PROJ #
PROJECT TITLE
START DATE
END DATE
REVISED END DATE
CP-1
ACCELERATOR FOR PORTLAND
3/1/80
4/1/81
CP-2
USE OF NUCLEAR GAGES
3/1/81
CP-3
EVALUATION OF STABILITY AND PERMEABILITY OF BASE COURSE DESIGN
7/1/80
6/1/81
CP-4
ACCEPTANCE PROCEDURES FOR REINFORCING STEEL
CP-5
OPTIMIZING THE INTERPRETATION OF SEISMIC AND RESISTIVITY DATA
CP-6
CONTINUED INVESTIGATION OF ANALYZATION METHODS OF SEISMIC DATA
10/1/81
8/1/82
IP-1
DEVELOPING & MANAGING VEGETATIVE COVERS FOR EROSION CONTROL WITH LITTLE MAINTENANCE IN WEST VIRGINIA HIGHWAY CORRIDORS
1/30/76
1/1/76
IP-2
SYNTHESIS OF STATISTICAL PARAMETERS FOR HIGHWAY CONSTRUCTION
12/15/77
5/1/80
IP-3
DURABILITY OF COATINGS APPLIED TO STEEL STRUCTURES
2/1/78
IP-4
RESOURCES FOR EDUCATING TRUCK DRIVERS ABOUT TRUCK ESCAPE RAMPS
8/16/80
7/1/82
IP-5
EFFECTIVENESS OF WARNING DEVICES AT RAIL-HIGHWAY GRADE CROSSINGS
2/22/83
7/15/84
IHE-1
DOW 888 COLD JOINT SEALER
8/1/80
4/1/85
IHE-2
STRESS RELIEF INTERLAYER FABRIC (MIRAFI)
1/1/87
IHE-3
STRESS RELIEF INTERLAYER FABRIC (PETROMAT)
6/1/85
IHE-4
PCC JOINT RESTORATION-PRESTRESSED SLABS
IHE-5
PCC JOINT RESTORATION - CAST-IN-PLACE SLABS
4//85
IHE-6
PCC JOINT RESTORATION - INVERTED T
IHE-7
HORIZONTAL SUBDRAIN SYSTEM
3/1/82
12/1/85
IHE-8
FREE DRAINING BASE COURSE
IHE-9
EXPERIMENTAL HOT POUR JOINT SEALERS
1/1/84
1/1/89
IHE-10
HIGH-TYPE RAILROAD HIGHWAY GRADE CROSSING SURFACES
11/1/84
12/1/88
RP-1
EVALUATION OF CRUSHED STONE FOR USE IN BASE COURSE
2/21/57
1/1/66
RP-2
CONDUCTING A STATEWIDE SURVEY FOR HIGHWAY AGGREGATES IN WEST VIRGINIA
1/1/56
5/1/62
RP-3
EVALUATION OF THE FLY ASH-LIME CEMENT WATER SYSTEM BY MEANS OF FACTORIAL DESIGN
2/1/64
RP-4
ENGINEERING CHARACTERISTICS OF WEST VIRGINIA SOILS
11/22/61
12/31/65
RP-5
EFFECT OF TEMPERATURE ON ASPHALTIC CONCRETE AT TIME OF MIXING
8/22/65
RP-6
ECONOMIC IMPACT OF LIMITED ACCESS HIGHWAYS BYPASSING CITIES IN WEST VIRGINIA
7/10/63
RP-7
A STUDY OF THE RELATIONSHIP BETWEEN AIR TEMPERATURE AND DEPTH OF FROST PENETRATION AS RELATED TO PAVEMENT PERFORMANCE OF WEST VIRGINIA HIGHWAYS
4/4/62
7/1/66
PREDICTION OF THE DEPTH OF FROST PENETRATION IN WEST VIRGINIA FOR PAVEMENT DESIGN (TECHNICAL SUPPLEMENTAL)
RP-8
DEVELOPMENT OF A PROCEDURE FOR THE DESIGN OF HOT-MIX ASPHALTIC CONCRETE MIXTURES FOR USE ON WEST VIRGINIA HIGHWAYS
6/1/88
RP-9
WEST VIRGINIA HIGHWAY LAWS STUDY
5/9/63
6/30/63
RP-10
LAND USE AND PLANNING CONTROLS
5/9/62
12/1/65
RP-11
URETHANE FOAM AS A BRIDGE DECK INSULATOR (PHASE I)
8/17/62
8/17/63
RP-12
CRITICAL PATH METHOD (C.P.M.) BASED HIGHWAY MANAGEMENT STUDY
7/8/63
1/8/64
RP-13
HIGHWAY MANAGEMENT RESEARCH AGREEMENT
7/22/63
6/30/64
RP-14
WEST VIRGINIA HIGHWAY SEVERANCE DAMAGE STUDY
1/24/64
6/7/68
RP-15
URETHANE FOAM AS A BRIDGE DECK INSULATOR (PHASE II)
1/1/64
5/3/66
RP-16
RUNOFF STUDIES ON SMALL DRAINAGE AREAS
7/1/63
RP-17
SOIL SUBBASE STABILIZATION
10/1/63
1/1/68
RP-18
DETERMINATION OF STATISTICAL PARAMETERS FOR HIGHWAY CONSTRUCTION
6/8/64
3/1/77
RP-19
COMPACTION CONTROL
8/1/64
8/1/68
RP-20
INTERSTATE SYSTEM ACCIDENT STUDY
7/1/64
9/1/69
RP-21
ESTABLISHING CRITERIA FOR SPEED LIMITS IN SCHOOL ZONES
3/29/65
5/31/67
RP-22
THE IMPACT OF HIGHWAY BEAUTIFICATION
6/9/66
8/25/67
RP-23
EVALUATION OF STRUCTURAL STEEL COATING IN RELATION TO INDUSTRIAL ATMOSPHERIC CONDITIONS
2/22/67
4/1/74
RP-26
ESTABLISHING A PERSISTENT VEGETATION ON CUTS AND FILLS ALONG WEST VIRGINIA HIGHWAYS
1/2/68
3/1/73
RP-27
DEVELOPMENT OF AN IMPROVED METHOD FOR LABORATORY COMPACTION OF FINE-GRAINED SOILS USING THE GYRATORY TESTING MACHINE (VOLUMES I AND II)
1/4/68
3/1/74
RP-28
POTENTIAL OF NEUTRON ACTIVATION ANALYSIS OF HIGHWAY MATERIALS
1/9/70
RP-29
REPORT ON THE INSPECTION AND ANALYSIS OF THE ST. MARY'S BRIDGE
4/18/68
12/1/70
RP-30
SAFETY PROVISIONS FOR SUPPORT STRUCTURES ON OVERHEAD SIGN BRIDGES
9/5/68
9/4/70
RP-31
MEANING AND APPLICATION OF COLOR AND ARROW INDICATIONS FOR TRAFFIC SIGNALS
10/21/68
5/1/73
RP-32
COST ESTIMATING MODELS FOR IDENTIFYING GROSS DOLLAR NEEDS FOR WEST VIRGINIA HIGHWAYS
8/4/69
11/1/71
RP-33
EFFECTS OF ABSORBED MOISTURE IN AGGREGATES ON CONCRETE DURABILITY
9/11/69
3/1/72
RP-34
HORIZONTALLY CURVED HIGHWAY BRIDGES
5/1/69
11/1/72
RP-35
ROAD TEST FOR SKID RESISTANT BITUMINOUS SURFACES
5/1/68
3/1/76
RP-36
BRIDGE SHOULDER WIDTH STUDY
5/15/70
3/31/76
RP-37
APPLICATION OF NONDESTRUCTIVE TESTING TECHNIQUES FOR EVALUATION OF THE ENGINEERING PROPERTIES OF PORTLAND CEMENT CONCRETE (PHASES I AND II)
3/2/71
11/1/75
RP-38
TRAFFIC SIGNAL WARRANTS FOR HEAVY TRAFFIC VOLUMES OCCURRING DURING SHORT PERIODS OF TIME
5/24/72
3/1/75
RP-39
RAILROAD-HIGHWAY GRADE CROSSING SAFETY
12/14/72
5/1/75
RP-40
PRODUCING VEGETATION COVER ON HIGHWAY SLOPES CONCURRENT WITH AND SUBSEQUENT TO HIGHWAY CONSTRUCTION
4/28/72
12/1/76
RP-41
CONCRETE MEDIAN BARRIERS
7/12/72
8/1/76
RP-42
EFFECTS OF HIGHWAYS ON WILDLIFE
7/31/72
1/5/77
RP-43
A MAINTENANCE MANAGEMENT SYSTEM FOR IMPLEMENTATION BY THE WEST VIRGINIA DEPARTMENT OF HIGHWAYS
10/1/72
4/1/75
MAINTENANCE STANDARDS - WEST VIRGINIA DEPARTMENT OF HIGHWAYS MAINTENANCE MANAGEMENT SYSTEM (RP-43 SUPPLEMENTAL)
RP-44
A STUDY OF TRIP PLANNING AND MAP USE BY AMERICAN MOTORISTS
6/1/77
RP-45
RESEARCH STUDY TO REFINE METHODS AND PROCEDURES FOR IMPLEMENTING FIELD USE OF LARGE SCALE PYCNOMETER FOR RAPID DETERMINATION OF ASPHALT CONTENT OF PAVING MIXTURES
12/19/72
3/5/78
RP-46
AN INVESTIGATION OF THE PARAMETERS INFLUENCING BOND BEHAVIOR WITH A VIEW TOWARDS ESTABLISHING DESIGN CRITERIA (VOLUMES I AND II)
2/16/73
11/1/77
RP-47
STUDY TO REFINE METHODS AND PROCEDURES FOR IMPLEMENTING THE METHOD OF EARLY PREDICTION OF POTENTIAL STRENGTH OF PORTLAND CEMENT CONCRETE
12/27/72
6/2/76
RP-48
UTILITY PLANT ACCOMMODATIONS WITHIN HIGHWAY RIGHTS-OF-WAY
12/1/72
10/10/74
RP-49
PAINT PERFORMANCE IN RELATION TO AIR QUALITY
6/22/73
8/30/76
RP-50
DEVELOPMENT OF A SHORT SPAN BRIDGE SYSTEM
8/5/73
8/6/79
RP-51
INVESTIGATION TOWARD THE DEVELOPMENT OF AN EQUIPMENT MANAGEMENT SYSTEM
4/3/75
RP-52
EVALUATION OF ALTERNATE CAPPING PROCEDURES FOR CONCRETE 28-DAY QUALITY ASSURANCE SPECIMENS
9/16/75
RP-53
DEVELOPMENT OF A PROBABILISTIC MODEL OF QUALITY ASSURANCE ACCEPTANCE PLAN (PHASE I)
8/6/75
2/1/81
RP-54
DEVELOPMENT OF AN EQUIPMENT MANAGEMENT SYSTEM
8/8/75
8/7/77
RP-55
LOW MAINTENANCE VEGETATION FOR EROSION CONTROL
4/6/76
RP-56
WILDLIFE USE OF DIFFERENT ROADSIDE COVER PLANTINGS
7/1/77
RP-57
DEVELOPMENT OF WARRANTS FOR THE USE AND LOCATION OF TRUCK ESCAPE RAMPS (VOLUMES I AND II)
RP-58
EVALUATION OF EXPERIMENTAL HOT POUR JOINT SEALANT FOR PORTLAND CEMENT CONCRETE
8/1/77
3/27/86
RP-59
STATE OF TECHNOLOGY FOR QUALITY ASSURANCE OF PLASTIC CONCRETE - STATE OF TECHNOLOGY PHASE I
6/19/78
6/1/80
RP-60
BITUMINOUS CONCRETE PLANT DUST COLLECTION SYSTEM EFFECTS OF USING RECOVERED DUST IN THE PAVING MIX
1/1/80
RP-61
FEASIBILITY STUDY OF STEEL GRID DECKS FOR BRIDGE FLOORS (PHASE I)
11/1/78
8/1/81
RP-62
SAFETY IMPROVEMENT CRITERIA FOR THE WEST VIRGINIA WYE INTERSECTION
1/1/82
RP-63
PAINT PERFORMANCE IN RELATION TO DRY FILM THICKNESS
3/1/79
9/1/86
RP-64
ACOUSTIC EMISSION MONITORING OF ELECTRO SLAG AND BUTT WELDS ON THE DUNBAR BRIDGE, WEST VIRGINIA
10/1/79
5/1/85
RP-65
RAPID FIELD TEST FOR LIFT THICKNESS DETERMINATION OF SHALE DURING CONSTRUCTION (PHASE I)
2/15/80
12/7/82
RP-66
ARRESTING CORROSION OF WEATHERING STEEL
12/1/80
10/1/86
RP-67
GUIDELINES FOR ADMINISTRATIVE SETTLEMENT OF CONTRACTS
11/1/82
RP-68
DETERMINING FEASIBILITY OF WEST VIRGINIA OIL AND GAS FIELD BRINES AS HIGHWAY DEICING AGENTS (PHASE I)
1/1/81
11/1/83
4/30/84
RP-69
EARLY AGE DURABILITY OF FLY ASH CONCRETE
9/1/81
8/1/85
RP-70
CREATING WETLANDS ALONG HIGHWAYS IN WEST VIRGINIA
12/15/81
1/5/85
RP-71
ACCIDENT COUNTERMEASURES AT HIGH-SPEED SIGNALIZED INTERSECTIONS (PHASE I)
6/15/83
RP-72
IMPROVED HIGHWAY RESTORATION THROUGH MAINTENANCE EFFECTIVENESS
9/1/83
3/1/85
3/1/86
RP-73
A PHOTOGRAM METRIC MAPPING SYSTEM WHICH UTILIZES NON-METRIC CAMERAS AND ELIMINATES THE NEED FOR GROUND CONTROL (PHASE I)
4/5/84
8/5/85
10/4/89
A PHOTOGRAM METRIC MAPPING SYSTEM WHICH UTILIZES NON-METRIC CAMERAS AND ELIMINATES THE NEED FOR GROUND CONTROL (PHASE II)
6/5/89
6/4/91
3/31/93
RP-74
EFFECTIVE GEOMETRIC DESIGN STANDARDS FOR 3R PROJECTS
1/23/84
7/22/87
RP-75
NATURAL BRINE AS AN ADDITIVE TO ABRASIVE MATERIALS AND DEICING SALTS
5/15/84
6/15/86
RP-76
DETERMINING FEASIBILITY OF WEST VIRGINIA OIL AND GAS FIELD BRINES AS HIGHWAY DE-ICING AGENTS (RP-68-PHASE II)
7/1/84
6/30/85
11/30/86
FEASIBILITY OF OIL AND GAS BRINES AS A DE-ICING AGENT (PHASE III)
1/7/88
5/6/89
5/3/91
RP-77
HIGHWAY MANAGEMENT INFORMATION SYSTEMS (PHASE I)
10/1/84
10/1/85
PR-78
EFFECTS OF HIGHWAY BRIDGES ON WILDLIFE (PHASE I)
9/17/84
9/16/87
12/31/89
RP-79
RAPID FIELD TEST FOR DETERMINATION OF ACCEPTABLE LIFT THICKNESS OF SHALE DURING EMBANKMENT CONSTRUCTION (PHASE II)
6/1/87
RP-80
STEEL GRID DECKS FOR BRIDGE FLOORS (RP-61-PHASE II)
7/1/85
12/31/87
3/22/90
RP- 82
BRIDGE STRINGER RATING STUDIES FOR VARYING STIFFNESS OF LATERAL BRACINGS
4/29/87
5/3/88
10/31/88
RP- 83
BENDING AND BOND BEHAVIOR OF CONCRETE SYSTEMS REINFORCED WITH FIBER REINFORCED PLASTIC REBARS (PHASE I)
3/1/88
4/1/92
FRP REBARS FOR BRIDGE DECKS - BEHAVIOR OF BRIDGE DECKS REINFORCED WITH FRP REBARS AND NMR CHARACTERIZATION (PHASE II)
5/22/91
8/31/93
RP-85
HANDBOOK ON ACCIDENT RECONSTRUCTION
3/3/89
3/2/90
RP- 86
CONCRETE FILLED STEEL GRID DECKS (VOLUME I)
8/11/89
8/10/91
8/10/92
THERMAL STUDIES ON PLAIN CONCRETE AND FILLED STEEL GRID DECKS (VOLUME II)
STATIC AND FATIGUE BEHAVIOR OF FILLED AND UNFILLED COMPOSITE GRID BRIDGE DECKS (VOLUME III)
RP- 87
DEVELOPMENT OF PRECISION STATEMENTS AND TOLERANCE LIMITS FOR TEST PARAMETERS ASSOCIATED WITH FOUR AND SIX-INCH DIAMETER MARSHALL METHOD MIX DESIGN SPECIMENS
10/17/91
10/16/92
3/16/93
RP- 88
DEVELOPMENT OF CRITERIA FOR INCENTIVES AND DISINCENTIVES IN HIGHWAY CONTRACTS
1/23/92
1/22/93
2/15/93
RP- 89
STUDY OF JOINTLESS BRIDGE BEHAVIOR AND DEVELOPMENT OF DESIGN PROCEDURES
1/22/94
9/30/94
RP- 90
RADAR SIGNAL PROCESSING AND ANALYSIS FOR IN-SITU EVALUATION OF REINFORCED CONCRETE BRIDGE DECKS (PHASE I)
2/10/92
2/10/93
RADAR SIGNAL PROCESSING AND ANALYSIS FOR IN-SITU EVALUATION OF REINFORCED CONCRETE BRIDGE DECKS (PHASE II)
5/2/94
5/15/95
RADAR SIGNAL PROCESSING AND ANALYSIS FOR IN-SITU EVALUATION OF REINFORCED CONCRETE BRIDGE DECKS (PHASE III)
12/16/96
12/15/97
7/31/03
RP- 91
WVU AXIAL LOAD MONITOR: A MICROPROCESSOR-BASED SYSTEM FOR AXIAL LOAD MEASUREMENT
7/12/93
8/19/97
RP- 93
MODERN TIMBER BRIDGES OF WEST VIRGINIA (VOLUMES I AND II)
7/9/93
7/8/94
4/30/95
RP- 94
TIME DETERMINATION FOR HIGHWAY CONTRACTS
8/23/93
8/1/94
8/31/95
RP- 95
INVESTIGATION ON HYDRAULIC PERFORMANCE OF BARREL CULVERT SYSTEMS
2/1/94
1/31/96
5/31/96
RP- 96
MANUAL FOR INSPECTION, QUALITY CONTROL AND ASSURANCE, AND LOAD-RATING OF MODERN TIMBER BRIDGES
3/15/94
3/14/96
6/30/03
RP- 97
ANALYSIS OF SLIDE SUPPRESSOR PILE WALLS EMBEDDED IN ROCK (VOLUMES I AND II)
5/12/94
5/14/96
5/31/98
RP- 98
PERFORMANCE OF FLEXIBLE PAVEMENTS REINFORCED WITH GEOGRIDS
8/15/94
8/14/96
8/15/98
RP-99
BRINGING CHAPTER 17C OF THE STATE CODE INTO CONFORMANCE WITH THE UNIFORM VEHICLE CODE
10/30/95
RP-100
TRAFFIC VOLUME PROJECTION IN WEST VIRGINIA AND ON THE I-81 CORRIDOR
7/14/94
7/13/95
9/30/95
RP-101
SYNTHESIS OF PRACTICE ON ACCIDENT COUNTERMEASURES AT HIGH-SPEED SIGNALIZED INTERSECTIONS
8/14/95
RP-104
STIFFENING OF STEEL STRINGER BRIDGES WITH CARBON FIBER REINFORCED PLASTIC POLYMERS
11/14/95
12/31/03
RP-106
STUDY OF BRIDGE APPROACH BEHAVIOR AND RECOMMENDATIONS ON IMPROVING CURRENT PRACTICE
11/16/94
6/15/95
12/31/95
RP-111
UPDATING THE WVDOH DRIVEWAY MANUAL
11/1/95
10/31/96
12/31/98
RP-112
SHEAR, DUCTILITY AND CREEP RESPONSE IN CONCRETE BEAMS REINFORCED WITH FRP REBARS (DRAFT FORM ONLY)
1/1/96
RP-113
DEVELOPMENT OF A MANAGEMENT INFORMATION SYSTEM FOR TRAFFIC DATA ON WEST VIRGINIA HIGHWAYS (DRAFT FORM ONLY)
1/1/95
4/30/03
RP-115
EVALUATION OF AUTOMATIC LICENSE PLATE READING EQUIPMENT FOR ADVANCED PLANNING
8/15/95
2/15/97
RP-117
STATISTICAL PROCEDURES TO DETERMINE SEASONAL FACTORS FOR TRAFFIC VOLUME MONITORING IN WEST VIRGINIA
5/15/97
RP-118
REVIEW OF BRIDGE TEXTURING ALTERNATIVES FOR WEST VIRGINIA (DRAFT FORM ONLY)
12/31/99
RP-122
COMPARISON OF 9.5 SUPERPAVE AND MARSHALL WEARING I MIXES IN WEST VIRGINIA (SUPPLEMENTAL REPORT #1)
9/5/97
9/4/96
9/4/04
AUTOMATION OF THE SUPERPAVE MIX DESIGN PROCESS FOR THE WEST VIRGINIA DIVISION OF HIGHWAYS (SUPPLEMENTAL REPORT #2)
EVALUATION OF THE EFFECT OF FINES ON ASPHALT CONCRETE (SUPPLEMENTAL REPORT #3)
EVALUATION OF BINDER GRADES ON RUTTING PERFORMANCE (SUPPLEMENTAL REPORT #4)
COMPARISON OF 19MM SUPERPAVE AND MARSHALL BASE II MIXES IN WEST VIRGINIA (SUPPLEMENTAL REPORT #5)
MANUAL FOR THE MARSHALL MIX DESIGN WORKSHOP
MANUAL FOR THE SUPERPAVE MIX DESIGN WORKSHOP
RP-123
MANUFACTURE AND REHABILITATION OF GUARDRAIL POSTS USING COMPOSITE FABRICS FOR SUPERIOR PERFORMANCE (PARTS I AND II)
3/15/97
3/14/02
RP-125
TRIP GENERATION RATES, PEAKING CHARACTERISTICS, AND VEHICLE MIX CHARACTERISTICS OF SPECIAL WEST VIRGINIA GENERATORS
4/1/97
3/31/99
4/30/00
RP-126
AUTOMATIC ACQUISITION OF INPUT PARAMETERS FOR HYDROLOGIC MODELING USING GIS (DRAFT FORM ONLY)
5/1/97
9/30/01
RP-127
CONSTRUCTION SMOOTHNESS SPECIFICATIONS IN WEST VIRGINIA (DRAFT FORM ONLY)
1/2/97
1/1/98
RP-128
HIGHWAY USER BENEFIT ANALYSIS SYSTEM
6/1/97
RP-130
FUNCTIONAL ASSESSMENT OF THREE WETLANDS CONSTRUCTED BY THE WEST VIRGINIA DIVISION OF HIGHWAYS
11/15/96
1/14/98
10/31/99
RP-131
FRP BEAM-COLUMN DESIGN EQUATIONS
3/3/97
3/2/98
12/31/01
RP-133
ASSESS WEST VIRGINIA'S OLDER DRIVERS' UNDERSTANDING OF TRAFFIC CONTROL DEVICES AND DESIGN FEATURES
6/7/99
6/6/00
10/1/01
RP-135
DEVELOPMENT OF DETAILED PROCEDURES FOR UPDATING THE WVDOT STATEWIDE TRAFFIC ASSIGNMENT MODEL (STAM) AND SOCIOECONOMIC DATABASE
2/1/98
10/31/98
9/30/99
RP-136
ASSESSMENT OF STEEL END CAPS WITH RUBBER INSERTS AS CAPPING MEDIA FOR CONCRETE CYLINDERS
RP-137
INTER LABORATORY VARIABILITY OF THE MARSHALL TEST METHOD OF ASPHALT CONCRETE
3/27/98
9/26/98
RP-140
OPTIMIZATION OF CONCRETE SLAB GEOMETRY FOR ENHANCED RIGID PAVEMENT PERFORMANCE AND SERVICE LIFE
6/30/99
RP-142
EFFECTIVENESS OF WVDOH STANDARD BAFFLE DESIGNS AT CULVERT OUTLETS
12/31/02
RP-147
STEP-BY-STEP ENGINEERING DESIGN EQUATIONS FOR FIBER- REINFORCED PLASTIC BEAMS FOR TRANSPORTATION STRUCTURES
3/17/98
3/16/99
RP-150
DESIGN AND FIELD EVALUATION OF CONCRETE JACKETS REINFORCED WITH FRP REBARS FOR THE JEFFERSON STREET HIGH LEVEL BRIDGE (TASK #1 ONLY IN DRAFT FORM)
11/20/96
11/19/00
RP-153 - PHASE I
EFFECTIVE SUPER-ELEVATION FOR LARGE TRUCKS ON STEEP GRADES AND SHARP CURVES
4/16/99
4/15/00
RP-154
UPDATING CHAPTER 17C OF THE STATE CODE AND BRINGING IT INTO CONFORMANCE WITH THE CURRENT UNIFORM VEHICLE CODE
5/14/99
5/31/00
RP-156
ON THE VALIDITY OF SLOPE INCLINOMETER DATA
10/1/99
8/26/01
RP-159
STRATEGIC ASSESSMENT OF ROADWAY RUNOFF RESEARCH NEEDS IN WEST VIRGINIA
1/3/00
1/2/01
RP-161
WOOD DECK BRIDGES: STRESS LAMINATED WOOD PANELS ON STEEL BEAMS
2/9/00
2/8/01
RP-164
USE OF PERMANENT TRAFFIC RECORDER DATA TO DEVELOP FACTORS FOR TRAFFIC AND TRUCK VARIATIONS
5/1/01
4/30/02
10/31/02
RP-166
EVALUATING AND DEVELOPING PROTOCOLS TO EFFECTIVELY AND EFFICIENTLY COLLECT DATA DESCRIPTIVE OF SEDIMENT AND CHANNEL STABILITY IN WES VIRGINIA STREAMS (DRAFT FORM ONLY)
2/1/01
8/31/03
RP-167
WATER RESOURCES DATA - WEST VIRGINIA WATER YEAR 2002 (FUNDING PROVIDED BY DOH FOR PAGES 247-264 ONLY)
9/30/02
9/30/03
ESTIMATING THE MAGNITUDE OF ANNUAL PEAK DISCHARGES WITH RECURRENCE INTERVALS BETWEEN 1.1 AND 3.0 YEARS FOR RURAL, UNREGULATED STREAMS IN WEST VIRGINIA
REGIONAL RELATIONS IN BANKFULL CHANNEL CHARACTERISTICS DETERMINED FORM FLOW MEASUREMENTS AT SELECTED STREAM-GAUGING STATIONS IN WEST VIRGINIA, 1911-2003
SPN T699-PTP/FD-1.00
FIELD DEMONSTRATION OF OIL AND GAS WELL BRINES IN LOCAL LEVEL ANTI-ICING PROGRAMS
8/15/97
8/14/98
2/28/99
T699-BRRES-1
EXPERIMENTAL AND THEORETICAL EVALUATION OF FIBER REINFORCED PLASTIC STRINGERS FOR BRIDGE SUPERSTRUCTURES (1989 MAUTC GRANT)
3/15/89
3/14/90
8/31/92
T699-BRRES-2
ASSESSMENT OF DYNAMIC LOAD FACTORS ACCOUNTING FOR SUPER-, SUB-, AND SOIL-STRUCTURE INTERACTION (1989 MAUTC GRANT)
3/15/91
T699-BRRES-3
EXPERIMENTAL AND THEORETICAL EVALUATION OF FIBER REINFORCED PLASTIC STRINGERS FOR BRIDGE SUPERSTRUCTURES -PHASE II (1990 MAUTC GRANT)
3/15/90
T699-CIDDMOC - PHASE I
CENTER FOR INNOVATIVE DESIGN, DIAGNOSTICS AND MAINTENANCE OF CONSTRUCTED FACILITIES
11/9/88
11/8/90
3/31/91
T699-CIDDMOC - PHASE II
DYNAMIC CHARACTERIZATION OF STRUCTURAL SYSTEMS (SUBTASK A-2)
4/3/92
4/2/95
12/31/96
EVALUATION OF DEGRADATION IN CONCRETE STRUCTURES USING ULTRASONIC TECHNIQUES (SUBTASK A-3)
UTILIZATION OF THE SIMULATION METHOD TO EVALUATE INFRARED THERMOGRAPHY (SUBTASK A-4)
CHARACTERIZATION OF FRP STRUCTURAL SHAPES - STIFFNESS AND STRENGTH OF FRP BEAMS (SUBTASKS B-1 AND B-2, PART I)
BUCKLING OF PULTRUDED FRP STRUCTURAL SHAPES (SUBTASKS B-1 AND B-2, PART II)
PERFORMANCE CHARACTERIZATION OF STRUCTURAL COMPONENTS MADE OF FIBER REINFORCED PLASTICS (SUBTASKS B-1 AND B-2, PART III)
CONSTRUCTION OF A FIBER REINFORCED PLASTIC BUILDING (SUBTASK B-3)
STATIC BEHAVIOR OF PULTRUDED GFRP BEAMS (SUBTASK C-1)
AN EVALUATION OF THE SKELETAL STRUCTURE OF THE WEST VIRGINIA INDEPENDENCE HALL, 1859 (SUBTASK E-1)
ACOUSTIC EMISSION MEASUREMENT OF CONCRETE STRUCTURES USING WAVEGUIDES (SUBTASK E-2)
T699-CIDDMOC - PHASE III
EFFECTS OF AGING ON BONDS BETWEEN FRP COMPONENTS AND CONCRETE (PART I)
6/30/04
DURABILITY OF REINFORCED CONCRETE MEMBERS WRAPPED WITH FRP FABRICS (PARTS II AND III)
THE EFFECTS OF AGING ENVIRONMENT ON THE DEGRADATION OF GLASS REINFORCED EPOXY (PART IV)
T699-MAUTC-1
BUCKLING OF PULTRUDED COMPOSITE COLUMNS - CHARACTERIZATION OF FRP STRUCTURAL SHAPES (1988 GRANT)
1/9/88
5/15/91
DEVELOPMENT OF FRP BRIDGE SUPER STRUCTURAL SYSTEMS - VOLUME I (1989 GRANT)
DEVELOPMENT OF FRP BRIDGE SUPER STRUCTURAL SYSTEMS - VOLUME II (1989 GRANT)
LOW CLEARANCE VEHICLES AT GRADE CROSSINGS (1990 GRANT)
1/1/90
6/14/91
NONDESTRUCTIVE EVALUATION METHODS FOR BRIDGE SUPERSTRUCTURES (1991 GRANT)
1/1/91
1/1/92
7/1/95
INTRODUCTION OF ADVANCED FIBER REINFORCED PLASTIC COMPOSITES FOR CIVIL ENGINEERING INFRASTRUCTURE (1991 GRANT)
5/1/96
STATIC AND FATIGUE RESPONSE OF PULTRUDED FRP BEAMS WITHOUT AND WITH SPLICE CONNECTIONS (1995 GRANT)
1/1/93
7/1/94
MAUTC #1
NONDESTRUCTIVE EVALUATION OF PAVEMENT LAYERS USING A COMBINED DYNAMIC AND ACOUSTIC TESTING TECHNIQUE (1995 GRANT)
6/30/98
MAUTC #2
ADVANCED PLANNING SURVEYS USING AUTOMATIC LICENSE PLATE READING EQUIPMENT (1995 GRANT)
MAUTC #3
ENHANCED PAVEMENT DETERIORATION MODELING THROUGH MAINTENANCE PARAMETERS (1995 GRANT)
2/7/00
MAUTC #4
DATA ISSUES IN UTILIZING GIS IN HIGHWAY ROUTE LOCATION PLANNING (1995 GRANT)
MAUTC #5
EVALUATION OF BACK CALCULATION ALGORITHMS THROUGH DYNAMIC MODELING OF THE FWD TEST (1997 GRANT)
MAUTC #6
FITTING THE FALLING WEIGHT DEFLECTOMETER WITH SASW MEASUREMENT CAPABILITY (1997 GRANT; DRAFT FORM ONLY)
MAUTC #7
IDENTIFICATION OF CRITICAL STRESS CONCENTRATION AROUND DOWEL BARS (1998-99 GRANT)
8/12/98
2/11/99
MAUTC #8
THE WEST VIRGINIA TRAC PROGRAM AT WEST VIRGINIA UNIVERSITY (1998-99 GRANT)
3/5/00
6/30/00
MAUTC #9
THE WEST VIRGINIA TRAC PROGRAM AT WEST VIRGINIA UNIVERSITY (2000 GRANT)
8/1/00
7/31/01
MAUTC #10
DEVELOPMENT OF DESIGN VEHICLES AND CHARACTERISTICS FOR THE "HANG-UP" PROBLEM
12/5/00
4/4/02
7/31/02
MAUTC #11
GRADUATE STUDENT RESEARCH IN TRANSPORTATION ENGINEERING
1/5/01
1/4/02
MAUTC #13
THE WV TCAP/TRAC PROGRAM AT WEST VIRGINIA UNIVERSITY (2001 GRANT)
7/1/01
6/30/02
MAUTC #14
THE WV TCAP/TRAC PROGRAM AT WEST VIRGINIA UNIVERSITY (2002 GRANT)
9/16/02
9/15/03
MAUTC #15
TRUCK FORECASTING RELATED RESEARCH - VOLUME I - STATEWIDE TRUCK FORECASTING - STATE OF THE ART REVIEW
3/15/04
9/30/04
TRUCK FORECASTING RELATED RESEARCH - VOLUME II -VEHICLE CLASSIFICATION PROFILES FOR INTERSTATES IN WEST VIRGINIA TO BE USED FOR MOBILE6 MODELING
TRP 99-03
FINDING A RIDE: IDENTIFYING TRANSPORTATION-RELATED BARRIERS TO HEALTH CARE IN A RURAL WEST VIRGINIA COUNTY
1/12/01
1/11/02
TRP 99-07
A ROCKFALL RATING MATRIX AND DATA MANAGEMENT SYSTEM FOR SLOPES ALONG HIGHWAYS IN WEST VIRGINIA AND KENTUCKY
TRP 99-24
CENTRAL CORRIDOR DOUBLE-STACK INITIATIVE
7/5/03
TRP 99-32
ANALYSIS AND EXPLOITATION OF GEOGRAPHIC INFORMATION SYSTEMS
10/11/01
WV - 25
FIELD MONITORING AND EVALUATION OF THE FIBER REINFORCED COLUMN WRAP FOR THE POND CREEK ROAD OVERPASS BRIDGE
12/1/97