACE 32,267.000 SY 0025 636006-001 PILOT TRUCK AND DRIVER 6.000 DA 0030 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN 91,767.000 LF 0035 636011-001 TRAFFIC CONTROL DEVICE 4,240.000 UN 0040 636014-001 FLAGGER 260.000 HR 0045 663001-005 EDGE LINE, TYPE II - 4 IN WHITE 4.400 MI 0050 663002-039 CENTERLINE, TYPE II - 4 IN 3.950 MI 0055 401001-020 MARSHALL HMA BASE CRSE, SG, TY I 192.000 TN AA1 0060 401001-021 MARSHALL HMA BASE CRSE, S, TY I 173.000 TN AA2 0065 401001-030 MARSHALL WMA BASE CRSE, SG, TY I 192.000 TN AA3 0070 401001-031 MARSHALL WMA BASE CRSE, S, TY I 173.000 TN AA4 1 FEDERAL PROJECT PAGE 63 Call Order : 037 CONTRACT ID : 1125928 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S326-0002/00-010.88 00 00NH 0002 519 D00 COUNTIES : MARSHALL DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION PAVING LUMP LUMP 0010 204001-000 MOBILIZATION PILING LUMP LUMP 0015 207001-001 UNCLASSIFIED EXCAVATION PILING 35.000 CY 0020 211009-000 SELECT BORROW EXCAVATION PILING 52.000 TN 0025 229001-000 SHOULDER AND DITCH 0.590 MI 0030 240002-000 CLEAN INLET TY. G BEHIND BARRIER WALL 9.000 EA 0035 408002-001 BITUMINOUS MATERIAL 1,502.000 GA 0040 415005-001 REMOVE EXISTING PAVEMENT SURFACE 1" DEEP 20,589.000 SY 0045 415005-001 REMOVE EXISTING PAVEMENT SURFACE 2" DEEP 52.000 SY 0050 495001-001 MICRO SURFACE MULTIPLE COURSE 20,589.000 SY 0055 604050-012 15 INCH CORRUGATED POLYETHYLENE PIPE 2.000 LF 0060 604050-016 18 INCH CORRUGATED POLYETHYLENE PIPE 231.000 LF 0065 605004-001 TYPE B INLET 5.000 EA 0070 605014-001 MODIFIED INLET, TYPE B 1.000 EA 0075 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET PILING 62.500 LF 0080 614001-175 W16X100 STEEL PILE TO BE SUPPLIED BY THE DOH 550.000 LF 0085 614003-001 CONCRETE LAGGING, THICKNESS 8" 247.500 SF 0090 636009-001 TEMPORARY PAVEMENT MARKING-TAPE 4 IN, TY SOLID WHITE LINE 750.000 LF 0095 636011-001 TRAFFIC CONTROL DEVICE 11,640.000 UN 0100 636014-001 FLAGGER 240.000 HR 0105 636021-001 ELECTRIC ARROW 50.000 DA 1 FEDERAL PROJECT PAGE 64 Call Order : 037 CONTRACT ID : 1125928 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S326-0002/00-010.88 00 00NH 0002 519 D00 COUNTIES : MARSHALL DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0110 636028-001 SHADOW VEHICLE 10.000 DA 0115 642004-002 SEED MIXTURE, B 65.000 LB 0120 642005-002 MULCH, WOOD CELLULOSE FIBER 0.540 TN 0125 642006-001 FERTILIZER 0.300 TN 0130 642012-001 SILT FENCE 64.000 LF 0135 642040-001 INLET PROTECTION 5.000 EA 0140 663001-004 EDGE LINE, TYPE II - 4 IN PERM. WHITE 6,166.000 LF 0145 663001-004 EDGE LINE, TYPE II - 4 IN TEMP. WHITE 12,332.000 LF 0150 663001-004 EDGE LINE, TYPE II - 4 IN TEMP. WHITE - ROTOMILL 6,166.000 LF 0155 663002-005 LANE LINE, TYPE II - 4 IN PERM. WHITE 1,542.000 LF 0160 663002-005 LANE LINE, TYPE II - 4 IN TEMP. WHITE 3,084.000 LF 0165 663002-005 LANE LINE, TYPE II - 4 IN TEMP. WHITE - ROTOMILL 1,542.000 LF 0170 663002-038 CENTERLINE, TYPE II - 4 IN PERM. YELLOW 12,332.000 LF 0175 663002-038 CENTERLINE, TYPE II - 4 IN TEMP. YELLOW 24,664.000 LF 0180 663002-038 CENTERLINE, TYPE II - 4 IN TEMP. YELLOW - ROTOMILL 12,332.000 LF 0185 663007-010 STRIPE, TYPE V - 12 IN YELLOW 1,460.000 LF 0190 663012-208 RAISED PAVEMENT MARKER, TYPE P-2 238.000 EA 0195 664002-001 EDGE LINE RUMBLE STRIP, ASPHALT 3,083.000 LF 0200 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 1, PILING 5.000 TN AA1 0205 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 1, PILING 5.000 TN AA2 0210 307005-003 AGGREGATE BASE COURSE, STEEL SLAG, CLASS 1, PILING 6.000 TN AA3 1 FEDERAL PROJECT PAGE 65 Call Order : 037 CONTRACT ID : 1125928 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S326-0002/00-010.88 00 00NH 0002 519 D00 COUNTIES : MARSHALL DBE GOALS : 8.00 GUARANTY : 5.0% OF BID PROPOSAL ONLY : 10.00 PLANS COMPLETE : 65.00 PLANS WO X-SECTIONS : 15.00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0215 401001-023 MARSHALL HMA BASE CRSE, SG, TY II PILING 6.000 TN BB1 0220 401001-024 MARSHALL HMA BASE CRSE, S, TY II PILING 6.000 TN BB2 0225 401001-025 MARSHALL HMA BASE CRSE, SS, TY II PILING 7.000 TN BB3 0230 401001-033 MARSHALL WMA BASE CRSE, SG, TY II PILING 6.000 TN BB4 0235 401001-034 MARSHALL WMA BASE CRSE, S, TY II PILING 6.000 TN BB5 0240 401001-035 MARSHALL WMA BASE CRSE, SS, TY II PILING 7.000 TN BB6 0245 401007-020 MARSHALL SCRATCH CRSE, SG, TY I 708.000 TN CC1 0250 401007-021 MARSHALL SCRATCH CRSE, S, TY I 694.000 TN CC2 0255 401007-022 MARSHALL SCRATCH CRSE, SS, TY I 747.000 TN CC3 0260 401007-023 MARSHALL WMA SCRATCH CRSE, SG, TY I 708.000 TN CC4 0265 401007-024 MARSHALL WMA SCRATCH CRSE, S, TY I 694.000 TN CC5 0270 401007-025 MARSHALL WMA SCRATCH CRSE, SS, TY I 747.000 TN CC6 1 STATE PROJECT PAGE 66 Call Order : 038 CONTRACT ID : 1131125 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S326-0021/00-008.80 00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 408002-001 BITUMINOUS MATERIAL 1,234.000 GA 0015 636011-001 TRAFFIC CONTROL DEVICE 3,470.000 UN 0020 636014-001 FLAGGER 160.000 HR 0025 663001-004 EDGE LINE, TYPE II - 4 IN PERM. WHITE 15,800.000 LF 0030 663001-004 EDGE LINE, TYPE II - 4 IN TEMP. WHITE 15,800.000 LF 0035 663002-038 CENTERLINE, TYPE II - 4 IN PERM. YELLOW 14,486.000 LF 0040 663002-038 CENTERLINE, TYPE II - 4 IN TEMP. YELLOW 14,486.000 LF 0045 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 170.000 TN AA1 0050 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 167.000 TN AA2 0055 307005-003 AGGREGATE BASE COURSE, STEEL SLAG, CLASS 10 180.000 TN AA3 0060 401001-023 MARSHALL HMA BASE CRSE, SG, TY II 1,402.000 TN BB1 0065 401001-024 MARSHALL HMA BASE CRSE, S, TY II 1,374.000 TN BB2 0070 401001-025 MARSHALL HMA BASE CRSE, SS, TY II 1,479.000 TN BB3 0075 401001-033 MARSHALL WMA BASE CRSE, SG, TY II 1,402.000 TN BB4 0080 401001-034 MARSHALL WMA BASE CRSE, S, TY II 1,374.000 TN BB5 0085 401001-035 MARSHALL WMA BASE CRSE, SS, TY II 1,479.000 TN BB6 0090 401002-023 MARSHALL HMA WEAR CRSE, SG, TY III 625.000 TN CC1 0095 401002-024 MARSHALL HMA WEAR CRSE, S, TY III 613.000 TN CC2 0100 401002-025 MARSHALL HMA WEAR CRSE, SS, TY III 659.000 TN CC3 0105 401002-029 MARSHALL WMA WEAR CRSE, SG, TY III 625.000 TN CC4 0110 401002-030 MARSHALL WMA WEAR CRSE, S, TY III 613.000 TN CC5 0115 401002-031 MARSHALL WMA WEAR CRSE, SS, TY III 659.000 TN CC6 1 STATE PROJECT PAGE 67 Call Order : 039 CONTRACT ID : 1130506 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S334-0034/00-000.00 00 COMPLETION DATE : 10/15/12 RES. ENG.: GREG HYLTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING PROJECT 0005 207001-001 UNCLASSIFIED EXCAVATION 354.000 CY 0010 408002-001 BITUMINOUS MATERIAL 2,276.000 GA 0015 636006-001 PILOT TRUCK AND DRIVER 6.000 DA 0020 636008-001 TEMPORARY PAVEMENT MARKING-PAINT 4 IN 16,228.000 LF 0025 636011-001 TRAFFIC CONTROL DEVICE 19,390.000 UN 0030 636014-001 FLAGGER 144.000 HR 0035 642012-001 SILT FENCE 400.000 LF 0040 642031-001 DITCH CHECK 169.000 EA 0045 663002-038 CENTERLINE, TYPE II - 4 IN 16,228.000 LF 0050 663005-011 STOP LINE, TYPE V - 24 IN 16.000 LF 0055 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 205.000 TN AA1 0060 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 187.000 TN AA2 0065 401001-020 MARSHALL HMA BASE CRSE, SG, TY I 700.000 TN BB1 0070 401001-021 MARSHALL HMA BASE CRSE, S, TY I 637.000 TN BB2 0075 401001-030 MARSHALL WMA BASE CRSE, SG, TY I 700.000 TN BB3 0080 401001-031 MARSHALL WMA BASE CRSE, S, TY I 637.000 TN BB4 0085 401002-020 MARSHALL HMA WEAR CRSE, SG, TY I 1,878.000 TN CC1 0090 401002-021 MARSHALL HMA WEAR CRSE, S, TY I 1,709.000 TN CC2 0095 401002-026 MARSHALL WMA WEAR CRSE, SG, TY I 1,878.000 TN CC3 0100 401002-027 MARSHALL WMA WEAR CRSE, S, TY I 1,709.000 TN CC4 0105 401007-020 MARSHALL SCRATCH CRSE, SG, TY I 740.000 TN DD1 0110 401007-021 MARSHALL SCRATCH CRSE, S, TY I 673.000 TN DD2 0115 401007-023 MARSHALL WMA SCRATCH CRSE, SG, TY I 740.000 TN DD3 1 STATE PROJECT PAGE 68 Call Order : 039 CONTRACT ID : 1130506 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S334-0034/00-000.00 00 COMPLETION DATE : 10/15/12 RES. ENG.: GREG HYLTON ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING PROJECT 0120 401007-024 MARSHALL WMA SCRATCH CRSE, S, TY I 673.000 TN DD4 1 STATE PROJECT PAGE 69 Call Order : 040 CONTRACT ID : 1131161 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S335-0015/01-002.00 00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0005 204001-000 MOBILIZATION LUMP LUMP 0010 408002-001 BITUMINOUS MATERIAL 1,267.000 GA 0015 415005-001 REMOVE EXISTING PAVEMENT SURFACE 2,920.000 SY 0020 605012-001 ADJUST INLET TYPE, B 1.000 EA 0025 636011-001 TRAFFIC CONTROL DEVICE 4,820.000 UN 0030 636014-001 FLAGGER 200.000 HR 0035 663001-004 EDGE LINE, TYPE II - 4 IN PERM. WHITE 9,941.000 LF 0040 663001-004 EDGE LINE, TYPE II - 4 IN TEMP. WHITE 9,941.000 LF 0045 663002-038 CENTERLINE, TYPE II - 4 IN PERM. YELLOW 9,588.000 LF 0050 663002-038 CENTERLINE, TYPE II - 4 IN TEMP. YELLOW 9,588.000 LF 0055 663002-038 CENTERLINE, TYPE II - 4 IN TEMP. YELLOW, ROTOMILL 1,500.000 LF 0060 663006-010 CROSSWALK LINE, TYPE V - 12 IN X 6 FT WHITE 270.000 LF 0065 663007-010 STRIPE, TYPE V - 12 IN WHITE 270.000 LF 0070 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 133.000 TN AA1 0075 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 131.000 TN AA2 0080 307005-003 AGGREGATE BASE COURSE, STEEL SLAG, CLASS 10 140.000 TN AA3 0085 401001-023 MARSHALL HMA BASE CRSE, SG, TY II 344.000 TN BB1 0090 401001-024 MARSHALL HMA BASE CRSE, S, TY II 337.000 TN BB2 0095 401001-025 MARSHALL HMA BASE CRSE, SS, TY II 363.000 TN BB3 0100 401001-033 MARSHALL WMA BASE CRSE, SG, TY II 344.000 TN BB4 0105 401001-034 MARSHALL WMA BASE CRSE, S, TY II 337.000 TN BB5 0110 401001-035 MARSHALL WMA BASE CRSE, SS, TY II 363.000 TN BB6 0115 401002-020 MARSHALL HMA WEAR CRSE, SG, TY I 1,058.000 TN CC1 1 STATE PROJECT PAGE 70 Call Order : 040 CONTRACT ID : 1131161 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S335-0015/01-002.00 00 COMPLETION DATE : 10/15/12 RES. ENG.: GUS SUWAID ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 RESURFACING 0120 401002-021 MARSHALL HMA WEAR CRSE, S, TY I 1,037.000 TN CC2 0125 401002-022 MARSHALL HMA WEAR CRSE, SS, TY I 1,116.000 TN CC3 0130 401002-026 MARSHALL WMA WEAR CRSE, SG, TY I 1,058.000 TN CC4 0135 401002-027 MARSHALL WMA WEAR CRSE, S, TY I 1,037.000 TN CC5 0140 401002-028 MARSHALL WMA WEAR CRSE, SS, TY I 1,116.000 TN CC6 0145 401007-020 MARSHALL SCRATCH CRSE, SG, TY I 392.000 TN DD1 0150 401007-021 MARSHALL SCRATCH CRSE, S, TY I 384.000 TN DD2 0155 401007-022 MARSHALL SCRATCH CRSE, SS, TY I 414.000 TN DD3 0160 401007-023 MARSHALL WMA SCRATCH CRSE, SG, TY I 392.000 TN DD4 0165 401007-024 MARSHALL WMA SCRATCH CRSE, S, TY I 384.000 TN DD5 0170 401007-025 MARSHALL WMA SCRATCH CRSE, SS, TY I 414.000 TN DD6 1 STATE PROJECT PAGE 71 Call Order : 041 CONTRACT ID : 1207510 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S349-0151/00-000.30 00 COMPLETION DATE : 10/15/12 RES. ENG.: KIP HALL ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 OLD US 33 0005 207001-001 UNCLASSIFIED EXCAVATION 289.000 CY 0010 408002-001 BITUMINOUS MATERIAL 1,450.000 GA 0015 605012-001 ADJUST INLET TYPE, G 1.000 EA 0020 605020-001 INSTALL INLET GRATE, TYPE 1 1.000 EA 0025 636006-001 PILOT TRUCK AND DRIVER 8.000 DA 0030 636011-001 TRAFFIC CONTROL DEVICE 3,850.000 UN 0035 636014-001 FLAGGER 160.000 HR 0040 663001-004 EDGE LINE, TYPE II - 4 IN WHITE 37,020.000 LF 0045 663002-038 CENTERLINE, TYPE II - 4 IN YELLOW 37,020.000 LF 0050 307005-001 AGGREGATE BASE COURSE, STONE OR GRAVEL, CLASS 10 200.000 TN AA1 0055 307005-002 AGGREGATE BASE COURSE, SLAG, CLASS 10 180.000 TN AA2 0060 401001-023 MARSHALL HMA BASE CRSE, SG, TY II 572.000 TN BB1 0065 401001-024 MARSHALL HMA BASE CRSE, S, TY II 515.000 TN BB2 0070 401001-033 MARSHALL WMA BASE CRSE, SG, TY II 572.000 TN BB3 0075 401001-034 MARSHALL WMA BASE CRSE, S, TY II 515.000 TN BB4 0080 402001-020 MARSHALL HMA SKID PVT, SG, TY I 2,280.000 TN CC1 0085 402001-021 MARSHALL HMA SKID PVT, S, TY I 2,052.000 TN CC2 0090 402001-029 MARSHALL WMA SKID PVT, SG, TY I 2,280.000 TN CC3 0095 402001-030 MARSHALL WMA SKID PVT, S, TY I 2,052.000 TN CC4 1 FEDERAL PROJECT PAGE 72 Call Order : 042 CONTRACT ID : 1203826 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S389-0GRD/RL-012.00 00 HSIP 2012 541 D00 COUNTIES : GREENBRIER FAYETTE DBE GOALS : 5.00 GUARANTY : 5.0% OF BID SUMMERS OTHERS PROPOSAL ONLY : 10.00 COMPLETIONLDATE : 12/31/12 RES. ENG.: GREG HYLTONWO X-SECTIONS : 15.00 ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 UPGRADE GUARDRAIL 0005 204003-000 MOBILIZATION, PER JOB ORDER 259.000 EA 0010 607001-001 TYPE 1 GUARDRAIL, CLASS I 58,500.000 LF 0015 607001-001 TYPE 1 GUARDRAIL, CLASS V 2,075.000 LF 0020 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET 48,030.000 LF 0025 607010-020 GUARDRAIL REMOVAL 61,005.750 LF 0030 607022-001 CUT SLOPE TERMINAL, REMOVE AND RESET, TYPE A 12.000 EA 0035 607023-001 MODIFIED CUT SLOPE TERMINAL, TYPE A 65.000 EA 0040 607023-001 MODIFIED CUT SLOPE TERMINAL, TYPE B 7.000 EA 0045 607025-001 CUT SLOPE TERMINAL, TYPE A 8.000 EA 0050 607025-001 CUT SLOPE TERMINAL, TYPE B 3.000 EA 0055 607030-001 SPECIAL TRAILING END TERMINAL 25.000 EA 0060 607030-002 SPECIAL TRAILING END TERMINAL, REMOVED AND RESET 14.000 EA 0065 607031-001 25 FT RAIL ELEMENT 28.000 EA 0070 607035-001 GUARDRAIL ELEMENT 130.000 EA 0075 607036-001 GUARDRAIL END SHOE 6.000 EA 0080 607037-001 BUFFER END SECTION 8.000 EA 0085 607039-001 6X6X14 IN TREATED WOOD BLOCK 20.000 EA 0090 607040-001 8X6X14 IN TREATED WOOD BLOCK 20.000 EA 0095 607040-002 8 IN BLOCKOUT PLASTIC 1,147.000 EA 0100 607042-001 6 FT STEEL POST 23.000 EA 0105 607043-001 8 FT STEEL POST 20.000 EA 0110 607044-001 6X8X72 IN TREATED WOOD POST 20.000 EA 1 FEDERAL PROJECT PAGE 73 Call Order : 042 CONTRACT ID : 1203826 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S389-0GRD/RL-012.00 00 HSIP 2012 541 D00 COUNTIES : GREENBRIER FAYETTE DBE GOALS : 5.00 GUARANTY : 5.0% OF BID SUMMERS OTHERS PROPOSAL ONLY : 10.00 COMPLETIONLDATE : 12/31/12 RES. ENG.: GREG HYLTONWO X-SECTIONS : 15.00 ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 UPGRADE GUARDRAIL 0115 607046-001 7 INCH ROUND X 6 FT TREATED WOOD POST 20.000 EA 0120 607048-001 STRUCTURE MOUNTED POST, ANCHORED 57.000 EA 0125 607048-002 BRIDGE POST SIDE MOUNTED WITH HARDWARE 12.000 EA 0130 607065-001 FLARED END TERMINAL 4.000 EA 0135 607065-002 FLARED END TERMINAL, REMOVE AND RESET 1.000 EA 0140 607066-001 TANGENT END TERMINAL 298.000 EA 0145 607066-002 TANGENT END TERMINAL, REMOVE AND RESET 12.000 EA 1 STATE PROJECT PAGE 74 Call Order : 043 CONTRACT ID : 1209751 Letting Date : 05/22/12 10:00 A.M. PROJECTS : S320-0119/00-025.53 00 : RES. ENG.: GARY MULLINS ------------------------------------------------------------------------------------------------------------------------------------ LINE NO. ITEM NO. DESCRIPTION QUANTITY UNITS ==================================================================================================================================== SECTION NO. 0001 COOPERS CREEK BRIDGE (DESIGN BUILD) 0005 105000-000 DESIGN BUILD CONTRACT COOPERS CREEK BRIDGE ( 1.00 ) LUMP