Dingess Street Bridge Replacement Project

Dingess Street Bridge Replacement Project

Join us on Thursday, April 28, 2016, from 4:00pm to 7:00pm, at Logan County High School cafeteria for an informational workshop public meeting on the Dingess Street Bridge Replacement Project. West Virginia Division of Highways (WVDOH) project representatives will be available to discuss the proposed project and answer questions. There will be no formal presentation, but project maps and other information will be on display. The Environmental Assessment will be available for review. The meeting handout is available for download.

Project Background

The Dingess Street Bridge was built in 1951 by the J.M. Francesa & Company from Fayetteville, WV. It is a four span continuous steel beam configuration, with a total bridge length of 324 feet long and 68 feet wide. It consists of four 11 foot wide travel lanes with a 6 foot wide sidewalk adjacent to the travel lanes and had an average daily traffic of 13,300 vehicles. Alternative #6A has been chosen as the Preferred Alternative, which provides a five lane bridge. Details will be available on the preferred.
Map of the project area

When and Where?

Thursday, April 28. 2016
4:00 PM to 7:00 PM
Logan County High School
Upon request, WVDOH will provide reasonable accommodations to afford an individual with a disability an equal opportunity to participate. Please contact us at (304) 558‐3931, or (800) 982‐8722 (voice to TTD), or (800) 982‐8771 (TDD to voice).

Comment

You may comment online or in writing. Comments are due Tuesday, May 31, 2016 on the project and can be submitted at the meeting or sent to:

Mr. RJ Scites, P.E.
Director, Engineering Division WVDOH
1334 Smith Street
Charleston, WV 25301

 

WV DOT Privacy Notices | Contact Us | Site Map | Disclaimer
E.E.O./AFFIRMATIVE ACTION EMPLOYER

Privacy, Security and Accessibility | WV.gov | USA.gov | © 2016 State of West Virginia